*CIAP-PDCB CONSOLIDATED CONSTRUCTORS
PERFORMANCE SUMMARY REPORT (CPES REPORTS)
12TH RELEASE
(ON-GOING/COMPLETED PROJECTS) FROM January 1, 2008- December 31, 2010
*You may access this report on this website http://www.gppb.gov.ph
1
BACKGROUND: This report is prepared in connection with the
implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION:
The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.
Information on contractors CPES ratings shall be used for
the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and in adopting measure to further improve performance of contractors in the prosecution of government projects.
REPORT COVERAGE:
This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.
REPORT CONTENTS:
Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: 1) Constructor General Information; 2) Project Data; and 3) CPES Rating.
Part 1 of the report includes the name of constructor/s and
PCAB License Number.
Information contained in Part 2 pertains to the project name, Implementing Agency, contract amount, and status of project (on-going or completed).
CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)
5/F Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati ave. Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791
CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from January 1, 2008 to December 31, 2010
2
Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental,
safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.
SOURCES OF INFORMATION
Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA) and University of the Philippines (U.P.) covering the period January 1, 2007 to December 31, 2009
As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter
may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.
For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned
implementing agencies listed below:
Engr. Arnel Fortunado (BCDA) Engr. Clarito Magsino (DBP) Arnaldo Reyes (DOST) Wilfredo C. Borbor (DOTC) Tel. No. 304-3511 Tel. No. 726-3508 Tel. No. 837-2071 loc. 2120 Tel No. 726-3508
For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.
Melrose Pailma (DPWH) Ma. Otelia F. Eclavea (NHA) Engr. Tess Pantalla (NIA) Atty. Ma. Hiyasmin Delos Santos (PPA) Tel No. 304-3511 Tel No. 928-4561 Tel. No. 927-79-84 Tel. No. 527-8356 loc. 356/541
Mr. Simon Aguilon (PRRC) Dr. Roland Viray (PUP) Dir. Ariel Betan (U.P) 926-5232/926-6449 716-91-53 928-28-63/925-0984
3
CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES
I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood
Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.
2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing
Office reported 100% completion.
II. CRITERIA FOR EVALUATION
Amended Guidelines as Approved by NEDA InfraCom 27 August 2008
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00
4
As approved by NEDA InfraCom
19 May 2005 During Construction Upon Completion
Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00
As approved by NEDA InfraCom
30 January 1998
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety
and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00
5
III. CPES RATING & ITS QUALITATIVE DESCRIPTION
CPES Implementing Guidelines as Approved on 27 August 2008
As Approved on May 2005 and 30 January 1998
*CPES RATING Ranges Rating Qualitative Description
>96% Outstanding
>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor
*CPES RATING Ranges Rating Qualitative Description
>90% Outstanding
>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor
6
*CAUSES OF DELAY
CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS
C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds
C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation
of utilities, (i.e. PLDT, MERALCO posts and other similar cases)
7
*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 05/30/08 NCR 3.341 90 C 0.393 0.149 0.300 - - - 84.20 *84.20%
V. Satisfactory
121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
121 Construction Corporation (Formerly: 121 Construction) 21686 Impvt. of MPB at Sta. Maria Agro-Industrial
High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97%
V. Satisfactory
2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -
2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%
V. Satisfactory
2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory
2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86%
V. Satisfactory
2-R Construction & Supply 15304 Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80%
Satisfactory
2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
V. Satisfactory
310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge Approaches
(Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory
3E Construction 19588 Completion of Multi-Purpose Bldg., (Water District, Phase IV) Tankulan 03/03/08 X 2.365 120 C 0.335 0.136 0.000 - - - 47.10 71.44%
Satisfactory
3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page1
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 91.07%
V. Satisfactory
3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S 03/06/08 II 0.410 90 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
3K Builders 27277 Repair/Rehab. of MNR, Km.174+000 - Km.175+000 w/ exception Villasis Section 06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V.Satisfactory
3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS 05/26/08 II 0.954 45 C 0.233 0.200 0.300 - - - 73.30 81.14%
V. Satisfactory
3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. Satisfactory
3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 87.40% Satisfactory
3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10%
V. Satisfactory
3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 89.64%
V. Satisfactory
3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94%
Satisfactory
3RB Construction & Supply 19541Road Upgrading along DM Jct.-Leg.-Sto.
Domingo-Tab.-Cam. Sur Bdry., Tiwi-Tabaco Section
02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory
3RB Construction & Supply 19541 Impvt. of San Fernando North Road, San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page2
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3RB Construction & Supply 19541 Road Conc. & Impvt. of Barangay Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 86.38% Satisfactory
3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10 89.10% Satisfactory
3RB Construction & Supply/Ajan Jaeda, Inc. (JV) JV-08-209 Const. of Tagas-Divino Rostro Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -
3S Builders 18009 Completion of Drainage System 05/29/08 VII 0.634 60 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding
4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory
4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory
4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory
4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
4B Construction Corporation 23445 Upgrading and Concreting of Subic-Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76%
Satisfactory
4B Construction Corporation 23445Rehab./Reconst./Upgrading of Damaged
Paved National Road, Olongapo-Bugallon Road
05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%Satisfactory
4B Construction Corporation 23445 Rehab./Reconst./Upgrading of Damaged Paved National Road at Subic-Philseco Rd. 05/29/10 III 41.378 120 O 0.321 0.228 0.150 0.018 0.022 0.033 77.20 -
4B Construction Corporation 23445Repair/Rehab. of Paete-Famy Pob. Rd.,
Pangil-Siniloan Sect. Km.109+000 - Km.110+400
05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory
525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. Satisfactory
525 Construction 28532 Rehab. of Sta.Rita-Biak na Bato via Pulong Bayabas Road 06/11/10 III 38.180 210 O 0.386 0.300 0.150 0.030 0.038 0.033 93.70
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page3
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
525 Construction / MGSCC (JV)JV-07-095/
SLI-SN-005104
Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V.Satisfactory
525 Construction/MGSCC Joint Venture JV-08-235 Rehabilitation of Sta. Maria-Norzagaray
Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20 86.64% Satisfactory
558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur Coastal Road (Taluya Section) 05/28/08 XII 9.435 189 C 0.346 0.300 0.000 - - - 64.60 67.68%
Fair
628 Construction Enterprises 30049 Construction of Two Classroom School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%
V. Satisfactory
722 Construction 21923 Rehab/Reconst./Upgrading of Old Cagayan Valley Road (Pulilan Section) 05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%
Satisfactory
722 Construction 21923Const. of Multi-Purpose Bldg. Malinta E/S Lawang Bato E/S, Brgy. Lawang Bato &
Natividad Homes03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10%
Satisfactory
722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%
V.Satisfactory
722 Construction 21923 Const. of Water System @ Northville II 08/19/08 NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50% Satisfactory
722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section 08/29/08 III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
722 Construction 21923 Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos Road (Barihan Section) 08/27/08 III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V. Satisfactory
722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez 05/20/08 III 0.618 70 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading of Damages Pavement along Mc Arthur Highway 05/31/10 NCR 9.506 120 C 0.436 0.200 0.300 - - - 93.60 93.60%
V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90 *91.90% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page4
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
739 Builders 31174 Completion of MPB, Brgy. Capangpangan 11/13/08 I 1.518 54 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory
739 Builders 31174 Conc. of Caparacadan Road 05/17/08 I 0.189 7 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory
739 Builders 31174 Const. of MPB @ Brgy. Sabang 05/17/08 I 4.750 150 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory
739 Builders 31174 Const. of MPB @ San Lorenzo Village 02/28/08 I 1.087 68 C 0.261 0.200 0.300 - - - 76.10 *76.10% Satisfactory
739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory
739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80 *90.80%
V. Satisfactory
739 Builders 31174 Const. of Drainage Canal, Brgy. VII 05/29/10 I 1.141 80 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
747 Builders & Trader 16892 Conc./Impvt. of Manila East Road 03/05/08 IV-A 6.236 150 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory
747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.60 86.97%
Satisfactory
747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. 11/21/08 NCR 9.589 120 C 0.355 0.200 0.300 - - - 85.50 78.96%
Satisfactory
747 Builders & Trader 16892 Proposed Rehab./Impvt. of Pres. Quirino Ave. West Bound (Singalong-Roxas Blvd.) 05/24/10 NCR 14.475 20 C 0.442 0.200 0.300 - - - 94.20 94.20%
V. Satisfactory
747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.10 88.70%
Satisfactory
811 Trading & Construction 21215 Const. of MPB at Sitio Simbahan, Brgy. Bagong Bayan II 05/15/08 IV-B 0.477 60 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page5
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
811 Trading & Construction 21215Const. of Two (2) Storey Bldg. Six (6)
Classroom Sch. Bldg. @ Dona Asuncion Reyes Memorial E/S
05/14/08 IV-B 0.948 80 C 0.304 0.300 0.300 - - - 90.40 91.73% Outstanding
811 Trading & Construction 21215 Repair/Rehab. of Multi-Purpose Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60 *89.60%
V.Satisfactory
811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section 11/19/08 IV-B 4.710 90 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road,
Calatrava-San Agustin Road (Intermittent Section)
11/25/08 IV-B 9.999 32 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR,
Buenavista, Carmen-Danao-Getafe Rd., Poblacion Danao Sect.
06/01/10 VII 9.541 419 O 0.360 0.300 0.000 0.030 0.045 0.033 76.80 -
888 ACY Enterprises 32898 Reconst. (Conc. Paving) of Loay Interior Rd., Trinidad & San Miguel Sect. 06/02/10 VII 14.320 270 O 0.356 0.300 0.000 0.030 0.045 0.033 76.40 -
A C J Construction Resources 10635 Concreting of Poblacion Magpet-Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -
A C O Construction 13105Const. of Rotonda along National Highway
(Zamboanga Peninsula) Cross Rd. Upgrading Project @ Poblacion Ipil
02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -
A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of
Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90%
V. Satisfactory
A C O Construction 13105Const. of Rotonda along National Highway
(Zamboanga Peninsula Crossroad Upgrading Project) at Poblacion Ipil
06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor
A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90%
Satisfactory
A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. 08/30/08 VIII 14.393 160 C 0.242 0.200 0.300 - - - 74.20 61.12%
Fair
A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road 11/20/08 II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84% V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Naguilian-San Mariano Rd., Villapaz Section 08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84%
V. Satisfactory
A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.00 91.42%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page6
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.50 88.78%
Satisfactory
A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.80 86.78%
Satisfactory
A. De Guia Construction 18228Rehab./Reconst./Upgrading of Damaged
Paved national Road, Daang Maharlika KO 320+000 - KO 321+000
06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved National Road Santiago-Baluarte-
Quirino Bdry. Road KO326+(-)280 - KO328+000 w/ exception
08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory
A. De Guia Construction 18228Restoration of Road Slope & Slope
Protection along Naguilian-San Mariano Road KO395+850 - KO401+800
08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory
A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct.
Ipil-Panang-Quirino Bdry. Road; KO366+058 - KO367+118
08/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90% Satisfactory
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved National Roads, Santiago-Baluarte-
Quirino Bdry. Road; KO328+100 - KO331+000 w/ exception
08/27/10 II 18.623 149 O 0.308 0.300 0.091 0.030 0.054 0.017 80.00 -
A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Santiago-Tuguegarao Rd. Burucboc Sect. 08/25/10 II 9.647 133 O 0.358 0.300 0.000 0.030 0.043 0.000 73.10 -
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved National Roads Santiago-Tuguegarao Road, KO333+500 -
KO334+850
08/28/10 II 17.123 149 O 0.347 0.300 0.000 0.030 0.054 0.000 73.10 -
A. Montalbo Trading and Construction 32684 Const. of Multi-Purpose Building at Bigain
1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page7
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater 06/27/08 PUP 1.389 60 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater 01/04/08 PUP 1.361 60 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20 *99.20%
Outstanding
A.A De Vera Construction 6191Completion of Tagbilaran City Puericulture
Center & Maternity House and Related Facilities
06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding
A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.70 95.52%
V. Satisfactory
A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%Satisfactory
A.A De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S 11/21/08 VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%
Outstanding
A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.50 61.50% Poor
A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.00 93.00%
V. Satisfactory
A.B Aponesto Construction Parts & Supply 22998 Road Upgrading (Gravel to Paved) along
Compostela-Cateel Rd., Osmeña Sect. 06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -
A.B Aponesto Construction, Parts & Supply 22998 Concreting of Montevista-DNAS Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30 88.48%
Satisfactory
A.B Taylan Construction & Development 25273 Const. of RCBC and Canal along Manila
North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory
A.C Cunanan Construction 20752Repair/Rehabilitation of Sewer and Drainage System at Northwing and
Eastwing07/23/08 PUP 1.241 67 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.C Rivero Development Corporation 5122 Const./Impvt. of Multi-Purpose Bldg. at Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page8
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.C Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I 02/27/08 VI 7.946 215 C 0.323 0.200 0.300 - - - 82.30 81.31% V. Satisfactory
A.C Rivero Development Corporation 5122Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km. 8+350 w/
exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -
A.C Rivero Development Corporation (Formerly: A.C. Rivero Const.) 5122 Const. of Subang Daku Bridge 09/04/10 VIII 18.890 345 O 0.382 0.240 0.150 0.030 0.037 0.033 87.20 -
A.C Rivero Development Corporation (Formerly: A.C. Rivero Const.) 5122
Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km. 8+350 with
exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98%
Satisfactory
A.C Soliven Construction & General Merchandise 19278 Construction of 2 CL S.B. at La Paz H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%
V. Satisfactory
A.C Soliven Construction & General Merchandise 19278
Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek & San Vicente
Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20%
V. Satisfactory
A.D Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
A.D.L Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School 08/21/08 IV-B 0.481 69 C 0.360 0.200 0.300 - - - 86.00 84.11%
V. Satisfactory
A.D.P Construction & Supply 3466 Const. of Bugasong-Valderrama Road, Liaures Section (Alternate Route) 11/27/08 VI 14.426 178 C 0.335 0.087 0.300 - - - 72.20 81.05%
V. Satisfactory
A.D.P Construction & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20 82.14%Satisfactory
A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -
A.D.P Construction & Supply 3466 Conc. of Pototan-Lambunao Road, Km. 38+380-Km. 53+000 with exception) 09/05/10 VI 9.419 150 O 0.397 0.240 0.150 0.030 0.047 0.033 89.70 -
A.D.P Construction & Supply 3466
Rehab./Reconst./Upgrading of Damaged Paved National Road, Roxas City Boundary-
Panitan Road-Jct. Bailan Road, Capiz (KM.112+750-Km.122+705) with exception
08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -
A.D.P Construction & Supply 3466 Road Upgrading of Sara-Concepcion Road, Sara and Concepcion 09/06/10 VI 66.119 270 O 0.371 0.240 0.150 0.030 0.042 0.033 86.60 -
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page9
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.D.P Construction & Supply 3466 Impv't./Conc. Of Mana-Ticulon-Lagumit-Little Baguio Rd. 08/25/10 XI 47.455 571 C 0.292 0.133 0.000 - - - 42.50 42.50%
Poor
A.D.S San Juan Construction 12853 Conc. of Dionisio Anore St., Brgy. Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory
A.F.G Construction & Construction Supply 17161
Rehab./Reconst./Upgrading of Damaged Paved National Road, Jct. Nat'l. Road-
Sagay-Bato-Dian-ay-Marcelo-Balea-Jct. National Road, Bato Section
08/29/10 VI 37.184 220 O 0.308 0.238 0.150 0.030 0.042 0.033 80.10 -
A.F.G Construction & Construction Supply 17161 Rehab. of Amerang Flood Control, Tigum
River, Brgy. Amerang 09/05/10 VI 8.159 257 C 0.456 0.133 0.000 - - - 58.90 69.28% Poor
A.F.G Construction & Construction Supply 17161 Conc. of Road @ Brgy. Mansilingan 02/27/08 VI 1.861 150 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
A.F.G Construction & Construction Supply 17161 Const. of Diversion/By Pass Road along
Kalibo-Iloilo Highway, Banga Section 11/30/08 VI 14.461 180 C 0.351 0.300 0.300 - - - 95.10 90.90% Outstanding
A.F.G Construction & Construction Supply 17161 Rehab. of Dumaguete North Road 11/27/08 VII 4.894 42 C 0.324 0.200 0.300 - - - 82.40 73.10%
Satisfactory
A.F.G Construction & Construction Supply 17161 Rehab. of Bacolod South Rd. (Hingaran
Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10 83.88% Satisfactory
A.F.G Construction & Construction Supply 17161 Const. of MPB (Covered Court) at San
Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50 87.08% Satisfactory
A.G Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68 *84.68% Satisfactory
A.G Herrera Construction Corp. 26307 Construction of Multi-Purpose Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10
90.42%
V. Satisfactory
A.I.P Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory
A.I.P Construction 32458 Rehab. of Kin-iway - Tamboan FMR 06/02/10 CAR 0.987 253 O 0.300 0.300 0.150 0.022 0.030 0.033 83.50 -
A.I.P Construction 32458 Rehab. of Ambasing-Balugang FMR 08/27/10 CAR 0.800 268 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page10
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.I.P Construction 32458Restoration of Road Cuts along Bontoc-Baguio Road Alab Section (Km. 383+619-
Km. 384+124)08/27/10 CAR 1.732 70 O 0.318 0.252 0.150 0.030 0.035 0.033 81.80 -
A.J Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory
A.J Lava Builders 22265 Repair & Rehab. of Daang Maharlika Road (Guiguinto & Plaridel Section) 08/28/08 III 9.930 20 C 0.257 0.211 0.300 - - - 76.80 *76.80%
Satisfactory
A.J Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway 11/24/08 III 9.927 18 C 0.255 0.300 0.300 - - - 85.50 *85.50%
V. Satisfactory
A.J Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50 *84.50% Satisfactory
A.J Lava Builders 22265 Impv't./Rehab. of MPB and Alley Fernandez St., Brgy. San Antonio 06/04/10 NCR 0.961 45 C 0.455 0.200 0.300 - - - 95.50 95.50%
V. Satisfactory
A.J Taylan Construction Corporation 2336 Const. of San Mateo Bridge 05/22/08 I 16.502 331 C 0.236 0.269 0.300 - - - 80.50 *80.50% V. Satisfactory
A.J Taylan Construction Corporation 2336 Const. of Seawall 08/25/08 II 14.173 270 C 0.323 0.226 0.000 - - - 54.90 74.58% Satisfactory
A.J Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga Apayao Road 02/29/08 I 19.283 270 C 0.215 0.200 0.300 - - - 71.50 77.80% Satisfactory
A.J Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road,
Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -
A.L Dare Construction 11932 Const./Rehab./Replacement/ Completion/ and Repair of Plaridel E/S 02/27/08 NCR 1.718 120 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -
A.L Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores 05/12/08 III 4.753 50 C 0.313 0.200 0.300 - - - 81.30 *81.30%
V. Satisfactory
A.L Dare Construction 11932 Impvt. of Kennon Road, Camp 4 06/09/10 CAR 7.177 150 O 0.306 0.300 0.150 0.022 0.030 0.033 84.10 -
A.L Dare Construction 11932 Const./Repair/Rehab. of Slope Protection along Porac River, Mabical Sect. 08/16/10 III 14.344 90 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
A.L Gantuangco Construction 30872 Construction of the Diversion Works and Canal System of Libertad CIP - Phase 2 11/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page11
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido National Road 05/29/08 IV-B 28.821 255 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
A.L Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong Bukawe, Phase II 11/27/08 IV-A 14.346 120 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
A.L.R Construction Corporation 24110 Completion of Two (2) Storey 4-CL at Landayan E/S 08/23/10 IVA 2.302 225 C 0.407 0.165 0.300 - - - 87.20 87.06%
Satisfactory
A.L.R Construction Corporation 24110 Construction of Overpass (Phase I), Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
A.L.R Construction Corporation 24110Const. of Pedestrian Overpass at Brgy. San
Antonio and Biñan-Carmona Road Intersection
06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86% V. Satisfactory
A.L.R Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory
A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass along Calamba-Sto. Tomas 05/22/08 IV-A 9.601 120 C 0.352 0.200 0.300 - - - 85.20 83.22%
V. Satisfactory
A.L.R Construction Corporation 24110 Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M. Santos NHS 03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass (Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90 *96.90%
Outstanding
A.L.R Construction Corporation 24110 Const. of Multi-Purpose Building at Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40 *84.40%
Satisfactory
A.L.R Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory
A.L.R Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page12
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.L.R Construction Corporation 24110 Completion of MPB at Brgy. Zapote 05/27/10 IVA 0.959 30 C 0.458 0.075 0.300 - - - 83.30 83.30% Satisfactory
A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass, Old Manila South Road, Km.34+520 08/23/10 IVA 9.632 167 O 0.381 0.274 0.150 0.022 0.030 0.033 89.00 -
A.L.R Construction Corporation 24110Road Upgrading (Gravel to Paved-HDM-4) of
Jct. MWCR (Bagong Silang)-Cabacao Diversion Road, Brgy. Cabacao
08/28/10 IVB 9.649 145 C 0.409 0.198 0.300 - - - 90.70 88.60% Satisfactory
A.M Ayunan Construction 13983 Const. of MPB at Datu Usman E/S 11/18/08 XII 1.908 75 C 0.319 0.182 0.300 - - - 80.10 65.40% Fair
A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096
Kalibo Airport Development Project (Asphalt Overlay of Runway, Extension of
Apron and Construction of Drainage Canal)04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40%
V. Satisfactory
A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge & Approaches 05/26/08 VI 138.616 611 C 0.370 0.278 0.000 - - - 64.80 78.74%
Satisfactory
A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-07-097 Conc. of Iloilo-Caticlan Highway (Pototan-
Passi-Capiz Bdry. Sect.) 05/31/10 VI 158.259 570 C 0.379 0.200 0.300 - - - 87.90 87.82% Satisfactory
A.M Robles Construction 28056 Conc. of FMR, Brgy. Colo 11/17/08 I 1.926 55 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
A.M Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00 *92.00%
V. Satisfactory
A.M Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90 *89.90%
V. Satisfactory
A.P Consebido Construction and Trading 33616 Const. of MPB, Brgy. Alimanguan 08/20/10 IVB 0.974 114 C 0.447 0.200 0.300 - - - 94.70 88.54%
Satisfactory
A.P Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road 08/25/08 III 2.170 150 C 0.347 0.206 0.300 - - - 85.30 *85.30%
V. Satisfactory
A.P Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose 11/26/08 III 0.702 75 C 0.316 0.300 0.300 - - - 91.60 *92.50%
Outstanding
A.P Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) 05/26/08 III 0.934 60 C 0.284 0.274 0.300 - - - 85.80 *85.80%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page13
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -
A.P Palacios Construction 29021 Const. of MPB, Brgy. Pingit 06/05/10 III 4.287 180 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory
A.P.B Construction 17055 Repair/Rehab. of Baguio-Bauang Road, Km. 296+050-Km. 297+050 with exceptions 08/29/10 CAR 4.891 47 C 0.456 0.176 0.300 - - - 93.20 93.40%
V. Satisfactory
A.P.B Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.20 84.20%
Satisfactory
A.P.B Construction 17055 Road Opening at Middle Quirino Hill Brgy. 08/28/08 CAR 0.953 45 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
A.P.O General Construction 7010 Rehab./Reconst. of Dungon-Agat Section, Km. 216+648-Km. 217+723 (V.S.) Camp 1 08/29/10 CAR 4.555 90 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
A.Q Loisaga Construction & General Services 32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
A.R & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES 11/20/08 X 0.495 60 C 0.236 0.300 0.300 - - - 83.60 *83.60% V. Satisfactory
A.R & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory
A.R Lustre Jr. Construction 7680 Puerto Princesa Airport Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80 98.80%
Outstanding
A.R Lustre Jr. Construction 7680 Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos Road 05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%
V. Satisfactory
A.R Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-Canigaran Road 11/17/08 IV-B 9.697 60 C 0.332 0.300 0.300 - - - 93.20 91.16%
Outstanding
A.R Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge, PPSR 08/11/08 IV-B 20.378 240 C 0.374 0.200 0.300 - - - 87.40 85.06% V. Satisfactory
A.R Lustre Jr. Construction 7680 Construction of Multi-Purpose Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80 *88.80% Satisfactory
A.R Lustre Jr. Construction 7680 Repair/Rehab/Impvt. of Santiago-Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20 *78.20% Unsatisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page14
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.R Lustre Jr. Construction 7680 Conc. of Puerto-Princesa-Sabang Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90 90.61%V. Satisfactory
A.R Lustre Jr. Construction 7680Rehab./Reconst./Upgrading of Damaged
Paved Nat'l. Rds. At Bigaa-Plaridel via Bulacan and Malolos Rd.
08/27/10 III 14.352 90 C 0.367 0.185 0.300 - - - 85.20 85.20% Satisfactory
A.R Lustre Jr. Construction 7680 Conc. of Puerto Princesa South Road 08/22/10 IVB 38.599 216 O 0.364 0.300 0.137 0.030 0.055 0.033 91.90 -
A.R.L Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%
Satisfactory
A.R.L Construction 27645 Conc. of Brgy. Road Caniogan 08/27/08 III 0.956 12 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
A.R.L Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion 11/24/08 III 0.500 20 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
A.R.L Construction 27645 Riprapping of Access Road @ Poblacion 11/24/08 III 0.477 35 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory
A.R.L Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40 *86.40%
Satisfactory
A.R.L Construction 27645Const. of Flood Control (Revetrment),
Poblacion, San Sebastian, San Jose, Sta. Monica,
09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
A.R.L Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.20 90.20% V. Satisfactory
A.R.L Construction 27645 Rehab./Reconst./Upgrading of Damaged Pavement along 7th Ave. East 05/31/10 NCR 6.445 90 C 0.409 0.200 0.300 - - - 90.90 90.90%
V. Satisfactory
A.S Obquia Construction 19844 Completion of MPB 09/03/08 VII 0.175 120 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding
A.S.M Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page15
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -
A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding
A.S.S. Construction 31509 Partial Completion of vast set, PCASTRD & PCIERD bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30 *98.30%
Outstanding
A.S.V Construction Supply and Services 13490 Const. of FMR, Venegas St., Brgy. Layac-
Sta.Isabel 05/26/10 III 0.473 60 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
A.Y.U Engineering and Construction 25632 Conc. of Road at Brgy. Dumoy 12/03/08 XI 9.435 90 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
AB Aponesto Construction, Parts & Supply 22998 Conc. of Lublub-Bolilac-Salad Road,
Km.277+707.50-Km.278+711 09/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -
Abesco Construction & Development Corp. 2934 Construction of Multi-Purpose Building @
Cupang Elem. School 05/21/09 III 3.273 88 C 0.484 0.133 0.300 - - - 91.70 90.23%V. Satisfactory
Abu Construction 22313 Const. of Tantangan RCDG Bridge 03/06/08 XII 3.858 154 C 0.323 0.237 0.300 - - - 86.00 83.48% V. Satisfactory
Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia 08/29/08 XII 0.873 120 C 0.338 0.300 0.300 - - - 93.80 87.57%
V. Satisfactory
Abu Construction 22313 Const. of Multi-Purpose Building 06/10/10 XII 1.926 126 C 0.494 0.133 0.300 - - - 92.70 92.70% V. Satisfactory
Abu Construction 22313 Completion of MPB (Mini Gym) at Brgy. San Rafael 06/08/10 XII 1.897 65 C 0.386 0.133 0.300 - - - 81.90 81.90%
Unsatisfactory
Abu Construction 22313 Completion of MPB (Gym) at Brgy. Baras 06/08/10 XII 0.764 65 C 0.339 0.133 0.300 - - - 77.20 77.20% Unsatisfactory
Abulug Construction Company, Inc. 5593 Matuno-Sto. Domingo CIS 2/11-12/2008 NIA 3.126 150 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -
Abulug Construction Company, Inc. 5593 Concreting of Jct. Claveria-Dibalio-Luzon Road 05/21/09 II 9.648 273 C 0.485 0.133 0.300 - - - 91.80 88.95%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page16
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao Road 02/19/08 II 8.199 180 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory
Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road, Tuguegarao City & Penablanca 08/27/08 II 13.884 240 C 0.358 0.200 0.300 - - - 85.80 84.30%
V. Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) 02/23/09 II 1.446 269 C 0.476 0.133 0.300 - - - 90.90 87.40% Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Punta Seawall 02/19/08 II 0.298 60 C 0.310 0.200 0.300 - - - 81.00 79.26% Satisfactory
Abulug Construction Company, Inc. 5593 Lucban River Control Project 02/29/09 II 3.858 347 C 0.417 0.133 0.300 - - - 85.00 83.35% Satisfactory
Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS 2/11-12/08 NIA 3.126 150 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -
Abulug Construction Company, Inc. 5593 Reblocking along MNR 08/26/08 II 19.296 180 C 0.295 0.215 0.300 - - - 81.00 82.08% V. Satisfactory
Abulug Construction Company, Inc. 5593 Replacement of Langagan Bridge along MNR 08/26/08 II 4.814 150 C 0.370 0.201 0.300 - - - 87.10 86.20%
V. Satisfactory
Abulug Construction Company, Inc. 5593Reblocking along Bangag-Allapacan-Magapit Road (BAMR), KO686+400-
KO687+20009/08/09 II 7.999 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
Abulug Construction Company, Inc. 5593 Concrete Paving of Ballesteros Road (Washington & Luna St.,) 09/08/09 II 1.930 150 C 0.405 0.200 0.300 - - - 90.50 88.94%
Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Zitanga Brgy. Roads 02/17/10 II 9.648 132 C 0.370 0.200 0.300 - - - 87.00 88.14% Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Ballesteros Central School Building 02/17/10 II 0.192 60 C 0.437 0.133 0.300 - - - 87.00 87.00%
Satisfactory
Abulug Construction Company, Inc. 5593 Construction of Deepwell 02/18/10 II 0.289 60 C 0.396 0.133 0.300 - - - 82.90 82.90% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page17
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abulug Developers & Builders Co., Inc. 2366 Conc. of Luna Street at Centro West 05/24/10 II 0.964 120 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Emergency Restoration of Cadcadir Bridge
#1 Approach KO 600+(-)595 Phase I 05/24/10 II 0.995 90 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366
Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 2 KO
602+723 Phase II05/24/10 II 0.771 90 C 0.408 0.200 0.300 - - - 90.80 90.80%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366
Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 1 Phase II,
KO 600+ (-594)05/24/10 II 0.963 90 C 0.467 0.134 0.300 - - - 90.10 90.10%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Const. of Sto.Tomas FMR 05/25/10 II 0.962 105 O 0.277 0.300 0.150 0.024 0.037 0.050 83.80 -
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road (Fugu
Bdry.-Bangag Section) 05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road
(Ballesteros-Abulug Section) 09/08/09 II 18.527 210 C 0.407 0.200 0.300 - - - 90.70 89.38% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Construction of 1-CL Bessang E/S 09/08/09 II 0.484 60 C 0.404 0.181 0.300 - - - 88.50 *88.50%
Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO
590+640, MNR 02/17/10 II 1.495 90 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope Protection KO
590+340, MNR 02/17/10 II 0.995 90 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Concrete Paving of Jones Street 02/12/10 II 0.868 90 C 0.384 0.200 0.300 - - - 88.40 88.40%
Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road (/Fugu
Bdry. - Bangag Sect.) 02/17/10 II 19.299 234 C 0.394 0.200 0.300 - - - 89.40 88.08% Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Rehab./Regravelling of Curva to
Capallepaan Farm-to-Market Road 02/18/10 II 0.675 60 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page18
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abulug Developers & Builders Co., Inc. 2366 Road Opening of Pimpila Farm-to-Market
Road 02/17/10 II 0.820 75 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Retrofitting of Pamplona Bridge, Manila
North Road 02/24/09 II 10.290 180 C 0.386 0.200 0.300 - - - 88.60 82.96% Satisfactory
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Restoration of River Control Project along
Goron & Langgangan River 08/19/10 II 12.542 166 O 0.400 0.300 0.150 0.020 0.043 0.050 96.30 -
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Restoration of Slope Protection KO591+320
- KO591+353, MNR 08/19/10 II 1.928 120 C 0.434 0.200 0.300 - - - 93.40 93.40% V. Satisfactory
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Const. of Slope Protection at KO673+000 -
KO673+853 MNR 08/19/10 II 1.929 90 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Conc. along Cadcadir-Kabugao Road 08/19/10 II 5.015 166 O 0.352 0.293 0.150 0.030 0.043 0.050 91.80 -
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Emergency Rehab. of Slope Protection
KO600+525 - KO602+200, MNR 08/19/10 II 4.195 90 C 0.347 0.200 0.300 - - - 84.70 87.58% Satisfactory
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Conc. along Claveria Dibalio-Luzon-
Cagayan Bdry. Road 08/19/10 II 2.938 153 C 0.374 0.200 0.300 - - - 87.40 87.40% Satisfactory
Aca Construction & Supply 10784 Conc. of Esperanza Road 05/27/08 I 0.382 30 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory
Aca Construction & Supply 10784 Construction of Multi-Purpose Building, Bancagan 02/26/09 I 0.096 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
Aca Construction & Supply 10784 Construction of Water Supply 02/26/09 I 0.096 30 C 0.338 0.188 0.300 - - - 82.60 *82.60%Satisfactory
Aca Construction & Supply 10784 Repair of Farm-to-Market Road 02/26/09 I 0.480 30 C 0.343 0.200 0.300 - - - 84.30 *84.30%Satisfactory
Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River, Brgy. Sta. Lucia 11/24/08 I 4.485 75 C 0.400 - 0.500 - - - 90.00 * 90.00%
V. Satisfactory
Acer Industrial/Solid Rock Construction Joint Venture
SLI-SN-005433/JV-
08-217
Rehabilitation of Libingan ng mga Bayani Road-MRT Road 05/27/09 NCR 4.694 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page19
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ACJ Construction Resources 10635 Concreting of Paco-Roxas-Arakan Road (Luhong-Kiyaab Section) 05/30/09 R-XII 18.566 205 C 0.338 0.200 0.300 - - - 83.80 88.42%
Satisifactory
ACJ Construction Resources 10635 Conc. of Paco-Roxas-Arakan Valley National Road, (Luhong-Kiyaab Section) 03/01/08 XII 12.751 170 C 0.365 0.102 0.300 - - - 76.70 *76.70%
Satisfactory
ACJ Construction Resources 10635 Concreting of Poblacion Magpet-Nowa Road (Nowa Basak Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -
ACJ Construction Resources 10635Const. of Malaang PSG Bridge inc. Conc.
Paving of Bridsge Approaches along Davao-Cotabato Road
05/17/08 XII 42.684 300 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory
ACJ Construction Resources 10635 Const. of MPB 08/23/08 XII 9.634 100 C 0.335 0.270 0.300 - - - 90.50 83.22% V. Satisfactory
ACJ Construction Resources 10635 Rechanneling of Malamote River 11/22/08 XII 1.443 45 C 0.375 0.188 0.300 - - - 86.30 *86.30% V. Satisfactory
ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-
Antipas Section (Km. 1648+300-Km.1649+385.63)
09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -
ACJ Construction Resources 10635 Conc. of Poblacion-Magpet-Nowa Road, Nowa-Basak Section w/ exception 09/05/09 XII 18.798 200 C 0.358 0.200 0.300 - - - 85.80 84.30%
Satisfactory
ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Saguing Section 03/01/10 XII 6.765 68 C 0.429 0.200 0.300 - - - 92.90 92.90%
V. Satisfactory
ACJ Construction Resources 10635 Asphalt Overlay along Davao-Cotabato Rd., Paco Section 03/01/10 XII 7.711 71 C 0.429 0.200 0.300 - - - 92.90 92.90%
V. Satisfactory
ACJ Construction Resources 10635Const. of Kinamalig Bridge including
Concrete Paving of Approach along Paco-Roxas-Arakan
03/02/10 XII 12.815 202 C 0.384 0.142 0.300 - - - 82.60 86.08% Satisfactory
ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road, Kiyab-
Antipas Section, Km. 1648+300-Km. 1649+385.63
03/02/10 XII 16.826 175 C 0.379 0.143 0.300 - - - 82.20 85.71% Satisfactory
ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road, inclined Gap Ipuan Section, Km. 1640+374.10 - Km.
1646+794.2803/02/10 XII 13.144 189 C 0.394 0.145 0.300 - - - 83.90 83.90%
Satisfactory
ACJ Construction Resources 10635Rehab./Reconst. of Damaged Paved along
Makilala-Allah Junction Road, La Esperanza Section
06/05/10 XII 9.961 55 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page20
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ACJ Construction Resources 10635 Rehab./Reconst. of Damage Paved along Matalam-M'lang-Bagontapay Road 06/05/10 XII 14.307 60 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
ACJ Construction Resources 10635Road Upgrading of Matalam-Mlang-Bagontapay Road, Additional Lane
(Poblacion Section)08/27/10 XII 18.338 153 C 0.476 0.127 0.300 - - - 90.30 90.30%
V. Satisfactory
Acme Builders Corp./MWJ Construction JV JV-08-243 Conc. of Burauen-Albuena Road Km.
98+986.50-Km. 986+857.50 w/ exceptions 02/22/10 VIII 46.887 240 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisactory
Acme Builders Corporation 6442 Construction of Sinugbuhan Bridge 06/04/09 VI 33.384 676 C 0.441 0.133 0.300 - - - 87.40 85.20% Satisfactory
Acme Builders Corporation 6442 Asphalt Overlay along Tigbao-Pulak-Sta. Fe Road, Km 925+370-Km 926+379 03/18/09 VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%
Satisfactory
Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River 11/25/08 VIII 9.635 150 C 0.312 0.200 0.300 - - - 81.20 *81.20%
V. Satisfactory
Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -
Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road 03/04/08 VI 33.372 600 C 0.267 0.200 0.300 - - - 76.70 78.59%
Satisfactory
Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek 03/03/09 VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80 84.10%Satisfactory
Acme Builders Corporation 6442 Const. of Palo East By-Pass Road 03/11/10 VIII 19.260 240 C 0.436 0.200 0.300 - - - 93.60 89.76% V. Satisfactory
Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of
Damaged Pavement, Tacloban Baybay South Rd.
06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -
Acme Builders Corporation 6442 Const. of Palo East By Pass Road (including Bridge) 09/07/10 VIII 28.738 180 O 0.377 0.240 0.150 0.030 0.042 0.050 88.90 -
Acme Builders Corporation 6442Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Section, Km.
915+000 to Km. 921+70009/07/10 VIII 24.050 200 O 0.385 0.240 0.150 0.030 0.042 0.033 88.00 -
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page21
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of
Damaged Pavement, Tacloban Baybay South Road
09/08/10 VIII 33.358 150 C 0.398 0.133 0.300 - - - 83.10 87.90% Satisfactory
Acme Builders Corporation / B. Vicencio Construction JV-07-066 Const. of Palo East By Pass Road (Const.
of Bernard Reed II Bridge) 08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -
Acme Builders Corporation / MWJ Construction (JV) JV-08-243 Const. of Albuera-Burauen Road including
Bridges, Burauen Sect. 09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -
Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067
Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion)
Section05/19/08 VIII 59.291 315 C 0.338 0.300 0.300 - - - 93.80 93.02%
Outstanding
ACV Construction & Surveying 10903 Concreting of FMR @ Various Brgys., Urbiztondo and Mangatarem 03/09/09 I 3.838 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%
Satisfactory
ADB Dynamic Builders & Supply 33359Repair/Rehab. of St., Brgy. Dalupirit; Rehab.
of San Roque St., Brgy. Vinisitahan; Rehab./Repair of St., Brgy. Pilar
03/07/09 VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding
Adelfa & Charlie Enterprises 11569
Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise
Steel Bridge along Sambolawan-Calaguise-Calubian Road
08/22/08 VIII 34.810 290 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory
Adelfa & Charlie Enterprises 11569 Construction of MPP Brgy. Hibulangan 03/11/09 VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%Satisfactory
Adelfa & Charlie Enterprises 11569 Mapuyo CIS 10/6-10/08 NIA 1.485 45 C 0.375 0.180 0.300 - - - 85.50 85.50% V.Satisfactory
Adfil Corporation 14437 Rehab./Reconst. of NRJ Bahbah-Talacogon Road 06/09/09 XIII 19.263 220 C 0.485 0.200 0.300 - - - 98.50 *98.50%
Outstanding
Adfil Corporation 14437
Repair/Rehab./Impvt. of Roads & Bridges along the National Highway Epoxy Sealing of Cracks in concrete girder, deck slab & conc. Pavement (injectable epoxy) along
Bahbah, Talacogon Road
06/09/09 XIII 9.429 180 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding
Adfil Corporation 14437 Rehabilitation/Concreting of Tagcatong-Vinapor Road 05/25/09 XIII 9.629 210 C 0.489 0.133 0.300 - - - 92.20 *92.20%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page22
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches 12/02/08 XIII 26.210 210 C 0.348 0.200 0.300 - - - 84.80 88.70%
V. Satisfactory
Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road 12/03/08 XIII 4.012 105 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory
Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road 03/07/09 XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.40 88.94% Satisfactory
Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road 03/10/08 XIII 4.791 185 C 0.367 0.200 0.300 - - - 86.70 81.12% V. Satisfactory
Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) 02/26/08 XIII 9.548 180 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) 05/17/08 XIII 22.141 280 C 0.360 0.300 0.300 - - - 96.00 96.00%
Outstanding
Adfil Corporation 14437 Rehab. of Camagong Flood Control 05/28/08 XIII 9.440 150 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Misamis Road 03/02/09 XIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36%
Satisfactory
Adfil Corporation 14437 Rehab./Reconst. of Damaged Paved National Road along Agusan-Surigao Road 03/03/09 XIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50%
Satisfactory
Adfil Corporation 14437Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Misamis Oriental
Road) inc. Bridge03/18/09 XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06%
V.Satisfactory
Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road 03/20/09 XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.10 87.04%
Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads Gingoog-Calveria-
Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -
Adfil Corporation 14437
Rehab./Reconst. of Damaged Paved National Rd. along Butuan City-CDO-Iligan
Rd.,(Agusan-Misamis Oriental Sect )Libertad-Bancasi Sect
09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -
Adfil Corporation 14437Const./Completion/Continuation of
Unfinished Bridge and Approaches, Brgy. Libertad
09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -
Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 14.427 210 C 0.416 0.194 0.300 - - - 91.00 94.66% V.Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page23
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -
Adfil Corporation 14437 Rehab. of Magaboy and Lucena Bridge Approaches-Slope/Bank Protection 06/13/10 XIII 4.709 105 C 0.450 0.200 0.300 - - - 95.00 95.00%
V. Satisfactory
Adfil Corporation 14437 Conc. of Butuan City-Pianing-Tandag Road 06/16/10 XIII 18.905 270 O 0.360 0.300 0.150 0.030 0.045 0.033 91.80 -
Adfil Corporation 14437 Conc. of NRJ Cuevas-Sampaguita Road 06/14/10 XIII 60.039 270 O 0.388 0.235 0.150 0.030 0.055 0.033 89.10 -
Adfil Corporation 14437 Rehab. of River Dike 06/01/10 XIII 9.649 150 C 0.408 0.179 0.300 - - - 88.70 88.46% Satisfactory
Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of
Tabon-Tabon Slip along Agusan- Davao Road
06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -
Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -
Adfil Corporation 14437 Completion/Continuation of Libertad Bridge & Approaches 09/08/10 XIII 11.224 180 C 0.462 0.189 0.300 - - - 95.10 92.58%
V. Satisfactory
Adfil Corporation 14437 Conc. of Pulang Lupa-Sta. Josefa Road 09/06/10 XIII 19.249 195 O 0.371 0.265 0.150 0.030 0.055 0.050 92.10 -
Adfil Corporation 14437 Conc./Repair of Slip along NRJ Cuevas-Sampaguita Road 09/06/10 XIII 47.951 470 O 0.381 0.252 0.150 0.030 0.055 0.050 91.80 -
Adfil Corporation 14437 Rehab. of Wawa Bridge along Agusan-Davao Road 09/06/10 XIII 110.862 315 O 0.379 0.263 0.150 0.030 0.055 0.033 91.00 -
Adfil Corporation 14437Rehab./Along Reconst. of Daang Maharlika (Agusan-Surigao Road) Ampayon-Taguibo
Sect.09/09/10 XIII 35.253 270 C 0.400 0.200 0.300 - - - 90.00 90.54%
V. Satisfactory
Adfil Corporation 14437 Rehab. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Mis. Or. Section) 08/25/10 XIII 105.123 210 O 0.334 0.300 0.150 0.030 0.050 0.033 89.70 -
Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of
Tabon-Tabon Slip along Agusan-Davao Road
09/06/10 XIII 32.398 225 C 0.440 0.133 0.300 - - - 87.30 87.66% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page24
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab./Reconst. of Damaged Rd. Gingoog-
Claveria-Villanueva Rd. 03/10/10 X 96.400 405 C 0.437 0.200 0.300 - - - 93.70 89.71% V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 Const. of River Dike Protection, Brgy. Agao 03/10/10 XIII 9.556 90 C 0.485 0.133 0.300 - - - 91.80 91.80%
V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 Impv't./Rehab. of Iligan-Cagayan-Butuan
Rd. (Agusan-Misamis Oriental Section) 02/23/10 XIII 67.446 180 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 Const./Conc. of NRJ San Francisco-Bahi
Rd. 03/07/10 XIII 28.892 330 C 0.431 0.133 0.300 - - - 86.40 91.20% V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 Upgrading/Conc. of NRJ Cuevas-Bislig Rd. 03/07/10 XIII 28.874 315 C 0.485 0.133 0.300 - - - 91.80 90.66%
V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction) 14437 Conc. of Dapa-Del Carmen (Sayak-Airport
Rd.) 02/26/10 XIII 75.947 390 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory
Adfil Corporation/RID Corporation (JV) JV-06-022 Repair/Rehab. of Patin-ay Bridge along
Agusan-Davao Road, Patin-ay 06/08/09 XIII 23.749 658 C 0.458 0.200 0.300 - - - 95.80 91.84% V. Satisfactory
Adige Sta. Clara (JV) JV-06-032 DPWH Component Project under the Help for Catubig Agricultural Advancement Proj. 05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -
Adige Sta. Clara (JV) JV-06-032 DPWH Component Project under the HELP for Catubig Agricultural Project (HCAAP) 08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adimre Construction 25534 Marilao Port Development Project 08/20/09 DOTC 2.862 60 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory
Adimre Construction 25534 Sta. Cruz Port Development Project 08/20/09 DOTC 0.960 30 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
Adimre Construction 25534 Sasmuan Port Development Project 08/20/09 DOTC 2.871 60 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page25
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adimre Construction 25534 Hagonoy Port Development Project 10/02/09 DOTC 0.949 30 C 0.460 0.200 0.300 - - - 96.00 96.00% Outstanding
Adimre Construction 25534 Baguio Airport Development Project 04/04/09 DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60% V. Satisfactory
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) 08/28/08 III 1.907 56 C 0.334 0.200 0.300 - - - 83.40 83.61% V. Satisfactory
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) 05/19/08 III 1.907 56 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -
Adimre Construction 25534 Const. of Standard One Classroom School Building (Modified) at GITMES 09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
Adimre Construction 25534
Dumaguete Airport Dev't Project (Completion of Imprv't of Terminal Building
and Purchase/ Installation of Bagage Conveyor)
01/21/10 DOTC 13.500 90 C 0.402 0.199 0.300 - - - 90.10 90.10% V.Satisfactory
Adimre Construction 25534 Tuguegarao Airport Dev't Project (Continuation of Widening of Runway) 03/04/10 DOTC 9.588 90 C 0.452 0.200 0.300 - - - 95.20 95.20%
V.Satisfactory
Adimre Construction 25534Tuguegarao Airport Dev't Project
(Continuation of Widening of Runway and Improvement of Fire Station Building)
03/04/10 DOTC 12.490 90 C 0.458 0.200 0.300 - - - 95.80 95.80% V.Satisfactory
Adimre Construction 25534
Laoag Airport Development Project (Upgrading of Radar Area, Continuation of Perimeter Fence Construction of Drainage
System)
04/09/10 DOTC 9.604 120 C - 0.419 0.200 0.300 - - 91.90 91.90% V. Satisfactory
Adimre Construction 25534 Laoag Airport Development Project (Improvement of Fire Station Building) 04/09/10 DOTC 4.821 120 C 0.464 0.200 0.300 - - - 96.40 96.40%
Outstanding
Adimre Construction 25534Laoag Airport Development Project
(Shoulder Grade Correction including Drainage System)
04/09/10 DOTC 4.793 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory
Adimre Construction 25534 Tuguegarao Airport Development Project (Repair/Rehabilitation of Terminal Building) 09/10/10 DOTC 1.927 90 C 0.449 0.200 0.300 - - - 94.90 94.90%
V. Satisfactory
Adimre Construction 25534 Canalate Port Development Project (Improvement of Port) 12/03/10 DOTC 1.919 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page26
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory
Adroit Construction 11169 Const. of 4 CL, Central Luzon State University 11/17/08 III 1.800 90 C 0.319 0.300 0.300 - - - 91.90 *91.90%
Outstanding
Advanced Foundation Construction Systems Corp. 15449
Const. of Baguio Flyover & Approaches (Phase V), BGH-Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road Jct.
03/06/08 CAR 61.894 100 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding
Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB (Phase III) 08/21/08 VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07%
Satisfactory
Aison Dominique Construction & Supply 32805 Const. of Multi-Purpose Building
(Cooperative) 02/23/10 VIII 0.473 86 C 0.399 0.200 0.300 - - - 89.90 77.79% Unsatisfactory
Ajan Jaeda, inc. 17869 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -
Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of Engineering
Campus 02/24/09 V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory
AJYSC Marketing 26924Const. of Office and Storage Bldg. and other Office/Quarter Requirements of
DPWH Regional Office XII06/06/09 R-XII 10.437 150 C 0.477 0.200 0.300 - - - 97.70 *97.70%
Outstanding
AJYSC Marketing 26924 Rehab./Improvement of Bulok Bridge along Marbel-Makar Road 06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -
AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) 08/27/08 XII 2.874 112 C 0.266 0.300 0.300 - - - 86.60 82.22%
V. Satisfactory
AJYSC Marketing 26924 Const./Widening of Matin-ao Bridge & Widening of Approaches 03/06/08 XII 3.848 184 C 0.351 0.115 0.300 - - - 76.60 81.82%
V. Satisfactory
AJYSC Marketing 26924 Repair of Multi-Purpose Building at San Emmanuel 03/12/09 XII 0.960 105 C 0.433 0.200 0.300 - - - 93.30 *93.30%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page27
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
AJYSC Marketing 26924 Road Upgrading (Gravel to concrete) along Surallah-Lake Sebu-Maitum Road 03/15/09 XII 16.034 289 C 0.476 0.200 0.300 - - - 97.60 90.14%
V. Satisfactory
AJYSC Marketing 26924 Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel Road 03/04/08 XII 11.332 277 C 0.352 0.200 0.300 - - - 85.20 84.90%
V. Satisfactory
AJYSC Marketing 26924Road Upgrading (Gravel to Paved) along
Isulan-H-way Jct. Dukay-Dagumbayan-Sen. Ninoy Aquino Road (Sarmiento Sect.)
09/09/09 XII 19.094 235 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
AJYSC Marketing 26924 Rehab./Impvt. of Bulok Bridge along Marbel-Makar Rd. Km. 1710+722 09/10/09 XII 4.764 90 C 0.400 0.200 0.300 - - - 90.00 87.60%
Satisfactory
AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches Phase II 03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -
AJYSC Marketing 26924 Const. of Multi-Purpose Pavement, Norala Park 06/11/10 XII 1.907 133 C 0.410 0.200 0.300 - - - 91.00 91.00%
V. Satisfactory
AJYSC Marketing 26924Const. of Sapali River Bank
Protection/River Control along Lamsugod to Lamian Section
06/11/10 XII 4.803 140 C 0.400 0.133 0.300 - - - 83.30 84.50% Satisfactory
AJYSC Marketing 26924 Repair of Buayan Bridge and Approaches and its Protection Structures, Brgy. Buayan 09/09/10 XII 18.855 134 C 0.463 0.133 0.300 - - - 89.60 89.60%
V. Satisfactory
AJYSC Marketing 26924Road Upgrading (gravel to paved) Based on Gravel Rd. Strategies, Surallah-Lake Sebu-
Maitum Rd., Lake Sebu Section09/03/10 XII 19.071 252 O 0.363 0.251 0.150 0.030 0.051 0.033 87.80 -
AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches, (Phase II) 09/03/10 XII 26.942 255 C 0.428 0.133 0.300 - - - 86.10 85.74%
Satisfactory
AJYSC Marketing 26924Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-Bagumbayan-Sen.
Ninoy Aquino Rd. (Sitio Nuling Section)08/31/10 XII 19.114 220 O 0.305 0.239 0.150 0.030 0.042 0.033 79.90 -
AKH Construction and Trading Corporation 20759
Repair/Maintenance of Waiting Area / Lounge of Secretary's Office DPWH Central
Office05/19/09 NCR 7.230 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
AKH Construction and Trading Corporation 20759 Construction of Multi-Purpose Building
Phase I, T. Paez Elem. School 02/27/09 NCR 9.645 60 C 0.389 0.013 0.300 - - - 70.20 *70.20% Poor
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page28
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged Pavement of
Legarda St. 08/14/08 NCR 6.713 90 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory
AKH Construction and Trading Corporation 20759 Proposed Rehab. of MPB at T. Paez Elem.
School (Phase 2) 09/01/09 NCR 10.609 90 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory
AKH Construction and Trading Corporation 20759 Proposed Repair/Rehab. of Roads &
Drainage at Brgy. 598/600 02/16/10 NCR 2.888 90 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
AKN Construction Corporation (Formerly: AKN Const.) 11845
Proposed Impvt. of Road inc. Drainage System along Magallanes St., Brgy.
Tunasan02/25/09 NCR 19.089 162 C 0.341 0.184 0.300 - - - 82.50 83.88%
Satisfactory
AKN Construction Corporation (Formerly: AKN Construction) 11845 Rehab./Reconstruction/Upgrading of Ninoy
Aquino Avenue 06/02/09 NCR 19.092 45 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory
AKN Construction Corporation (Formerly: AKN Construction) 11845
Rehab./Reconstruction of Muntinlupa Insular Prison Road and its Vicinity, Brgy.
Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -
AKN Construction Corporation (Formerly: AKN Construction) 11845
Reconst./Const. of Dikes, Valenzuela-Obando Bdry. Dike, Brgy. Palasan and
Pariancillo Villa08/19/10 NCR 2.850 90 C 0.339 0.200 0.300 - - - 83.90 83.90%
Satisfactory
Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) 08/28/08 VII 4.492 85 C 0.316 0.042 0.000 - - - 35.80 55.18%
Poor
Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S 11/18/08 VII 0.841 240 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
AL Chris Construction 12406 Tagbilaran Airport Development Project 03/27/09 NIA 5.756 120 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory
Al Chris Construction 12406 Concrete Paving of Panglao Island Circ. Road, Songculan 08/24/10 VII 9.075 130 O 0.385 0.233 0.150 0.023 0.037 0.050 87.80 -
Al Fahdel Const. and Services 17953Conc./Impvt. of Tubod-Ganassi Road
(Caniogan Section) Sta. 1602+0000-Sta. 1603+000 w/ exception
09/14/09 X 18.126 150 C 0.429 0.200 0.300 - - - 92.90 89.18% V. Satisfactory
Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section 08/30/08 X 4.525 90 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
Al Hussein Construction 18438
Rehab./Reconst./Upgrading along Misamis Oriental- Ma. Cristina Bdry. Road at Marcelo-
Timoga Section, Sta.1532+961 - Sta 1535+068 w/ exception
06/09/10 X 9.255 105 O 0.386 0.240 0.150 0.030 0.055 0.033 89.40 -
Al Hussein Construction 18438 Conc. of Kibawe-Kadingilan-Kalilangan Road, Kadilingan Sect. 06/14/10 X 73.672 330 C 0.407 0.168 0.300 - - - 87.50 88.52%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page29
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Al Hussein Construction 18438Rehab./Reconst./Upgrading of Segapod
Maigo Kolambugan Section, Sta. 1564+000 - Sta.1566+000 w/ exception
06/09/10 X 18.546 150 O 0.383 0.240 0.127 0.030 0.055 0.033 86.80 -
Alafalfa Construction 29712Restoration of Roadslip along Nueva
Vizcaya-Ifugao-Mt. Province Bdry. Road, Km. 330+800-Km. 330+828, Phase I
08/25/10 CAR 1.238 136 C 0.445 0.133 0.300 - - - 87.80 87.80 Satisfactory
Alajeno Construction and Supplies 28713 Construction of MPB (Municipal Building) Phase II 06/02/09 IX 2.480 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Alajeno Construction and Supplies 28713 Const. of Public Market at Brgy. Penoles, Lakewood 06/11/10 IX 0.495 45 C 0.491 0.133 0.300 - - - 92.40 92.40%
V. Satisfactory
Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.) Phase I 11/27/08 IX 4.595 160 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory
Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio NHS 08/30/08 IX 0.481 30 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory
Al-B Construction 11740 Rehab./Reconst./Upgrading along Angeles-Porac-Floridablanca-Dinalupihan Rd. 06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
Al-B Construction 11740Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along Angeles-Porac-
Floridablanca-Dinalupihan Rd.08/16/10 III 19.175 100 C 0.438 0.160 0.300 - - - 89.80 89.26%
V. Satisfactory
Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road 11/13/08 V 0.956 30 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
Alberto Uy Construction & Development 20924 Repair/Rehab. of Multi-Purpose Building @
Sitio Facoma, Bagong Bayan II 05/27/09 IV-B 0.476 45 C 0.424 0.170 0.300 - - - 89.40 *89.40% V. Satisfactory
Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan Road 02/26/09 IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @ Carmundo NHS 05/15/08 IV-B 0.470 120 C 0.376 0.300 0.300 - - - 97.60 *97.60%
Outstanding
Alberto Uy Construction & Development 20924 Const. of Drainage Canal 11/19/08 IV-B 1.889 91 C 0.358 0.200 0.300 - - - 85.80 89.40%
V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of MPB at Buong Lupa 05/26/10 IVB 0.480 43 C 0.447 0.180 0.300 - - - 92.70 92.70%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page30
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alcel Construction 15129 Construction of School Building at Cayucay NHS 03/10/09 I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%
Satisfactory
Alcel Construction 15129 Const. of San Vicente-Pogo Bridge, San Vicente 03/01/10 I 22.182 380 C 0.333 0.200 0.300 - - - 83.30 83.30%
Satisfactory
Alcel Construction 15129 Rehab./Impvt. at Kennon Road, Km.244+000 - Km.248+138 06/09/10 CAR 9.616 60 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
Alcel Construction 15129Repair/Rehab. along Manila North Road, Km. 445+28 - Km.484+897, Pinili, Badoc,
Currimao, Batac & San Nicolas06/02/10 I 9.649 60 C 0.473 0.133 0.300 - - - 90.60 90.60%
V. Satisfactory
Alcel Construction 15129 Repair/Impvt. of Agoo Processional Road, Km. 235+298-Km. 236+708 w/ exception 08/25/10 I 8.652 90 C 0.405 0.133 0.300 - - - 83.80 83.80%
Satisfactory
Alcel Construction 15129Asphalt Overlay of Sta. Barbara-Mangaldan
Road Km. 203+700-Km. 205+300 w/exception
05/26/09 I 14.473 25 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
Alcel Construction 15129 Completion of MPB, PSU Bamban 08/29/08 I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory
Alcel Construction 15129 Conc. of FMR, Brgy. Licsi 11/27/08 I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Alcel Construction 15129 Const. of MPB, Phase VI 05/30/08 I 0.812 70 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory
Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road 05/30/08 I 27.954 255 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory
Alcel Construction 15129 Rehab./Reconst./Upgrading of Mangaldan-Manaoag-Binalonan Road 08/28/09 I 48.250 240 C 0.422 0.200 0.300 - - - 92.20 *92.20%
V. Satisfactory
Aldana Construction 21763 Construction of Perimeter Fence Gate, Slope Protection 03/2-3/10 DOST 6.363 75 C 0.491 0.20 0.30 - - - 99.10 87.13%
Satisfactory
Aldana Construction 21736 Const. of Drainage Poblacion Zone II 03/04/10 I 2.407 90 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Aldana Construction 31174 Road Conc. of Farm-to-Market Road, Brgy. Sallacong (San Mariano) 02/19/10 I 1.901 70 C 0.329 0.200 0.300 - - - 82.90 82.90%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page31
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aldana Construction 21736 Const. of MPB (Phase V) 06/10/10 I 7.715 125 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Ale Builders Construction & Development Corp. 5180 Drainage Impvt. along Boni-Serrano Avenue 03/02/10 NCR 4.754 90 C 0.440 0.133 0.300 - - - 87.30 87.30%
Satisfactory
Ale Builders Construction & Development Corp. 5180 Proposed Const. of Roads and Drainage at
Baseco Compound 02/16/10 NCR 72.324 303 C 0.368 0.190 0.300 - - - 85.80 85.98% Satisfactory
ALE Builders Construction & Development Corp. 5180
Proposed Rehab./Reconst./Upgrading of Damaged Paved National Roads, Quirino
Ave.05/24/10 NCR 19.294 30 C 0.442 0.200 0.300 - - - 94.20 94.20%
V. Satisfactory
ALE Builders Construction & Development Corp. 5180 Proposed Const./Rehab./Repair of School
Building @ Manuel A. Roxas High School 05/24/10 NCR 4.818 120 C 0.492 0.133 0.300 - - - 92.50 85.78% Satisfactory
ALE Builders Construction and Development Corp. 5180 Impvt./Upgrading of Paraiso ng Batang
Maynila Multi-Purpose Building 05/18/09 NCR 0.964 30 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
ALE Builders Construction and Development Corp. 5180 Proposed Repair/Rehab. of Epifanio Delo
Santos Elem. School 05/13/08 NCR 1.444 60 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
ALE Builders Construction and Development Corp. 5180 Repair/Rehab. Roads with Drainage Impv't,
Brgy. 34, Zone 3 03/03/09 NCR 5.254 90 C 0.342 0.200 0.300 - - - 84.20 *84.20% Satisfactory
ALE Builders Construction and Development Corp. 5180 Rehab./Reconst./Upgrading of G. Araneta
Ave. 08/18/10 NCR 9.549 90 C 0.300 0.200 0.300 - - - 80.00 80.00% Unsatisfactory
ALE Builders Construction and Development Corp. 5180 Proposed Repair/Rehab. of Baseco MPB,
Baseco Compound 08/23/10 NCR 1.155 45 C 0.322 0.133 0.300 - - - 75.50 75.50% Unsatisfactory
Ale-J Construction & Trading 26445 Const. of Multi-Purpose Bdlg. @ Veterans Memorial Medical Center 03/09/09 NCR 3.819 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%
Satisfactory
Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta. 1602+000-Sta.
1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -
Al-Fahdel Const. and Eng'g 17953Rehab./Reconst./Upgrading along Linamon-
Zamboanga Road at Tacub Section, Sta.1540+711 - Sta.1543+440.50
06/07/10 X 9.279 105 O 0.354 0.240 0.150 0.030 0.050 0.050 87.40 -
Al-Fahdel Const. and Eng'g 17953
Rehab./Reconst./Upgrading of Damaged Paved National Roads along Misamis
Oriental-Ma.Cristina Bdry. Road, Sta.1519+966 - Sta.1520+962, Sta.Felomina-
Valderama Section
08/28/10 X 13.919 120 C 0.468 0.200 0.300 - - - 96.80 91.64% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page32
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Al-Fahdel Const. and Eng'g 17953
Rehab./Reconst./Upgrading of Damged Paved National Roads along Misamis
Oriental-Ma.Cristina Bdry. Road, Nunucan-Ditucalan Section, Sta.1532+245.50 -
Sta.1535+000
08/28/10 X 9.277 105 C 0.467 0.200 0.300 - - - 96.70 91.24% V. Satisfactory
Al-Fahdel Const. and Eng'g. 17953 Road Upgrading (Gravel to Paved) Iligan City-Marawi City via Bito-Abaga Rd. 09/11/09 X 14.361 115 C 0.339 0.200 0.300 - - - 83.90 *83.90%
Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at Kulasihan
Primary School 08/30/08 X 0.417 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. At SADMIS 03/14/09 X 0.944 111 C 0.408 0.133 0.300 - - - 84.10 *84.10%
Satisfactory
Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga Road,
Maigo Section 03/15/09 X 13.492 261 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road (Intermittent Section) 05/26/09 CAR 7.590 200 C 0.407 0.200 0.300 - - - 90.70 82.60%
Satisfactory
Alfalfa Construction 29712Rehab./Reconst. of Damaged National Road along N. Vizcaya-Ifugao-Mt. Province Bdry.
Road, Nayon Section08/25/10 CAR 10.206 180 O 0.348 0.300 0.150 0.008 0.025 0.033 86.40 -
Alfalfa Construction 29712Restoration of Road along Banaue-
Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road
03/06/09 CAR 4.277 179 C 0.443 0.200 0.300 - - - 94.30 92.80% V.Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)17162 Completion of Binalbagan Bridge 2 - Km.
66+910 along Hinigaran-Isabela Road 03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout,
Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -
Alfie's Construction 17162 Construction and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.762 408 C 0.441 0.200 0.300 - - - 94.14 *94.14%
Satisfactory
Alfie's Construction 17162 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 7.699 271 C 0.427 0.300 0.200 - - - 92.70 92.70%
V. Satisfactory
Alfie's Construction & Construction Supply Inc. (Formerly: Alfie's
Construction & Construction Supply)17162
Conc. of Jct. Bearin-Salong-Tapi-Dacongcogon-Bantayan Rd. (Km. 99+675-
Km. 131+142.75 w/ exceptions) Brgy. Salong & Bantayan
03/08/10 VI 79.400 400 C 0.363 0.192 0.300 - - - 85.50 85.50% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page33
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alfies Construction & Construction Supply, Inc. 17162 Completion of Binalbagan Bridge 2 along
Hinigaran-Isabela Road 09/15/09 VI 45.049 850 C 0.465 0.133 0.300 - - - 89.80 86.22% Satisfactory
Alfies Construction & Construction Supply, Inc. 17162
Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-Bantayan Raod (Km.
99+675.50-Km.131+142.75 w/ exception, Brgy. Salong & Batayan
09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)17162 Conc. of Jct. Bearin-Salong-Tapi-Bantayan
Rd. (Salong Section), Brgy. Salong 08/25/10 VI 14.301 110 C 0.409 0.133 0.300 - - - 84.20 85.16% Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)17162
Reconst. of Vallehermosa-Canlaon City, La Castellana Road, Sta. 65+665.80-Sta.
66+500.00 w/ exception08/26/10 VI 5.600 147 C 0.350 0.200 0.300 - - - 85.00 85.00%
Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)17162
Rehab./Reconst./Upgrading of Damaged Paved National Road along Bacolod North
Road, Silay City Section08/28/10 VI 14.900 130 C 0.423 0.133 0.300 - - - 85.60 84.94%
Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)17162
Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Road, Tapi Section
at Brgy. Tapi08/25/10 VI 28.917 290 O 0.355 0.240 0.150 0.030 0.037 0.033 84.50 -
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfies
Construction & Construction Supply)17162
Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Rd., Tapi Sect. at
Brgy. Tapi06/05/10 VI 27.998 280 O 0.354 0.225 0.150 0.022 0.051 0.033 83.50 -
Alfrego Builders & Supply 19284 Improvement/Riprapping of Sasa Creek Second Congressional District 06/11/09 XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -
Alfrego Builders & Supply 19284 Conc. of Road at Alambre 08/19/08 XI 0.933 90 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory
Alfrego Builders & Supply 19284 Conc. of Road at Mercedes 03/11/08 XI 0.935 90 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding
Alfrego Builders & Supply 19284Conc. of Road from Davao-Agusan National
Road Jct. passing through Iliong up to Purok Communal
12/04/08 XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Alfrego Builders & Supply 19284 Improvemant/Riprap of Sasa Creek 06/11/09 XI 4.721 160 C 0.476 0.133 0.300 - - - 90.90 91.56% V. Satisfactory
Alfrego Builders & Supply 19284 Construction of Mandug River Control 03/08/10 XI 4.720 90 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page34
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algamon Construction 30704 Const./Widening/Gravelling of Roads from Brgy. R. Ecleo-Brgy. Del Pilar 06/01/09 XIII 1.927 209 C 0.385 0.168 0.300 - - - 85.30 84.52%
Satisfactory
Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. 11/26/08 XIII 1.848 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Algamon Construction 30704 Const. of MPB (Covered Court) Brgy. Anticala 03/10/10 XIII 2.226 90 C 0.478 0.133 0.300 - - - 91.10 91.10%
V.Satisfactory
Algamon Construction 30704 Const. of MPB (Covered Court), Brgy. Doongan 06/16/10 XIII 1.898 90 C 0.441 0.200 0.300 - - - 94.10 94.10%
V. Satisfactory
Algamon Construction 30704 Const. of Ipil Public Market, Brgy. Ipil 06/07/10 XIII 0.733 60 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory
Algimar Construction 1523 Esperanza Port Development Project 07/08/09 DOTC 8.637 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
Algimar Construction 15232 Concreting of Tablas Circumferential Road (Hinugasan-Camantaya Section) 05/21/09 IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -
Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road, Nabangig-Pawican Sect. 05/26/09 V 14.249 120 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
Algimar Construction 15232Const. of 1 Unit 7x7 S/B at Teofilo
Tamabago E/S, Palanas South realigned to Dimasalang C/S
05/26/09 V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -
Algimar Construction 15232 Conc. of Lubi-Binoog Road 11/24/08 IV-B 9.398 100 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Algimar Construction 15232 Const. of Bridge Approaches @ Maingaran Bridge 02/27/09 V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -
Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod 08/25/08 V 9.597 45 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
Algimar Construction 15232Const. of Lined Canal with Cover from
Quezon St. infornt of MNCHS, JZES and Jollibee Store
08/23/08 V 3.798 180 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory
Algimar Construction 15232 Const.of Multi-Purpose Building (Balai Alumni) 02/28/09 V 0.480 120 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page35
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road 02/28/09 V 9.598 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binunga-an Section) 08/27/09 IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -
Algimar Construction 15232 Conc. of Buenavista-Cawayan Road, San Jose-Tuburan 08/28/09 V 18.998 131 C 0.432 0.150 0.300 - - - 88.20 *88.20%
Satisfactory
Algimar Construction 15232 Concreting of Jct. Buenavista-Cawayan Road, Cabungahan-Madbad Section 08/28/09 V 19.000 130 C 0.427 0.151 0.300 - - - 87.80 *87.80%
Satisfactory
Algimar Construction 15232 Conc. of Tablas Circumferential Road (Doña Juana-Binongaan Section) 02/22/10 IVB 19.652 180 C 0.388 0.200 0.300 - - - 88.80 87.72%
Satisfactory
Algimar Construction 15232 Conc. of Tablas Circumferential Road (Hinugusan-Camantaya Section) 02/23/10 IVB 19.676 180 C 0.395 0.200 0.300 - - - 89.50 85.81%
Satisfactory
Algimar Construction 15232 Conc. of Milagros-Cataingan-Esperanza Road, Malamag Section 02/19/10 V 38.585 150 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
Algimar Construction 15232 Const./Road Opening of Sta. Maria-Pato-o-Odiongan Road 08/24/10 IVB 19.298 175 C 0.354 0.036 0.300 - - - 69.00 69.00% Poor
Algimar Construction 15232 Const. of Masbate 2nd DEO Bldg. (Phase I) 08/23/10 V 8.900 60 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
Algimar Construction 15232 Rehab./Reconst. Of Masbate-Cataingan Placer Rd., Masbate-Catingan-Placer 08/23/10 V 18.817 90 C 0.406 0.200 0.300 - - - 90.60 90.60%
V. Satisfactory
Algimar Construction 15232Const. of 1 unit 1 CL 7x7 S/B Teofilo
Tamabago E/S, Palanas South realigned to Dimasalang C/S
08/24/10 V 0.843 190 C 0.347 0.200 0.300 - - - 84.70 84.00% Satisfactory
Algimar Construction/Hi-Tone Construction & Development
Corporation JVJV-07-078 Concreting of Cataingan-Esperanza Road 02/19/10 V 90.015 453 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Algon Eng'g Construction Corp. 270 Construction of Laboratory Building 02/02/10 DOST 16.635 210 C 0.468 0.20 0.30 - - - 96.80 97.43% Outstanding
Algon Engineering Construction Corp. 270 Construction of Overhead Water Tank with
Cistern 8/12/09 DOST 3.193 138 C 0.500 0.200 0.100 - - - 80.00 80.00% Unsatisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page36
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-Makar
Road 05/30/09 XI 31.136 180 C 0.498 0.140 0.300 - - - 93.80 *93.80% V. Satisfactory
Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-Cotabato By Pass
Road 05/16/08 XI 12.771 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
Algon Engineering Construction Corporation 270 Bridge Component of CP 6, Mindanao
Bridges, Rawa-an and Sagadan Bridges 03/14/09 ADB 37.809 1,078 O 0.365 0.300 0.000 0.030 0.045 0.050 79.00 -
Algon Engineering Construction Corporation 270 Impv't./Conc. of La Fortuna Tagum Terminal-
Capitol, Canocotan Road 03/01/08 XI 34.314 226 C 0.303 0.300 0.300 - - - 90.30 88.56% V. Satisfactory
Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-Bayabas-Eden
Road 11/17/08 XI 4.816 90 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding
Algon Engineering Construction Corporation 270 Rehab. of Sumlog Bridge and Approaches
along Davao-Oriental-Surigao Coastal Road 03/05/10 XI 52.988 270 C 0.485 0.133 0.300 - - - 91.80 91.80% V. Satisfactory
Algon Engineering Construction Corporation 270
CP-5: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-
Boston) Caraga-Baganga Section03/04/10 XI 172.836 537 C 0.359 0.200 0.300 - - - 85.90 89.02%
V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impvt. of Davao-Bukidnon Rd. at
Calinan Sect. 05/31/10 XI 10.743 90 C 0.451 0.133 0.300 - - - 88.40 88.40% Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-Makar
Rd. 06/10/10 XI 14.465 90 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
Algon Engineering Construction Corporation 270 Rehab. Sumlog Bridge and Approaches
along Davao Oriental-Surigao Coastal Rd. 09/07/10 XI 82.031 530 C 0.467 0.133 0.300 - - - 90.00 89.94% V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impv't. of Davao-Bukidnon Rd. at
Mintal Sect. 08/24/10 XI 18.892 180 C 0.391 0.200 0.300 - - - 89.10 88.98% Satisfactory
Algon Engineering Construction Corporation 270 Construction of Laboratory Building Phase
2 11/17/10 DOST 17.637 - C 0.465 0.20 0.30 - - - 96.50 97.08% Outstanding
Allado Construction Co., Inc. 228 Rehab./Reconst./Upgrading along Davao-Cotabato Rd. (Davao City-Jct. Digos Sect.) 06/12/10 XI 93.085 450 C 0.408 0.133 0.300 - - - 84.10 86.08%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page37
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Allado Construction Co., Inc. 228Rehab./Reconst./Upgrading of Damaged
Paved National Rd. along Davao-Cotabato Rd. (Davao City-Junction Digos Sect.)
08/28/10 XI 78.045 240 O 0.284 0.291 0.150 0.030 0.043 0.050 84.80 -
Allen Construction 12584 Regravelling of Various Barangays 05/26/09 III 1.875 25 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory
Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. 05/22/08 III 0.751 60 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding
Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School 03/02/09 III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%
V. Satisfactory
Allen Construction 12584 Rehab./Reconst. of Nueva Ecija-Pangasinan Road 09/03/09 III 12.165 61 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Allen Construction 12584Repair/Restoration of Damaged Pavement
Daang Maharlika Rd. Km.136+050 - Km.136+550
06/08/10 III 2.809 21 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
Allen Construction 12584 Rehab./Reconst. Cabanatuan City-Carmen Rd. 06/07/10 III 14.075 60 C 0.420 0.133 0.300 - - - 85.30 85.30%
Satisfactory
Allen Construction 12584 Rehab./Reconst. of Daang Maharlika Rd. Km.137+330 - Km.137+770, Baloc 08/23/10 III 5.430 25 C 0.394 0.200 0.300 - - - 89.40 89.40%
V. Satisfactory
Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 02/27/09 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Alleyway Construction 15310 Rehab./Reconst./Upgrading of España Boulevard 08/24/10 NCR 38.956 204 C 0.345 0.193 0.300 - - - 83.80 83.80%
Satisfactory
Allied Trade Resources 31667 Construction of Site Development Projects 8/12/09 DOST 3.065 131 C 0.475 0.182 0.300 - - - 95.70 95.70% Outstanding
Allied Trade Resources Multi Purpose Cooperative 31667 Const./Impv't of 2-CL School Building @
Malitbog E/S, Brgy. New Malitbog 03/12/09 XI 2.352 60 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy. Ising 11/30/08 XI 2.356 90 C 0.301 0.233 0.300 - - - 83.40 87.53%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page38
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Allied Trade Resources Multi-Purpose Cooperative 31667 DOTC-CARAGA Regional Office Dev't
Project (Phase 1) 07/30/09 DOTC 3.953 150 C 0.426 0.200 0.300 - - - 92.60 92.60% V. Satisfactory
Allied Trade Resources Multi-Purpose Cooperative 31667 Repair & Waterproofing of Central
Administration Building 07/08/09 U.P. 1.154 60 C 0.450 0.200 0.300 - - - 95.00 *95.00% V. Satisfactory
Allied Trade Resources Multi-Purpose Cooperative 31667 Completion of Multi-Purpose Buiding at
Davao City National H/S 03/10/10 XI 0.940 90 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory
Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at Gahak Marulas E/S 11/10/08 IV-A 0.669 75 C 0.344 0.300 - - - - 64.40 *64.40%
Fair
Almakar Builders & Metal Works 21929 Const. of Concrete Pathway 05/26/08 IV-A 0.258 45 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
Almakar Builders and Metal Works 21929 Complete Const. of Two (2) Storey 2-CL Academic Sch. Bldg. at Soldier's Hill IV E/S 08/27/10 IVA 2.115 150 O 0.354 0.225 0.150 0.030 0.029 0.033 82.10 -
Alnino Construction & Supply 18378 Const. of Access Road to RORO Terminal, Guiron-San Antonio Section 08/19/08 V 4.750 90 C 0.201 0.200 0.300 - - - 70.10 *70.10%
Satisfactory
Alnino Construction & Supply 18378 Const. of Buenavista Seawall 05/13/08 V 4.751 90 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Alnino Construction & Supply 18378 Concreting of Bayawas Road 02/15/10 V 1.882 120 C 0.370 0.200 0.300 - - - 87.00 87.00% Satisfactory
Alnino Construction & Supply 18378 Const. of Abucay-Cagdongon Road 05/25/10 V 4.705 90 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory
Alnino Construction & Supply 18378 Conc. Of San Vicente-Mayon Rd. 08/30/10 V 1.448 60 O 0.286 0.300 0.150 0.030 0.040 0.050 85.60 -
Alnino Construction & Supply 18378 Conc. Of Sugod-Sta. Teresita-Canarum Rd. 08/30/10 V 1.448 60 O 0.287 0.300 0.150 0.022 0.035 0.050 84.40 -
Alnino Construction & Supply 18378 Conc. Of San Juan (Roro) Rd. 08/30/10 V 1.448 60 C 0.325 0.200 0.300 - - - 82.50 82.50% Satisfactory
Alnor Construction & Const. Supplies 26705 Conc. of Kinalablaban Bridge Approaches and Road, Surigao-Davao Coastal Road 08/23/08 XIII 7.643 180 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page39
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran 05/14/08 XIII 0.926 60 C 0.377 0.200 0.300 - - - 87.70 87.67% V. Satisfactory
Alnor Construction & Const. Supplies 26705 Const./Widening of Dinagat-Loreto Road (Tag-abaca Sect.) 11/19/08 XIII 14.390 195 C 0.375 0.300 0.000 - - - 67.50 61.74%
Fair
Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan Road 11/19/08 V 4.682 60 C 0.346 0.200 0.300 - - - 84.60 *84.60%
V. Satisfactory
Alpha Ryder Construction and Supplies 12197 Conc. of Legazpi Manito-Punta De Jesus
Road, Malabago-Tinapian Section 03/03/09 V 32.545 210 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
Alpha Ryder Construction and Supplies 12197 Road Upgrading of Ariman-Casiguran 08/30/10 V 15.168 75 C 0.375 0.200 0.300 - - - 87.50 87.50%
Satisfactory
Alpha Ryder Construction and Supplies 12197 Rehab./Reconst. Of Jct. Abuyog-Gubat-
Ariman Rd. 08/29/10 V 8.379 135 C 0.404 0.200 0.300 - - - 90.40 86.02% Satisfactory
Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road 05/23/08 VII 0.915 10 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road 08/22/08 VII 0.915 10 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) 03/04/08 I 0.289 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Alphin Trading & Construction 26260 Construction of 1 Classroom, Payas NHS 03/06/09 I 0.482 150 C 0.456 0.154 0.300 - - - 91.00 *91.00%V. Satisfactory
Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-Calasiao Road 08/27/08 I 2.891 75 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding
Alphin Trading & Construction 26260 Construction of 2-CL @ Mabulitek 08/27/09 I 0.972 65 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding
Alphin Trading & Construction 26260 Rehab. of DPWH Pangasinan 3rd DEO Building, Tumana 08/25/09 I 2.885 75 C 0.442 0.139 0.300 - - - 88.10 91.39%
V. Satisfactory
Alpiz Construction and Development Corp. 11039 Impvt. and Desilting of Teresa River 06/10/10 IVA 9.621 60 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page40
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 05/26/09 IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -
Alraf Construction & Enterprises 17297Completion (Impvt./Conc. Paving) of Licomo
Quiniput Road, Segment II Manguso-Mulawin Section
11/17/08 IX 36.137 290 C 0.365 0.200 0.300 - - - 86.50 88.27% V. Satisfactory
Alraf Construction & Enterprises 17297 Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan Section 05/15/08 IX 7.605 131 C 0.219 0.300 0.300 - - - 81.90 80.61%
V. Satisfactory
Alraf Construction & Enterprises 17297 Rehabilitation of Brgy. Mercedes Road (Phase II) 03/03/09 IX 4.651 60 C 0.426 0.200 0.300 - - - 92.60 *92.60%
V. Satisfactory
Alraf Construction & Enterprises 17297Rehab./Reconst. of Damaged Paved
National Road (Pagadian-Zamboanga City Road)
09/01/09 IX 14.152 132 C 0.429 0.200 0.300 - - - 92.90 94.88% V. Satisfactory
Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with Intermittent Section) 09/02/09 IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -
Alraf Construction & Enterprises 17297
Impvt./Gravelling of Sirawai-Sibuco Rd., Bongon-Piacan-Napolan-Lagao Sect.
Sta.11+160 - Sta.11+860, Sta.12+311.70 - Sta.14+120
06/02/10 IX 60.373 531 O 0.377 0.249 0.150 0.030 0.042 0.050 89.80 -
Alraf Construction & Enterprises 17297
Impv't./Gravelling of Sirawai-Sibuco Rd. Bongon-Piacan-Napolan-Lagao Sect., Sta.11+160 - Sta.11+860, Sta.11+860 -
Sta.11+311.70, Sta.12+343 - Sta.14+120
08/24/10 IX 60.373 569 O 0.369 0.249 0.150 0.030 0.042 0.050 89.00 -
Alraf Construction & Enterprises 17297 Pagadian-Zamboanga City Rd. (Sangali-Victoria Sect.) 09/08/10 IX 19.160 170 C 0.447 0.133 0.300 - - - 88.00 88.00%
Satisfactory
Alraf Construction & Enterprises 17297
Const./Opening of Zamboanga West Coast Rd., Napolan-Cawit-Cawit-Anongan Sect. Sta.14+700 - Sta.18+780 w/ exceptions,
Sta.18+420 - Sta.18+500
09/05/10 IX 95.698 765 C 0.439 0.133 0.300 - - - 87.20 85.78% Satisfactory
Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge 11/21/09 V 13.202 200 C 0.400 0.200 0.300 - - - 90.00 87.90%
V. Satisfactory
Alro Construction & Development Corp. 18361 Road Opening/Improvement of Montinegro
Cabanbanan Road 03/09/09 V 19.108 90 C 0.458 - 0.500 - - - 95.80 *95.80% V. Satisfactory
Alro Construction & Development Corporation 18361 Rehabilitation of Goyundan to Payak Road 05/29/09 V 4.777 158 C 0.357 0.200 0.300 - - - 85.70 *85.70%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page41
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alro Construction & Development Corporation 8361 Concreting of FMR from Macad to Tilnac 06/01/09 V 9.459 150 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
Alro Construction & Development Corporation 18361
Rehab./Reconst. of Iriga City-San Isidro-Sagrada-San Ramon Road (San Pedro
Section)09/09/09 V 15.275 179 C 0.401 0.174 0.300 - - - 87.50 *87.50%
Satisfactory
Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 03/17/09 VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -
Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section 08/19/08 V 4.754 90 C 0.251 0.200 0.300 - - - 75.10 *75.10%
Satisfactory
Alt Construction 32365 Const. of Sorsogon State College Flood Control/Drainage System 05/21/08 V 4.800 45 C 0.375 0.177 0.300 - - - 85.20 *85.20%
V. Satisfactory
Alzam Enterprises 19113
Demolition/Reconst. of Approaches & Dranaige incl. Bridge Protection Works,
Reconst. of Gov. Generoso (Bankerohan) Br.
09/04/08 XI 30.557 180 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory
Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road 03/02/09 XI 19.280 210 C 0.365 0.200 0.300 - - - 86.50 85.66% Satisfactory
Alzam Enterprises 19113 Road Impvt./Conc. of Additional Two Lanes along Maa Rd. Section 09/04/08 XI 18.870 210 C 0.329 0.300 0.300 - - - 92.90 87.14%
V. Satisfactory
Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section 03/18/09 XI 28.925 210 C 0.439 0.200 0.300 - - - 93.90 93.42%
V. Satisfactory
Alzam Enterprises 19113Rehab./ Reconst./Upgrading of Damaged
Paved National Roads at Davao City Diversion Road, La Verna Section
09/16/09 XI 19.272 210 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding
Alzam Enterprises 19113Widening of Agusan-Davao Road for
Package 2-A, Bunawan Section, Brgy. Bunawan
09/16/09 XI 9.639 150 C 0.484 0.148 0.300 - - - 93.20 *93.20% V. Satisfactory
Alzam Enterprises 19113 Construction of Road Network Camp Catitipan, PNP 03/11/10 XI 22.145 180 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Alzam Enterprises 19113
Rehab./Reconst./Upgrading of Damaged paved National Roads at Davao City
Diversion Road for Package 2-C at a) Junction Davao-Agusan to Panacan
Relocation Section
03/11/10 XI 19.275 210 C 0.397 0.200 0.300 - - - 89.70 89.70% V. Satisfactory
Alzam Enterprises 19113Rehab./Reconst. Of Damaged Paved National Roads/Widening of Road at
Package III09/09/10 XI 38.503 210 C 0.450 0.133 0.300 - - - 88.30 88.60%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page42
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis Tourist Road
(Mua-an Section) 08/24/08 XII 5.760 55 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory
Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Magpet-Pangao-An
Road (Sumawan-Gubatan Section) 08/24/08 XII 11.338 143 C 0.270 0.287 0.300 - - - 85.70 85.58% V. Satisfactory
AMA Construction 10015 Const. of MPB, Brgy. Victoria 08/29/08 XIII 0.737 60 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory
Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road 08/19/08 V 0.944 90 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory
Ameg Construction & Supply 21556 Repair/Impvt. of DPWH Bldg. 11/19/08 V 1.910 90 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory
Ameg Construction & Supply 21556 Construction of 1-CL School Building 08/24/09 V 0.575 90 C 0.398 0.162 0.300 - - - 86.00 85.02% Satisfactory
Ameg Construction & Supply 21556 Conc. Of San Antonio Sevilla Rd. 08/30/10 V 0.942 60 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory
Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road, KPES-UCCP Section both sides 03/02/08 XII 9.398 120 C 0.291 0.100 0.000 - - - 39.10 57.76%
Poor
Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis Tourist Road 05/17/08 XII 8.079 90 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -
Angel & Sam Construction & General Merchandise 19968 Const. of 2-Classroom School Building,
Kibungsod NHS 06/01/09 X 1.188 134 C 0.435 0.098 0.300 - - - 83.30 83.93% Satisfactory
Angel & Sam Construction & General Merchandise 19968 Conc. of Cadre Rd. Camp Evangelista Main
Road going to Hospital Section 02/26/08 X 9.548 180 C 0.305 0.200 0.300 - - - 80.50 87.04% V. Satisfactory
Angel & Sam Construction & General Merchandise 19968 Rehab. of ICBR Puerto-Cugman Section 03/02/09 X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -
Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of National Road-South
Divisiria (RN Abejuela St.-Corrales St.) 09/01/09 X 3.564 130 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page43
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Angel & Sam Construction & General Merchandise 19968 Repair of ICBR Puerto-Cugman Section 09/01/09 X 14.311 207 C 0.459 0.133 0.300 - - - 89.20 83.80%
Satisfactory
Angel & Sam Construction & General Merchandise 19968 Rehab./Upgrading of Sayre Highway 02/22/10 X 16.172 240 C 0.341 0.200 0.300 - - - 84.10 83.53%
Satisfactory
Anilos Trading & Construction 31557 Const. of MPB @ Poblacion 05/30/08 IV-B 1.919 110 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot E/S 03/05/08 IV-B 1.540 90 C 0.393 0.200 0.300 - - - 89.30 82.93% V. Satisfactory
Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS 03/06/09 IV-B 0.568 180 C 0.493 0.200 0.300 - - - 99.30 83.20% Satisfactory
Anilos Trading & Construction 31557 Const. of Multi-Purpose Building, Phase II, Brgy. Bagong Sikat 03/07/09 IV-B 0.549 90 C 0.473 0.127 0.300 - - - 90.00 *90.00%
V.Satisfactory
Anilos Trading & Construction 31557 Const.of MPB 1st Engineering District, Poblacion Roxas 03/06/09 IV-B 0.947 100 C 0.482 0.105 0.300 - - - 88.70 *88.70%
Satisfactory
Anilos Trading & Construction 31557 Construction of Farm to Market Road 03/07/09 IV-B 1.378 104 C 0.442 0.110 0.300 - - - 85.20 *85.20% Satisfactory
Anilos Trading and Construction 31557 Construction of MPB Relocation Site Brgy. Matahimik 06/05/09 IV-B 0.387 75 C 0.385 0.155 0.300 - - - 84.00 *84.00%
Satisfactory
Anilos Trading and Construction 31557 Rehab./Impvt. of DPWH-Palawan 1st DEO Bldg. inc. Employees Quarters, 09/07/09 IVB 1.895 120 C 0.500 0.110 0.000 - - - 61.00 62.12%
Poor
Anilos Trading and Construction 31557 Const. of 4-CL Don Ramon Roces MES (Partial) 03/05/10 IVB 3.766 210 C 0.330 0.200 0.300 - - - 83.00 77.51%
Unsatisfactory
Annasor Construction & Trading 30825 Const. of MPB 08/13/08 III 1.909 60 C 0.391 0.300 0.000 - - - 69.10 58.18% Poor
Anrol Construction 10136 Rehab. of Manila East Road, Morong-Pililla Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.446 0.133 0.300 - - - 87.90 *87.90%
Satisfactory
Anrol Construction 10136 Rehab. of Manila East Road, Baras Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.429 0.133 0.300 - - - 86.20 *86.20%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page44
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road 11/27/08 IV-A 9.587 45 C 0.265 0.284 0.300 - - - 84.90 *84.90% V. Satisfactory
Anrol Construction 10136 Impvt./Rehab. of MPB Brgy. West Triangle 03/01/10 NCR 3.372 120 C 0.486 0.133 0.300 - - - 91.90 91.90% V.Satisfactory
Antonio V. Nidea Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road 08/15/08 V 9.430 200 C 0.323 0.221 0.300 - - - 84.40 80.86%
V. Satisfactory
Antonio V. Nidea Construction 6382 Opening/Const. of Banao-Calpi Road 11/13/08 V 19.176 120 C 0.397 0.294 0.300 - - - 99.10 *99.10% Outstanding
Antonio V. Nidea Construction 6382 Repair/Restoration of Awang River Control, Awang River 02/26/08 V 9.499 378 C 0.371 0.200 0.300 - - - 87.10 *87.10%
V. Satisfactory
Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-Sabang Road 08/13/08 V 14.358 120 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory
Antonio V. Nidea Construction 6382Const. of Iriga Flood Control Project
(Consolidation Dam, Ground Sill, Slope Protection & Damage Canal)
02/28/10 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -
Antonio V. Nidea Construction 6382 Construction/Imvpt. Of Ponso-San Agustin FMR 02/28/10 V 4.808 180 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
Antonio V. Nidea Construction, Inc. 6382 Const./Repair/Rehab./Impv't. of Libmanan-Cabusao Flood Control 09/02/10 V 57.610 240 C 0.389 0.200 0.300 - - - 88.90 88.90%
Satisfactory
Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea
Construction)6382 Opening/Impvt. of Brgy. Manika-Sitio Tina
Rd. (Phase II) 02/27/10 VI 36.658 340 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea
Construction)6382 Opening/Imprv't. of Sitio Babangan-Sito
Igtulukon Rd. (Phase I) 02/26/10 VI 19.297 270 C 0.383 0.162 0.300 - - - 84.50 84.50% Satisfactory
Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea
Construction)6382 Desilting/Deepening of Agbunyog River 08/24/10 IVB 33.770 240 O 0.390 0.268 0.150 0.022 0.028 0.017 87.50 -
Antonio V. Nidea Construction, Inc. (Formerly: Antonio V. Nidea
Construction)6382 Opening/Impvt. of Brgy. Manika-Sitio Tina
Road (Phase I) 09/04/10 VI 40.517 360 C 0.480 0.191 0.300 - - - 97.10 89.30% V. Satisfactory
AOG Construction 29758
Rehab. of National Arterial Secondary & Local Roads Brdy. Maasin-Macrohon-
Sogod, Daang Maharlika Road with exception
05/26/09 VIII 19.088 270 C 0.337 0.200 0.300 - - - 83.70 82.98% Satisfactory
AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR 08/30/08 VIII 9.437 260 C 0.303 0.200 0.300 - - - 80.30 83.30% V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page45
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
APB Construction 17055 Repair of Public Market at Baguio City 06/09/10 CAR 3.813 90 C 0.464 0.200 0.300 - - - 96.40 96.40% Oustanding
APD Construction 17467 Addalam River Irrigation Project 2/13-15/2008 NIA 7.466 180 O 0.3369 0.1871 0.03 0.03 0.0408 0.2 82.48 -
APD Construction 17467 Conc. of Naguilian-San Marcelino Road (Alibadbad Section) 05/21/08 II 9.648 90 C 0.376 0.202 0.300 - - - 87.80 *87.80%
V. Satisfactory
APD Construction 17467 Conc. of Villa Sur Brgy. Road 05/26/08 II 2.720 90 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding
APD Construction 17467 Const. of Pigalo Bridge (Phase II) 02/28/08 II 2.820 195 C 0.362 0.200 0.300 - - - 86.20 86.95% V. Satisfactory
APD Construction 17467
Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA) Road & ist related
Roads & Bridges (Cab-Diffun Section) Cualo Blvd Road
03/04/08 II 0.959 100 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
APD Construction 17467Impvt. of Cordon-Diffun-Maddela-Aurora
(CDMA) Bdry. Road & its related Roads & Bridges (Rehab. Of Ramos Bridge Phase II)
08/18/08 II 2.604 110 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding
APD Construction 17467 Impvt./Conc. of Cordon-Aurora Bdry. Road (Maddela Jct.-Dumabato Section) 08/18/08 II 13.274 200 C 0.366 0.262 0.300 - - - 92.80 *92.80%
Outstanding
APD Construction 17467 Impv't/Rehab of Ricarte Norte-Ifugao Villa Road, Ganano ARC 03/07/09 II 9.646 180 C 0.454 0.200 0.300 - - - 95.40 *95.40%
V.Satisfactory
APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. 11/25/08 II 9.576 180 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
APD Construction 17467
Impvt./Conc. along Cordon-Diffun-Madella-Aurora Bdry. Rds. & its related roads (San Marcos-Gundaway Section & its Related
Road
09/03/09 II 19.300 150 C 0.437 0.200 0.300 - - - 93.70 94.30% V. Satisfactory
APD Construction 17467Rehab./Reconst./Upgrading of Damaged
Paved National Roads with Widening, Daang Maharlika KO346+610-KO347+290
08/26/09 II 13.006 132 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory
APD Construction 17467 Upgrading/Concreting of Ilagan-Delfin-Mallig Road 08/25/09 II 12.540 104 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page46
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
APD Construction 17467Impvt./Conc. along Divisoria-Panang Bdry. Road & Its Related Roads (Divisoria Rd. &
its related roads)02/25/10 II 19.223 150 C 0.419 0.200 0.300 - - - 91.90 91.90%
V. Satisfactory
APD Construction 17467Impvt./Conc. along CDMA Bdry. Road & its related Road (Palacian Road and its related
Roads)06/05/10 II 15.419 120 C 0.478 0.176 0.300 - - - 95.40 95.40%
V. Satisfactory
APD Construction 17467Impvt./Conc. along CDMA Boundary Road
and its related Roads (Gundaway Road and its Related Roads)
08/29/10 II 19.279 150 C 0.446 0.184 0.300 - - - 93.00 93.00% V. Satisfactory
Apex Builders 32329Repair/Rehab. of Scoured Slope Protection
along DM Jct. Legazpi-Sto. Domingo Tabaco-CamSur Bdry.
02/26/10 V 3.019 90 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
APU Trading & Construction (Formerly: APU Const.) 8379
Const. of Farm-to-Market Road at Brgy. Doña Anicia Road, Brgy. Dau, Mabalacat
and San Ildefonso06/04/09 III 1.897 30 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V. Satisfactory
Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000-Sta. 1+500 06/03/09 IV-B 2.690 90 C 0.358 0.171 0.300 - - - 82.90 83.70%
Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Rehabilitation of Farm-to-Market Road 03/05/09 I 1.250 25 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Const. of One Unit, 2-CL S/B at Enrico T.
Prado NHS 03/02/10 I 0.965 60 C 0.401 0.133 0.300 - - - 83.40 83.40% Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751
Repair and Rehab. of Urdaneta Jct. - Dagupan Rd. Sta. Barbara and Calasiao, Pangasinan, Km.202+130 - Km.203+064
with exception
06/03/10 I 10.000 30 C 0.449 0.133 0.300 - - - 88.20 88.20% Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Rehab. of Tarlac Road 06/07/10 I 8.675 20 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Rehab./Impvt. of Sta. Barbara Old Road Km.
200+024-Km. 200+407 08/31/10 I 4.014 15 C 0.420 0.195 0.300 - - - 91.50 91.50% V. Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Const. of Employees Quarter & Impvt. of
DPWH Pangasinan Sub-DEO 08/30/10 I 3.858 120 C 0.483 0.133 0.300 - - - 91.60 87.19% Satisfactory
Aquino-Dela Cruz Eng'g. & Construction 16751 Road Upgrading (Gravel to Paved) of San
Nicolas-San Quintin-Umingan-Guimba Road 08/25/09 I 10.598 89 C 0.407 0.200 0.300 - - - 90.70 89.26% V. Satisfactory
AR Adlawan Construction 13108 Road Upgrading (Gravel to Paved), Sibonga-Dumanjug Road 06/01/09 VII 9.531 45 C 0.413 0.200 0.300 - - - 91.30 *91.30%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page47
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
AR Adlawan Construction 13108 Concreting of Sibonga-Dumanjug Road 06/01/09 VII 28.915 210 C 0.440 0.200 0.300 - - - 94.00 83.14% Satisfactory
AR Adlawan Construction 13108Conc. of Sibonga-Dumanjug Road, Starting at Boundary Cebu 2nd DEO and Cebu 4th
DEO (Km. 65+968-Km.64+988)06/01/09 VII 18.391 120 C 0.426 0.200 0.300 - - - 92.60 74.48%
Poor
AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road 09/04/08 VII 34.318 210 C 0.322 0.300 0.300 - - - 92.20 85.14% V. Satisfactory
AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS 03/08/08 VII 34.320 60 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
AR Adlawan Construction 13108 Const. of Lower Calajo-an-Pakigne Bridge 06/17/10 VII 4.815 90 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory
AR Adlawan Construction 13108Rehab./Reconst//Upgrading of Carcar-Barili-
Mantayupan Road, Km. 45+500 - Km. 46+070
08/24/10 VII 25.387 210 C 0.421 0.200 0.300 - - - 92.10 92.10% V. Satisfactory
AR Adlawan Construction 13108Impvt./Asphalting of Sibonga-Dumanjug
Road, Sta. 71+000-Sta. 73+920 (with exception)
09/07/10 VII 48.116 285 O 0.345 0.292 0.150 0.022 0.033 0.033 87.50 -
Arago Construction & Supply 31324 Const. of 1 Unit 1 CL Sch. Bldg. @ Bagtong C/S 03/17/09 VIII 0.460 75 C 0.461 0.200 0.300 - - - 96.10 *96.10%
Outstanding
Arcinue Commercial 6746 Rehab./Asphalt Overlay of Manaoag Cadre Road, Km. 0+000-Km. 0+587 05/26/09 I 3.857 20 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Arcinue Commercial 6746Rehab./Reconts./Upgrading along Bacnoton-Luna-Balaoan Road, Km. 283+221-Km. 307+896 w/exception
05/27/09 I 16.169 90 O 0.358 0.207 0.150 0.030 0.040 0.033 81.80 -
Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS 02/20/08 I 0.899 90 C 0.373 0.207 0.300 - - - 88.00 83.73% V. Satisfactory
Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S 08/11/08 I 0.764 90 C 0.324 0.200 0.300 - - - 82.40 *82.40% V. Satisfactory
Arcinue Commercial 6746 Const. of Maypalic Bridge 02/29/08 I 12.048 200 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair
Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road 08/25/08 I 9.468 90 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page48
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan 08/11/08 I 0.478 45 C 0.386 0.289 0.300 - - - 97.50 *97.50%
Outstanding
Arcinue Commercial 6746 Rehab. & Impvt. of Cabaroan Bridge along San Juan-San Gabriel Road 08/22/08 I 1.897 50 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Arcinue Commercial 6746 Rehab./Reconst. of Damaged Nat'l Road, San Fernando-Bagulin Road 08/22/08 I 19.219 90 C 0.363 0.200 0.300 - - - 86.30 83.96%
V. Satisfactory
Arcinue Commercial 6746 Replacement of Cuenca NHS 02/02/08 I 0.899 90 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Arcinue Commercial 6746 Rehab./Reconst./Upgrading of Bacnotan-Luna-Balaoan Road 09/02/09 I 16.169 99 C 0.425 0.200 0.300 - - - 92.50 86.08%
Satisfactory
Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road with exception, Paoay Section 09/09/09 I 31.831 360 C 0.364 0.168 0.300 - - - 83.20 85.96%
Satisfactory
Arcinue Commercial 6746 Const. of Mangato Bridge, Brgy. Mangato 09/10/09 I 27.553 519 C 0.459 0.133 0.300 - - - 89.20 82.96% Satisfactory
Arcinue Commercial 6746 Construction of School Building @ Sto. Rosario E/S 09/01/09 I 2.148 210 C 0.440 0.086 0.300 - - - 82.60 *82.60%
Satisfactory
Arcinue Commercial 6746 Const./Repair of Tavora E/S 02/27/10 I 4.982 180 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Arcinue Commercial 6746Raising of Grade of Earthdike &
Const./Rehab. of Agno River Bank Protection, Brgy. Warding
06/04/10 I 9.647 120 C 0.325 0.200 0.300 - - - 82.50 82.50% Satisfactory
Arcinue Commercial 6746 Asphalt Overlay along Manila North Road, Km.293+000 - Km.296+000 w/ exception 05/25/10 I 14.256 40 C 0.390 0.003 0.300 - - - 69.30 69.30%
Poor
Arcinue Commercial 6746 Concrete Lining Dike along Sinocalan River, Maningding-Ventinilla-Tuliao Section 08/30/10 I 14.474 240 C 0.383 0.200 0.300 - - - 88.30 88.30%
Satisfactory
Arcinue Commercial 6746
Installation & Application of Road Safety Devices Pangasinan-Zambales Road,
Pangasinan-Tarlac Road and Labrador-Lingayen Rd. w/ exceptions
09/01/10 I 4.997 30 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page49
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Arcinue Commercial 6746
Urgent Rehab. Works due to Passage Typhoon Peping in the Province of
Pangasinan under the Agno River Control Project, Brgy. San Felipe
08/27/10 AFCS-PMO 1.947 45 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Arcinue Commercial / Top Tech Trading & Const. (JV) JV-09-223
Rehab./Reconst./Upgrading of Damaged National Rd., Diokno Highway inc. Slope
Protection08/24/10 IVA 23.874 150 C 0.462 0.133 0.300 - - - 89.50 89.50%
V. Satisfactory
Aretas Development & Supply 25669 Const. of MPB, Sampaguita Hills, Brgy. Marcelo Green 02/17/10 NCR 3.837 75 C 0.497 0.133 0.300 - - - 93.00 93.00%
V.Satisfactory
Argealis Construction 16122 Construction of PPMC Motorpool Shed 8/19-22/08 PPA 1.200 45 C 0.342 0.300 0.300 - - - 94.19 94.19% Outstanding
Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road 11/27/08 V 0.467 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Arky Construction and Supply 32692 Const. of Circ. Road, Brgy. Ibinigay-Bagumbayan 05/19/08 V 4.750 90 C 0.325 0.200 0.300 - - - 82.50 82.38%
V. Satisfactory
Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.475 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) 08/23/08 V 0.948 75 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Arky Construction and Supply 32692Rehab./Reconst. of Damaged Masbate-
Cataingan-Placer National Road (Intermittent Section)
08/27/09 V 17.364 150 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory
Arky Construction and Supply 32692 Rehab./Reconst. of Damaged Masbate Capitol-Cadre National Road 02/18/10 V 11.566 253 C 0.418 0.160 0.300 - - - 87.80 83.69%
Satisfactory
Arlor Construction 30822 Const./Rehab. of Road at Natunuan North-Kaingin 02/26/10 IVA 0.497 30 C 0.442 0.133 0.300 - - - 87.50 87.50%
Satisfactory
Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage Impvt. of M.
dela Fuente St. 05/16/08 NCR 15.936 150 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding
Armando U. Khong Hun General Contractor 16163
Rehab./Reconst./Upgrading of Diokno Ave., including Approach of Diokno Bridge
(Phase I)05/19/09 NCR 19.290 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page50
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Armando U. Khong Hun General Contractor 16163 Construction of Pedestrian Overpass
along Domestic Road 05/19/09 NCR 11.573 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
Armando U. Khong Hun General Contractor 16163 Const./Improvement of Slope Protection of
San Dionisio River (Phase I, II & III) 06/02/09 NCR 33.720 90 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory
Armando U. Khong Hun General Contractor 16163
Proposed Rehab./Reconst./Upgrading of Damaged Paved National Road, South
Superhighway West Service Road, Pasay City
05/24/10 NCR 19.295 30 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory
Armando U. Khong Hun General Contractor, Inc. 16163 Rehab./Reconst./Upgrading of Blumentrit
St. 08/24/10 NCR 24.071 150 C 0.416 0.133 0.300 - - - 84.90 87.78% Satisfactory
ARN Builders 18930 Rehab./Recons. of Aklan East Road 06/06/09 VI 19.283 180 C 0.438 0.200 0.300 - - - 93.80 84.32% Satisfactory
ARN Builders 18930 Conc. of Altavas Diversion Road 03/06/08 VI 16.521 160 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory
ARN Builders 18930 Construction of Kinawahan Bridge & Approaches 03/06/09 VII 25.238 210 C 0.269 0.192 0.300 - - - 76.10 *76.10%
Unsatisfactory
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road 11/30/08 VI 19.283 180 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -
ARN Builders 18930 Rehab./Reconst./Upgrading of Aklan East Road 09/05/09 VI 31.795 240 O 0.335 0.240 0.150 0.000 0.032 0.100 -
ARN Builders 18930 Const. of Multi-Purpose Building at Cabadiangan 09/14/09 VII 1.776 90 C 0.485 0.200 0.300 - - - 98.50 -
ARN Builders 18930 Const. of Cabancalan-Canduman Bridge (E. Cortes Bridge) 03/08/10 VII 30.409 255 C 0.444 0.078 0.300 - - - 82.20 73.92%
Poor
ARN Builders 18930 Road to Complete Nautical Highway, Rehab. of Daang Maharlika Road 02/28/10 VIII 47.490 365 C 0.392 0.200 0.300 - - - 89.20 88.58%
Satisfactory
ARN Builders 18930CP-4: Imprvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Niño
Section Phase I02/27/10 XI 153.445 530 C 0.387 0.200 0.300 - - - 88.70 90.29%
V. Satisfactory
ARN Builders 18930CP-5: Impvt. / Conc. Of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Nino
Section Phase II 02/27/10 XI 173.459 540 C 0.363 0.200 0.300 - - - 86.30 89.60%
V. Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page51
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ARN Builders 18930CP-8: Const. of Six (6) Bridges inc.
Approaches along Kapalong-Talaingod-Valencia-Bukidnon Road
02/26/10 XI 123.463 540 C 0.355 0.133 0.300 - - - 78.80 89.52% V. Satisfactiry
ARN Builders 18930Repair/Rehab. of Caraga Gov. LN Lopez and Quinonoan Bridges along Baganga-
Mati Road03/04/10 XI 93.754 375 C 0.402 0.133 0.300 - - - 83.50 83.50%
V. Satisfactory
ARSVI Construction 23518 Conc. and Impvt. of San Andres Road 09/09/09 IVA 2.893 90 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
ARSVI Construction 23518 Const. of School Building at Elementary School, Brgy. Banjo East 03/03/10 IVA 0.998 90 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
Aryanesa Construction & Enterprises 33362 Repair/Const. of Dolores River Control 09/05/10 VIII 4.724 335 O 0.337 0.242 0.150 0.030 0.025 0.033 81.70 -
Asanco Gen. Merchandising & Construction 30517 Const. of Multi-Purpose Pavement,
Barangay New Guinlo 03/04/10 IVB 0.775 54 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory
Asand Construction and Development 21691 Construction of Academic Building II 12/2/09 DOST 10.309 210 C 0.455 0.195 0.300 - - - 95.00 95.00%
V. Satisfactory
ASC Construction and Concrete Products 26788 Addalam River Irrigation Project 2/13-15/08 NIA 5.013 150 C 0.308 0.240 0.300 84.77 *84.77%
V. Satisfactory
Asian Pearl Construction & Development Corporation 9059 Completion of Multi-Purpose Building, Sitio
Parang, Brgy. San Marcos 03/03/09 I 1.414 34 C 0.416 0.133 0.300 - - - 84.90 *84.90%Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao Road 11/17/08 I 11.226 152 C 0.340 0.200 0.300 - - - 84.00 85.20%
V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Const. of First Floor of the Proposed Three
(3) Storey Bldg., Ilocos Norte NHS 08/21/08 I 8.356 180 C 0.334 0.200 0.000 - - - 53.40 74.22% Satisfactory
ASS Construction 31509 Construction of Sports Complex 5/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding
Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II 11/27/08 IX 2.300 120 C 0.355 0.133 0.300 - - - 78.80 *78.80%
Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page52
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Asugas Builders 32764 Const./Impvt. of MPB (Municipal Bldg.) Phase III, Poblacion Tigbao 03/14/09 IX 1.835 120 C 0.415 0.133 0.300 - - - 84.80 *84.80%
Satisfactory
Asugas Builders 32764 Construction and Completion of Multi-Pupose Building (Phase III) 03/14/09 IX 1.835 120 C 0.447 0.133 0.300 - - - 88.00 *88.00%
Satisfactory
Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S 02/26/08 II 0.473 35 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan 05/20/08 II 0.421 55 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Atlantic Construction 24232 Const. of Sta. Maria MPB 03/02/09 II 3.816 120 C 0.410 0.200 0.300 - - - 91.00 82.04% Satisfactory
Atlantic Construction 24232 Rehab./Impvt. of Road Jct. Santiago-Tuguegarao to Sta. Maria Town Proper 03/02/09 II 4.765 146 C 0.406 0.200 0.300 - - - 90.60 85.38%
Satisfactory
Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) 08/13/08 II 0.743 35 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
Atlantic Construction 24232Road Concreting of Brgys. Quibal, San Andres, Visitacion, San Roque and San
Juan03/02/09 II 4.772 120 C 0.389 0.200 0.300 - - - 88.90 84.10%
Satisfactory
Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari 11/18/08 II 2.865 70 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
Atlantic Construction 24232 Construction of 2-CL Naguilian Bacolod E/S 09/05/09 II 1.816 60 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Atlas Enterprises 4953 Construction of Cabanatuan-Gen. Trinidad Road 09/04/09 III 4.752 90 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
ATR Construction 15968 Conc. of Roads at Quirino District 11/20/08 XI 1.884 75 C 0.195 0.300 0.300 - - - 79.50 *79.50% Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page53
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ATR Construction 15968 Concreting of Roads at Brgy., Tres De Mayo, Quirino St.-Perfect 03/07/09 XI 1.884 45 C 0.462 0.192 0.300 - - - 95.40 *95.40%
V. Satisfactory
ATR Construction 15968 Const. of Drainage along Digos-Makar Road 05/15/08 XI 4.701 90 C 0.393 0.200 0.300 - - - 89.30 90.68% Outstanding
Avatar Construction Company 31455 Const./Widening/Gravelling of Roads from Brgy. Glenville to Brgy. Gomez 06/02/09 XIII 1.902 234 C 0.497 0.169 0.300 - - - 96.60 *96.60%
Outstanding
Avatar Constructions Company 31455Rehab./Reconstruction of Damaged Paved National Road along Dinagat-Loreto Road
(San Jose Section)06/02/09 XIII 5.717 240 C 0.464 0.200 0.300 - - - 96.40 85.69%
Satisfactory
Avatar Constructions Company 31455 Completion of Brgy. Aurelio MPB 11/20/08 XIII 2.892 180 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory
Avatar Constructions Company 31455 Completion of Road from Brgy. Mahayahay Road to Shrine Road 03/05/09 XIII 2.364 180 C 0.385 0.200 0.300 - - - 88.50 *88.50%
Satisfactory
Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road (San Jose-Mahayahay Section) 08/21/08 XIII 10.411 322 C 0.374 0.200 0.300 - - - 87.40 76.48%
Satisfactory
Avatar Constructions Company 31455 Const. of Sta. Cruz Beach Road 03/05/09 XIII 3.855 210 C 0.473 0.132 0.300 - - - 90.50 *90.50% V. Satisfactory
Avatar Constructions Company 31455 Const./Widening of Rds. From Brgy. Poblacion to Brgy. Jacquez 09/04/09 XIII 1.897 332 C 0.497 0.133 0.300 - - - 93.00 *93.00%
V.Satisfactory
Avatar Constructions Company 31455 Opening of Brgy. Matingbe - Brgy. Gomez Farm to Market Rd. 02/24/10 XIII 4.813 150 C 0.491 0.133 0.300 - - - 92.40 92.40%
V.Satisfactory
Avatar Constructions Company 31455 Road Conc. with Drainage along Jct. National Rd. to Brgy. Justiniana Rd. 02/24/10 XIII 4.773 210 C 0.473 0.133 0.300 - - - 90.60 90.00
V.Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page54
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Avatar Constructions Company 31455 Const. of MPB, Phase IV 06/03/10 XIII 14.473 210 O 0.379 0.300 0.150 0.030 0.050 0.033 94.20 -
Avatar Constructions Company 31455 Const./Conc. of Roads w/ Drainage System leading to San Jose MBP, Brgy. Don Ruben 08/25/10 XIII 9.263 180 O 0.390 0.238 0.150 0.030 0.045 0.050 90.30 -
Avatar Constructions Company 31455 Repair/Rehab. of Brgy. Sta. Cruz-Brgy. Wilson FMR 08/25/10 XIII 9.452 210 C 0.437 0.133 0.300 - - - 87.00 87.24%
Satisfactory
Aylan Construction & Trading 11884 Completion of Multi-Purpose Bldg. 06/05/10 VII 0.143 150 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory
Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S & GSIS E/S 05/26/08 NCR 3.818 60 C 0.228 0.300 0.300 - - - 82.80 *82.80% V. Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan H/S 02/29/08 NCR 0.710 45 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Aylan Construction and Trading 11884 Completion of Academic Bldg., San Roque Elem. School 09/10/09 NCR 9.591 90 C 0.337 0.133 0.300 - - - 77.00 *77.00%
Unsatisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame High School, Brgy. Lipunan ng Crame 02/26/10 NCR 1.781 90 C 0.493 0.133 0.300 - - - 92.60 92.60%
V.Satisfactory
Aylan Construction and Trading 11884 Const. of MPB @ Monte Vista Subd. Brgy. Industrial Valley Complex 06/02/10 NCR 1.445 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Aylan Construction and Trading 11884 Const./Completion of School Building @ Leodegario Victorino E/S 06/03/10 NCR 14.450 170 C 0.406 0.200 0.300 - - - 90.60 87.24%
Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame E/S 08/16/10 NCR 0.654 75 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
B B C Construction 16510 Const. of Multi-Purpose Building (Covered Court) Agusan National High School 06/10/09 XIII 3.737 150 C 0.478 0.200 0.300 - - - 97.80 *97.80%
Outstanding
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page55
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B L F Construction 15829 Const. of School Building (CNM) Phase III @Bataan, Peninsula State University 08/28/09 III 1.870 36 C 0.420 0.133 0.300 - - - 85.30 *85.30%
Satisfactory
B. Bernardo Construction 6196 Improvement of Farm-to-Market Road, Brgy. Catmon 06/01/09 III 3.524 90 C 0.446 0.200 0.300 - - - 94.60 *94.60%
V. Satisfactory
B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road 03/06/09 III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72% Satisfactory
B. Bernardo Construction 6196 Rehab. of Sumulong Highway 08/21/08 NCR 19.220 150 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory
B. Bernardo Construction 6196 Completion of Riprapping along Malanday Creek, Brgy. Malanday 02/23/10 NCR 4.785 60 C 0.371 0.200 0.300 - - - 87.10 87.10%
Satisfactory
B. Bernardo Construction 6196 Const. of Two (2) Classroom School Bldg. (2nd Flr.) at Caypombo 08/28/10 III 2.623 100 C 0.482 0.089 0.300 - - - 87.10 87.10%
Satisfactory
B. Valencerena Trading & Construction 22147 Const./Impvt. of Various MPB, Brgy.
Teachers Village West 09/11/09 NCR 2.861 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
B. Valencerina Trading & Construction 22147 Rehabilitation of Alley at Sweet Dreams
Compound, Brgy. Parang 05/28/09 NCR 0.675 90 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory
B. Valencerina Trading & Construction 22147 Completion of MPB 11/18/08 NCR 1.903 60 C 0.375 0.252 0.300 - - - 92.70 *92.70%
Outstanding
B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro 11/17/08 I 1.637 50 C 0.243 0.200 0.300 - - - 74.30 *74.30%
Satisfactory
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin at Brgy.
San Isidro 03/06/08 IVA 0.957 30 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy. San Rafael 11/27/08 IV-A 0.960 45 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Building 06/10/10 IVA 0.994 45 C 0.472 0.200 0.300 - - - 97.20 97.20%
Outstanding
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page56
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 1, 2008 to December 31, 2010
NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Valencerina Trading & Construction 22147 Rehab. of Hanging Bridge, Brgy. San Rafael 08/16/10 IVA 1.927 45 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
B. Valencerina Trading & Construction 22147 Const. of Road, Barangay Geronimo 08/16/10 IVA 1.919 45 C 0.356 0.200 0.300 - - - 85.60 85.60%
Satisfactory
B. Valencerina Trading and Construction 22147 Conc. of Bungon Farm-to-Market Road 02/22/10 I 1.927 75 C 0.293 0.133 0.300 - - - 72.60 72.60%
POOR
B. Valencerina Trading and Construction 22147 Const. of MPB., Brgy. Rosario 02/24/10 NCR 5.271 90 C 0.427 0.200 0.300 - - - 92.70 92.70%
V.Satisfactory
07 November 2010* 1st/Final* For DPWH, only the region and PMO office are listed 12thCPES Release Page57