2013 OUTLOOK FOR TRANSMISSION
A TransmissionHub WebcastWednesday, November 28, 2012
8/17/2019 121212 Thub Slides
2/44
The PanelRandy RischardVice President of Data and AnalyticsEnergy Central
Carl DombekSenior EditorTransmissionHub.com
Sue SheridanPresident and Chief CounselCoalition for Fair Transmission Policy
8/17/2019 121212 Thub Slides
3/44
Thank you to our sponsor.
8/17/2019 121212 Thub Slides
4/44
Welcome & Introduction
Rosy LumChief Analyst, TransmissionHub
Energy Central
8/17/2019 121212 Thub Slides
5/44
TRANSMISSION OUTLOOK FOR 2013
Randy RischardTransmissionHub
8/17/2019 121212 Thub Slides
6/44
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 > 2021
Estimated Transmission Investment inNorth America, in Billions $
8/17/2019 121212 Thub Slides
7/44
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 > 2021
North American Transmission Mile Additions
8/17/2019 121212 Thub Slides
8/44
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
2012 2013 2014 2015 2016 2017 2018 2019 2020 > 2021
Estimated Transmission Investment by NERC Region - in Billions$
WECC
TRE
SPP
SERC
RFC
NPCCMRO
FRCC
8/17/2019 121212 Thub Slides
9/44
0.0
2.0
4.06.0
8.0
10.0
12.014.0
16.0
18.0
20.0
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 >2021
Transmission Investment in Billions of $ by
NERC Region - Eastern Interconnection
SPPSERC
RFCNPCCMROFRCC
8/17/2019 121212 Thub Slides
10/44
Mostactive
companies
Company Project MilesPacifiCorp 4,291
Xcel Energy 3,535Clean Line Energy Partners, LLC 2,750Duke-American Transmission Company 2,577Western Area Power Administration 2,177TransCanada Energy 1,970Idaho Power 1,450American Transmission Company 1,419ITC Holdings Corp. 1,409Manitoba Hydro 1,358FirstEnergy's American Transmission System 1,219Oncor Electric Delivery Company 1,049
Southern California Edison 968Oklahoma Gas & Electric 938American Electric Power 914Electric Transmission Texas, LLC 887Southwestern Public Service 851
Ameren Transmission 666
8/17/2019 121212 Thub Slides
11/44
8/17/2019 121212 Thub Slides
12/44
AEP active via JVs and JVs of JVs
AEP
MidAmerican – ElectricTransmission Texas
Sharyland – Cross Texas
Project
Duke - Pioneer Transmission
TVA - Rockport-Paradise
Great Plains - TransourceEnergy
OPPD - NebraskaCity to Maryville
MidAmerican -- ElectricTransmission America
OGE – Tallgrass
Exelon -RITELineWestar -
Praire Wind
ITC/Sunflower/Mid-Kansas
- Great Plains
Projects in partnerships: 27Total Miles: 3,340Total Partnership Est. Cost $9 Bn
8/17/2019 121212 Thub Slides
13/44
Other productive partnershipsCompany Partner (s)
Duke ATCOGE SPS
Pacificorp Idaho PowerWAPA Tri-StateAmeren ITC/Duke/MidAmericanNortheast Utilities National GridITC MidAmerican/SunflowerATC Excel/ITC/FirstEnergy/We EnergiesAPS Salt River ProjectNV Energy LS Power's Great Basin
8/17/2019 121212 Thub Slides
14/44
Key Drivers
• Plant retirements/reliability•
Aging grid• Connecting renewables with the power
markets•
Policy
8/17/2019 121212 Thub Slides
15/44
Order No. 1000Key dates:Oct. 11, 2012 - Local and regional compliance filings were due (most requestedand were granted late filings)PJM, Midwest ISO, California ISO, SPP and ISO New England have submittedcompliance filings
Feb 8, 2013 – Some entities, such as utilities in the Southeast, have beengranted extensions until this date to submit their regional compliance filing
April 11, 2013 - Interregional compliance filings are due
Key issues:
Right of first refusal: This issue may be the one that will take it to courtPublic policy requirementsCost allocationsInterregional issues
8/17/2019 121212 Thub Slides
16/44
FERC rate incentives test changes
• No longerconsiderswhether aproject isroutine/non-routine
• Stricterreview ofneed forROE adder
8/17/2019 121212 Thub Slides
17/44
Coal capacity retirements
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
2017
Retired
Operating
8/17/2019 121212 Thub Slides
18/44
Fossil-fueled capacity additions
0
5,000
10,000
15,000
20,000
25,000
2012 2013 2014 2015 2016
Gas
Coal
8/17/2019 121212 Thub Slides
19/44
7 projects stay on federal fast track
8/17/2019 121212 Thub Slides
20/44
Renewables will continue to be driver
State renewableportfolio standards willcontinue to driverenewablesdevelopment, which iscurrently drivingtransmissiondevelopment
0
20
40
60
80
100
120
140
CAISO ERCOT ISO - NE MISO NewYork -
ISO
PJM SERC SPP WECC
T W h
2010 Renewable Supply 2017 RPS Demand 2025 RPS Demand
2010 Renewable Supply 2017 RPS Demand 2025 RPS Demand
Renewable Energy Output (2010) vs.Renewable Portfolio Standard Energy Requirements (2017 and 2025)
Source: ScottMadden
8/17/2019 121212 Thub Slides
21/44
What happens if the PTC expires
8/17/2019 121212 Thub Slides
22/44
Big Transmission Projects
8/17/2019 121212 Thub Slides
23/44
10 largest projects
Project Name Sponsor Miles VoltageFromState
ToState Status
InService
Estimated cost$/M
High Plains ExpressTransmission Project Xcel Energy 2,500 500 WY AZ Planned 2017 $5,000
Energy Gateway Project PacifiCorp 2,000 500 Building 2019 $6,000Gateway West Project Ida Pwr, Rocky Mtn Pwr 1,150 500 WY ID Planned 2018 $7,100Chinook TransCanada 1,000 500 MT NV Planned 2018 $3,000
Zephyr PowerTransmission Project
Duke-AmericanTransmission Company 950 500 WY NV Planned 2018 $3,500
Centennial West CleanLine
Clean Line EnergyPartners, LLC 900 600 NM CA Planned 2018 $2,500
Bipole III Project Manitoba Hydro 858 500 MB MB Planned 2017 $1,260
Plains & Eastern Clean Clean Line Energy 800 600 OK TN Planned 2017 $3,500
Atlantic Wind Connection Trans-Elect 756 320 VA NJ Planned 2021 $5,000
TransWest Express TransWest Express, LLC 725 600 WY NV Planned 2017 $3,000
8/17/2019 121212 Thub Slides
24/44
Largest projects for 2013Project Name Spnosr Miles Voltage O State D StateON Line Transmission Project NV Energy 235 500 NV NVGreat Plains (KETA Project) ITC Holdings Corp. 225 345 KS NEWest Shackelford to Navarro-SamSwitch Lone Star Transmission 192 345 TX TXRiley to West Krum Line Oncor Electric Delivery Company 163 345 TX TXHanna Region Transmission
Development ATCO Electric 149 240 AB AB
Green Line Project (NEITC)New England IndependentTransmission Company, LLC 140 500 MA ME
Big Hill to Kendall Lower Colorado River Authority 139 345 TX TXSeminole to Muskogee Oklahoma Gas & Electric 125 345 OK OKDesert Southwest PowerTransmission Project Desert Southwest Power, LLC 118 500 CA CADevers to Colorado River Southern California Edison 115 500 CA CA
Bakersfield to Big Hill Line South Texas Electric Cooperative 112 345 TX TX
Clear Crossing to Willow Creek Line Oncor Electric Delivery Company 110 345 TX TXGray to Tesla Cross Texas Transmission 109 345 TX TXScurry County South to WestShackelford Line Lone Star Transmission 103 345 TX TXGateway Central Project - Mona toOquirrh (Segment C) PacifiCorp 100 500 UT UT
8/17/2019 121212 Thub Slides
25/44
Project Sponsor Manitoba Hydro Line Miles 858
Voltage (kV) 500 kVFrom State MBTo State MB
Year In Service 2017
Costs ($M) $3,300Project Status PlannedDescription: HVDC
Bipole III
Project Sponsor Nalcor Energy From NL
8/17/2019 121212 Thub Slides
26/44
Project Sponsor Nalcor Energy Line Miles 684
Voltage (kV) 450
From NL To NL
Year In Service 2016Costs ($M) $2,100
Labrador
IslandLink
8/17/2019 121212 Thub Slides
27/44
Renewables transmission will
advance
8/17/2019 121212 Thub Slides
28/44
$8.7 Billion in transmissionprojects in ERCOT by 2016, $7Billion of which are to connectrenewables5,047 miles will be added and1,653 miles improved in thattime.
Texas CREZ Program
8/17/2019 121212 Thub Slides
29/44
2013 Texas projectsProject Name Spnosr Miles Voltage
West Shackelford to Navarro-Sam Switch Lone Star Transmission 192 345Riley to West Krum Line Oncor Electric Delivery Company 163 345Big Hill to Kendall Lower Colorado River Authority 139 345Bakersfield to Big Hill Line South Texas Electric Cooperative 112 345Clear Crossing to Willow Creek Line Oncor Electric Delivery Company 110 345Gray to Tesla Cross Texas Transmission 109 345Scurry County South to West Shackelford Line Lone Star Transmission 103 345
Hereford to White Deer Line Sharyland Utilities 91 345Clear Crossing to Dermott Electric Transmission Texas, LLC 90 345Edith Clarke to Cottonwood Electric Transmission Texas, LLC 89 345Silverton to Tesla Cross Texas Transmission 85 345Edith Clarke to Clear Crossing Electric Transmission Texas, LLC 84 345Long Draw to Sand Bluff Wind Energy Transmission Texas, LLC 77 345Odessa to Bakersfield South Texas Electric Cooperative 76 345Cottonwood to Dermott Wind Energy Transmission Texas, LLC 74 345West Krum to Anna Oncor Electric Delivery Company 70 345White Deer to Silverton Line Sharyland Utilities 68 345Tesla to Riley Electric Transmission Texas, LLC 66 345Silverton to Cottonwood Line Sharyland Utilities 65 345Kendall to Miller Creek to Paleface Rebuild Lower Colorado River Authority 57 138Long Draw to Grelton Wind Energy Transmission Texas, LLC 55 345Tesla to Edith Clarke Electric Transmission Texas, LLC 55 345Scurry County South to Long Draw Line Wind Energy Transmission Texas, LLC 51 345Grelton to Odessa Wind Energy Transmission Texas, LLC 50 345
8/17/2019 121212 Thub Slides
30/44
SouthernCross
Project Sponsor Pattern Energy Line Miles 400
Voltage (kV) 345/500
From State TXTo State MS/AL
Year In Service 2016Costs ($M) $1,000Project Status Proposed
8/17/2019 121212 Thub Slides
31/44
Project Sponsor Trans-Elect Line Miles 756
Voltage (kV) 320From State VATo State NJ
Year In Service 2021
Costs ($M) $5,000Project Status PlannedDescription: Underwater and
underground HVDC
Atlantic Wind Connection
8/17/2019 121212 Thub Slides
32/44
Project Sponsor Southern CaliforniaEdison Line Miles 333
Voltage (kV) 500From State CATo State CA
Year In Service 2015Costs ($M) $2,200Project Status Under construction
Description: Some segments aredelayed.
Tehachapi RenewableTransmission
8/17/2019 121212 Thub Slides
33/44
Tehachapi RenewableTransmission
8/17/2019 121212 Thub Slides
34/44
Tehachapi RenewableTransmission
8/17/2019 121212 Thub Slides
35/44
20 largest HVDC projectsProject Name Sponsor Miles Voltage O State D State Completion Cost ($M)
Chinook TransCanada Energy 1000 500 MT NV 2018 3000
Zephyr Power Transmission ProjectDuke-American TransmissionCompany 975 500 WY NV 2020 3500
Centennial West Clean LineClean Line Energy Partners,LLC 900 600 NM CA 2019 2500
Plains and Eastern Clean Line Project Clean Line Energy Partners 800 600 OK TN 2018 3500
Atlantic Wind ConnectionTrans-Elect DevelopmentCompany 756 320 VA NJ 2021 5000
TransWest Express Project TransWest Express, LLC 725 600 WY NV 2017 3000Labrador Island Link Nalcor Energy 684 450 NL NL 2016 2100
West Coast Cable ProjectSea Breeze Pacific RegionalTransmission System, Inc. 650 500 OR CA 2016 2000
Grain Belt Express Clean Line Clean Line Energy Partners 550 600 KS MO 2017 1700Overland Transmission Project Jade Energy Associates, LLC 550 500 WY ID 2017 1700Rock Island Clean Line Clean Line Energy Partners 500 600 IL IA 2016 1700Southern Cross Transmission Project Pattern Energy Group, LP 400 500 TX MS 2016 1000Champlain to Hudson Power Express Project Transmission Developers, Inc. 333 320 QC NY 2016 1900Maritime Transmission Link ENL Maritime Link Inc. 321 200 NL NS 2017 1200Eastern Alberta Transmission Line ATCO Electric 302 500 AB AB 2014 1622Northeast Energy Link National Grid USA 240 320 ME MA 2018 2000Western Alberta Transmission Line AltaLink 215 500 AB AB 2015 1329Central California Clean Energy Project Pacific Gas & Electric 170 500 CA CA 2019 1000
Green Line ProjectNew England IndependentTransmission Company 140 500 MA ME 2014 1000
Northern Pass Transmission Project Northern Pass Transmission, 140 300 QC NH 2016 1100
8/17/2019 121212 Thub Slides
36/44
AnbaricTransmission
Hudson Transmission is
on scheduled and underbudget
Green Line is expected tostart construction in 2013
8/17/2019 121212 Thub Slides
37/44
Clean Line
Energy
Plains and Eastern: 750 miles $3.5 BnGrain Belt: 550 miles $1.7 Bn
Rock Island: 500 miles $1.7 BnCentennial West: 900 miles $2.5 Bn
8/17/2019 121212 Thub Slides
38/44
Suspended projectsCountry Project Name Sponsor Miles Voltage O State D State Completion Cost ($M)
USA Canada Pacific Northwest to Northern Calif. Pacific Gas & Electric 1000 500 BC CA 2021 7000Canada NorthernLights TransCanada Energy 970 500 AB OR 2015 1700
USA West Side Tie NV Energy 476 500 NV NV 2018 798
USA Gateway South Project - Mona to Crystal PacifiCorp 330 500 UT NV 2018 990
USA
Potomac Appalachian Transmission Highline
Project (PATH) FirstEnergy 275 765 WV MD 2012 2100USA Navajo Transmission Project Segment 1 Dine Power Authority 198 500 NM NV 2013 350
USA Mid-Atlantic Power Pathway (MAPP) Pepco Holdings, Inc. 152 500 MD DE 2019 1005USA RTI Westside Tie 345 kV NV Energy 141 345 NV NV 2015 380
USA RTI Tracy-Viewland 345 kV NV Energy 79 345 NV NV 2015 138
USA Keystone XL Pipeline 115 kV Project NPPD 74 115 NE NE 49
USA Boswell to Riverton Minnesota Power 68 230 MN MN 2012 76
USA Barnhart to Branch River Project ATC 65 345 WI WI 2018 262USA Zenith to Fayetteville CenterPoint Energy 60 345 TX TX 2014 175
USA RTI Dixie-Oreana NV Energy 41 345 NV NV 2015 72
USA RTI Zone 4 to Harry Allen NV Energy 40 500 NV NV 2015 183Canada Essex County Transmission Reinforcement Hydro One 18 230 ON ON 2013 100Canada Airdrie Area AltaLink 15 138 AB AB 2015 28
8/17/2019 121212 Thub Slides
39/44
Greater Sage Grouse
8/17/2019 121212 Thub Slides
40/44
In conclusionIn 2013, we’ll continue to see fourcategories of trends, drivers, and
inhibitors, along with some subsets:
• Aging infrastructure• Plant retirements•
Interconnecting renewables• Regulatory changes
8/17/2019 121212 Thub Slides
41/44
Welcome & Introduction
Sue SheridanPresident and Chief Counsel
Coalition for Fair Transmission Policy
8/17/2019 121212 Thub Slides
42/44
Questions & Answers
Additional questions can be sent to:
303.782.5510
8/17/2019 121212 Thub Slides
43/44
Thank you to our sponsor.
8/17/2019 121212 Thub Slides
44/44
Interactive intelligence for transmission grid and power generation professionals.
Start your free trials:
http://transmissionhub.com/register.php
http://generationhub.com/register.php
http://transmissionhub.com/register.phphttp://generationhub.com/register.phphttp://generationhub.com/register.phphttp://generationhub.com/register.phphttp://transmissionhub.com/register.phphttp://transmissionhub.com/register.phpTop Related