10th Annual Symposium: The Prevention of Serious Accidents
Lessons Learned from the BP Refinery Explosion and Other IncidentsCSB Investigator, Cheryl MacKenzie22 November 2007
2
www.csb.gov
CSB Mission
• Investigating chemical incidents• Determining causes• Making recommendations• Promoting awareness • Conducting research and studies on
accidental releases (e.g. reactives, dust)
To promote prevention of industrial chemical accidents by…
3
www.csb.gov
CSB Overview• Five-member board
– Presidential appointment– Senate confirmation– Five year terms
• Staff positions– Investigators– Recommendations– Outreach
4
www.csb.gov
• Deaths or injuries onsite or offsite• Property losses• Offsite impact
Public/Environmental• Incidents with broad national
significance• Resources available
Investigation Criteria
5
www.csb.gov
Two Key Lessons from BP Texas City
1. Human Error is a symptom of underlying problems
2. Process safety metrics need to be developed; injury rate data provides an incomplete picture of safety performance
6
www.csb.gov
Incident Summary• March 23, 2005• 15 deaths and 180
injuries• During startup, tower
and blowdown drum overfilled
• Liquid hydrocarbon released, vapor cloud formed and ignited
• Explosion and fire
7
www.csb.gov© Financial Times
8
www.csb.gov© Financial Times
9
www.csb.gov
10
www.csb.gov
Three Initiating Conditions• The overfilling of the distillation tower
• The use of a blowdown drum and stack that open to the atmosphere
• The placement of the contractor work trailers adjacent to high hazard process units
11
www.csb.gov
Why was the splitter tower overfilled?
Careless operators?
Lesson 1
Human Error is a Symptom of Underlying Problems
13
www.csb.gov
Human factors• Human errors contributed to the
overfilling of the tower for 3 hours
• But individuals do not plan to make mistakes; they do what makes sense to them at the time
14
www.csb.gov
Human Factors• Must ask:
Why did the individuals take the actions that they did?
• Numerous underlying conditions influenced operators’ decision-making and actions
15
www.csb.gov
Human Error was a Symptom of Underlying Problems at Texas City• Historical deviations of startup• A lack of a shift communication policy or
emphasis on communication• Malfunctioning equipment/instruments• Fatigued operators and lack of a policy for
maximum allowable hours• Budget cuts to staffing and training
16
www.csb.gov
Historical Deviations of Startup• The startup procedure required the tower
level control valve be open and the tower be filled within the range of the level transmitter
• However, the board operator closed the tower level control valve and filled the tower above the amount specified in the procedures
• To understand why he made these decisions, the CSB reviewed what other board operators did in previous startups
17
www.csb.gov
Procedural deviations common in 19 startups of the unit from 2000 to 2005• In a majority of the startups the tower was filled
above the range of the level transmitter• Swings in level experienced in 18 of these
startups• Tower ran with high level to protect equipment• None of these startups was considered
abnormal or investigated to correct problems• Management did not revise out-dated
procedures
18
www.csb.gov
Communication was ineffective between operations personnel
• Multiple critical miscommunications occurred– Instructions for routing feed led to the level
control valve being closed– The condition of equipment was not
communicated from one shift to the next
• BP had no policy for effective communication between operations personnel during shift changes
19
www.csb.gov
Tower instruments malfunctioned• Six pieces of instrumentation
malfunctioned on the day of the incident, including:– A redundant high level alarm– A sight glass on the tower– A miscalibrated level transmitter
• The level transmitter’s setting was incorrect, likely not altered since it was set 30 years ago
20
www.csb.gov
Operators were likely Fatigued• Operators worked 12-hr shifts,
7 days-a-week, 29+ days• Acute sleep loss and
cumulative sleep debt resulted
32130292827
26252423222120
19181716151413
1211109876
543212827
March 2005
• BP has no corporate or site-specific fatigue prevention policy or maximum shift work regulations
• No fatigue prevention guidelines widely used in refining industry
21
www.csb.gov
Supervisor and Operator Staffing was Insufficient• Unit Startups are especially hazardous
• No supervisor assisted with startup
• 25% budget cut target in 1999 led to ISOM staffing cuts - control room consolidation and increased workloads followed
• Hazard review recommended two board operators during all startups, but only one on March 23
22
www.csb.gov
Operator Training was not effective• Move to computer-based training without
effective verification methods of competency
• Switch to computer-based training “was a business decision driven by cost”
• From 1998 to 2004 central training staff reduced from 28 to 8 and budget cut in half
• Concurrent with BP London instruction to cut costs 25%
23
www.csb.gov
Operator Training was not effective• Audits and reviews from 2002 - 2005
identified on-going deficiencies in operator competency
• Yet managers adopted a compliance strategy that relied more on operating personnel and less on engineering controls to prevent accidents due to cost
• No effective training for abnormal situation management or simulation technology made available
24
www.csb.gov
Safety Culture
25
www.csb.gov
Safety Culture
• “The way we do things around here”
• Can be positive or negative
• Is influenced by management changes, historical events, and economic pressures
• Can be used as an analysis tool
26
www.csb.gov
Companies with a Positive Safety Culture:
• Learn from previous incidents and safety deficiencies
• Encourage reporting of safety concerns, issues, and problems by all levels of staff and take visible and concrete actions to remedy the issues
27
www.csb.gov
Companies with a Positive Safety Culture:
• Focus on controlling the risks of major hazards
• Provide adequate resources for safe operation
28
www.csb.gov
BP Texas City Did Not Have a Positive Safety Culture• Organizational causes were embedded in the
refinery’s history and culture• Causes extended beyond the ISOM unit to
actions of people at all levels of the corporation • Multiple safety system deficiencies were found
BP did not effectively measure and manage safety
Lesson 2
Process safety metrics need to be developed; injury rate data provides an incomplete picture of safety performance
30
www.csb.gov
BP’s “Days Away from Work” Rate
http://www.bp.com/sectiongenericarticle.do?categoryId=9010712&contentId=7021106
31
www.csb.gov
Major Hazard
RiskEvent
Severity
Frequency / probability
Major hazard accidents are
here
..but most of the management systems, (e.g. performance measures, audits, behavior-based safety programs, etc.) are aimed here
Event Severity
Frequency/Probability
© HSE
32
www.csb.gov
Examination of BP Texas City’s History
• In the previous 30 years, the Texas City site experienced multiple major accidents and 23 fatalities, not counting the 15 deaths on March 23
• Recurring safety problems identified in audits, reports, and investigations
33
www.csb.gov
CSB Investigation Findings• Texas City infrastructure and equipment
found to be in “complete decline”• A 2002 Texas City study warned of “serious
concerns about the potential for a major site incident” due to mechanical integrity problems
• A follow-up report found that from 1992 to 2000, capital spending was reduced 84% & maintenance spending was reduced 41%
34
www.csb.gov
CSB Investigation Findings• A 2003 refinery maintenance study
concluded that maintenance and mechanical integrity problems persisted at Texas City
• A 2003 external safety audit found inadequate training, a large number of overdue action items and a concern about “insufficient resources to achieve all commitments”
35
www.csb.gov
CSB Investigation Findings
• In 2004, Texas City experienced three major incidents and three fatalities
• Safety system action item closure rate was down to 79% in 2004, from 95% in 2002.
36
www.csb.gov
Safety Culture Assessment found:• Serious mechanical integrity hazards led
to “an exceptional degree of fear of catastrophic incidents”
• “Production and budget compliance gets … rewarded before anything else” and “pressure for production, time pressure, and understaffing are the major causes of accidents”
• Leadership commitment “is undermined by the lack of resources to address severe hazards”
CSB Investigation Findings
37
www.csb.gov
CSB Investigation Findings
Management’s Response Insufficient• Continued focused on improving worker
behavior without sufficient assessment of safety systems and hazardous conditions
• Mistakenly thought safety culture at the site was improving because personal safety statistics were improving
38
www.csb.gov
CSB Investigation Findings• BP Corporate Refining executives ordered
a 25% reduction “challenge” for 2005• The 2005 refinery safety business plan
developed for site leadership listed the following key risks:– Mechanical integrity– Operator competency– The possibility that “Texas City kills
someone in the next 12-18 months”
And NOT Only At BP
Safety culture and process safety systems of high hazard industries need the same emphasis and focus as personal safety
40
www.csb.gov
Formosa Plastics ExplosionIlliopolis, IL • April 23, 2004
• Flammable vinyl chloride release ignited
• 5 fatalities, 2 injured
41
www.csb.gov
Operator at control panel
Operator at drain valve
42
www.csb.gov
Formosa Plastics ExplosionImmediate Events – Human Error• Operator in the process of cleaning a
reactor accidentally drained a full reactor • Operator bypassed an interlock to open the
reactor bottom valve, releasing its highly flammable contents
• Operations staff attempted to stop release• Vinyl chloride ignited
Careless operations staff?
43
www.csb.gov
Formosa Plastics ExplosionSafety System Deficiencies• Controlled risk through procedures and
training instead of making an engineering design change to safeguard unintentional opening of a reactor
• Ambiguous facility emergency procedures for evacuation; no drills in 10+ years
• Lessons from previous incidents not shared and learned
44
www.csb.gov
Giant Industries Refinery ExplosionGallup, NM • April 8, 2004
• Workers removing a pump
• Valve connecting the pump to a distillation column left open
• Release and ignition of flammable material
• 4 seriously injured
45
www.csb.gov
46
www.csb.gov
Giant Industries Refinery ExplosionImmediate Events – Human Error• Operator relied on the position of the valve
wrench to determine if the valve was open• The operator tagged and locked the valve in
what he thought was a closed position• The valve was actually open• When maintenance began unbolting the
pump, the flammable material was released, and ignited
Careless workers?
47
www.csb.gov
• Equipment was allowed to be used in a manner for which it was not designed with no assessment of the safety implications of the change
• Additionally, the valve wrench was not permanently affixed to the valve equipment
• Due to its size, it was often removed and replaced only when needed
Giant Industries Refinery ExplosionSafety System Deficiencies
48
www.csb.gov
• The pump had a history of failures – 23 work orders submitted to repair the pump in the one year previous to the incident
• Yet the pump was never assessed to determine the cause of the failure
Giant Industries Refinery ExplosionSafety System Deficiencies
49
www.csb.gov
For more information…www.csb.gov- BP Texas City Explosion and Fire- Formosa Plastics Vinyl Chloride Explosion- Giant Industries Refinery Explosion and Fire - Other reports, videos, animations
http://www.safetyreviewpanel.com/- The Baker Report
10th Annual Symposium: The Prevention of Serious Accidents
Lessons Learned from the BP Refinery Explosion and Other IncidentsCheryl MacKenzie ([email protected])
Questions?www.csb.gov
51
www.csb.gov
DisclaimerThis presentation is given for general informational purposes only. The presentation represents the individual views of Cheryl MacKenzie and all references, conclusions or other statements regarding current on going CSB investigations are preliminary in nature and limited to information that is already in the public domain. Furthermore, my statements today and this presentation do not represent a formal adopted product of the entire Board. Users of this presentation should also note that the contents were compiled solely for this presentation. For specific and accurate information on completed investigations, please refer to the final printed version by going to the CSB website at www.csb.gov. and clicking on the specific report desired under completed investigations. To the extent this presentation discusses completed investigations, such statements come under the general prohibition in 42 U.S.C. §7412(r)(6)(G).