Annexture I Item Description Unit Qty Remarks 1 14.4 750.00 10,800.00 b. Backfilling above Area with borrowed sod 14.4 350.00 5,040.00 2 Supply and installation of 6'' - 90° 3D Bends (A-B & C-D) Nos. 2 5,537.00 11,074.00 3 a. Hiring charge for Hydra with diesel Hour 2 900.00 1,800.00 b. Manhour cost for Riggers, Helpers & Supervisor LS LS 6,000.00 6,000.00 4 Nos. 5 1,200.00 6,000.00 5 inch-dia 12 1,405.00 16,860.00 7 inch-dia 6 1,340.00 8,040.00 8 NDT work for 6" & 3" pipe Joints at A,B,C,D,E, F, G, H LS LS 30,876.00 30,876.00 Total 96,490.00 WORK EXECUTED BY AIPL FOR PIPELINE/PIPING MODIFICATION AT MORAI TERMINAL (Ref: Enclosed Sketch) PROJECT: GSRTC TO CREATIVE TEXTILE CONNECTIVITY SPURLINE PROJECT AT VAPI CLIENT: M/S GSPC GAS COMPANY LTD. Sl.No . Unit Rate Rs. Total Amount Rs. a. Excavation of Hard Rock by Rock Breaker and backfilling from point A to E (Length 6M X Width 2M X Depth 1.2M) Rate as per item no. 260 of SOR Installation of 6'' U/G pipeline utilizing Hydra and other required tools & tackles Supply and Application of Joint Coating material for 6" line at A, B, C, D & E Installation including Welding of A/G 6" seamless pipe (6"-2 Nos Joints) Rate as per Sl. No. 5.1 of Final order Amendment Sheet Installation inc. welding of A/G 3" pipe at G & H (1.6M) (2 joints at G & H) Rate proportionate to the rate at Sl. No. 5.2 of above sheet i. NDT Charge as per bill dated 28.02.2015(copy of Bill of M/s IXAR enclosed) ii. Taxi Hiring charge for IXAR personnel on 20.01.2015 (Copy of Bill enclosed) iii. Taxi Hiring charge for IXAR on 02.02.2015 (Copy of Bill enclosed) iv. Expense on fooding charge for IXAR personnel Total Amount t AIPL overhead@ 15% Total uncluding AIPL overhead Rs. 30,876.00

description

z

Transcript of Zxx

Sheet1Annexture I

WORK EXECUTED BY AIPL FOR PIPELINE/PIPING MODIFICATION AT MORAI TERMINAL(Ref: Enclosed Sketch) PROJECT: GSRTC TO CREATIVE TEXTILE CONNECTIVITY SPURLINE PROJECT AT VAPICLIENT: M/S GSPC GAS COMPANY LTD.Sl.No.Item Description UnitQtyUnit RateRs.Total AmountRs.Remarks1a. Excavation of Hard Rock by Rock Breaker and backfilling from point A to E (Length 6M X Width 2M X Depth 1.2M)m14.4750.0010,800.00b. Backfilling above Area with borrowed sodm14.4350.005,040.002Supply and installation of 6'' - 90 3D Bends (A-B & C-D)Nos.25,537.0011,074.00Rate as per item no. 260 of SOR3Installation of 6'' U/G pipeline utilizing Hydra and other required tools & tacklesa. Hiring charge for Hydra with dieselHour2900.001,800.00b. Manhour cost for Riggers, Helpers & SupervisorLSLS6,000.006,000.004Supply and Application of Joint Coating material for 6" line at A, B, C, D & ENos.51,200.006,000.005Installation including Welding of A/G 6" seamless pipe (6"-2 Nos Joints)inch-dia121,405.0016,860.00Rate as per Sl. No. 5.1 of Final order Amendment Sheet7Installation inc. welding of A/G 3" pipe at G & H (1.6M) (2 joints at G & H)inch-dia61,340.008,040.00Rate proportionate to the rate at Sl. No. 5.2 of above sheet8NDT work for 6" & 3" pipe Joints at A,B,C,D,E, F, G, HLSLS30,876.0030,876.00i. NDT Charge as per bill dated 28.02.2015(copy of Bill of M/s IXAR enclosed) Rs.10805.00ii. Taxi Hiring charge for IXAR personnel on 20.01.2015 (Copy of Bill enclosed) Rs. 8250.00iii. Taxi Hiring charge for IXAR on 02.02.2015 (Copy of Bill enclosed) Rs. 6794.00iv. Expense on fooding charge for IXAR personnel Rs.1000.00Total Amount Rs. 26849.00Annexture IAIPL overhead@ 15% Rs. 4027.00Total uncluding AIPL overhead Rs. 30,876.00Total96,490.00

Sheet2

Sheet3