Equity Office Panorama I
7630 South Chester Street Englewood, CO 80127
Testing Summery Report UPS Testing
Reference #0244
Prepared By:
Carlton Electric, Inc. 1284 S. Cherokee Street
Denver, CO 80223 303-722-5742
0244 Panorama UPS Testing
Two UPS units labeled North and South
Index
Section I. UPS ATS
Section II. Panel TCGSDP
Section III. Powerware 375 UPS North and Bypass
Section IV. Panel UPS DP North
Section V. Powerware 375 UPS South and Bypass Section VI. Panel UPS DP South
Page 1 of 3 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749
STEP-BY-STEP PROCEDURE
Step Date Tim
e
PROCEDURE Action
By Comp
1) The following will be done at the beginning of each
shift.
Contact a Equity Office Representative or maintenance
personal.
Carlton __x___
2) Meet with Equity Office personnel and obtain security
access badges form the main lobby security desk.
Carlton
__NA_
3) Hold a MOP meeting to review steps to be conducted
during maintenance activity
Carlton
__x___
4) Proceed to the Electrical room and gain access to the
two Powerware UPS modules (May be done in
advance)
Carlton
__x___
5) Set up tools and test equipment. Carlton __x___
6) Record all UPS Name Plate information and UPS
locations. Compare to equipment to the Contract
Short Form and update information if necessary.
Carlton _see
photo_
7) With Permission from Equity Office, Carlton will
begin Anual UPS and Battery Maintenance on the
Powerware 375 300kva UPS Systems located in the
UPS Electrical room.
Carlton _x____
8) Perform the battery maintenance by recording the
following;
DC String Voltage
DC Charging Current
AC millivolts per battery
DC voltage per battery
AC millivolts on string
Perform visual inspection on each battery looking for
Carlton _See
Report
for
Details
____
Page 2 of 3 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
post seal cracks
corrosion on posts and cabling
battery case swelling
Thermal heat inspection
Battery MFG
Battery M/N
Battery Date Code
Number of Battery Strings
Number of Batteries per string.
9) Complete On-Line physical inspection of UPS
Systems by checking:
DC and AC Capacitors
Fan operation
verify proper operational parameters are
correct
Check air filters: (replace if necessary)
Check for proper air movement, in and around
the equipment
Inspect Instruments and record Equipment
readings
Verify status indicating lights are functional
Verify alarm and system status indication
lights are displaying correct equipment
operational status
Identify any abnormal noise or Vibration
Verify automatic transfer systems are enabled
Carlton _See
Report
for
Details
_____
10)
Start Generator
Place Transfer switch into Manual and transfer
load onto Generator and confirm voltages
before proceeding
Place Bypass module 2 in bypass
Open battery string
Open UPS control power
Place voltage drain on Cap banks
Verify 0 voltage at Cap banks
Replace 30 Capacitors Alum 12000UF on DC
string.
Close control power.
Start up UPS
Carlton
_N/A__
Page 3 of 3 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
Close battery string
Place Bypass Module 2 in Normal
11) Capacitor replacement and Battery test complete
Carlton _N/A__
___
12) Carlton will verify no alarms or notices present prior
to departure.
Carlton _N/A__
13) All tools and test equipment will be picked up and
work area clean prior to departure
Carlton _x____
Section I UPS ATS
-400.0
-350.0
-300.0
-250.0
-200.0
-150.0
-100.0
-50.00
0.000
50.00
100.0
150.0
200.0
250.0
300.0
350.0
400.0
V
8:15:00.257 AM6/28/2010
8:15:00.274 AM6/28/2010
3 mSec/Div16.678 (mS)
Name Date Time Duration RMS UnitsWaveform V1 6/28/2010 8:15:00.257 AM 16.678 281.7 VWaveform V2 6/28/2010 8:15:00.257 AM 16.678 282.6 VWaveform V3 6/28/2010 8:15:00.257 AM 16.678 282.2 V
Waveform V1281.74 Vrms, 6.62 %THD
0
10
20
30
40
50
60
70
80
90
100
1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM
6/28/2010 - 8:15:00.000 AMVal3.000 Waveform V1-330.8 Waveform V2355.5 Waveform V3
Waveform V1
(%) (%) (%)H01 100.0H02 0.1H03 6.5H04 0.0H05 0.8H06 0.0H07 0.3H08 0.0H09 0.3H10 0.0H11 0.2H12 0.0H13 0.2H14 0.0H15 0.1H16 0.0H17 0.2
H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.2H24 0.0H25 0.2H26 0.0H27 0.0H28 0.0H29 0.2H30 0.0H31 0.2H32 0.0H33 0.0H34 0.0
H35 0.2H36 0.0H37 0.3H38 0.0H39 0.0H40 0.0H41 0.2H42 0.0H43 0.2H44 0.0H45 0.0H46 0.0H47 0.2H48 0.0H49 0.2H50 0.0
Recording Start Date 6/28/2010 - 8:15:00 AMRecording Duration 0 (s)Instrument ID Model: 3945 - 1 1:220240 2.6
Channel Name: Waveform V1Frequency: 59.96 HzVoltageRatio: 1.000
Photo Report
1
-400.0
-200.0
0.000
200.0
400.0
A
8:15:00.257 AM6/28/2010
8:15:00.274 AM6/28/2010
3 mSec/Div16.678 (mS)
Name Date Time Duration RMS UnitsWaveform I1 6/28/2010 8:15:00.257 AM 16.678 350.8 AWaveform I2 6/28/2010 8:15:00.257 AM 16.678 343.7 AWaveform I3 6/28/2010 8:15:00.257 AM 16.678 349.5 A
Waveform INeutral 6/28/2010 8:15:00.257 AM 16.678 53.76 A
Waveform I1350.84 Arms, 7.57 %THD
0
10
20
30
40
50
60
70
80
90
100
1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM
6/28/2010 - 8:15:00.000 AMVal477.9 Waveform I1-273.8 Waveform I2-192.9 Waveform I311.20 Waveform INeutral
Waveform I1
(%) (%) (%)H01 100.0H02 0.4H03 4.5H04 0.2H05 6.0H06 0.1H07 1.0H08 0.0H09 0.1H10 0.0H11 0.3H12 0.0H13 0.2H14 0.0H15 0.1H16 0.0H17 0.2
H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.1H24 0.0H25 0.1H26 0.0H27 0.0H28 0.0H29 0.1H30 0.0H31 0.1H32 0.0H33 0.0H34 0.0
H35 0.1H36 0.0H37 0.0H38 0.0H39 0.0H40 0.0H41 0.0H42 0.0H43 0.0H44 0.0H45 0.0H46 0.0H47 0.0H48 0.0H49 0.0H50 0.0
Channel Name: Waveform I1Frequency: 59.96 HzCurrentRatio: 1.000
1
-600.0
-400.0
-200.0
0.000
200.0
400.0
600.0
V
8:15:00.257 AM6/28/2010
8:15:00.274 AM6/28/2010
3 mSec/Div16.678 (mS)
Name Date Time Duration RMS UnitsWaveform U1 6/28/2010 8:15:00.257 AM 16.678 488.8 VWaveform U2 6/28/2010 8:15:00.257 AM 16.678 487.7 VWaveform U3 6/28/2010 8:15:00.257 AM 16.678 487.3 V
Waveform U1488.81 Vrms, 1.21 %THD
0
10
20
30
40
50
60
70
80
90
100
1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM
6/28/2010 - 8:15:00.000 AMVal333.9 Waveform U1-686.3 Waveform U2352.4 Waveform U3
Waveform U1
(%) (%) (%)H01 100.0H02 0.0H03 0.6H04 0.0H05 0.8H06 0.0H07 0.3H08 0.0H09 0.0H10 0.0H11 0.2H12 0.0H13 0.2H14 0.0H15 0.0H16 0.0H17 0.2
H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.2H24 0.0H25 0.1H26 0.0H27 0.0H28 0.0H29 0.2H30 0.0H31 0.1H32 0.0H33 0.0H34 0.0
H35 0.2H36 0.0H37 0.2H38 0.0H39 0.0H40 0.0H41 0.2H42 0.0H43 0.1H44 0.0H45 0.0H46 0.0H47 0.2H48 0.0H49 0.1H50 0.0
Channel Name: Waveform U1Frequency: 59.96 HzVoltageRatio: 1.000
3
NamePower Line1Power Line2Power Line3
Power Sum of Phases
Photo:Start Date: 6/28/2010Start Time: 8:15:00 AMDuration: 0:0.000 (M:S)W: -6.425E+3 WVAR: -98.53E+3 WVA: 98.74E+3 WPower Factor: -65.00E-3Displacement Power Factor: -64.00E-3TAN: 15.56VoltageRatio: 1.000CurrentRatio: 1.000
4
Photo Report
OperatorCarlton ElectricJoe Tate1284 So Cherokee Street
Denver , CO 802233038841536
Test SiteEquity Office
,
Database: C:\Program Files\DataView\DataFiles\PowerPad\PAN 1 ATS normal.dvb
CommentsPanorama 01 / ULA UPS Testing
277/480 volt 3 phase reading taken at ATS
5
Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]
0244 PAN I UPS Testing Chiller Panel Inspection Prepared For:
Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699
1284 South Cherokee Street
IR20000108_43052.is2 1/8/2000 9:19:27 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 87.6°F
Image Range 83.3°F to 93.0°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:19:27 PM
1284 South Cherokee Street
IR20000108_43053.is2 1/8/2000 9:20:25 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 90.3°F
Image Range 85.3°F to 95.1°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:20:25 PM
1284 South Cherokee Street
IR20000108_43054.is2 1/8/2000 9:20:56 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 89.1°F
Image Range 81.5°F to 95.1°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:20:56 PM
1284 South Cherokee Street
IR20000108_43055.is2 1/8/2000 9:21:25 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 88.0°F
Image Range 82.2°F to 95.0°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:21:25 PM
1284 South Cherokee Street
IR20000108_43056.is2 1/8/2000 9:22:01 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 84.1°F
Image Range 80.4°F to 89.2°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:22:01 PM
1284 South Cherokee Street
IR20000108_43057.is2 1/8/2000 9:22:33 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 84.8°F
Image Range 79.0°F to 88.7°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 9:22:33 PM
1284 South Cherokee Street
Summary All temperature readings are in normal range We were able to test only the primary source of power. Secondary was unavailable do to usage. All Gear was visually inspected for defects
Power Photo:
ATS Summery
The ATS that feeds the Panel TCGSDP appears to be in good functional condition.
Power Quality Photo: We placed the three phase watt meter on this panel to get an idea of the power
quality that is coming into the building. This would also give us an idea of the condition of the UPS units.
During this Photo UPS South was powered on with no load. Note that the Current or ‘I’ reading has some
‘Flat Topping’ of the sine wave. This is common with the old UPS units as they relied heavily on Pulse
Width Modulation like the older VFD’s.
Note that the current wave form for A Phase shows more flat topping then the other two phases. A phase
would fail on the inverter 4 hours later.
Thermal Image: All Terminations were within limits for Temperature.
Section II Panel TCGSDP
Panel TCGSDP Summery Thermal Imagery: All Terminations were within limits of temperature. At the conclusion of the testing we arranged the breakers to bypass the UPS units.
Section III Powerware 375 UPS North w/ Bypass
UPS North External Bypass Panel: Thermal Imagery: All readings were within Normal Temperature. Kirk Key Interlock is missing from MIB Breaker. This will allow Utility power to be thrown in with UPS Output power (>30 degrees out of phase) and that could be very dangerous as it would be equivalent to a 3Phase 480 volt short.
Page 1 of 2 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749
Location: __PAN 1___UPS North____________________________
. Liebert PPC Inspection Checklist
Unit Model Number: __Powerware 375____________________________
Technician/Date: __Joe Tate _________________________________
Exterior Inspection
_x__ Confirm that the exterior of unit is clean and cables, connections and
housings are securely fastened.
_x__ Use vacuum to clean exterior ventilation openings and grilles.
Interior Inspection:
_x__ Remove accessible exterior panels and pull quick disconnect ground
connection terminals located on the unit chassis.
_N/A_ Perform IR scan on all electrical connections in transformer, mains and
unit and panel boards and document with photos:
(No Load available on unit for Thermal scan)
_x__ Inspect all wire and conductors’ insulation for damage.
_x__ Check all transformer terminal connections for tightness. Re-torque if
necessary.
_x__ Check all breaker connections for tightness. Re-torque if necessary.
_x__ Check all terminal block connections for tightness. Re-torque if necessary.
_x__ Check transformer mounting bolts for tightness. Re-torque if necessary.
_x__ Check that the intake and exhaust air screens are clean and free of
obstructions.
Page 2 of 2 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
_x__ Reconnect the panel ground wires Replace side panels, leaving access to
circuit breakers for the following procedure:
_x__ Check and record the input voltage at the main input breaker. Measured
voltages should correspond to the unit’s nameplate input voltage.
Volts, phase A to phase B = ___488.8_________________
Volts, phase B to phase C = ___487.7_________________
Volts, phase C to phase A = ___487.7_________________
_x___ Check and record the voltages at the line-side terminals of the output
circuit breaker. Measured voltages should correspond to the unit’s nameplate
output voltage (within +4%,-0%). (Reading not availabler)
Volts, phase A to phase B = _____0_______________
Volts, phase B to phase C = _____0_______________
Volts, phase C to phase A = _____0_______________
Volts, phase A to neutral = _____0_______________
Volts, phase B to neutral = _____0_______________
Volts, phase C to neutral = _____0_______________
.CONTROL VOLTAGE:
_x__ Measure and record the DC control voltage on terminals 1 (+) and 3 (com).
N/A_ Control Voltage = ____________________
Page 1 CARLTON ELECTRIC
CABINET: 1
STRING VOLTAGE: NA Max C rate of rise: NA
AC RIPPLE CURRENT: NA
DC VOLTS AC MV DC VOLTS AC MV
BATTERY : 1 6.03 0F 21 7.97 0F
2 5.23 0F 22 7.2 0F
3 5.22 0F 23 5.23 0F
4 5.56 0F 24 5.22 0F
5 11.76 4.61 25 5.41 0F
6 5.33 0F 26 6.45 0F
7 5.56 0F 27 5.22 0F
8 5.23 0F 28 5.45 0F
9 5.36 0F 29 7.97 0F
10 5.4 0F 30 6.33 0F
11 5.78 0F 31 5.72 0F
12 5.88 0F 32 5.11 0F
13 10.51 0F 33 7.48 0F
14 7.21 0F 34 5.1 0F
15 5.22 0F 35 4.8 0F
16 3 0F 36 3.2 0F
17 7.27 0F 37 7.61 0F
18 5.42 0F 38 3.89 0F
19 5.22 0F 39 5.27 0F
20 5.36 0F 40 3.11 0F
CABINET: 2
STRING VOLTAGE: NA Max C rate of rise: NA
AC RIPPLE CURRENT: NA
DC VOLTS AC MV DC VOLTS AC MV
BATTERY : 1 7.61 0F 21 5.99 0F
2 5.08 0F 22 5.61 0F
3 7 0F 23 5.22 0F
4 4.21 0F 24 5.12 0F
5 10.03 0F 25 8.96 0F
6 5.23 0F 26 7.23 0F
7 5.22 0F 27 6.75 0F
8 7.1 0F 28 4.86 0F
9 10.01 0F 29 9.8 0F
10 5.32 0F 30 3.55 0F
11 6.45 0F 31 4.83 0F
12 3.11 0F 32 5.78 0F
13 7.05 0F 33 8.07 0F
14 6.22 0F 34 7.23 0F
15 5.02 0F 35 6.58 0F
16 5.22 0F 36 8.1 0F
17 7.45 0F 37 9.71 0F
18 3.45 0F 38 5.23 0F
19 3.44 0F 39 5.45 0F
20 3.1 0F 40 7.82 0F
Carlton ElectricSummery page
Cabinet 1:
Cabinets 1 and 2: All batteries in these cabinets are at least 8 years old. All batteries failed
the internal Impedance measurments.
Cabinet 2:
Cabinet 3:
Cabinets 3 and 4: These two cabinets were emptied of all batteries.
Summery:
Note position of Control Circuit Breaker. Also Switches S2 and S3 (Battery Disconnect are in the open position. Summary of UPS North diagnostics:
UPS > Batteries > Cabinets 1 & 2 > Total of 80 batteries: The batteries in this unit were manufactured by Dynasty (Original OEM) and were at least 8 years old. These were completed discharged all the way down to the Core Cell.
UPS > Batteries > Cabinets 3 & 4 > these cabinets were emptied out in Dec of 2007.
UPS > Controls: The UPS was found with the main control circuit breaker in the off position. Battery disconnects switches S2 & S3 were also in the open position.
UPS > Rectifier board: There were 4 attempts to fire up the rectifier board. Rectifier CB1 had been left in the closed position but when 480 volts was applied CB1 Tripped. Further attempts were not made as permissions would need to be given to proceed with board repairs and maintenance.
UPS > Summery
Section IV
Panel UPS DP North
Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]
0244 PAN I UPS Testing Panel UPS DP North Prepared For:
Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699
1284 South Cherokee Street
IR20000109_43064.is2 1/9/2000 11:46:55 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 88.4°F
Image Range 86.3°F to 93.3°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:46:55 PM
1284 South Cherokee Street
IR20000109_43065.is2 1/9/2000 11:47:22 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 87.1°F
Image Range 85.8°F to 90.4°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:47:22 PM
1284 South Cherokee Street
IR20000109_43066.is2 1/9/2000 11:48:11 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 87.1°F
Image Range 85.3°F to 90.2°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:48:11 PM
1284 South Cherokee Street
IR20000109_43067.is2 1/9/2000 11:48:48 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 89.2°F
Image Range 86.8°F to 99.5°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:48:48 PM
1284 South Cherokee Street
Summary All temperature readings are in normal range All Gear was visually inspected for defects
Section V
Powerware 375 UPS South w/ Bypass
UPS South External Bypass Panel: Thermal Imagery: All readings were within Normal Temperature. Kirk Key Interlock is missing from MIB Breaker. This will allow Utility power to be thrown in with UPS Output power (>30 degrees out of phase) and that could be very dangerous as it would be equivalent to a 3Phase 480 volt short.
Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]
0244 PAN I UPS Testing Panel UPS South Bypass Prepared For:
Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699
1284 South Cherokee Street
IR20000108_43058.is2 1/8/2000 10:24:02 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 86.1°F
Image Range 85.1°F to 89.6°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 10:24:02 PM
1284 South Cherokee Street
IR20000108_43059.is2 1/8/2000 10:24:34 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 84.7°F
Image Range 83.8°F to 88.7°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 10:24:34 PM
1284 South Cherokee Street
IR20000108_43060.is2 1/8/2000 10:25:21 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 85.5°F
Image Range 84.7°F to 88.5°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 10:25:21 PM
1284 South Cherokee Street
IR20000108_43061.is2 1/8/2000 10:26:24 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 86.3°F
Image Range 85.3°F to 88.7°F
Lens Description 20mm/F0.8
Image Time 1/8/2000 10:26:24 PM
1284 South Cherokee Street
IR20000109_43062.is2 1/9/2000 12:44:33 AM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 88.9°F
Image Range 88.3°F to 90.2°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 12:44:33 AM
1284 South Cherokee Street
IR20000109_43063.is2 1/9/2000 12:45:22 AM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 88.1°F
Image Range 86.8°F to 88.9°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 12:45:22 AM
1284 South Cherokee Street
Summary All temperature readings are in normal range All Gear was visually inspected for defects
Page 1 of 2 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749
Location: __PAN 1___UPS South____________________________
. Liebert PPC Inspection Checklist
Unit Model Number: __Powerware 375____________________________
Technician/Date: __Joe Tate _________________________________
Exterior Inspection
_x__ Confirm that the exterior of unit is clean and cables, connections and
housings are securely fastened.
_x__ Use vacuum to clean exterior ventilation openings and grilles.
Interior Inspection:
_x__ Remove accessible exterior panels and pull quick disconnect ground
connection terminals located on the unit chassis.
_N/A_ Perform IR scan on all electrical connections in transformer, mains and
unit and panel boards and document with photos:
(No Load available on unit for Thermal scan)
_x__ Inspect all wire and conductors’ insulation for damage.
_x__ Check all transformer terminal connections for tightness. Re-torque if
necessary.
_x__Check all breaker connections for tightness. Re-torque if necessary.
_x__ Check all terminal block connections for tightness. Re-torque if necessary.
_x__ Check transformer mounting bolts for tightness. Re-torque if necessary.
_x__ Check that the intake and exhaust air screens are clean and free of
obstructions.
Page 2 of 2 All Information contained within this document is confidential and proprietary. This document and
information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of
Carlton Electric.
_x__ Reconnect the panel ground wires Replace side panels, leaving access to
circuit breakers for the following procedure:
_x__ Check and record the input voltage at the main input breaker. Measured
voltages should correspond to the unit’s nameplate input voltage.
Volts, phase A to phase B = ___488.8_________________
Volts, phase B to phase C = ___487.7_________________
Volts, phase C to phase A = ___487.7_________________
_x___ Check and record the voltages at the line-side terminals of the output
circuit breaker. Measured voltages should correspond to the unit’s nameplate
output voltage (within +4%,-0%). (Reading not availabler)
Volts, phase A to phase B = _____0_______________
Volts, phase B to phase C = _____0_______________
Volts, phase C to phase A = _____0_______________
Volts, phase A to neutral = _____0_______________
Volts, phase B to neutral = _____0_______________
Volts, phase C to neutral = _____0_______________
.CONTROL VOLTAGE:
_x__ Measure and record the DC control voltage on terminals 1 (+) and 3 (com).
120v_ Control Voltage = ____________________
Page 1 CARLTON ELECTRIC
CABINET: 1
STRING VOLTAGE: NA Max C rate of rise: NA
AC RIPPLE CURRENT: 1.7A
DC VOLTS G Ohms DC VOLTS AC MV
BATTERY : 1 11.6 5.35 21 11.8 4.53
2 11.7 5.2 22 11.77 4.6
3 11.5 5.3 23 11.7 4.55
4 11.6 4.6 24 11.8 5.22
5 11.8 4.47 25 11.74 4.35
6 11.6 5.1 26 11.6 4.6
7 11.7 4.4 27 11.75 8.65
8 11.77 4.54 28 11.7 4.92
9 11.8 4.44 29 11.71 10.99
10 11.8 4.6 30 11.8 9.84
11 11.7 4.4 31 11.77 8.76
12 11.7 4.5 32 11.7 11.23
13 11.8 4.72 33 11.7 15.82
14 11.8 4.52 34 11.7 6.79
15 11.8 4.5 35 11.8 6.77
16 11.8 4.5 36 11.7 8.47
17 11.77 4.89 37 11.74 4.75
18 11.75 4.8 38 11.8 5.96
19 11.7 4.7 39 11.7 4.99
20 11.8 4.4 40 11.7 4.55
CABINET: 2
STRING VOLTAGE: NA Max C rate of rise: NA
AC RIPPLE CURRENT: 1.99
DC VOLTS AC MV DC VOLTS AC MV
BATTERY : 1 11.76 4.98 21 11.78 0F
2 11.7 5 22 9.88 9.39
3 11.82 4.99 23 11.11 8.66
4 11.77 5.21 24 11.65 5.67
5 11.72 5.15 25 11.74 6.77
6 11.77 4.95 26 11.21 6.33
7 11.67 4.6 27 11.13 6.76
8 11.77 5 28 11.45 4.98
9 11.78 5.22 29 11.63 0F
10 11.43 5.23 30 11.55 4.88
11 10.55 5.22 31 11.71 4.86
12 11.33 5.4 32 11.7 4.85
13 11.76 10.9 33 11.76 5.48
14 11.78 6.4 34 11.77 5.52
15 11.77 5.53 35 11.55 5.6
16 11.76 5.61 36 11.7 4.9
17 11.76 5.62 37 11.71 9.76
18 11.01 5.68 38 11.75 5.62
19 11.8 5 39 11.77 5.65
20 11.79 5.67 40 11.78 6.25
Carlton ElectricSummery page
Cabinet 1:
Batteries in cabinets 1 and 2 have been left off for to long to be considered reliable
enough for maintaining a load for any length of time. The cut off from the manufacturere
for Impedance is 4.0 Gig Ohms and all of these batteries exceed that limit.
Cabinet 2:
Cabinet 3:
The batteries in cabinets 3 and 4 have been left without a charge for to long to recover or
even get a goot test read off of.
Summery:
Summary of UPS South diagnostics:
UPS > Batteries > Cabinets 1 & 2 > Total of 80 batteries: The batteries in this unit are a Generic manufacture and are dated 12/2007. These show a propensity to maintain a charge albeit week.
UPS > Batteries > Cabinets 3 & 4 > these cabinets were disconnected in December of 2007. The Batteries were left behind in the cabinets and will need to be disposed of at some point. Some batteries are showing signs of leaking acid at the terminals.
UPS > Controls: The UPS was found with the main control circuit breaker in the on
position however the unit was off. Battery disconnects switches S2 & S3 were also in the closed position. The Mimic Panel fired up on day two of testing but was so burned in that it could hardly be made out (see photo above - yes it is on).
UPS > Rectifier board: The 3phase bridge rectifier was in good condition and performed adequately. Rectifier CB1 had been left in the closed position.
UPS > Inverter boards: The 3phase inverter boards fired up when the control power was
first reset. The unit functioned properly and went into normal mode. Sometime between 1530 and 0800 the next day the unit failed out at the inverter board. Both 800A SCR fuses were blown on the A phase inverter bus. We replaced the fuses on the A phase using fuses out of the UPS North (Inverter A Phase in photo above). The issue appears to be a bas sequencing board for the inverter. No further tests were completed without further authorization.
UPS Inverter Board Continued:
Scope Reading A: A Phase Inverter at 0 volts before fuse replacement. Scope Reading B: B Phase Inverter at 544 volts per specification for equipment.
Scope Reading A: A Phase After fuse Replacement > During Capacitor Discharge state. Scope Reading B: B Phase during Capacitor discharge state.
A Phase Sequencing Board. Note the Scorch mark in the center of the board around the Resistor.
Further attempts were not made for Start Up or Repairs as permissions would need to be given to proceed with board repairs and maintenance (We are also looking for spare parts for this model of UPS.
UPS > Summery: Between the batteries needing replacement, The Mimic Panel being next to useless, and the boards that will need to be replaced, I would recommend replacement of the UPS Unit as a whole. Even with reconditioning due to the age of the unit (appears to be between 1992 and 1996 when the building was completed) I would have a hard time believing in the reliability of this unit. Spare OEM parts for this unit appear to be nonexistent (I am looking actively for any available) and that would be another good reason not to rely on this.
Section VI Panel UPS DP South
Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]
0244 PAN I UPS Testing Panel UPS DP South Prepared For:
Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699
1284 South Cherokee Street
IR20000109_43068.is2 1/9/2000 11:50:32 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 83.3°F
Image Range 82.0°F to 88.7°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:50:32 PM
1284 South Cherokee Street
IR20000109_43069.is2 1/9/2000 11:50:55 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 83.5°F
Image Range 81.5°F to 87.4°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:50:55 PM
1284 South Cherokee Street
IR20000109_43070.is2 1/9/2000 11:51:14 PM
Graph
Visible Light Image
Image Info Background Temperature 68.0°F
Emissivity 0.95
Average Temperature 83.2°F
Image Range 81.5°F to 88.7°F
Lens Description 20mm/F0.8
Image Time 1/9/2000 11:51:14 PM
1284 South Cherokee Street
Summary All temperature readings are in normal range All Gear was visually inspected for defects