8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
1/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
Installation Protocol
AIA-360 Analyzer
Rev 8May 2008
TOSOH BIOSCIENCE INC.
CONTROLLED DOCUMENT Page 1 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
2/12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
3/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
Diluent bottle 500 ml(DILUENT)
Wash solution bottle 1000 ml(WASH)
Waste fluid bottle 1000 ml(WASTE)
Diluent bottle cap
Wash solution bottle cap
Waste fluid bottle cap
Level sensor lead
Printer paper (thermal paper roll)
ABC Power conditioner
CONTROLLED DOCUMENT Page 3 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
4/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
3. Tape the smart media card to the back of the analyzer for safe keeping.
4. Remove and discard the following items from the plastic bag found in the AIA-360 box:
Japanese Operators Manual
Japanese QC Certificate
5. Remove the gray plastic stopperlocated at the back of the system.This stopper secures the probeduring shipping and must beremoved prior to installing thesystem. Remove the two screws andthe wing nut that secures the probe.
Carefully pull the gray stopper awayfrom the unit.
Gray Plastic Stopper
CONTROLLED DOCUMENT Page 4 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
5/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
6. Replace the gray plastic stopper withthe black metal plate to cover thehole.
Be sure to keep the gray plasticstopper should the system need to
be returned to TOSOH. TOSOHBioscience, Inc. will not beresponsible for damages to the probeif the stopper is not in place when theanalyzer is shipped back.
7. Remove the bracket which secures the carousel for transportation.
8. Attach the bracket to the back panel
as shown.
This prevents the bracket fromgetting lost.
9. Remove the two outside covers of the instrument by removing the six screws foreach cover.
10. Open the door to the carousel and remove the tape that holds the carousel inplace during shipment.
CONTROLLED DOCUMENT Page 5 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
6/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
11. Inspect the rollers from the front and back to ensure the carousel has not slipped
in shipment.
12. Call ISC (Dan Minard) or Tech Support immediately if there is a problem. Do notcontinue with installation.
CONTROLLED DOCUMENT Page 6 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
7/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
13. Inspect all tubing and connections from the back and both sides. Pay particularattention to the keypad ribbon cable.
Roller andcarousel homesensor
14. Reattach the two outside covers.
CONTROLLED DOCUMENT Page 7 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
8/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
15. Install the substrate holder onto the back of the system as follows. Remove thescrew circled in red.
16. Attach the two spacers with the two screws provided as shown.
Spacer
17. Install freshly prepared substrate.
CONTROLLED DOCUMENT Page 8 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
9/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
18. Locate the tubes extending from the back of the system and connect the tubes tothe port assembly as shown. The tubes are labeled diluent, wash, and waste andshould be connected to their corresponding position on the assembly.
Waste
DiluentWash
DiluentWashWaste
19. Connect the bottle tray to the right side of the instrument.
20. Connect the tubes extending from the port assembly to their corresponding bottlecaps as shown. Fill the bottles with diluent and wash solutions. Tighten the bottlecaps and arrange as shown.
Diluent
Wash Waste
CONTROLLED DOCUMENT Page 9 of 12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
10/12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
11/12
8/13/2019 12-CSS-030 Rev 8.0 360 Installation Protocol
12/12
TOSOH Bioscience AIA-360 Installation Protocol 12-CSS-030 Rev 8
26. llation Wizard have been successfully completed, thephysical installation of the analyzer is finished. Refer to 12-CSS-005, AIA-360Installation and Customer Training, section 6.1 for verification of analyzerperformance.
When all steps of the Insta
7. Refer to the AIA-360 Specification Adjustment Procedure document to changeassay and system specifications.
2
CONTROLLED DOCUMENT Page 12 of 12
Top Related