Transcript of zone2 csr rates punjab
-
8/10/2019 zone2 csr rates punjab
1/251
P KIST N
W TER ND POWER DEVELOPMENT UTHORITY
ZONE-2
Lahore, Gujranwala, Sialkot, Jhang, Faisalabad, Hafizabad, Sheikhupura,Nankana sahib, Narowal, Toba Tek Singh, Bhakkar, Sahiwal, Okara,
Pakpattan and Kasur
RATES DIRECTORATECOORDINATION & MONITORING DIVISION (WATER)
WAPDA HOUSE, LAHORE (Pakistan)January, 2013
-
8/10/2019 zone2 csr rates punjab
2/251WAPDA WCSR-2013 (Zone-2)
Reproduction in part or whole of this book by an Individual, Department,Agency, Consultants, Contractor or Firm etc. is strictly prohibited.
Rs 1000/-
-
8/10/2019 zone2 csr rates punjab
3/251WAPDA WCSR-2013 (Zone-2)
-
8/10/2019 zone2 csr rates punjab
4/251
WAPDA WCSR-2013 (Zone-2)
SECTION 1
CARRIAGE OF MATERIAL,
LOADING AND UNLOADING
-
8/10/2019 zone2 csr rates punjab
5/251
WAPDA WCSR-2013 (Zone-2)
SECTION 2
EARTHWORK(EXCAVATION AND EMBANKMENT)
-
8/10/2019 zone2 csr rates punjab
6/251
WAPDA WCSR-2013 (Zone-2)
SECTION 3
DISMANTLING (DEMOLITION)
-
8/10/2019 zone2 csr rates punjab
7/251
WAPDA WCSR-2013 (Zone-2)
SECTION 4
M O R T A R
-
8/10/2019 zone2 csr rates punjab
8/251
WAPDA WCSR-2013 (Zone-2)
SECTION 5
C O N C R E T E
-
8/10/2019 zone2 csr rates punjab
9/251
WAPDA WCSR-2013 (Zone-2)
SECTION 6
B R I C K W O R K
-
8/10/2019 zone2 csr rates punjab
10/251
WAPDA WCSR-2013 (Zone-2)
SECTION 7
S T O N E M A S O N R Y
-
8/10/2019 zone2 csr rates punjab
11/251
WAPDA WCSR-2013 (Zone-2)
SECTION 8
R O O F I N G
-
8/10/2019 zone2 csr rates punjab
12/251
WAPDA WCSR-2013 (Zone-2)
SECTION 9
F L O O R I N G
-
8/10/2019 zone2 csr rates punjab
13/251
WAPDA WCSR-2013 (Zone-2)
SECTION 10
SURFACE RENDERING
-
8/10/2019 zone2 csr rates punjab
14/251
WAPDA WCSR-2013 (Zone-2)
SECTION 11
W O O D W O R K
-
8/10/2019 zone2 csr rates punjab
15/251
WAPDA WCSR-2013 (Zone-2)
SECTION 12
PAINTING AND VARNISHING
-
8/10/2019 zone2 csr rates punjab
16/251
WAPDA WCSR-2013 (Zone-2)
SECTION 13
WATER SUPPLY AND SANITATION WORKS
-
8/10/2019 zone2 csr rates punjab
17/251
WAPDA WCSR-2013 (Zone-2)
SECTION 14
ROADS AND ROAD STRUCTURES
-
8/10/2019 zone2 csr rates punjab
18/251
WAPDA WCSR-2013 (Zone-2)
SECTION 15
LINING OF CANALS
-
8/10/2019 zone2 csr rates punjab
19/251
WAPDA WCSR-2013 (Zone-2)
SECTION 16
S H E E T P I L I N G
-
8/10/2019 zone2 csr rates punjab
20/251
WAPDA WCSR-2013 (Zone-2)
SECTION 17
RIVER TRAINING AND DIVERSION WORK
-
8/10/2019 zone2 csr rates punjab
21/251
WAPDA WCSR-2013 (Zone-2)
SECTION 18
O U T L E T S
-
8/10/2019 zone2 csr rates punjab
22/251
WAPDA WCSR-2013 (Zone-2)
SECTION 19
SINKING OF WELLS
-
8/10/2019 zone2 csr rates punjab
23/251
WAPDA WCSR-2013 (Zone-2)
SECTION 20
MISCELLANEOUS
-
8/10/2019 zone2 csr rates punjab
24/251
WAPDA WCSR-2013 (Zone-2)
SECTION 21
ELECTRIFICATION
-
8/10/2019 zone2 csr rates punjab
25/251
WAPDA WCSR-2013 (Zone-2)
SECTION 22
BASIC RATES OF MATERIAL
FOR CIVIL WORKS
-
8/10/2019 zone2 csr rates punjab
26/251
WAPDA WCSR-2013 (Zone-2)
SECTION 23
BASIC RATES OF MATERIAL
FOR ELECTRIC WORKS
-
8/10/2019 zone2 csr rates punjab
27/251
WAPDA WCSR-2013 (Zone-2)
SECTION 24
BASIC RATES OF LABOUR
-
8/10/2019 zone2 csr rates punjab
28/251
WAPDA WCSR-2013 (Zone-2)
SECTION 25
BASIC RATES OF MACHINERY USAGE
-
8/10/2019 zone2 csr rates punjab
29/251
WAPDA WCSR-2013 (Zone-2)
C O N T E N T S
Section Title Pages
Preface i to iii
Abbreviation & Symbol... iv to v
Conversion Factors. vi to viii
1. CARRIAGE OF MATERIAL, LOADING AND UNLOADING. 1-1 to 1-13
A) Carriage of Material 1-1 to 1-10
B) Loading, Unloading and Stacking. 1-11 to 1-13
2. EARTHWORK (EXCAVATION AND EMBANKMENT). 2-1 to 2-8
3. DISMANTLING (DEMOLITION) 3-1 to 3-4
4. MORTAR 4-1
5. CONCRETE. 5-1 to 5-5
6. BRICK WORK.. 6-1 to 6-5
7. STONE MASONRY 7-1 to 7-5
8. ROOFING. 8-1 to 8-5
9. FLOORING. 9-1 to 9-6
10. SURFACE RENDERING 10-1 to 10-3
11. WOOD WORK. 11-1 to 11-7
12. PAINTING AND VARNISHING. 12-1 to 12-5
13. WATER SUPPLY AND SANITATION.. 13-1 to 13-24
14. ROAD AND ROAD STRUCTURES.. 14-1 to 14-5
15. LINING OF CANALS... 15-1 to 15-2
16. SHEET PILING 16-1
17. RIVER TRAINING AND DIVERSION WORKS.. 17-1 to 17-3
18. OUTLETS. 18-1 to 18-3
19. SINKING OF WELLS.. 19-1
20. MISCELLANEOUS. 20-1 to 20-24
-
8/10/2019 zone2 csr rates punjab
30/251
WAPDA WCSR-2013 (Zone-2)
Section Title Pages
21. ELECTRIFICATION 21-1 to 21-45
A-I Internal Electrification of Building.. 21-1 to 21-40
1. Point Wiring. 21-1 to 21-5
2. Miscellaneous. 21-5
3. Mains and Sub-Mains 21-6 to 21-22
4. Electrical accessories 21-23 to 21-26
5. Boards. 21-26 to 21-27
6. Fittings and Fixtures.. 21-27 to 21-28
7. Fans. 21-28 to 21-30
8. Switch Gears.. 21-30 to 21-36
A-II Internal Electrification of Building. 21-37 to 21-45
B) O/H Transmission & Distribution 21-41 to 21-44
22. BASIC RATES OF MATERIAL FOR CIVIL WORKS. 22-1 to 22-18
23. BASIC RATES OF MATERIAL FOR ELECTRICAL WORKS 23-1 to 23-14
24. BASIC RATES OF LABOUR.. 24-1 to 24-2
25. BASIC RATES OF MACHINERY USAGE 25-1 to 25-3
-
8/10/2019 zone2 csr rates punjab
31/251
WAPDA ( i ) WCSR-2013 (Zone-2)
P R E F A C E
1. The cost of a project directly depends on rates and prices of different items and inputsof a contract, therefore the rates and prices of goods, works and services comprisingcomposite rates set out in the estimate of a contract must be realistic, updated andworkable in the country. Since one of the major cost overrun factors is use of
incorrect/inappropriate methods of cost estimation; therefore, it is of utmost importanceto prepare proper cost estimates on the basis of WAPDA Composite Schedule ofRates (WCSR) or otherwise on the basis of authentic market rates, where WCSR doesnot fulfil the intended purpose for WAPDA projects.
2. The first WCSR was issued by WAPDA in 1979, subsequently revised during 1985-86,1990, 1998, 2005 and 2008 considering the changes in price, working methodologyand technology.
3. As per instructions of the Authority during 2008, separate Schedule of Rates preparedfor ten different areas. These areas termed as zones comprised districts/cities havingalmost similar range of rates/prices considering remote, hard, hilly terrain, plain and
easily accessible areas.
4. The previous WCSR has now been updated in eleven (11) zones keeping in view offluctuation and unstable costs and prices of materials, high cost of services andmachinery. This WCSR-2013 is specifically meant for Zone-2, consists of the followingdistricts/cities:
ZONE - 2 Lahore, Gujranwala, Sialkot, Jhang, Faisalabad, Hafizabad, Sheikhupura,Nankana sahib, Narowal, Toba Tek Singh, Bhakkar, Sahiwal, Okara, Pakpattanand Kasur
5. The other zone-wise distribution of districts/cities is as under:
ZONE - 1 Islamabad, Rawalpindi, Attock, Chakwal, Jhelum, Gujrat, Mandi Bahauddin,Sargodha, Khushab, Mianwali and Mir Pur, Kotli & Bhimber (A.J.K).
ZONE - 3 Multan, Khanewal, Vehari, D.G. Khan, Rajanpur, Muzaffargarh, Layyah,Bahawalpur, Rahim Yar Khan, Lodhran and Bahawalnagar
ZONE - 4 Sukkur, Nawab Shah, Khairpur, Larkana, Jacobabad, Shikarpur, Ghotki, KambarAli Khan and Nowshero Feroze
ZONE - 5 Karachi, Hyderabad, Dadu, Jamshoro, Mirpur Khas, Tharparkar, Tando AlahYar, Tando Muhammad Khan, Umar Kot, Sanghar, Thatta and Badin
ZONE - 6 Peshawar, Mardan, Charsada, Swabi, Buner, Haripur, D.I. Khan, Kark,Tank,Bannu, Laki Marwat, Kohat, Hangu,and Nowshera
ZONE - 7 Swat, Lower Dir, Upper Dir, Shangla, Malakand and Bajour, Mohmand, Khyber,South Waziristan , North Waziristan, Orakzai & Kurram Agencies
ZONE - 8 Quetta, Loralai, Zhob, Musa Khel, Qila Abdullah, Pishin, Bhag, Gandava,Mustang, Sibbi, Kohlu, Dera Bughti, Nasirabad, Bolan, Jhal Magsi, Ziarat,Jaffarabad, Qila Saifullah, Barkhan.
ZONE - 9 Khuzdar, Turbat, Kalat, Kharan, Washuk, Chagai, Nushki, Panjgor, Awaran,Gwadar and Lasbela
ZONE-10 Abbotabad, Mansehra, Buttgram, Ballakot and Muzaffarabad (A.J.K)
ZONE-11 Chitral, Dasu, Gilgit, Besham, Diamer and Sarkadu.
-
8/10/2019 zone2 csr rates punjab
32/251
WAPDA ( ii ) WCSR-2013 (Zone-2)
6. WCSR-2013 has been revised by incorporating basic rates of material, labour andmachinery usage for the month of November-December 2012, mostly from a subsidiaryof Pakistan Engineering Council (PEC), being reliable single source of cost data in theconstruction industry. Price inflation factor has also been considered where costs of
some inputs were not available in order to bring the Schedule rates at prevailingmarket level.
7. Twenty percent (20%) profit and overhead charges have been included in RateAnalysis of composite rates, whereas three percent (3%) sundry charges have beenadded only to the labour component of Rate Analysis. These factors have been workedout considering an average rated Contractor registered/licensed with PEC.
8. The cost estimate valued on the basis of above factors, if comes out to be more thanRs 1000 million, the same shall be adjusted by applying a premium of ten percent(10%) on composite rates, in order to cater head office/establishment charges forsignificantly big Contractors and accordingly to have a trustworthy cost estimate.
9. The Composite Items of Rates for each Zone constitute full compensation for thecompleted items of works in that Zone. In cases where composite items of works donot exist in this Schedule, the special governing conditions like distance from source ofsupply to the nearest District/City Head Quarter, site of works and cost of availability ofwater etc. including Contractors overhead and profit, shall be considered, in order toprepare realistic composite rates for cost estimates.
10. The rates for items of works not covered by this Schedule shall be prepared andapproved by the respective Chief Engineers as non-scheduled items.
11. The general order/arrangement of listing of items has been kept on lines of previous
Schedule. Some improvements in different sections have been made in WCSR-2013,whereas some obsolete Items of works have been deleted.
12. The Composite rates and the basic material, labour and machinery usage rates listedin this Schedule are for the purpose of preparation of cost estimates for WAPDAProjects. Therefore, neither the Contractor shall use these rates for making claim norshall be used for hiring labour on daily wages, under a specific preference of choice.
13. During 1998, the Authority for the guidance of its different formations published"WAPDA Standard Specifications" of material and execution of works and "WAPDADrafting Standards" for material, labour and machinery usage.
14. The applicability of this Schedule is based on WAPDA Standard Specifications formaterial and execution of works, 1998 (3 volumes). In case WAPDA StandardSpecifications of any work are not given in the WCSR-2013, Standard Specificationsissued by Punjab Highway and Building Departments, Public Health EngineeringDepartment, National Highway Authority and C. E. (Design) NTDC may be followed.
15. In case of any question regarding applicability of any particular rate, omission anderror, the matter immediately be referred to the Director (Rates), C&M, Water, WAPDA,527- WAPDA House, Lahore for clarification. The Steering Committee (WCSR) orDirector (Rates) cannot accept any legal responsibility or liability for any error oromission that may have been made while preparing the cost data.
16. This Schedule of Rates will be effective from January 1st 2013 and all orders,instructions and circulars issued by the Authority or any agency there under from timeto time on this issue, shall stand repealed.
-
8/10/2019 zone2 csr rates punjab
33/251
WAPDA ( iii ) WCSR-2013 (Zone-2)
17. The assignment is completed by the Rates Directorate, C&M Division, Water under thetechnical support of Steering Committee, which comprises the following:
Engr: Muhammad Ali Shah Convener
Engr: Nasir Hanif
Chief Engineer (Civil) CCC WAPDA
Member
Engr: Itebar Ali AbbasiChief Engineer (Contracts) C&M Water
Member
Engr: Falah-ud-Din QureshiManager (Civil) NTDC
Member
Engr: P.L. WadhwaniDirector (Rates) C&M Water
Secretary
18. Following officers were also involved in the preparation of WCSR-2013 and assisted
the Steering Committee:
Engr: A.Z.K. Durrani,Manager (Civil), NTDC
Engr: Riaz Ali ShahDirector , CCC, WAPDA
Engr: Safadar Ali KhanDy. Director Design (CDO) Water
Engr: Muhammad Jaffer,
Dy. Director (Rates) C&M Water
Engr; Javed Iqbal CheemaSDO (Electrical), Building Circle, WAPDA
Engr: Umer FarooqJr. Engineer (Rates) C&M Water
19. The General Manager (C&M) Water would like to acknowledge with gratitude toMr. Muhammad Hanif, General Manager CCC WAPDA for providing valuable guidancein the preparation of Schedule of Rates and appreciations are placed on record for thework, dedicatedly carried out by Mr. Jawaid Akhtar Latif, Director (Contracts) C&M for
updating WCSR-2013.
20. Any suggestion for improvement in the Schedule of Rates would be welcomed.
(Sherin Khan)General Manager (C&M) Water
Convenor Steering Committee (WCSR)
Ex-General Manager (C&M) Water
-
8/10/2019 zone2 csr rates punjab
34/251
WAPDA ( iv ) WCSR-2013 (Zone-2)
Abbreviations & Symbols
Abbreviation& Symbol
Description
AASHTO American Association of State Highway and Transportation Officials
AC Asbestos Cement
AC Alternate Current
ACI American Concrete Institute
ACSR Conductor Aluminum Conductor Steel Reinforced Conductor
APM Adjustable Proportionate Module
APM Absolute Perfect Module
ASTM American Society for Testing and Materials
B WG Birmingham Wire Gauge
BC Batten Bayonet Cap BattenBCP Brass Chromium Painted
BG Broad Gauge
cc Cubic Centimetre
CDO Central Design Office, WAPDA
CI Cast Iron
CP Chromium Plated/Painted
cum Cubic metre
DMO Double Module Outlet
DPC Damp Proof Course
DW Board Double Wire Board
DW Board Double Woofer Board
ECC Earth Continuity Conductor
EI Shade Enamel Intensive Shade
ETA type Elektrotechnische Apparate GmbH (Circuit Protection Control) Type
FICO Fair Isaac Corporation
GI Galvanised Iron
gm Grams
HP Horse Power
HT wire High Tension wire
kg Kilogram
KGO Kenndys Gauge Outlet
km Kilometre
KM Stone Kilo Metre Stone
L&T Section Angle Iron (L) and Tee Iron Section
-
8/10/2019 zone2 csr rates punjab
35/251
WAPDA ( v ) WCSR-2013 (Zone-2)
Abbreviation& Symbol
Description
LT wire Low Tension wire
ltr Litre
m Metre
MG Metre Gauge
mm Milimetre
Mpa Maga Pascal
MS Mild Steel
NG Narrow Gauge
No Number
OF Open Flume
oz Ounce
Pa Pascal
P.Trap In plumbing, a trapin a P-, U-, S-, or J-shaped pipe.
PB Polymers modified bitumen
PC Pole Prestressed Concrete/Reinforced Concrete Pole
PCC Plain Cment Concrete
PE Polyethylene
PP Polypropylene
psi Pound per Square inch
PVC Polyvinyl Chloride
RB Reinforced Brick
RCC Reinforced Cement Concrete
RCC Roller Compacted Concrete
rpm Revolution per minute
S.Trap In plumbing, a trapin a P-, U-, S-, or J-shaped pipe.
sqm Square Metre
SW Board Single Wire Board
SW Board Sub Woofer Board
SW Board Switcher Board
SWG Standard Wire Gauge
SWO Standing Wave Outlet
UPVC Unplasticized Polyvinyl Chloride
WC Water Course
WC Water Closet
WI Wrought Iron
Diametre
-
8/10/2019 zone2 csr rates punjab
36/251
WAPDA ( vi ) WCSR-2013 (Zone-2)
CONVERSION FACTORS
TO CONVERT INTO MULTIPLY BY
LENGTH
Inch Millimetre 25.400
Millimetre Inch 0.039
Foot Metre 0.305
Metre Foot 3.281
Yard Metre 0.914
Metre Yard 1.094
Mile Kilometre 1.609
Kilometre Mile 0.621
Canal Mile (5000 ft) Kilometre 1.524
Kilometre Canal Mile 0.656
Mile International Nautical (6076.12 ft) Metre 1,852.000
Mile UK Nautical (6080 ft) Metre 1,853.180
MASS & WEIGHT
Pound Kilogram 0.454
Kilogram Pound 2.205
Ounce Gram 28.350
Gram Ounce 0.035
Quintal Kilogram 100.000
Hundred Weight Kilogram 50.802
Tonne Hundred Weight 19.684
Ton Kilogram 1,016.046
Ton Tonne 1.016
Tonne Ton 0.984
Short Ton (2000 lbs) Tonne 0.907
AREA
Square Inch Square Millimetre 645.160
Square Millimetre Square Inch 0.002
Square Foot Square Metre 0.093
Square Metre Square Foot 10.764
Square Yard Square Metre 0.836
Square Metre Square Yard 1.196
Acre Square Metre 4,046.856
Acre Hectare 0.405
Hectare Acre 2.471
Hectare Square Metre 10,000.000
Square Mile Square Kilometre 2.590
-
8/10/2019 zone2 csr rates punjab
37/251
WAPDA ( vii ) WCSR-2013 (Zone-2)
TO CONVERT INTO MULTIPLY BY
Square Kilometre Square Mile 0.386
Square Mile Hectare 258.999
Hectare Square Mile 0.004
CAPACITY & VOLUME
Gallon (Imperial) Litre 4.546
Cubic Foot Litre 28.317
Cubic Metre Litre 1,000.000
Litre Cubic Foot 0.035
Cubic Inch Millilitre 16.387
Fluid Ounce (UK) Millilitre 28.413
Litre Gallon (Imperial) 0.220
Cubic Inch Cubic Millimetre 16,387.100
Cubic Foot Cubic Metre 0.028
Cubic Metre Cubic Foot 35.315
Cubic Yard Cubic Metre 0.765
Cubic Metre Cubic Yard 1.308
Acre Foot Hectare Metre 0.123
VELOCITY/SPEED
Foot Per Second Metre Per Second 0.305
Foot Per Minute Metre Per Second 0.005
Foot Per Second Kilometre Per Hour 1.097
Kilometre Per Hour Foot Per Second 0.911
Mile Per Hour Metre Per Second 0.477
Kilometre Per Hour Mile Per Hour 0.621
Mile Per Hour Kilometre Per Hour 1.609
FORCE
Kilogram Force Newton 9.807
Pound Force (Avoirdupois) Newton 4.448
Ton Force Kilo Newton 9.964
Newton Pound Force 0.225
Kilo Newton Ton Force 0.100
FORCE PER UNIT LENGTH
Pound Force Per Foot Newton Per Metre 14.594
PRESSURE (l Pa = I N/m)
Pound Force Per Square Foot Pascals 47.8803Pound Force Per Square Inch Kilo Pascals 6.89476
Ton Force Per Square Foot Kilo Pascals 107.252
Kilo Pascals Pound Per Square Foot 20.8354
-
8/10/2019 zone2 csr rates punjab
38/251
WAPDA ( viii ) WCSR-2013 (Zone-2)
TO CONVERT INTO MULTIPLY BY
Ton Force Per Square Inch Mega Pascals 15.4443
Mega Pascals Pound Per Square Inch 145.038
MASS PER UNIT LENGTH
Pound Per Foot Kilogram per Metre 1.488
Kilogram Per metre Pound Per Foot 0.672
Ton Per Mile Tonne Per Kilometre 0.631
MASS PER UNIT AREA
Ton Per Square Mile Kilogram Per Square Kilometre 392.298
Pound Per Square Foot Kilogram per Square Metre 4.882
Kilogram Per Square Metre Pound Per Square Foot 0.205
MASS PER UNIT VOLUME
Pound Per Cubic Foot Kilogram Per Cubic Metre 16.019
Pound Per Cubic Foot Grams Per Litre 16.019
Kilogram Per Cubic Metre Pound Per Cubic Foot 0.062
Gram Per Litre Pound Per Cubic Foot 0.062
VOLUME/RATE OF FLOW
Cubic Foot Per Second (Cusec) Cubic Metre Per Second (Cumecs) 0.028
Cubic Foot Per Second (Cusec) Litre Per Second 28.317
Gallon Per Minute Litre Per Second 0.076Cubic Foot Per Thousand Acres Litre Per hectare 0.069
Cubic Foot Per Thousand Acres Cubic Metre Per Square Kilometre 0.007
FUEL CONSUMPTION
Gallon Per Mile Litre Per Kilometre 2.825
Mile Per Gallon Kilometre Per Litre 0.354
PLANE ANGLE
Degree Radian 0.017
WORK, ENERGY, POWER (1J = 1Ws)
Kilowatt Hour Kilo Joule 3,600.000
Foot Pound Force Joule 1.356
Horse Power Kilowatt 0.746
Horse Power Kilogram Force Metre Per Second 76.040
-
8/10/2019 zone2 csr rates punjab
39/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-1 WCSR-2013(Zone-2)
SECTION-1CARRIAGE OF MATERIAL, LOADING AND UNLOADING
(A) Carriage of Material including Loading and Unloading
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
1. Carriage of 3.0 cum or 5 metric tons of allmaterial like earth, silt,sand, stone aggregatespawl, coal, lime, surkhi.Steel girders, M.S.sheets, M.S. Bars etc. or4.25 cum of timber or3.75 metric tons of fuelwood by truck or any
other means.
1.1 (30 mlead is
convertedinto 50 m)
Cement in bagsnot consideredunder this item.
Upto 50 m 50 m 111.79
50 m to 500 m 50 m 15.82
500 m to 1 km 50 m 11.65
Over one km;
1st km km 353.27
2nd km km 64.31
3rd km km 56.86
4th km km 51.84
5th
km km 47.226th km km 45.01
7th and subsequent kms. km 42.01
2. Carriage of 1000 Nos.bricks 225 x 113 x 75 mm(9 x 4 x 3) standardsize.
-do-
Upto 50 m 50 m 90.33
50 m to 500 m 50 m 13.22
500 m to 1 km 50 m 9.77Over one km;
1st km km 285.96
2nd km km 52.05
3rd km km 46.02
4th km km 42.01
5th km km 38.19
6th km km 36.37
7th and subsequent kms. km 33.97
3. Carriage of 1000 No. tiles225 x 113 x 38 mm(9x4x1)
-do-
Upto 50 m 50 m 56.27
-
8/10/2019 zone2 csr rates punjab
40/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-2 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
50 m to 500 m 50 m 6.87
500 m to 1 km 50 m 5.07
Over one km;1st km km 148.31
2nd km km 26.92
3rd km km 23.91
4th km km 21.71
5th km km 19.90
6th km km 18.89
7th and subsequent kms. km 17.68
4. Carriage of cement inbags (50 kgs). 1.1
Upto 50 m 50 m 1.27
50 m to 500 m 50 m 0.18
500 m to 1 km 50 m 0.13
Over one km;
1st km km 3.61
2nd km km 0.61
3rdand subsequent kms km 0.61
5. Carriage of 100 No.empty cement bagsincluding bundling.
-do-
Upto 50 m 50 m 1.36
50 m to 1 km 50 m 0.61
Over one km;
1st km km 11.46
Measured in theshape of compactround bundlesand of the sizespecified for work.
2nd to 6th km km 4.83
7th and subsequent kms. km 2.21
6. Carriage of 3.0 cum ofSarkanda or pilchi, Frash
orbrush wood by boat or
road.
-do-
Upto 50 m 50 m 19.82
50 m to 500 m 50 m 3.19
500 m to 1 km 50 m 2.36
Over one km;
1st km km 59.69
2nd km km 9.85
3rd to 6th km km 8.84
7th and subsequent kms. km 4.43
-
8/10/2019 zone2 csr rates punjab
41/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-3 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
7. Carriage of lightmachinery weighing upto1000 kg.
1.1
Upto 50 m 50 m 155.24
50 m to 1 km 50 m 10.43
Over one km;
1st km km 298.62
2nd km km 46.02
3rd km km 46.02
4th km km 34.96
5th km km 34.96
6th km km 24.12
7
th
and subsequent kms.km
16.48
For machinesweighing 1000 to1500 kgs rate beincreased by 50%and for machines,weighing 1500 to3000 kgs ratebe increased by100%.
8. Carriage of smallconsignment weighingupto 250 kg (job rates)
-do-
Upto 50 m 50 m 20.06
50 m to 1 km 50 m 1.68
Over one km;
1st km km 46.02
2nd and subsequent kms km 7.64
For consignmentsweighing 250 to500 kgs rate beincreased by 50%and forconsignments,weighing 500 to1000 kgs ratebe increased by100%.
9. Carriage of Bitumen, Taror other lubricants inDrums (1000 Kg)
-do-
Upto 1st km km 49.23
2nd km km 18.69
3rd and subsequent kms km 12.05
10. Carriage of AsbestosCement pipes BSS Class
'B' with cement joints andrubber ring, includingloading unloading andstacking (Rate per 30 mpipes).
1.1 to 1.2which ever is
applicable
i) 75 mm
Upto 50 m 50 m 4.83
50 m to 500 m 50 m 0.83
500 m to 1 km 50 m 0.61
Over one km;
1st km km 14.75
2nd km km 1.60
3rd km km 1.60
-
8/10/2019 zone2 csr rates punjab
42/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-4 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
4th km km 1.20
5th km km 1.20
6th km km 1.20
7th and subsequent kms. km 0.61
ii) 100 mm
Upto 50 m 50 m 5.90
50 m to 500 m 50 m 0.96
500 m to 1 km 50 m 0.71
Over one km;
1st km km 17.22
2nd km km 2.21
3rd km km 1.60
4th km km 1.60
5th km km 1.60
6th km km 1.60
7th and subsequent kms. km 0.63
iii) 150 mm
Upto 50 m 50 m 8.30
50 m to 500 m 50 m 1.49
500 m to 1 km 50 m 1.09
Over one km;
1st km km 26.22
2nd km km 5.42
3rd km km 2.81
4th km km 2.21
5th km km 2.21
6th km km 2.21
7th and subsequent kms. km 1.20
iv) 200 mm
Upto 50 m 50 m 14.86
50 m to 500 m 50 m 2.50
500 m to 1 km 50 m 1.85
Over one km;
1st km km 44.86
2nd km km 5.02
3rd km km 5.02
4th km km 3.82
5th km km 3.82
6th km km 3.21
7th and subsequent kms. km 1.60
-
8/10/2019 zone2 csr rates punjab
43/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-5 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate(Rs)
Specification Remark
1 2 3 4 5 6
v) 250 mm
Upto 50 m 50 m 23.14
50 m to 500 m 50 m 3.93
500 m to 1 km 50 m 2.90
Over one km;
1stkm km 70.31
2ndkm km 8.23
3rdkm km 7.03
4thkm km 6.63
5thkm km 5.42
6thkm km 5.42
7thand subsequent kms. km 2.81
vi) 300 mm
Upto 50 m 50 m 31.43
50 m to 500 m 50 m 5.33
500 m to 1 km 50 m 3.93
Over one km;
1st km km 95.07
2nd km km 10.85
3rd km km 9.85
4th km km 8.84
5th km km 7.64
6th km km 7.03
7th and subsequent kms. km 7.03
vii) 400 mm
Upto 50 m 50 m 60.70
50 m to 500 m 50 m 10.30
500 m to 1 km 50 m 7.59
Over one km;
1st km km 183.56
2nd km km 21.31
3rd km km 19.09
4th km km 16.48
5th km km 14.87
6th km km 14.26
7th and subsequent kms. km 7.64
viii) 450 mm
Upto 50 m 50 m 103.49
50 m to 500 m 50 m 17.59
500 m to 1 km 50 m 12.95
-
8/10/2019 zone2 csr rates punjab
44/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-6 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
Over one km;
1st km km 312.96
2nd km km 36.17
3rd km km 32.75
4th km km 28.53
5th km km 25.72
6th km km 24.12
7th and subsequent kms. km 13.06
ix) 508 mm
Upto 50 m 50 m 113.95
50 m to 500 m 50 m 19.37
500 m to 1 km 50 m 14.25
Over one km;
1st km km 323.13
2nd km km 39.67
3rd km km 35.92
4th km km 31.30
5th km km 28.22
6th km km 26.46
7th and subsequent kms. km 14.33
x) 600 mm
Upto 50 m 50 m 129.05
50 m to 500 m 50 m 21.93
500 m to 1 km 50 m 16.14
Over one km;
1st km km 366.07
2nd km km 44.81
3rd km km 40.39
4th km km 35.57
5th km km 31.75
6th km km 29.54
7th and subsequent kms. km 16.48
11. Carriage of PVC pipesBSS Class 'B', C, Dand E including loadingunloading and stacking(Rate per 300 m pipes)
1.1 to 1.2which ever is
applicable
i) 50 mm
Upto 50 m 50 m 11.40
50 m to 500 m 50 m 1.93
500 m to 1 km 50 m 1.42
-
8/10/2019 zone2 csr rates punjab
45/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-7 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
Over one km;
1st km km 32.28
2nd km km 3.98
3rd km km 3.62
4th km km 3.62
5th km km 2.66
6th km km 2.66
7th and subsequent kms. km 1.33
ii) 63 mm
Upto 50 m 50 m 18.86
50 m to 500 m 50 m 3.20
500 m to 1 km 50 m 2.36
Over one km;
1st km km 53.48
2nd km km 6.51
3rd km km 5.91
4th km km 5.30
5th km km 4.58
6th km km 4.22
7th and subsequent kms. km 2.29
iii) 75 mm
Upto 50 m 50 m 27.50
50 m to 500 m 50 m 4.67
500 m to 1 km 50 m 3.44
Over one km;
1st km km 78.01
2nd km km 9.52
3rd km km 8.56
4th km km 7.60
5th km km 6.87
6th km km 6.27
7th and subsequent kms. km 3.62
iv) 100 mm
Upto 50 m 50 m 38.91
50 m to 500 m 50 m 6.61
500 m to 1 km 50 m 4.87
Over one km;
1st km km 110.37
2nd km km 13.51
-
8/10/2019 zone2 csr rates punjab
46/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-8 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
3rd km km 12.18
4th km km 10.49
5th km km 9.52
6th km km 8.92
7thand subsequent kms. km 4.94
v) 125 mm
Upto 50 m 50 m 68.78
50 m to 500 m 50 m 11.69
500 m to 1 km 50 m 8.61
Over one km;
1st km km 195.08
2nd km km 23.993rd km km 21.70
4th km km 17.12
5th km km 15.80
6th km km 14.95
7thand subsequent kms. km 12.05
vi) 150 mm
Upto 50 m 50 m 101.67
50 m to 500 m 50 m 17.28500 m to 1 km 50 m 12.73
Over one km;
1st km km 288.39
2nd km km 35.45
3rd km km 32.19
4th km km 27.98
5th km km 24.95
6th km km 23.27
7thand subsequent kms. km 12.78
vii) 200 mm
Upto 50 m 50 m 161.57
50 m to 500 m 50 m 27.46
500 m to 1 km 50 m 20.22
Over one km;
1st km km 458.24
2nd km km 56.04
3rd
km km 50.924th km km 44.29
5th km km 39.88
6th km km 37.08
-
8/10/2019 zone2 csr rates punjab
47/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-9 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
7thand subsequent kms. km 20.23
viii) 250 mm
Upto 50 m 50 m 255.1150 m to 500 m 50 m 43.37
500 m to 1 km 50 m 31.93
Over one km;
1st km km 723.62
2nd km km 88.48
3rd km km 80.41
4th km km 69.99
5th km km 62.79
6th km km 58.817th and subsequent kms. km 32.76
ix) 300 mm
Upto 50 m 50 m 363.07
50 m to 500 m 50 m 61.70
500 m to 1 km 50 m 45.43
Over one km;
1st km km 1029.76
2nd
km km 125.923rd km km 114.43
4th km km 99.54
5th km km 89.61
6th km km 83.33
7th and subsequent kms. km 45.45
x) 350 mm
Upto 50 m 50 m 462.71
50 m to 500 m 50 m 78.66500 m to 1 km 50 m 57.92
Over one km;
1st km km 1312.48
2nd km km 160.48
3rd km km 145.85
4th km km 126.94
5th km km 113.88
6th km km 106.67
7th
and subsequent kms. km 59.41
-
8/10/2019 zone2 csr rates punjab
48/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-10 WCSR-2013(Zone-2)
Note:1 The rates for items not in this Schedule can be deduced from these basic rates on the following
assumption;
Quantities of different materials equivalent to 1000 No. bricks 225x113x75 mm size,3.0 cu.m. or 5 ton weight with almost similar amount of labour involved in loading,
unloading and stacking shall have rates equivalent to these basic rates. Fluctuation if anyshall be proportionate to the increase or decrease in the weight, volume or labourinvolved.
2 The rates are applicable to carriage of materials on pacca roads only. For kacha roads anallowance of extra 25% shall be allowed for 2nd and subsequent Kilometre rates. Rates upto1st Kilometre is however common to both kacha and pacca roads.
3 For hilly areas, 25% above the rates in the plain areas shall be allowed for total Kilometrescovered.
4 In case of articles longer than 4.50 m carried in trucks, the following rates shall be allowed asunder:
a) Above 4.50 to 7.50 m :- Total rate to be paid for 4.50 m to 7.50 m length will be
1.5 times the rates given in the Composite Schedule of Rates.b) Above 7.50 m :- The total rates to be paid for above 7.50 m length will be 2 times of
the rate given in Composite Schedule of Rates.
5 The term Kilometre wherever used is to mean statute Kilometre.
6 The rate included loading and unloading of material and conveyance and staking as directed.
-
8/10/2019 zone2 csr rates punjab
49/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-11 WCSR-2013(Zone-2)
(B) Loading, Unloading and Stacking
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
1. Loading or unloading earth,
sand, silt, Shingle, surkhi,ashes, kankar, brick ballast,coal, and lime etc. laid/piledand stacked lead within30m.
cum 100.88 1.2
2. Loading or unloadingbricks/tiles properly laid andstacked lead within 30 m.
-do-
a) 225 mm or larger. 1000 no 378.39
b) smaller than 225 mm. 1000 no 302.63
3. Loading or unloadingcement in bags and stackingwithin 30 m.
100 bags 378.39 -do-
4. Loading or unloading emptycement bags and stacking.
100 bags 36.37 -do-
5. Loading or unloading whitelime in bags and stackingwithin 30 m.
1000 kg 60.89 -do-
6. Loading or unloadingstructural steel, steel joistand other steel items.
1000 kg 181.66 -do-
7. Loading or unloading up to225 litres drum full, lead upto30 m.
each 24.31 -do-
8. Loading or unloadingpackages or stocks all sortsupto 50 kg (except cement,jute or paper bags).
each 12.05 -do-
9. Loading or unloading timberlogs or timber for shutteringof any gauge includingstacking lead within 30 m.
1000 kg 85.41 -do-
10. Loading or unloadingbhoosa lead upto 45 m.
100 kg 24.31 -do-
11. Loading or unloading timberscrap or wooden plugs and
stacking with 30 m.
1000 kg 151.32 -do-
12. Loading or unloadingpitching stone or spawl ofany gauge (clear distance1.50m).
cum 226.98 1.2
-
8/10/2019 zone2 csr rates punjab
50/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-12 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
13. Loading or unloadingbuilding stone (cleardistance 1.50m).
cum 302.64 -do-
14. Unloading oil, bitumen, taretc.
-do-
a) Crude oil (to be pumpedfrom tank into tank
1000 litre 84.00
b) Crude oil (drained bygravity)
1000 litre 84.00
c) Crude oil materials cum 33.13
d) Fuel oil from tank drumsincluding stacking within30 m
1000 kg 138.45
e) Petrol (9 litre tin) 100 no 190.70f) Kerosine oil (16 litre) 100 no 380.80
15. Removing and stackingwithin 30 m
-do-
a) Stones, spawls, brickbats, shingle, sand, limesurkhi, ashes, kankar &coal etc.
cum 53.45
b) Bricks 1000 no 438.87
c) Steel girders, rails, pipes,
cement etc.
1000 kg 229.98
d) Broad gauge woodensleepers.
100 no 2421.65
e) Metre gauge or narrowgauge wooden sleepers.
100 no 1383.34
f) Bridge and crossingtimber.
100 no 808.23
16. Loading steel girders, rails,iron work, MS bars, pipesetc. lead 30 m and
stacking.
1000 kg 193.71 -do-
17. Unloading steel girders,rails, iron work, MS bars,pipes etc. lead upto 30mexcluding stacking.
1000 kg 96.86 -do-
18. Loading wooden broadgauge sleepers includinglead 30 m and stacking.
100 no 605.47 -do-
19. Unloading wooden broadgauge sleepers includinglead 30 m and stacking.
100 no 302.63 1.2
-
8/10/2019 zone2 csr rates punjab
51/251
SECTION 1 CARRIAGE OF MATERIAL, LOADING AND UNLODING
WAPDA 1-13 WCSR-2013(Zone-2)
Sr.No.
Description Unit Rate
(Rs) Specification Remark
1 2 3 4 5 6
20. Loading wooden metre/narrow gauge sleepersincluding lead upto 30 m andstacking.
100 no 332.97 -do-
21. Unloading wooden metre/narrow gauge sleepersincluding lead upto 30 m andstacking.
100 no 160.36 -do-
22. Loading bridge and crossingtimber including lead upto30m and excluding stacking.
cum 100.88 -do-
23. Unloading bridge andcrossing timber including
lead upto 30m and excludingstacking.
cum 53.45 -do-
-
8/10/2019 zone2 csr rates punjab
52/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-1 WCSR-2013(Zone-2)
SECTION-2EARTHWORK (EXCAVATION AND EMBANKMENT)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
1. Earthwork excavationundressed lead of asingle throw of shovel.
a) In ashes, sand, softsoil or silt clearance
cum 78.31
2.1 to2.8
whichever isapplica
bleb) In ordinary soil. cum 94.33
.
2. Earthwork excavation inashes, sand and soft soilor silt clearance,undressed lead upto30 m.
cum 115.10 -do-
3. Borrow pit excavationundressed lead upto50 m.
a) Ordinary soil
b) Hard soil
cum
cum
146.54180.36
-do- .
4. Excavation in shingle orgravel formation and rocknot requiring blasting
undressed lead upto50 m.
-do-
a) Dry cum 398.09
b) Wet cum 460.98
c) In flowing water cum 586.75
5. Earthwork excavation inirrigation channels, drainsetc., dressed to designedsection grades andprofiles, excavated
material disposed off anddressed within lead of30 m.
-do-
a) Ordinary soil cum 171.80
b) Hard soil cum 205.62
c) Very hard soil cum 241.22
d) Shingle and gravelformation
cum 449.34
6. Excavation in rockdressed to designedsection, grades andprofiles, excavatedmaterial disposed offwithin lead of 50 m andlift upto 1.5 m.
-do-
-
8/10/2019 zone2 csr rates punjab
53/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-2 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
a) Soft rock slate, shaleschist or laterite workwith pick and crowbar.
cum 524.65
b) Medium hard rockrequiring occasionalblasting.
cum 639.02 661.15
7. Excavation in hard rockrequiring blasting anddisposal of excavatedmaterial (blastedmaterial) up to 30 m lead(including dressing andleveling to designed
section etc. complete)
2.1 to2.8
whichever isapplica
ble
i) Grade-I cum 369.40 391.53
ii) Grade-II cum 400.96 437.92
Reduce therate by 10% ifthe excavatedsection is notdressed orleveled todesigned
section.
iii) Grade-III cum 479.71 523.97
iv) Grade-IV cum 535.47 587.03
v) Grade-V cum 592.56 651.65
vi) Grade-VI cum 639.05 705.44
8. Excavation in hard rockrequiring blasting butblasting prohibited anddisposal of excavatedmaterial (blastedmaterial) upto 30 m lead(including dressing andleveling to designedsection etc. complete).
cum -do- Add 100% tothe rate asapplicable initem 7.
9. Extra for every 15madditional lead or partthereof upto a lead of1 km.
-do-
a) For earth work (soft,ordinary, hard andvery hard).
cum 3.56
Carriage ofmaterial willbe paid forlead more
than 1 km.
b) For gravel shingle orrock.
cum 4.15
10. Re-handling of earthwork -do-
a) Lead upto singlethrow of shovel.
cum 52.21
b) Upto a lead of 30 m. cum 73.57
11. Re-handling of gravelwork or excavated rocklead upto 30 m.
cum 209.43 -do-
-
8/10/2019 zone2 csr rates punjab
54/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-3 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
12. Dressing and leveling ofearthwork to designedsection complete.
a) Ashes, sand, silt orsoft soil.
cum 7.43
2.1 to2.8
whichever isapplica
ble
b) Ordinary or hard soil. cum 15.37
c) Gravel work or softrock (not requiringblasting).
cum 29.77
13. Refilling the excavatedstuff in trenches in150 mm thick layersincluding watering,
ramming to compactionetc., complete.
cum 192.82 -do-
14. Dowel dressing of canalbanks, marginal bunds,and flood protectionbunds.
m 8.87 -do-
15. Earthwork compaction(soft, ordinary or hard soil)
-do-
a) Laying earth in
150 mm layers /leveling dressing andwatering forcompaction etc.complete.
cum 27.67 36.85
b) Compaction by roller.
i) Soft or sandy soil cum 35.94 40.71
ii) Ordinary soil cum 42.44 47.21
iii) Hard soil cum 47.19 51.96
iv) Admixture of
shingle
cum 53.68 58.45
As per ASTM-D698 /AASHTO-T99or as specifiedby theEngineer.
c) Ramming earthwork(all type of soil)
cum 31.44
d) Ramming earthworkbehind retaining wall.
cum 42.12
16. Excavation in puddlingslush includingdewatering throughmechanical means andarrangements.
cum 167.90 196.04 -do-
17. Earthwork excavation inopen cutting upto 1.5 mdepth for storm waterchannels, drains, salluge
-do-
-
8/10/2019 zone2 csr rates punjab
55/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-4 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
drains in open areas,roads, streets, lanesincluding under pinning ofwalls and shoring toprotect existing works,shuttering and timberingto trenches, dressingsides to true alignment,shape, dimensions andlevel to correct limit andgrade, removal of surfacewater from trenches,back filling and surplusexcavated materialdisposed off and dressed
within 30 m.
2.1 to2.8
whichever isapplica
ble
i) In ordinary soil cum 184.34
ii) In hard soil cum 198.02
iii) Gravel and shingleformation
cum 287.17
18. Excavation in opencutting for sewer andmanholes as shown indrawing, dressing tocorrect section and
dimension according totemplate and levels andremoving surface waterin all types of soil shingle,gravel and rock.
-do-
i) 0 2.0 m cum 183.17
ii) 2.0 - 4.5 m cum 251.55
iii) above 4.5 m cum 335.20
19. Providing and fixing openshuttering and timbering
for item 20 and removingof timbering aftercompletion of job.
-do-
i) 0 2.0 m sqm 39.45 194.05
ii) 2.0 - 4.5 m sqm 49.84 255.29
iii) above 4.5 m sqm 56.06 312.38
20. Excavation of trenchesfor water supply pipelines in all kinds of soil,hard, average or softUpto 1.5 m depth fromground level, includingtrimming, dressing sides,leveling the bed of trench
cum 188.66 -do-
-
8/10/2019 zone2 csr rates punjab
56/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-5 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
to correct grade andcutting in pits for joints.
21. Earthwork in small rainwater drains, along canalbanks, roads, andplantation drains, dressedetc.
m 1.78
2.1 to2.8
whichever isapplica
ble
22. Excavation in foundationof buildings, bridges andother structures includingdibbling dressing, refillingaround structure withexcavated earth, watering
and ramming lead upto30 m and lift upto 1.5 m.
-do-
a) In sand, ashes orloose soil.
cum 193.16
b) In ordinary soil. cum 226.92
c) In hard soil or softsoil
cum 254.18
23. Cutting hard rock such asgranite, ballast, hard limestone or sand-stone etc.
with chisels and hammersfor small foundations.
cum 1538.69 1724.66 -do-
24. Extra for excavationrequiring shoring.
cum 28.77 63.74 -do-
25. Filling watering andramming earth underfloors with surplus earthfrom foundation.
cum 102.59 -do-
26. Filling watering andramming earth underfloors with new earth(excavation from outside)lead upto 30 m and liftupto 1.5 m.
cum 173.51 -do-
27. Filling and compactingsoil, earth and bouldersbehind retaining walls(including excavation ofsoil and lead upto 30 m).
cum 229.54 -do-
28. Dressing of banks orground surface.
sqm 9.38 -do-
29. Dag belling 75 mm deep. km 1325.99 -do-
-
8/10/2019 zone2 csr rates punjab
57/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-6 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
30. Turfing slopes of banks orlawns with grass sodsincluding plugging, laying,setting and watering (turfgot from within a distanceof 10kms andmaintenance for 15days).
sqm 255.70 2.1 to2.8
whichever isapplica
ble
31. Berm cutting
a) Lead upto a singlethrow of shovel.
cum 94.33 -do-
b) Upto 30 m. cum 146.54
32. Both sides Berm trimming
including channel 1.0 mwide:
-do-
a) Upto 1.0 m depth km 5321.32
b) From 1.0 - 1.5 mdepth
km 7059.36
c) From 1.5 - 2.5 mdepth
km 11194.98
33. Plugging and levelingborrow pits (areaploughed to be
measured)
hectare 5627.24 -do-
34. Making boundary serviceroads including dagbelling, leveling anddressing in unpluggedland:
-do- Extra Rs.15may be paidfor ploughedland.
a) From 3.0 to 6.0 mwide
m 31.85
b) From 6.0 to 12.0mwide
m 43.40
35. Earthwork by boat.
a) Digging and loadinginto boat upto 15 m.
cum 157.22
-do- For ordinarysoil.
b) Carriage by boat upto300 m.
cum 63.07
c) Extra for distancebeyond 300 m per30 m.
cum 4.16
d) Unloading earth fromboats.
cum 73.57
36. Unloading earth fromtrucks.
cum 62.89 -do-
-
8/10/2019 zone2 csr rates punjab
58/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-7 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
37. Termite proofing withapproved chemicals.
i) Pre Construction: sqm 46.87 130.49
ii) Post Construction: Per hole
51.62 118.52
2.1 to2.8
whichever isapplica
bleDrilling depth450-600 mm
EARTHWORK BYMECHANICAL MEANS
38. Excavation in all kind ofOrdinary Soil/Borrow areaunder following conditiondressed to designedlevel, section, grades,and profile within 100 mlead as directed by theEngineer.
Borrow areato beapproved bythe Engineer/Employer.
i) Dry cum 68.86
ii) Dry and wet cum 73.92
39. Excavation in all kind ofOrdinary soil in drainsand irrigation channelsunder following conditiondressed to designed
level, section, grades,and profile within 100 mlead as directed by theEngineer.
i) Wet and slush (1:1) cum 82.95
ii) Wet and slush (1:2) cum 86.72
iii) Slush cum 90.81
iv) Under water cum 114.59
40. Extra for Item 38 & 39;
for every 15 m additionallead or part thereof upto alead of 1 km.
cum 6.21 Carriage of
material willbe paid forlead morethan 1 km.
41. Earthwork in ordinary soilfor embankment lead upto 50 m includingplugging and mixing withblade or disc harrow orother suitable equipmentand compaction bymechanical means atoptimum moisturecontents and dressingto designed section,
As per ASTM-D1557 /AASHTO-T180or as specifiedby theEngineer.
-
8/10/2019 zone2 csr rates punjab
59/251
SECTION 2 EARTHWORK (EXCAVATION AND EMBANKMENT)
WAPDA 2-8 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
complete in all respects.
i. More than 95% of drydensity.
cum 42.44 89.30
ii. 90% to 95% of drydensity.
cum 42.44 85.47
CONVERSION TABLE
In the case of earthwork measurement where extra lead is to be paid for lift the method will be asfollows:
The lift will be measured from the centre of gravity of the excavated earth to that of placed earth. Thiswill constitute the mean lift for the section.
When earth has to be carried over a spoil bank and dumped beyond it the mean lift would be thedifference in level between the centre of gravity of the excavated earth and the top of the spoil bankomitting the dowel.
The equivalent leads for various means lifts are given below:
Lift in Meters Conversion
factorEquivalent Horizontal
lead in Meters
0.5 4
1.08
8
1.5 15
2.0 20
2.5
10
25
3.0 36
3.5 47
4.0 60
4.5 75
5.0 92
5.5 110
6.0 130
6.5 152
7.0 175
7.5
3.28xLiftinMeter+2
200
8.0 216
8.5 230
9.0 243
9.5 257
10.0
27
270
Note:
These conversion factors also incorporate allowance for extra lead due to cross lead with a viewto ensuring a uniform system. The equivalent lead will be added to the horizontal lead to get thetotal lead to be paid. The exact site or R.D.s between which extra lead is to be given must berecorded in the first column of detailed measurements in the Measurement Book.
-
8/10/2019 zone2 csr rates punjab
60/251
SECTION 3 DISMANTLING (DEMOLITION)
WAPDA 3-1 WCSR-2013 (Zone-2)
SECTION- 3DISMANTLING (DEMOLITION)
1. Composite rate for all finished works include the removal of surplus debris, unusedmaterial and by products.
2. The composite rates constitute full compensation for the completed items of the worksas per drawings, specifications and instructions of Engineer Incharge including alllabour and material/equipment required for the finished work.
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
STONE WORK
1. Dismantling dry stonemasonry.
cum 177.98 3.1 to3.3
2. Dismantling stonemasonry in cementmortar.
cum 625.23 -do-
3. Dismantling dry stonespall pitching.
cum 314.44 -do-
4. Dismantling stone orspall pitching and apronin silted condition.
cum 521.32 -do-
5. Dismantling stonepitching cement grouted.
cum 834.24 -do-
6. Dismantling stones in: -do-
a) Wooden crates. cum 416.82
Add extra15%, 30% &50% onlabour rateonly for 2nd,3rd, 4th andsubsequentfloorsrespectivelyagainstitems No.3,10, 11, 12,14, 15, 18,19, 24, 25,33, 39, 40and 41.
b) Wire crates cum 521.32
7. Dismantling stone waredrain including baseconcrete.
cum 421.29 -do-
BRICK WORK8. Dismantling dry brick
masonry.cum 177.12 -do-
9. Dismantling brick work incement mortar.
cum 886.19 -do-
10. Dismantling perforatedwall.
cum 208.41 -do-
CONCRETE
11. Dismantling cementconcrete cum 573.28 -do-
12. Dismantling cementconcrete block masonry.
cum 781.69
-
8/10/2019 zone2 csr rates punjab
61/251
SECTION 3 DISMANTLING (DEMOLITION)
WAPDA 3-2 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
13. Dismantling cementconcrete under water.
cum 2189.20 3.1 to3.3
14. a) Dismantling cementconcrete plain 1:4:8
cum 1146.56 -do-
b) Dismantling cementconcrete plain 1:3:6.
cum 1876.29 -do-
c) Dismantling cementconcrete plain 1:2:4
cum 2293.70 -do-
d) Dismantling cementconcrete with brickaggregate
cum 625.23 -do-
e) Dismantling D.P.C. ofcement concrete40mm thick andclearing the site etc
cum 312.91 -do-
15. Dismantling cementconcrete reinforcedseparating reinforcementfrom concrete cleaningand straightening thesame.
cum 3753.17 -do-
ROOFING16. Dismantling G.I. sheet
roofing.sqm 38.38 -do-
17. Dismantling roof ofwooden planks andbattens.
sqm 45.09 -do-
18. Dismantling asbestossheets and ridge coping.
sqm 53.60 -do-
19. Dismantling brick tileroofing.
sqm 95.05 -do-
20. Dismantling woodenceiling above 6m heightin difficult position,including lifting with careand special scaffoldingalong live electric wiresand with machinesunderneath.
sqm 172.94 -do-
21. Dismantling jack archroofing including removalof joists.
sqm 127.56 -do-
-
8/10/2019 zone2 csr rates punjab
62/251
SECTION 3 DISMANTLING (DEMOLITION)
WAPDA 3-3 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
22. a) Stripping and stackingslates or tiles from thetruss roofing.
sqm 107.83 3.1 to3.3
b) Stripping and stacking(G.I. Sheet roof).
sqm 74.46 -do-
FLOORING
23. Dismantling brick orconcrete flooring.
sqm 53.99 -do-
24. Dismantling tile flooring. sqm 80.09 -do-
25. Disjointing R.C.C. pipes
inside the trench anddismantling and removingthe pipes from the trenchand stacking themoutside.
-do-
a) 150 to 300 mm m 24.32
b) 300 to 600 mm m 33.82
c) 600 to 900 mm m 43.90
d) Above 900 mm m 42.52
WOODWORK26. a) Removing door,
window and frame.no 272.91 -do-
c) Removing Windowsand sky light withframe.
no 196.77 -do-
27. Removing ventilators andwooden sunshades etc.
no 98.39 -do-
28. a) Dismantling wooden
beams upto 3.5m inlength
no 148.32 -do-
b) Dismantling woodenbeams from 3.5m to7.0 m length
no 296.64 -do-
29. Dismantling woodenpartition jaffery work.
sqm 37.38 -do-
30. Dismantling woodentrusses.
kg. 10.33 -do-
31. Dismantling woodenpalisade fencing.
m 97.89 -do-
-
8/10/2019 zone2 csr rates punjab
63/251
SECTION 3 DISMANTLING (DEMOLITION)
WAPDA 3-4 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
IRON WORK
32. Dismantling iron work of
trusses, sheds, watertanks, etc.
kg. 10.48 3.1 to
3.2
33. Dismantling rolled steelbeams, iron grill or ironrail etc.
kg. 4.75 -do-
34. Dismantling tees, bendsor sluice valves upto300 mm .
each 45.94 -do-
35. Dismantling all type of
wire fencing includingrolling wires into bundlesand collecting materials.
m 17.21 -do-
MISCELLANEOUS
36. Dismantling wire nettingof tennis courts andframe work.
sqm 25.51 -do-
37. Dismantling cloth ceilingand supporting timber.
sqm 48.06 -do-
38. Dismantling and removingroad metalling.
cum 418.86 -do-
39. Removing cement plaster. sqm 25.51 -do-
SCRAPING
40. a) Whitewash or colourwash.
sqm 16.02 -do-
b) Ordinary distemper,oil bound distemper,
or paint on wall
sqm 48.06 -do-
41. Dismantling glazed orencaustic tiles etc.
sqm 169.25 -do-
42. Scraping boulders. cum 733.29 -do-
43. Cleaning mortar of oldstones to be reused inmasonry.
cum 366.65 -do-
-
8/10/2019 zone2 csr rates punjab
64/251
SECTION 4 MORTAR
WAPDA 4-1 WCSR-2013(Zone-2)
SECTION- 4
M O R T A R
Dry material required for 1.00 cum Wet (including wastage) mortar.
Quantity
Sr. No Ratio of Mortar Cement
(50 kg bag)
Sand
(cum)
Aggregate
(cum)
1. Cement Sand
1:2 13.64 0.97
1:3 10.23 1.09
1:4 8.19 1.16
1:5 6.80 1.21
1:6 5.85 1.24
1:7 5.12 1.27
1:8 4.55 1.29
2. Cement Concrete
1:1:3 7.802 0.415 0.829
1:2:4 6.130 0.434 0.869
1:3:6 4.290 0.456 0.912
1:4:8 3.300 0.468 0.935
1:5:10 2.682 0.475 0.950
Wet mortar required for 1.00 cum masonry
Sr.No. Mix Quantity
1. Brick Masonry (Cement Sand) 0.250 cum (25%)
2. Stone Masonry (Cement Sand)
a) Random rubble, uncoursed
Foundation and plinth 0.464 cum (46%)
Super structure 0.393 cum (39%)
Coursed 0.357 cum (36%)
b) Ashler block masonry 0.214 cum (21%)
c) Ashler fine masonry 0.214 cum (21%)
Note:
1) Cement 1.0 cum contains (1290-1540) kg
2) Sand 1.0 cum contains (1450-1650) kg
3) Aggregate 1.0 cum contains (1725-1920) kg
-
8/10/2019 zone2 csr rates punjab
65/251
SECTION 5 CONCRETE
WAPDA 5-1 WCSR-2013(Zone-2)
SECTION- 5C O N C R E T E
1. Composite rate for all finished works include the removal of surplus debris, unusedmaterial and by products.
2. The composite rates constitute full compensation for the completed items of the worksas per drawings, specifications and instructions of Engineer Incharge including alllabour and material/equipment required for the finished work.
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
1. Cement concrete withbrick or stone ballast 40 to50mm size infoundation and plinth.
Ratio:
5.6
a) 1:3:6 cum 1234.54 4800.51
b) 1:4:8 cum 1234.54 4091.72
2. Cement concrete plainincluding placing,compacting, finishing andcuring complete (includingscreening and washing ofstone aggregate) withoutshuttering.
Ratio:
-do-
a) 1::3 cum 1690.27 7628.62
b) 1:2:4 cum 1690.27 6748.05
c) 1:3:6 cum 1690.27 6010.45
d) 1:4:8 cum 1690.27 5280.98
3. Reinforced cementconcrete work usingcoarse sand except thecost of steel
reinforcement and itslabour for bending andbinding. This rate alsoincludes all kinds offorms moulds; liftingshuttering, curing,rendering and finishingthe exposed surface(including screening andwashing of shingle).
5.6 &5.10
a) In-situ in roof slabs,
beams, columns, rafts,lintels and otherstructural memberscomplete in all respect.
-
8/10/2019 zone2 csr rates punjab
66/251
SECTION 5 CONCRETE
WAPDA 5-2 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
Ratio:
i) 1:2:4 cum 7207.32 13503.95
ii) 1:1:3 cum 7207.32 14375.58
b) Precast in columnsbeams, slab, lintel,staircases, shelves,etc.Ratio:
i) 1:2:4 cum 6840.23 13979.39
ii) 1:1:3 cum 6840.23 13418.42
If plaster isdone tosmoothenthe surface itshould notbe paid forextra.
c) Erecting and fixing inposition precastcement concrete orstone slab in roofs orlintels, etc. lift uptofirst floor including allcharges.
cum 2004.12 2468.06
d) Add extra labour forR.C. concrete in 2ndand subsequentstories.
cum 838.30
4. Providing and casting insitu bored RCC piles in1:1:3 cement concreteof approved crushedstone and coarse sandincluding all costs ofboring drilling with rotary,reverse rotary or anyapproved method,placing concrete withtremie excluding cost ofsupply and fabrication of
steel bars reinforcementcage, which shall be paidseparately includingscreening and washing ofshingle;
5.6 to5.9
Crushingstrength of152x152x152mm cubeat 28 days of4000 psi orcompressivestrength of3600 psi for15x30 cmtest cylinder.
i) 450 mm m 3103.84 6298.81
ii) 600 mm m 4036.28 8483.51
iii) 900 mm m 5941.70 14415.24
iv) 1200 mm m 5993.31 18001.29
v) 1600 mm m 9458.27 28220.80
vi) 1700 mm m 11375.75
32092.47
5. Supplying and fixing PVCwater stop 190 mm wide.
m 44.50 332.93 5.7
-
8/10/2019 zone2 csr rates punjab
67/251
SECTION 5 CONCRETE
WAPDA 5-3 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
6. Supplying and fabricationof Intermediate gradedeformed reinforcement
for R.C.C. in slabs,beams, columns and pilecaps, including cutting,bending laying in positionincluding cost of bindingwire;
5.8
a. 40,000 psi (276 MPa)yield
kg 14.34 110.48
b. 60,000 psi (420 MPa)yield
kg 14.34 118.16
7. Supplying and fabricationof intermediate gradedeformed reinforcementfor R.C.C. piles includingcutting, bending, laying inposition, welding andfastening including costof binding wire;
-do-
a. 40,000 psi (276 MPa)yield
kg 25.72 144.49
b. 60,000 psi (420 MPa)
yield
kg 25.72 152.17
8. Providing and fixingR.C.C. pre-stressedbattens 60mm x 150mmx 2 m)
no 105.01 773.10 8.1,2.1
9. Construction of precastcement concrete solid orface blocks masonry(1:4:8) including cost oftemplate in mortar 1:6.
5.10
a) foundation & plinth cum 1710.90 4854.84
b) super structure cum 2084.84 6913.66
10. Construction of precastcement concrete solid orface blocks masonry(1:3:6) including cost oftemplate in mortar 1:6.
-do-
a) foundation & plinth cum 1433.87 5348.40
b) super structure cum 1754.64 5669.16
11. Precast cement concretesolid or face blocks(1:2:4) including cost oftemplates and
cum 1651.43 7359.85 -do-
-
8/10/2019 zone2 csr rates punjab
68/251
SECTION 5 CONCRETE
WAPDA 5-4 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
construction of wallsthereof.
12. Precast cement concretehollow blocks (1:2:4)including cost oftemplates andconstruction of wallsthereof.
cum 3624.90 7058.15 5.10
13. Providing and fixingornamental cement jalli50mm thick (1:2:4)without steel.
sqm 409.62 835.04 -do-
14. Extra labour for layingconcrete plain or reinforced.
5.1 &5.6
a) Above 6 upto 12m,height.
cum 838.30
b) For every additional3m height.
cum 209.43
15. Extra labour for work ofweirs, road bridges,syphons and similar
concreting in superstructure.
cum 209.43 -do-
16. Reinforced cementconcrete spout includingfixing in position (150 x125 x 800 mm).
each 380.69 742.95 5.6,5.10&8.9
17. Making holes upto450mm deep in cementconcrete or in stone
masonry walls andrepairing. (75mm )
perhole
1065.93 5.5
18. Skipping concreteincluding mixing.
cum 2947.43 5.6 &19.3 K
19. Nicking concrete surface. sqm 50.19 5.6.3
20. Preparing, watering andramming surface forlaying concrete (for headworks only).
a) Horizontal floor sqm 41.11
b) Glacis and crest sqm 66.21
c) Inverted filters sqm 19.80
-
8/10/2019 zone2 csr rates punjab
69/251
SECTION 5 CONCRETE
WAPDA 5-5 WCSR-2013(Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
21. Erection and removal ofcentering for R.C.C. orplain cement concrete
work:
5.6.2 &5.6.17
i) Horizontal sqm 427.77 485.08
ii) Vertical sqm 491.85 549.16
22. Providing and fixing 150mm wide G.I sheet 18SWG stopper toexpansion joint.
m 24.37 173.27 5.7
23. Grouting cementconcrete between thegrooves of gatesincluding shuttering.
cum 2443.52 20.8
24. Chisel dressing completesurface on sides ofgrooves.
sqm 25.10 -do-
25. Making pre-cast cementconcrete solid blocks(1:2:4) with moldingmachine.
cum 506.12 6140.97
26. Providing and installationof saddle (gutka)60x60x230mm in 1:2:4concrete with angle iron40x40x5mm, Steel wireSWG18 and paintingcomplete.
sqm 802.39 1497.22
27. Concrete, 1:2:4 byBatching Plant, including
production, haulage andPlacing without formwork.
cum 12574.95
28. Roller CompactedConcrete containingtypical, bedding mixturesof 360 to 460 kg/cum ofcement 170 to 220kg/cum of fly ash and4.75 to 50 mm size ofaggregate (ACI 207.5R-89)
cum Compositerate wouldbe 25% to50% lessthan rate ofnormalconventionalconcrete.
-
8/10/2019 zone2 csr rates punjab
70/251
SECTION 6 BRICK WORK
WAPDA 6 - 1 WCSR-2013 (Zone-2)
SECTION- 6B R I C K W O R K
1. Composite rate for all finished works include the removal of surplus debris, unusedmaterial and by products.
2. The composite rates constitute full compensation for the completed items of the works
as per drawings, specifications and instructions of Engineer Incharge including alllabour and material/equipment required for the finished work.
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specif-ication
Remark
1 2 3 4 5 6 7
1. Bricks work in foundationand plinth in Cementsand mortar. Ratio:
6.1 to6.5
1:2 cum 1511.12 7132.69
1:3 cum 1511.12 6774.29
1:4 cum 1511.12 6559.05
1:5 cum 1511.12 6404.17
1:6 cum 1511.12 6315.38
2. Bricks work in groundfloor (including striking ofjoints) in Cement sandmortar. Ratio:
-do-
Only firstclass bricksshall beused againstrespective
Items of thissection.Standardsize of bricks225 x 113 x75 mm (9 x4 x 3).
1:2 cum 1957.55 7579.11
1:3 cum 1957.55 7235.37
1:4 cum 1957.55 7005.47
1:5 cum 1957.55 6862.32
1:6 cum 1957.55 6761.81
3. Add extra labour in itemNo.2 for brick work in:
-do-
First floor cum 291.22
Second floor cum 665.17
Third floor cum 1038.18
4th and subsequent floor cum 1681.65
4. Bricks work other thanbuilding including strikingof joints upto 3.0 mheight in Cement sandmortar. Ratio:
-do-
1:2 cum 1764.04 7385.60
1:3 cum 1764.04 7027.21
1:4 cum 1764.04 6811.96
1:5 cum 1764.04 6668.82
1:6 cum 1764.04 6568.30
5. Add extra labour in itemNo.4 for every 3.0 metersadditional height.
cum 291.22 -do-
-
8/10/2019 zone2 csr rates punjab
71/251
SECTION 6 BRICK WORK
WAPDA 6 - 2 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
6. Providing and laying tilecoping 300 x 150 x40mm in 1:3 Cement
sand mortar including13mm thick plaster 1:4complete.
m 94.19 211.15 -do-
7. Providing and laying tilecoping 300 x 150 x40mm in 1:3 cementsand mortar.
m 18.71 113.71 -do-
8. Extra labour for archwork in brick masonryincluding labour for
centring and decentring.
cum 746.96 6.6
9. Extra labour for bruntbrick work in wells or anyother circular masonry.
cum 409.90 620.15 -do-
10. Extra labour for profileand flared walls.
cum 537.53 6.7
11. Extra labour for bruntbrick work in piers andabutment;
-do-
i) From 3 to 6 m height cum 373.94
ii) Above 6 m height cum 642.54
12. Reinforced brick work inlintel/slab laid in 1:3cement sand mortarincluding all labour,material, forms, liftingand shuttering, etc. butexcluding cost andlabour of steel
reinforcement.
cum 4874.69 10153.24 6.1 to6.5
13. Dressing or chamferingof bricks
-do-
a) Special architecturalshape.
no 30.85
b) For circular sewer,manholes and vent,shafts pertaining tosewer works and outlets of Irrigation
channels.
no 21.56
14. Perforated brick walling115 mm thick in groundfloor in cement sandmortar.
6.14
-
8/10/2019 zone2 csr rates punjab
72/251
SECTION 6 BRICK WORK
WAPDA 6 - 3 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
Ratio:
1:2 sqm 304.06 729.22
1:3 sqm 304.06 701.86
1:4 sqm 304.06 685.53
1:5 sqm 304.06 675.02
1:6 sqm 304.06 667.68
15. Add extra labour in itemNo.14 brick work in:
6.14
First floor sqm 44.12
Second floor sqm 101.25
Third floor sqm 157.79
4th and subsequent
floors
sqm 256.04
16. Perforated brick walling230mm thick in groundfloor in cement sandmortar. Ratio:
6.1& 6.5
1:2 sqm 447.02 1306.28
1:3 sqm 447.02 1251.55
1:4 sqm 447.02 1218.97
1:5 sqm 447.02 1196.83
1:6 sqm 447.02 1181.57
17. Add extra labour in itemNo.16 for brick work in.
-do-
First floor sqm 66.65
Second floor sqm 202.84
Third floor sqm 357.29
4th and subsequentfloors
sqm 512.08
18. Bricks walling laid in 1:3cement sand mortarreinforced with 25mmwide 18 gauge hoop iron.
6.8
i) 115mm thick wallingwith hoop bonding150mm apart.
sqm 202.38 838.30
ii) 115mm thick wallingwith hoop bonding300mm apart.
sqm 202.38 837.42
iii) 75mm thick walling
with hoop bonding150mm apart.
sqm 158.30 593.87
iv) 75mm thick wallingwith hoop bonding300 mm apart.
sqm 161.66 596.35
-
8/10/2019 zone2 csr rates punjab
73/251
SECTION 6 BRICK WORK
WAPDA 6 - 4 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
21. Eaves brick moldedweathered and throatedwith back bricks or dripcourse cornice in 1:3cement sand mortar.
6.1 to6.5
i) 75 mm m 91.54 196.06
ii) 115 mm m 105.25 256.62
22. Laying dressed ormolded brick cornice in1:6 cement sand mortar,plastering or pointingcomplete.
6.9
i) One brick m 105.25 161.47
ii) Two bricks m 153.98 309.47iii) Three bricks m 206.01 485.84
iv) Four bricks m 259.22 662.72
23. Scraping or cleaningbricks dismantled frommasonry.
no. 0.93 6.1 to6.5
24. Supplying and fillingsand under floors orplugging in wells
cum 67.67 712.62 9.6.4/19.4(L)
25. Damp proof course with(cement, sand andshingle concrete 1:2:4)including 2 coats ofasphaltic mixture.
20.8
a) 40 mm sqm 208.00 505.86
b) 50 mm sqm 208.00 560.27
c) 75 mm sqm 217.79 739.05
26. Vertical damp proof
course of 20 mm thickcement plaster 1:2 withbitumen at 1 kg persqm.
sqm 193.77 404.99 -do-
27. Constructing cavity wallconsisting of 115mmthick external and230mm internal brick walllaid in (1:4) and (1:6)cement sand mortarrespectively including
providing and fixing9.5mm tie bars 40mmthick thermopore sheet,weep holes and air ventholes complete as per
cum 2001.05 7576.89 20.8
-
8/10/2019 zone2 csr rates punjab
74/251
SECTION 6 BRICK WORK
WAPDA 6 - 5 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
Drawing No. CDO(W)301-5-B/63
28. Reinforced brick worklaid in 1:3 cement sandmortar in foundation andplinth excluding the costof reinforcement and itsfabrication.
cum 1512.05 6775.75 20.8
29. Reinforced brick worklaid in 1:3 cement sandmortar in ground andsubsequent floorsexcluding cost of
reinforcement and itsfabrication.
cum 2048.32 7312.02 -do-
-
8/10/2019 zone2 csr rates punjab
75/251
SECTION 7 STONE MASONRY
WAPDA 7 - 1 WCSR-2013 (Zone-2)
SECTION- 7S T O N E M A S O N R Y
1. Composite rate for all finished works include the removal of surplus debris, unusedmaterial and by products.
2. The composite rates constitute full compensation for the completed items of the worksas per drawings, specifications and instructions of Engineer Incharge including alllabour and material/equipment required for the finished work.
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
FOUNDATION & PLINTH
1. Random Rubble masonryuncoursed).
7.3 &7.4
a) Dry cum 1284.49 3179.51b) In cement sand
mortar, Ratio:
i) 1:3 cum 2466.09 6238.53
ii) 1:4 cum 2466.09 5915.90
iii) 1:6 cum 2466.09 5546.47
iv) 1:8 cum 2466.09 5342.26
2. Coursed Rubble,masonry including
hammer dressing.
7.3 &7.11
a) Dry cum 1612.59 3507.61
b) In cement sandmortar, Ratio:
i) 1:3 cum 2466.09 6238.53
ii) 1:4 cum 2466.09 5915.90
iii) 1:6 cum 2466.09 5546.47
iv) 1:8 cum 2466.09 5342.26
SUPER STRUCTURE
(Ground floor or 6.0mheight of uncovered wall)
3. Random Rubble masonry(uncoursed).
7.3 &7.4
a) Dry cum 1449.01 3344.02
b) In cement sandmortar, Ratio:
i) 1:3 cum 2681.88 6454.33
ii) 1:4 cum 2681.88 6131.69
iii) 1:6 cum 2681.88 5762.26
iv) 1:8 cum 2681.88 5558.05
c) Add extra labour initem No.3:
First floor cum 414.05
-
8/10/2019 zone2 csr rates punjab
76/251
SECTION 7 STONE MASONRY
WAPDA 7 - 2 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
Second floor cum 938.73
Third floor cum 1284.49
4th and subsequent
floors
cum 2354.87
d) Extra labour for every1.50 m additionalheight of uncoveredwall.
cum 373.94
4. Coursed Rubble,masonry includinghammer dressing.
7.3 &7.11
a) Dry cum 1882.12 3777.14
b) In cement sand
mortar, Ratio:
i) 1:3 cum 3114.40 6810.63
ii) 1:4 cum 3114.40 6523.81
iii) 1:6 cum 3114.40 6195.36
iv) 1:8 cum 3114.40 6020.21
c) Add extra labour initem No.4:
First floor cum 414.05
Second floor cum 938.73
Third floor cum 1284.494th and subsequentfloors
cum 2354.87
d) Extra labour for every1.5m additionalheight of uncoveredwall.
cum 373.94
5. Ashlar block in course orscabbled Masonryincluding dressing etc.,
7.3 &7.6
a) In cement sandmortar, Ratio:
i) 1:3 cum 8356.56 13177.04
ii) 1:4 cum 8356.56 12961.79
iii) 1:6 cum 8356.56 12718.13
b) Add extra labour initem No.5:
First floor cum 414.05
Second floor cum 938.73
Third floor cum 1473.154th and subsequentfloors
cum 2354.87
-
8/10/2019 zone2 csr rates punjab
77/251
SECTION 7 STONE MASONRY
WAPDA 7 - 3 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
6. Ashlar fine masonryincluding dressing etc.
7.3 &7.7
a) In cement sandmortar, Ratio:
i) 1:3 cum 15723.39 20862.20
ii) 1:4 cum 15723.39 20754.81
iii) 1:6 cum 15723.39 20634.27
b) Add extra labour nitem No.6:
First floor cum 414.05
Second floor cum 938.73
Third floor cum 1473.15
4th and subsequent
floors.
cum 2354.87
MISCELLANEOUSDRESSING STONES ETC
7. Extra labour for archwork in stone masonryincluding centering andde-centering etc.
cum 1075.06 7.3 &7.12
8. Moulding and dressingstones etc.
7.3 &7.5
a) Extra for coping andcaps, etc.
cum 5908.65 8160.55
b) Cornice and stringcourse.
cum 5908.65
9. Dressing stone:
a) Hammer dressed sqm 659.65
b) Rough tooled dressed sqm 1255.82
7.5 &7.10
c) Chisel dressed sqm 1520.06
d) Fine dressed sqm 3120.61
10. Sand grouting in stoneapron with high pressurehose.
sqm 89.17 178.29 7.14
11. Grouting stone pitchingor apron in 1:3 cementmortar.
sqm 257.57 639.37 7.14 &7.15
12. Levelling and dressingstone filling under blocksand grouting with shingle.
sqm 89.17 245.53 7.3 &7.14
13. Grouting voids betweenblocks with bajri.
cum 291.22 634.87 -do-
-
8/10/2019 zone2 csr rates punjab
78/251
SECTION 7 STONE MASONRY
WAPDA 7 - 4 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
14. Stone filling dry handpacked as filling behindretaining walls or in
pitching and aprons.
cum 537.53 1739.00 7.3 &7.14
15. Grouting stone filling orpitching with bajri.
cum 261.64 873.89 -do-
16. Breaking stone ballastscreened and stacked:
7.3
a) 50 mm cum 733.29
b) 40 mm cum 838.30
c) 25 mm cum 942.72
d) 13 mm cum 1257.16
e) 13 to 6 mm cum 2094.87
17. Breaking stone intospawls and stacking.
cum 314.44 -do-
18. Screening and stackingstone ballast shingle orbajri etc.
cum 209.43 -do-
19. Washing ballast, bajrishingle etc.
cum 209.43 -do-
20. Crushing stone ballast andstacking within 100 m.
cum 628.28 -do-
21. Stone pitching withhammer dressed stoneson surface laid in coursesincluding carriage ofmaterial within 100 m.
cum 1786.66 3848.53 7.3 &7.15
22. Stone pitching handpacked with surfacelevelled off to the correctsection with hammerdressed stone and voidsfilled in 1:8 cementmortar in floors of bridgesand along banks and inaprons etc. including100 m lead.
cum 2077.88 6191.18 -do-
23. Removing, stone andrepitching, hand packedon slopes after making
good damaged slope.
cum 792.80 792.80 -do-
24. Collecting and stackingboulders from nullahbeds or loose shale from
cum 418.86 418.86 -do-
-
8/10/2019 zone2 csr rates punjab
79/251
SECTION 7 STONE MASONRY
WAPDA 7 - 5 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
any other site, within100 m.
25. Stone pitching for topLayer only:
7.3 &7.15
a) On slope cum 1206.34 3268.21
b) On horizontal level cum 1058.02 3119.89
Top layermean350mm to450mm thickstonepitchinglayer.
26. Laying stone or spawlfilling:
-do-
a) On slope cum 291.22 2181.27
b) On horizontal level cum 239.01 2129.06
27. Providing and fixing150mm thick dressedstone pavement on walkway properly dressed setin cement mortar 1:4curing etc. complete.
sqm 420.08 941.81 7.3 &7.14
28. Supply and spreading ofcrushed stone/water borngravel of 20mm size.
cum 105.11 2145.95 -do-
-
8/10/2019 zone2 csr rates punjab
80/251
SECTION 8 ROOFING
WAPDA 8 - 1 WCSR-2013 (Zone-2)
SECTION- 8R O O F I N G
1. Rates for all finished works shall include the removal of surplus debris, unusedmaterial and by products.
2. The composite rates shall constitute compensation for the completed items of worksas per drawings, specifications and instructions of Engineer Incharge including alllabour and material/equipment required for the finished works.
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
1. Brick tiles 300 x 150 x50mm roofing consistingof 13 mm thick cementplaster 1:6 with 1.75 kg.of hot bitumen coatingsand blinded providedover tiles laid in 1:6cement mortar including1:2 cement pointingunder-neath of tilescomplete including curingetc.
sqm 633.29 1094.25 8.1 &8.2
2. Brick tiles 225 x 113 x38mm laid over 100mmearth & 25mm mud
plaster grouted withcement sand 1:3 on topof RCC roof slabprovided with 1.75 kg.bitumen coating sandblinded.
sqm 253.03 718.82 8.11
3. Jack arch roofing 115mmthick laid in 1:5 cementmortar including anaverage depth of 100mmcement concrete in
haunches and overcrown with 100mm earth& mud plaster soffits ofarches cement plastered1:6, 13mm thick.The rate also includesbitumen coating centring,laying skew bricks incement sand mortar (1:3)and encasing exposedflanges of the joists withfine cement concrete
1:2:4 using stoneaggregate:
8.3, 8.4& 8.5
For steelpart & itserection etc,items underIron work -
Misc. of theCompositeSchedule ofRates bereferred.
Cement concrete inhaunches 1:3:6
sqm 888.00 2282.56
-
8/10/2019 zone2 csr rates punjab
81/251
SECTION 8 ROOFING
WAPDA 8 - 2 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
4. Jack arch roofing 115mmthick laid in 1:5 cementmortar including an
average depth of 100mmcement concrete inhaunches and overcrown with 13mm cementplaster, 1:6 on top(except earth filling andmud plaster) soffit ofarches cement plastered.The rate also includesbitumen coating,centring, laying skewbricks in cement sand
mortar (1:3) andencasing exposedflanges of the joists withfine cement concrete1:2:4 using stoneaggregate.
8.3, 8.4& 8.5
Cement concrete inhaunches 1:3:6.
sqm 717.19 2047.36
For steelpart & itserection etc,
items underIron work -Misc. of theCompositeSchedule ofRates bereferred
5. Extra for vaulted jackarch roofing.
sqm 153.93 -do-
6. Jack arch roofing ofshingle & cementconcrete (1:3:6) 115mmthick at crown, with13mm cement plasterincluding cost ofsupplying erecting anddismantling centring.
sqm 742.70 1218.96 -do-
7. Two coats of bitumen laidhot using 1.66 kg. per
sqm over roof & blindedwith sand at 0.003 cumper sqm
sqm 64.07 110.66 8.11
8. Corrugated galvanizediron sheets fixed with G.I.bolts, nuts limpets andbitumen washer, windtiescomplete in all respectswithout valleys & ridges:
8.7
a) 20 S.W.G sqm 154.85 1874.02
b) 22 S.W.G sqm 154.85 1650.85
c) 24 S.W.G sqm 154.85 1399.68
-
8/10/2019 zone2 csr rates punjab
82/251
SECTION 8 ROOFING
WAPDA 8 - 3 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
9. Plain galvanized ironsheets of 22 S.W.G. rainwater down pipeincluding clamps andfixed in place:
8.10
a) 100 mm m 236.32 1173.33
b) 125 mm m 236.32 1465.80
10. Plain galvanized ironsheet flashing 22 gauge
sqm 960.72 1620.17 -do-
11. Cast iron rain water downpipe fixed in placeexcluding heads & shoesbut including clamps etc:
-do-
a) 100 mm m 169.19 2229.10
b) 75 mm m 169.19 1864.56
12. Rain water down pipecast iron heads fixed inplace including cost ofclamps hold fast andpainting:
-do-
a) 100 mm each 208.94 767.29
b) 75 mm each 208.94 671.02
13. Shoes, bends or offsetsfor cast iron rain waterdown pipe including fixingand painting.
each 69.60 910.62 8.1
14. Plain G.I. sheet ironspouts fixed in placeincluding painting (700mm length & 150mmwidth).
each 236.32 347.78 8.9 &8.10
15. 13mm thick deodarceiling complete includingsawing planning andfixing.
sqm 405.32 3129.08 8.12
16. Flat sheet roof withgalvanized iron plainsheets including battensrolls screws clips etc.;
8.8
a) 22 B.W.G. sqm 392.16 1066.99
b) 24 B.W.G. sqm 392.16 992.71
17. Asbestos cementcorrugated sheet roofingincluding necessary overlaps & G.I. hook, bolts,nuts, screws, washers &
sqm 181.10 1404.94 -do-
-
8/10/2019 zone2 csr rates punjab
83/251
SECTION 8 ROOFING
WAPDA 8 - 4 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
bitumen washers, etc.(excluding valleys andridges etc.).
18. Extra labour for erectionof G.I. sheets, flat sheetsor asbestos sheet roofingabove 6.00m height indifficult position includinglifting with care & specialscaffolding along liveelectric wires.
sqm 40.82 8.8
19. Asbestos cement sheetridges & valleys 6mmthick.
m 63.45 394.19 -do-
20. Plain galvanized ironsheet ridging includingfixture, timber for ridgeroll and ridge sheeting:
8.7
a) 150mm lap & 450mmover all of 22 gaugeG.I. sheet ridging.
m 252.28 1970.97
b) 230mm lap & 600mmover all of 24 gaugeG.I. sheet ridging.
m 252.28 2048.73
c) 300mm lap & 750mmover all of 22 gaugeG.I. sheet ridging.
m 252.28 2261.28
21. Plain 22 gauge G.I. sheetgutter semi circular200mm .
m 143.38 494.27 8.1
22. Making masonryventilators.
each 1522.75 2111.08
23. Earthen ware syphonventilators. each 169.03 206.23
24. Single layer of buildingpaper/2-ply bitumenpaper for floors etc. laidover two coats of bitumenhot using 1.66 kg. persqm blinding with sand at0.003 cum per sqm.
sqm 71.79 532.49 8.1 &8.11
25. Double layer of building
paper laid over 2 coats ofhot bitumen PB-3 or PB-4for floors etc. using 1.66kg. bitumen per sqm.
sqm 75.35 821.97 -do-
-
8/10/2019 zone2 csr rates punjab
84/251
SECTION 8 ROOFING
WAPDA 8 - 5 WCSR-2013 (Zone-2)
Rate (Rs)Sr.No.
Description UnitLabour Composite
Specification
Remark
1 2 3 4 5 6 7
26. Polythine sheet 0.2 mmthick laid over two coatsof bitumen using 1.66 kg.bitumen hot per sqm overfloors & DPC etc.
sqm 71.79 284.81 8.1&8.11
27. 3 ply bitumenized paperlaid over two coats of hotbitumen PB-3 or PB-4,using 1.66 kg. bitumenper sqm.
sqm 75.35 536.05 -do-