123-09-05 AB/CO Review, Adriaan Rijllart
AT Measurement SystemsAT Measurement Systems
AB-CO Viewpoint
NOELL Würzburg SM18
223-09-05 AB/CO Review, Adriaan Rijllart
Colour codeColour code
To be maintained until LHC completion
To be transformed after LHC completion
New projects for LHC operation support
To be maintained beyond LHC completionTo be maintained beyond LHC completion
323-09-05 AB/CO Review, Adriaan Rijllart
The four categoriesThe four categories
To be maintained until completion:
•Measurement benches in industry (50 in total)
To be maintained until completion and then transformed:
•SM18, Block 4 (and B181)
New projects
•FIDEL - Field Description for the LHC (DB)
•FAME - Fast Measurement Equipment (LV-RT)
To be maintained beyond LHC completion
•Cable, strands and Cryolab test systems
423-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW SystemsLabVIEW Systems
Systems in industry
•Magnetic measurements (Dipoles, Quads, Correctors)
•Geometric measurements (Bores, End caps, Feet)
•Electrical tests (Quench, Quench heaters, Isolation)
But I’m quite sure that some of these systems will be reused for the Magnet Rescue Factory.
523-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems in industryLabVIEW Systems in industry
ALSTOM
ANSALDO
ACCELNOELL Zeitz
NOELL Würzburg
TESLA
ANTEC
QIMM8CIMM5CIMM10CIQR1CIQR2CIQR3CIQR4
CIMM2CIMM8CIQR5CIQR6
DIMM1DIMM5QIMM4DGM3DGM7DGM10DIQH3EDMA1EDMA2
DGM1DIMM2
QIMMSaclay1QIMMSaclay2QIMM7
DIMM3QIMM7DGM4DGM5DIQH5EDMA5EDMA6
CAT, India
DIMM4DIMM6QIMM5CIMM9CIMM11DGM2DGM6CIQR7DIQH1DIQH4EDMA7EDMA8
CIMM4CIMM6CIMM11
50 systems in operation
DGM 8 and 9 travel in between firms
EDMA3EDMA4
JEUMONT
623-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems in industryLabVIEW Systems in industry
TESLA correctors
ANSALDO dipoles
723-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems in industryLabVIEW Systems in industry
ACCEL, Troisdorf (quadrupoles)Noell, Zeitz (dipole cold-masses)
823-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems at CERNLabVIEW Systems at CERN
SM18 Magnet Test Bench applications (-> Magnet Rescue Factory)
•Test Master + Hardware Recognition: Applications to automate sequence from all systems
•HFDAQ, LFDAQ, AQA, HVT, MMP, LOSS, MRM
New systems: FAME (implemented in PXI - LabVIEW-RT)
•On-line Hall plate DAQ 0.5 man*years
•On-line Rotating Coil DAQ 1.5 man*years
•On-line Fixed Coil DAQ ?
To be maintained beyond LHC completion
•Warm magnet test bench, Calibration bench, File Server MTBNFS1
•SC Cable Test Station
•SC Strand Test Station
•Central Cryolab test systems
923-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems at CERNLabVIEW Systems at CERN
High Temperature Superconductor test Corrector Magnetic Measurements
Quench recording
High Voltage Isolation test
1023-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems at CERNLabVIEW Systems at CERN
Superconducting Strands test B163 Special magnetic and optical measurements SM18
Corrector cold testsBlock 4
MagneticMeasurementsSM18
1123-09-05 AB/CO Review, Adriaan Rijllart
LabVIEW Systems at CERNLabVIEW Systems at CERN
B163- FRESCA: superconducting cable reception test
SM18: Magnet Test Control Room
1223-09-05 AB/CO Review, Adriaan Rijllart
Supervision and PLC Systems (Supervision and PLC Systems (PhilippePhilippe + Herv + Hervéé))
Upgrade from PCVue to PVSS using UNICOS on PLCs
•SM18: Refrigerator and cryo for the benches (PLC S7)
•Block4: Cryo for the benches + PLCs (S5 to S7)
To be maintained beyond LHC completion
•Manufacturing tools based on PLC for winding, collaring, and welding. Now at magnet industries, these tools need to be installed and maintained at CERN.
1323-09-05 AB/CO Review, Adriaan Rijllart
Databases (Ronny and Maciej)Databases (Ronny and Maciej)
SM18 + Block4 upgrade to Oracle 10 (? not desirable)
•Magnetic Measurement Data
•Reference tables
•HW Recognition: maintain + develop MS-DS SSS (ongoing)
Magnet Rescue Factory and FIDEL
•HW Recognition: adaptation to low test rate, less complex
•Field description for LHC, 1 month cycle, measure analyse include in FIDEL (request of ABP)
•Later cycle time much faster (request of ABP)
1423-09-05 AB/CO Review, Adriaan Rijllart
ConclusionConclusion
Systems deployed in industry will return
•Some will be reused for the Magnet Rescue Factory
Magnet Rescue Factory + SM18, Block 4
•LabVIEW, PCVue+PLC and Database upgrade
FAME and FIDEL
•LabVIEW-RT and Database
Many presently running systems are to be maintained
•LabVIEW Cables, Strands, Cryolab, Warm measurements and Calibration systems
•PLC manufacturing tools systems
•Magnetic Measurement DB
Top Related