Sunrise Powerlink Project
Alternative Routes Firesheds
Proposed Project Firesheds
Sunrise Powerlink Project
September 2008
Forester's Co-OpProfessional ForestryF
CO
& GIS Services(530) 273-8326
www.forco-op.com
0 32,00016,000 Feet
0 84 Miles
15
805
5
8
8
8
15
8
1
905
2
63
2
1
94
6779
15125
78
78
94
94
78
78
79
94
78
94
D-5
D-0
CC-0
NC-0
SV-0
CC-0
OH-5
OH-0
SV-0
PM-5
PM-0
D-15
D-10
SBS-0
MRD-5
OH-20
OH-15OH-10
OHR-0
BCD-5
BCD-0
I8-90
I8-85
I8-80
I8-75
I8-70
I8-65
I8-60
I8-55
I8-50
I8-45
I8-40
I8-35I8-30
BSU-0
CNF-0
BSW-5
BSW-0
CWR-0
BCDS-5
BCDS-0
MRD-35
MRD-30
MRD-25
MRD-20 MRD-15MRD-10
SYPU-5
SYPU-0
BCD-15
BCD-10
SR78-0
SR78-5
LPCM-0
SR78-30
SR78-25
SR78-20 SR78-15
SR78-1080
70
65
60
140135
130
125
120
115
110
105
N
PFS-5 Poway Fireshed
PFS-4 Ramona Fireshed
PFS-1 Ranchita Fireshed
AFS-4 El CapitanFireshed
AFS-6 Pine HillsFireshed
AFS-5 BoulderCreek Fireshed
AFS-3 Guatay Fireshed
AFS-2 La Posta Fireshed
AFS-8 Dulzura Fireshed
AFS-7 Campo Fireshed
AFS-1 Boulevard Fireshed
USAMexico
PFS-2 San FelipeFireshed
PFS-3 Santa Ysabel Fireshed
Proposed Project and Alternative Routes
Extreme Fire Weather -Estimated Fire Perimeter - Limited Fuel Model Data
Wildfire Containment Conflict Model -Minimum 1.5 mile Segments
Extreme Fire Weather -Fire Behavior Trend Modeled within Firesheds
Environmentally Superior Southern Route, Overhead Portion
Jurisdictional Land Owership
Bureau of Land Management Land
Department of Defense Land
State Land
State Park
U.S. Forest Service Land
Tribal Land
RoadInterstate
Milepost
Partial Underground ABDSP SR78 to S2 Alternative, Overhead Portion
Partial Underground ABDSP SR78 to S2 Alternative,Underground Portion
Pomerado Road to Miramar Area North Alternative, Overhead PortionPomerado Road to Miramar Area North Alternative, Underground PortionRoute D AlternativeSan Vicente Road Transition Alternative, Overhead PortionSan Vicente Road Transition Alternative, Underground Portion
Modified Route D Alternative
Proposed Project Overhead 500kVProposed Project Overhead 230kV
Oak Hollow Road Alternative, Overhead Portion
Oak Hollow Road Alternative, Underground PortionOverhead 500 kV ABDSP within Existing ROW
Santa Ysabel Existing ROW AlternativeSanta Ysabel Partial Underground Alternative, Overhead PortionSanta Ysabel Partial Underground Alternative, Underground PortionSanta Ysabel SR79 All Underground Alternative, Overhead PortionSanta Ysabel SR79 All Underground Alternative,Underground PortionTop of the World Substation AlternativeBlack Mountain to Park Village Road Underground AlternativeCentral South Substation AlternativeChuck Wagon Road Alternative, Overhead PortionChuck Wagon Road Alternative, Underground PortionCNF Existing 69 kV Route AlternativeBuckman Springs Underground OptionCampo North OptionInterstate 8 Alternative, Overhead PortionSouth Buckman Springs OptionInterstate 8 Alternative, Underground PortionWest Buckman Springs OptionLos Peñasquitos Canyon Preserve-Mercy Road AlternativeSDG&E Mesa Grande Alternative
Proposed Project Underground 230kV
2. Assets At Risk 1,382 Residential Parcels1. Total Acres Burned = 198,129 AcresModel Results Within Firesheds
Residential Asset at Risk
Final EIR/EIS
AP.3E FIRE AND FUELS MANAGEMENT
Final Environmentally Superior Southern Route, Overhead Portion
Fire Behavior Trend Model4 Burn Periods - Extreme Weather
Figure Ap.3E-12
Top Related