zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux –...

51
date 05/07/2011 - page 1 zVM – zLinux – InfoSphere Experiences 2011 Information Management Solutions with Linux on System z 28 June 2011 Tom Van den Bossche Hein Vandenabeele Toyota Motor Europe

Transcript of zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux –...

Page 1: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 1

zVM – zLinux – InfoSphere Experiences 2011

Information Management Solutions with Linux on System z

28 June 2011

Tom Van den Bossche – Hein Vandenabeele

Toyota Motor Europe

Page 2: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 2

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 3: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 3

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 4: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 4

Toyota – in the World

• Established in 1937

• 77 manufacturing companies in 27 countries

• Vehicles sold in more than 170 countries worldwide

• Over 8.4 million vehicles sold worldwide in 2010

• Market share: 47% in Japan (2009), 15% in US (2010),

4.4% in Europe (2010)

• Over 3 million cumulative hybrid sales

• €142 billion net revenue in FY 2008-09

• Approx. 318,000 employees worldwide

Page 5: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 5

Regional Headquarters

Toyota Motor

Corporation

(TMC)

Toyota Motor Asia

Pacific Pte Ltd.

(TMAP-MS)

Toyota Motor Europe

NV/SA (TME)

Toyota Motor North

America, Inc. (TMA)

Page 6: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 6

Toyota – in Europe

• Began selling cars in 1963

• 9 manufacturing plants in 7 countries

• Over €7 billion invested since 1990

• Approx. €5 billion spent with European-based suppliers per year

• 808,320 vehicles sold in 2010

• Over 300,000 hybrid vehicles sold in Europe to date

• 4.4 % market share in 2010

Page 7: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 7

• 30 NMSCs

• 56 Countries

• 272 Lexus retailers

• 2,856 Toyota retailers

National Marketing & Sales Companies

Not shown: Toyota Caucasus LLP, Union Motors Ltd (Israel), Toyota Motor Kazakhstan LLP

Page 8: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 8

14 Parts Logistics Centres

11 Vehicle Logistics Centres

Logistic Companies

Zeebrugge

Vehicle Centre Toyota Parts

Centre Europe

Page 9: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 9

TMIP - Engine Plant

Toyota Caetano Portugal Commercial vehicles

TMUK - Engine Plant

TPCA - Aygo

TMMF - Yaris

TMMP - Engine & Transmission Plant

TMMR - Camry

TMMT - Auris & Verso

TMUK - Auris & Avensis

Manufacturing Facilities

Page 10: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 10

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 Including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 11: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 11

TME – Current IT Infrastructure

Mainframe: 2 x z196 UNIX: 320 images (AIX: Power4, Power5, Power7 - Solaris: 40 Sun Blades) Linux: Under VM/Ware on HP Blades and HP Proliant AS/400: 18 Lpars 3 physical machines Windows: 30 VM Ware ESX Servers Hosting 500 virtual machines Lotus Notes, File Sharing, Printing, Web, …

Page 12: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 12

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 13: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 13

New z196 Including z/Linux

TME had 2 x z9: - Acquired Jan 2007 - PSLC Pricing Scheme - Not upgradable after June 2011 (IBM decision ) TME has now 2 x z196: - Acquired Jan 2011 - Rationale: 1) Be sure to have enough capacity for the future 2) Switch PSLC to AWLC to save €€€

- Negotiated inclusion of 2x2 IFLs, zVM for future opportunities

Page 14: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 14

z/VM - z/Linux – Opportunities

A number of applications rely on heavy TCPIP communication with DB2 on z/OS: - InfoSphere DataStage on Sun Solaris - WebSphere Application Server on Sun and AIX - Cognos BI on Windows Performance Issue: Network configurations and the huge number of communications cause delay in the applications

Page 15: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 15

z/VM - z/Linux – Opportunities

Z196

zOS

DB2 V9

High Volume

Latency

Important

High Volume Low Volume

High network traffic is an obstacle for good application response times

Application response time not good

Page 16: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 16

z/VM - z/Linux – Opportunities

Solution:

This can be mended by System z HiperSockets:

- Network in a box

- Latency very close to 0 msec which will prove to be

significant for performance

Page 17: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 17

z/VM - z/Linux – Opportunities

Z196 TASC

DWH Lpar

zOS

DB2 V9

z/Linux / z/VM

Hip

erS

ockets

Hig

h V

olu

me

Low Volume

Low Volume

High network traffic has been moved to a zero latency network-in-the-box

Application response times a lot better (50% - 80%)

Page 18: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 18

Server Consolidation: * Simulation was done by PSSC (IBM Montpellier) based on performance data - for Windows (Cognos) - for Solaris (DataStage, WebSphere App Server) * It shows that in our specific case we can achieve positive consolidation ratios * Ratio depends on a number of parameters

z/VM - z/Linux – Opportunities

Page 19: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 19

Server Consolidation: * Advantages Software Licence Cost (PVU Scheme is used) Software Annual Support Costs Number Of Servers CR Space and Cooling System Management Efficiency Networking infrastructure Hardware maintenance DR Strategy …

z/VM - z/Linux – Opportunities

Page 20: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 20

z/Linux - PSSC Sizing Study - Capacity

Peak

Total Equivalent

MIPS on z196

Different Physical Servers That Will be consolidated in the simulation

* the graph shows the consolidation of the workload of the intended (physical) machines * goal is to determine how many IFLs are needed to replace the open processors

1 IFL

2 IFLs

Page 21: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 21

z/Linux – Typical Sizing Estimate for TME

IBM Software Distributed System z196

Datastage 16 cores (50 PVUs per core)

800 PVUs

2 cores (120 PVUs per IFL)

240 PVUs

WebSphere 40 cores (50 PVUs per core)

2000 PVUs

4 cores (120 PVUs per IFL)

480 PVUs

Cognos 12 cores (50 PVUs per core)

600 PVUs

4 cores (120 PVUs per IFL)

480 PVUs

Additional Software

management tools

68 cores (50 PVUs per core)

3400 PVUs

4 cores (120 PVUs per IFL)

480 PVUs

* z/Linux uses the PVU (Processor Value Unit) pricing scheme * You pay more PVUs for an IFL but if you can consolidate, you might have a €€€ bonus

SW Invoice Benefit because

LESS PVUs

Page 22: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 22

z/Linux - PSSC Sizing Study - Results

• 3 x z196 IFL engines are needed to support the consolidation

of 12 distributed servers

Distributed core / IFLs consolidation ratio of around 22

(68/3)

TME decided to install 4 IFL to have a configuration in

parallel

Page 23: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 23

z/Linux - PSSC Sizing Study - Results

Impact of the consolidation project:

- Savings on Software Licenses and Software annual support costs

- Savings on Power and Cooling

- Savings on Data Center room

- Savings on Network infrastructure

- Savings on System Management efficiency

- Savings on Hardware maintenance costs

- Improvements on Disaster Recovery plan

- Improvements of overall Quality of service

- Less network bandwidth needed

- …

To be confirmed case

by case for each

environment !

Page 24: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 24

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Conclusions

Page 25: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 25

z/VM – Installation - Experiences

* : z/VM and z/Linux on IBM System z – The Virtualisation CookBook for SLES11SP1 (SG24-7931-00) is of excellent quality * Order / Download z/VM + Maintenance via ShopzSeries * Write zip files on DVD * Installation using HMC using ‘Integrated 3270 Console’ * z/VM lpar needs to be defined in IOCDS with specific profile (IFLs !) * DASD used was in same range as zOS DASD: not recommended !

Page 26: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 26

z/VM – Profile Definition

Page 27: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 27

z/VM – Installation - Experiences

* Installation of Vanilla z/VM took 2h15min - 1h00 real effort - 1h15 waiting for copying operations to DASD to complete * IPL z/VM using HMC * No problems at all * Vanilla z/VM (‘Out Of The Box’): - No RACF - No DIRMAINT

Page 28: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 28

z/VM – Up and … running !

Page 29: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 29

z/VM – Experiences (2)

- z/VM commands need a bit of getting used to

link * cf1 cf1 mr

acc cf1 f copy profile xedit z = = a

- Getting some knowledge before is a plus - Excellent HELP is provided: ‘HELP command’’

Page 30: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 30

z/VM – Future

Remaining questions - opportunities: * Getting a better knowledge of the product * Backup * Recovery * Installation of a test z/VM system * Standardisation (naming, …) * Performance and Tuning * Availability * Security: Implement RACF * …

Page 31: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 31

z/Linux – RedHat or SUSE

* Only these two are supported on System z * IBM doesn’t care which one you choose. You can run whichever you want. * Differences ? * Packaging * Price * Personal Experience / Preference * YAST: Yet Another Setup Tool (SUSE) * SUSE is mostly used in Belgium TME has chosen SUSE

Page 32: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 32

z/Linux – Installation

* : z/VM and z/Linux on IBM System z – The Virtualisation CookBook for SLES11SP1 (SG24-7931-00) is of excellent quality * Download ISO image from SUSE and mount ISO images on NFS server: - Tried (free) PC NFS servers. Didn’t work - Asked AIX colleagues for help with their NAS * Create parameter files for new zLinux machine * IPL from bootstrap files * YAST to configure

Page 33: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 33

z/Linux – Installation

Cloner Image

Golden Image

User Image User

Image User Image User

Image

This image will CLONE the

Golden Image

This image is the CLONE

source These images are

the usable images. Creation in 5 mins

(snapshot)

Page 34: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 34

Hipersockets

- High speed network within one System z (Internal LAN) - Created by in memory µcode communication - 100% secure: no wires, no sniffing, no routers, no adapters, no functional differences, no encryption needed - Latency = 0 or not measurable (using PING) - Easy implementation

Page 35: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 35

Hipersockets - IODF

-> IO Configuration: chpid type IQD

Page 36: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 36

Hipersockets - Devices

Page 37: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 37

Hipersockets – TCPIP config

Page 38: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 38

Hipersockets – VM definition

Page 39: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 39

Hipersockets - Linux

Page 40: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 40

Hipersockets - example

Database access Round trip (in=32K, out=32K)

1,000

1,500

2,000

2,500

3,000

3,500

4,000

0 20 40 60 80 100

Observation number

Mic

roseco

nd

s

HiperSocket

Wired dev

Wired prod

DWH Lpar

z/OS

DB2 V9

192.0.1.9

z/Linux / z/VM

Hip

erS

ock

ets

Db

2p

ing

(3

2K

) 192.0.1.11

Page 41: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 41

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 42: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 42

Datastage at TME

- Graphical E(xtract)T(ransform)L(oad) tool

SOURCE

(DW2P tables +

delta files)

TARGET

(DW2P tables)

EXTRACT

TR

AN

SF

OR

M

LOAD

- Might replace COBOL batch for future ETL projects - Current version 8.0.1 running on Sun Solaris - Processes are delayed due to high number of lookups from Solaris to DB2 on z/OS

Page 43: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 43

Datastage on z/Linux – Phase 1

POC testing at PSSC – January 2011 * PSSC provided an infrastructure with - Datastage 8.5 on z/Linux using HiperSockets - DB2 for z/OS V9 as source/target environment

* Conclusions: - Migration (export-import-compile) from Datastage 8.0.1 to 8.5 proves to be easy (very minor application modifications needed) - 1 IFL is not enough (1 process can block entire CPU) – need at least 2 (virtual) – parallelism ! - Enormous performance improvements (> 50% reduction in elapsed times)

Page 44: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 44

Datastage on z/Linux – Phase 2

TME implementation – March 2011

* Install Datastage 8.5 on z/Linux using Hipersockets - gcc compiler problems needed to use

SLES10 SP3 (solved in meantime) - testing ongoing – still some memory problems (related to version of datastage)

Page 45: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 45

Datastage on z/Linux – TPC-H

TPC-H is a decision support benchmark Sort and load sequential file of 1 GB into DB2 table

TPCH lineitem scale 1GB load (elapsed in hh:mm:ss)

00:00:00

00:07:12

00:14:24

00:21:36

00:28:48

00:36:00

00:43:12

00:50:24

2 4 8 16 32

Nodes

Ela

psed

tim

e

Solaris

Windows

zLinux 1 IFL

zLinux 2 IFL

-80%

Degradation due to overhead

Increased nodes (parallelism)

Page 46: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 46

Datastage on z/Linux – TPC-H

the number of nodes (parallellism inside Datastage) on

zLinux is much more scalable then on Solaris, resulting in major throughput advantages

TPCH lineitem scale 1GB load (throughput)

0

10,000

20,000

30,000

40,000

50,000

60,000

2 4 8 16 32

Nodes

# r

ow

s / s

ec Solaris

Windows

zLinux 1 IFL

zLinux 2 IFL

X 10

Page 47: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 47

Datastage on z/Linux - TME applications

TME processes (Elapsed)

00:00:00

01:12:00

02:24:00

03:36:00

04:48:00

06:00:00

07:12:00

08:24:00

09:36:00

SDR WAT-1 WAT-2

Testcase

Ela

psed

tim

e

Solaris

zLinux 1 IFL

zLinux 2 IFL

-50%

-50% -80%

Elapsed time (hh:mm:ss) reduction > 50% !

Page 48: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 48

Agenda

• Overview of Toyota Motor Europe (TME)

• TME - Current IT Infrastructure

• New z196 including zLinux

• Installation zVM and zLinux

• InfoSphere DataStage

• Our Conclusions

Page 49: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 49

Our Conclusions

* HiperSockets dramatically enhances the application response time. This is the main benefit in our case. If your data is elsewhere, then HiperSockets might not be of big use to you

* Possibility to consolidate an important number of ‘open’ processors onto a limited number of IFLs with all associated benefits. We should consider benefits in licensing, management, environmentals, …

* Both z/VM and z/Linux have a (significant) learning curve * Still lots of things to be investigated (sizing, load balancing, DR, security, …)

Page 50: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 50

Questions ?

Page 51: zVM zLinux InfoSphere Experiences 2011 - Infocura - · PDF filezVM – zLinux – InfoSphere Experiences 2011 ... Lotus Notes, File Sharing, Printing, Web, ... from Datastage 8.0.1

date 05/07/2011 - page 51

Thank You !