The topology of the Hybrid power system秘密▲

Generator1

Generator2ATS BAT

48V

Power-48V24V

220V

RBS24V

MW48V

Page 3: ZTE HYBRID Installation Guide

Content

—Install the hybrid power system Install the power and battery cabinet Install the battery Install the load cables Install power alarm cables Install ATS Make the labels —The SWAP procedure

Page 4: ZTE HYBRID Installation Guide

Install the power and battery cabinet

Content

Page 5: ZTE HYBRID Installation Guide

Install the power and battery cabinet-fix the cabinet

Expand bolts(total 8 bolts for each cabinet)

The RD engineer will design paper footprint of the power and battery cabinet to help the subcontractor to make hole.

Page 6: ZTE HYBRID Installation Guide

Battery Cabinet with DC Air Conditioner

Dimension:2100 mm × 1050 mm × 1110 mm

(H × W × D)

Dimension:2100 mm × 1050 mm × 1110 mm

(H × W × D)

Battery quantity :24*2 V/1000 AH battery cells

Battery quantity :24*2 V/1000 AH battery cells

Cabinet Weight:250 kg approximately

Cabinet Weight:250 kg approximately

Page 7: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install AC cable

This breaker to ZTE power

ZTE AC input power

ZTE AC input breaker

The specification of AC cable is 4*10mm2 and it must be outdoor used

Page 8: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install battery

Install the battery cableThe biggest screw is for the battery cable.

The breaker must be off

Page 9: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install battery temp sensor

Battery temp sensor should be in the top of the battery cabinet( 2nd battery of top layer)

The other side of battery temp sensor should be installed here. You can see the terminal mark on the cover

Page 10: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install environment temp sensor

The environment temp sensor should be installed in the top of the power cabinet

Page 11: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install cable for battery cabinet cooling

Alarm cable for Cooling Power cable The terminals should be covered with tap very well

the other side of the power cable should be in fuse F204

The alarm cable should be installed here

Page 12: ZTE HYBRID Installation Guide

Install the power and battery cabinet-install door alarm cable for battery cabinet

The door alarm cable should be installed here

Page 13: ZTE HYBRID Installation Guide

Install battery

Content

Page 14: ZTE HYBRID Installation Guide

Battery Cabinet with DC Air Conditioner

Dimension:2100 mm × 1050 mm × 1110 mm

(H × W × D)

Dimension:2100 mm × 1050 mm × 1110 mm

(H × W × D)

Battery quantity :24*2 V/1000 AH battery cells

Battery quantity :24*2 V/1000 AH battery cells

Cabinet Weight:250 kg approximately

Cabinet Weight:250 kg approximately

Page 15: ZTE HYBRID Installation Guide

Install battery

The battery layout of top layer

The battery layout of bottom layer

The layout should strictly follow thisWhen connect the battery to the Power ,the battery breaker must be off

Breaker

Battery voltage detect signal cable .each battery has one cable

Page 16: ZTE HYBRID Installation Guide

Install battery

The battery cell voltage detect cable

Page 17: ZTE HYBRID Installation Guide

Install the load cables

Content

Page 18: ZTE HYBRID Installation Guide

Install load cable –Load distribution

Breaker-48V

F10125A

F10225A

F10325A

F10425A

F10525A

F10625A

F10720A

F10825A

F10925A

F11025A

F11163A

F11263A

F11363A

F11463A

F11540A

Load

ZXD2430-1

ZXD2430-2

ZXD2430-3

ZXD2430-4

ZXD2430-5

ZXD2430-6

INV Dc cooling

Spare Spare RBS1 RBS2 RBS3 RBS4 3G

Breaker-48V

F20116A

F20116A

F20316A

F20416A

F20510A

F20610A

Load

MW1 MW2 MW3 Battery cooling

DC security light

AWL

24V NO1100A

NO2100A

NO3100A

NO4100A

RBS1 RBS2 RBS3 RBS4

The load connection should strictly obey the following tableF101-F114 means breaker of LLVD1 F201-F205 means breaker of LLVD2INV : inverter MW : micro wave

Page 19: ZTE HYBRID Installation Guide

Install the load cables-RBS cable(+24V RBS)

24V +(red 35mm2)

GND ( black 35mm2)

Make terminals and labels in RBS side

There are 4 pcs 24V breakers ,from left to right, RB1-RBS4

Page 20: ZTE HYBRID Installation Guide

-48V GND

Make terminal in IDU side Make sure the -48V and GND are right

Install the load cables-microwave cable

Page 21: ZTE HYBRID Installation Guide

Install alarm cable

Content

Page 22: ZTE HYBRID Installation Guide

Install alarm cable

Here 8 alarms, 16pcs signal cables.

relay 8 Alarms

A1 Generator alarm

A2 Battery alarm

A3 Rectifiers alarm

A4 System alarm

A5 High temp alarm

A6 Battery discharge

A7 Air conditioner alarm

A8 reversed

Page 23: ZTE HYBRID Installation Guide

Install alarm cable

PIN Cable connection alarm definition

X15 Pin 2 : white 3 ; bluePin 5: white 6: orange

Generator alarmBattery alarm

X16 Pin 2 : white 3 ; greenPin 5: white 6: brown

Rectifier alarmSystem alarm

X17 Pin 2 : red 3 ; bluePin 5: red 6: orange

High temp alarmBattery discharge

X18 Pin 2 : red 3 ; greenPin 5: red 6: brown

Air conditioner alarmReversed alarm

16 cores twisted-pair as alarm cable

white/blue white/orange white/green white/brown

red/blue red/orange red/green red/brown

X18

X17

X16

X15

Page 24: ZTE HYBRID Installation Guide

Install ATS

Content

Page 25: ZTE HYBRID Installation Guide

ATS

Dimension:1200mm × 890 mm × 300 mm

( H × W × D)

Dimension:1200mm × 890 mm × 300 mm

( H × W × D)

Weight:The whole machine < 130kg.

Weight:The whole machine < 130kg.

Page 26: ZTE HYBRID Installation Guide

Install ATS-Signal cable (power-ATS)

Color Cable connection

Definition

Orange/white EXB X3Pin2 whitePin3 orange

Start Generator1

Green/white EXB X3Pin 5 whitePin5 Green

Start Generator2

Brown/white SIB X12(pin1 brown(Pin3 white)

Grid feedback

Blue/white Reserved Reserved

Page 27: ZTE HYBRID Installation Guide

Make the labels

Content

Page 28: ZTE HYBRID Installation Guide

Make the labels

All the cable must have label ZTE will give the label template

Page 29: ZTE HYBRID Installation Guide

The SWAP procedure

Content

Page 30: ZTE HYBRID Installation Guide

Preparation work before SWAP-install and Debug ZTE power

Debug the power:Check whether the can work normallySet the parameters Check whether the generator can start when the battery charge current is 0.1C

Page 31: ZTE HYBRID Installation Guide

Preparation work before SWAP-connect RBS cable

24V +

GND

Make terminals and labels in RBS side

Page 32: ZTE HYBRID Installation Guide

-48V

Preparation work before SWAP-connect IDU cable

GND

Make terminal in IDU side Make sure the -48V and GND are right

Page 33: ZTE HYBRID Installation Guide

SWAP procedure-SWAP RBS power cable

After start the generator , please call MTN staff about the SWAP

Page 34: ZTE HYBRID Installation Guide

SWAP procedure-SWAP RBS power cable

24V battery +

24V battery -Take the battery + and battery – cable from RBS. And it must be covered with insulation tap

Do not touch the breaker here

Page 35: ZTE HYBRID Installation Guide

SWAP procedure-SWAP RBS power cable

Install new 24v power cable from ZTE powerMake sure the Positive and negative poles are right

Page 36: ZTE HYBRID Installation Guide

SWAP procedure-SWAP RBS power cable

AC input of 24v power module

1.Switch on the breaker of the new power cable and check the power voltage (27V)

2.Take off the A C input socket of 24V power module and check if the RF module can work

If every thing is ok, take off power alarm cable

Page 37: ZTE HYBRID Installation Guide

SWAP procedure-SWAP IDU power cable

Switch on the breaker of new IDU power cable, and check the power voltage

Take AC input power cable of IDU Insert the new DC power for IDU If the IDU can not work, rollback

After SWAP , call MTN engineer to check if every is OK

Page 38: ZTE HYBRID Installation Guide

Tidy UP the side

1.Tidy the cable and make label2.Clean up the site3.If there is commercial power , turn off the generator

Page 39: ZTE HYBRID Installation Guide

CONNECTION OF THE SIGNAL INTERFACE

• X22 -------------------------- BMU 1• BACK 17 ------------------- VB1• DMS OUT ------------------- DMS IN• X11 OUT -------------------- X11 IN• BATT SENSOR ------------- SIB X6• X12 IN ---------------------- X 12 OUT• ALM IN ---------------------------- ALM OUT

Page 40: ZTE HYBRID Installation Guide

GEN to ATS SIGNAL CONNECTIVITY

• BROWN +12 6• BLUE -12 5• BLACK START 4• BLUE FUEL SOLENOID{33/3}• BROWN D+(NIL) DYNAMO 19(not terminated)• BLACK HWT TEMP SWITCH (16)• BROWN LOP OP(17)