Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena...

8
Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished with sprayed concrete Dischinger did a doctor thesis on the theory of polygonal shells in 1929 Concrete Shells, Ian Liddell, Buro Happold
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    242
  • download

    1

Transcript of Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena...

Page 1: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922

Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag

The shell was finished with sprayed concrete

Dischinger did a doctor thesis on the theory of polygonal shells in 1929

Concrete Shells, Ian Liddell, Buro Happold

Page 2: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Engineer Franz Dischinger, 1/5th model of a market shell for Dresden constructed by Dywidag 1931. 7.3m square, 15mm thick at the crown, 25mm at the edges

Concrete Shells, Ian Liddell, Buro Happold

Page 3: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Brynmawr rubber factory 1950, Arup and Jenkins

Concrete Shells, Ian Liddell, Buro Happold

Page 4: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Smithfield poultry market. Model tests to establish buckling load. Shell thickness was 1/4 inches. Buckling load was found to be 190 lbs/sq.ft at full size.

Page 5: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Hatfield pool

©1963Hatfield Swimming Pool 1965

Page 6: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

Cooling Towers at Didcot

120m high by 100 feet diameter

Concrete Shells, Ian Liddell, Buro Happold

Page 7: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

ST21 Stuttgart’;s new train station

Ingenhoven, Otto, Leonhardt & Andrae, Buro Happold.

Concrete Shells, Ian Liddell, Buro Happold

Page 8: Zeiss / Dywidag shell for planetarium No 1 built at Jena. 1922 Walter Bauersfeld, Carl zeiss,Jena and Franz Dischinger, Dywidag The shell was finished.

ST21 Stuttgart’;s new train station

Ingenhoven, Otto, Leonhardt & Andrae, Buro Happold.

Concrete Shells, Ian Liddell, Buro Happold