ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k...

15
(as if ) No boundaries at all Pavel Šidlichovský INSPIRE Conference 2018; Antwerpen 18.9.2018 LAND SURVEY OFFICE of Czech Republic

Transcript of ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k...

Page 1: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

ZEMĚMĚŘICKÝ ÚŘAD

(as if) No boundaries at all

Pavel ŠidlichovskýINSPIRE Conference 2018; Antwerpen

18.9.2018

LAND SURVEY OFFICEof Czech Republic

Page 2: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz

Directive 2007/2/EC ; Chapter III Article 10 paragraph 2:

In order to ensure that spatial data relating to a geographical feature, the location of which spans the frontier between two or more Member States, are coherent, Member States shall, where appropriate, decide by mutual consent on the depiction and position of such common features.

IR Requirement Annex II, Section 7.9.1 for TN and Section 8.7.1 for HYTheme-specific Requirements – Consistency between spatial data sets

Connectivity between ….Networks across state borders and – where applicable – also across regional borders (and data sets) within Member States shall be established and maintained by the respective authorities, using the cross-border connectivity mechanisms provided by the NetworkConnection type.

TG: D 2.6 „Methodology for the development of data specifications“ Anex B

„Management of connections at international boundaries“2

INSPIRE legislation :

Page 3: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 3

International boundary definition

• http://www.statnihranice.cz/ by Ministry of Interior of the CR

Page 4: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 4

www.statnihranice.cz

Page 5: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 5

State boundary „is known“

Page 6: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 6

Data Sources - Border Documentation

List of Border Points Description

Page 7: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz

• Temporal aspect ( measurement recognized by formal treatycould be 20 years old)

• Transformations to/from 19th century coordinate systems

• LOD, generalization

• Natural features forming boundary

7

Issues influencing border representation

Page 8: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 8

Data Harmonisation with Neighbouring Countries

Saxony• Since 2009 as the EU project (2009-2011)• 171 connecting points• Update is beeing in a proposal• Working meeting in 1/2017, 6/2018

ATKIS

Bavaria• Since 2012• 586 connecting points set• Annual update• Working meeting every year

ATKIS

Austria• in 2016 all watercourses connected• 11/2016 first meeting• 12/2016 all data exchange• 12/2017 set 170 connecting points in

a proposal form at section I• 09/2018 working meeting

Poland• Since 2014 • 353 connecting points in a proposal until now• From 2015 until now harmonisation process

stucked from Polish side• No working meeting

BDOT10k

Slovakia• Since 2014 • In 2015 set 268 connecting points in a

proposal form• From 2016 detailed verification of all

connections is beeing in process• Up to 9/2018 section I-V finished• By the end 2018 all section (I to IX) will

be finished

ZBGIS®

ZABAGED®

Czech Republic

DLM

Situation in 9/2018

2326.87 km

Page 9: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 9

TYPE of Connection Points

CP = Connecting Point

FP = Fixed Point

CP-SBC = Connecting Point-Start of Border Concourse

CP-EBC = Connecting Point-End of Border Concourse

CP-SBO = Connecting Point-Start of Border Oscillation

CP-EBC = Connecting Point-End of Border Oscillation

SBC = Start of Border Concourse

EBC = End of Border Concourse

SBO =Start of Border Oscillation

EBO = End of Border Oscillation

(eg. EBO+SBC, EBC+SBO)

EP = End Point

SP = Start Point

EP-SBC = End Point-Start of Border Concourse

EP-EBC = End Point-End of Border Concourse

Page 10: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz

TYPE of Connecting Points - Oscillation

CP-SBO - Start of Border Oscillation

CP-EBO - End of Border Oscillation

Identical geometry between CP-SBO and CP-EBO in both partner‘s databases?

Page 11: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz

Oscillating watercourse

01-42-25 Načetínský potok

Page 12: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 12

Data Exchange

Spreadsheet list of connection pointsNo need for „spatial data“ exchange

Page 13: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 13

INSPIRE Datasets

HY available datasets

TN available datasets

Page 14: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.cz 14

Proposal

„Network connection“ elements describe the data „Network connection“ elements suplement the metadata

„Network connection“ elements should bepublished as separate dataset.(preferably open data)

Page 15: ZEMĚMĚŘIKÝ ÚŘAD LAND SURVEY OFFICE · stucked from Polish side •No working meeting BDOT10k Slovakia •Since 2014 •In 2015 set 268 connecting points in a proposal form •From

www.cuzk.czZeměměřický úřad, Pod sídlištěm 9, Praha 8

Thank You for Your Attention

[email protected]