ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office...

24
LYNN RD HINTON ST GODFREY DR CAMPUS DR HUNTER ST TONY TANK LN WILDERNESS RD LILAC LN WILKINSBURG RD JAMBOREE RD WESTMILL CT ROXTON CT Zoning: CAC: Drainage Basin: Acreage: Sq. Ft.: OX-3-CU Northwest Hare Snipe Creek .36 4,800 0 600 300 Feet Planner: Phone: Applicant: Phone: Ryan Boivin (919) 996-2681 Richard Rabon (919) 524-1251 ¯ ZACKERY MICHAEL OFFICE BUILDING SR-110-17

Transcript of ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office...

Page 1: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

LYNN RD

HINTON ST

GODF

REY D

R

CAMP

US D

R

HUNT

ER S

T

TONY TANK LNWILDERNESS RD

LILAC LNWILKINSBURG RD

JAMBOREE RD

WESTMILL CT

ROXTON CT

Zoning:CAC:

Drainage Basin:Acreage:

Sq. Ft.:

OX-3-CUNorthwestHare Snipe Creek.364,800

0 600300 Feet

Planner:Phone:

Applicant:Phone:

Ryan Boivin(919) 996-2681Richard Rabon(919) 524-1251

¯ZACKERY MICHAEL OFFICE BUILDINGSR-110-17

Page 2: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

SR-110-17 Zackery Michael Office Building 1

City of Raleigh Development Services Department

One Exchange Plaza Raleigh, NC 27602

(919) 996-2495 [email protected]

www.raleighnc.gov

Administrative Approval Action

SR-110-17, Zackery Michael Office Building Transaction # 539653, AA # 3829

LOCATION: This site is located on the south side of Lynn Road. The site is addressed at 2449 Lynn Rd, which is inside City limits.

REQUEST: Development of a 0.361-acre tract zoned OX-3-CU (Zoning Case Z-7-2009) into a 4,800 square foot general building for office use.

DESIGN ADJUSTMENT(S)/ ALTERNATES, ETC: Design Adjustment(s) granted for:

- DA-2-18 -- Block Perimeter- DA-2-18 -- Alternate Streetscape- DA-2-18 -- Waiving 5’ utility placement easement

Variance (A-49-18) granted for 38.5’ and 21’ relief on the western and eastern property lines, respectively, from Zone B Neighborhood Transition requirements

FINDINGS: City Administration finds that this request, with the below conditions of approval being met, conforms to the Unified Development Ordinance. This approval is based on a preliminary plan submitted by Edwin Sconfienza of The Site Group, PLLC, dated May 31, 2018.

CONDITIONS OF APPROVAL and NEXT STEPS: Note: This document must be applied to the second sheet of all future submittals with

the exception of final plats.

PRIOR TO THE ISSUANCE OF ANY SITE PERMITS OR APPROVAL OF CONCURRENT REVIEW PROCESS, WHICHEVER IS APPLICABLE:

ENGINEERING 1. Required NCDOT encroachment and/or driveway permits must be approved and copies provided

to Development Services – Development Engineering prior to concurrent review approval.

2. Next Step: A right-of-way obstruction permit must be obtained from Right-of-way Services prior tothe commencement of any construction activities within the right-of-way.

PRIOR TO ISSUANCE OF BUILDING PERMITS:

GENERAL 3. Comply with all conditions of Z-7-09.

4. A Final Plat shall be recorded with the Wake County Register of Deeds office for all Subdivisions,Recombinations, Right Of Way and/or Easement Dedications, and Tree Save Areas.

5. Provide fire flow analysis.

ENGINEERING 6. The required right of way for Lynn Road shall be dedicated to the City of Raleigh and is shown on

a plat approved for recordation.

7. In accordance with Part 10A Section 8.1.10, a fee-in-lieu for 1’ sidewalk shall be paid to the Cityof Raleigh.

Page 3: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 4: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 5: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 6: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 7: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 8: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 9: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 10: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 11: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 12: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 13: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 14: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 15: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 16: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 17: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 18: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 19: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,
Page 20: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

HC

7

5

OFF

ICE

BUIL

DING

ZACK

ERY

MIC

HAEL

SITE001

Raleigh, North Carolina

2449 LYNN ROAD ZACKERY MICHAEL OFFICE BUILDING

NOTE: A VARIANCE (A-49-18) TO THE 50' ZONE BUSE AREA REQUIRED BY UDO SECTION 3.5 WASGRANTED BY THE RALEIGH BOARD OF ADJUSTMENTON JUNE 11, 2018.

TRAN

SAC

TIO

N N

UM

BER

#53

9653

H:\Th

e SITE G

ro

up

\P

ro

jects\Z

MLR

\D

WG

\Z

MLR

_Siteb

ase.d

wg

, 6/11/2018 2:39:35 P

M, A

uto

CA

D P

DF (G

en

eral D

ocu

men

tatio

n).p

c3

Page 21: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

OFF

ICE

BUIL

DING

ZACK

ERY

MIC

HAEL

SITE100

H:\Th

e SITE G

ro

up

\P

ro

jects\Z

MLR

\D

WG

\Z

MLR

_Siteb

ase.d

wg

, 6/11/2018 2:07:21 P

M, A

uto

CA

D P

DF (G

en

eral D

ocu

men

tatio

n).p

c3

Page 22: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

HC

7

5

HC

OFF

ICE

BUIL

DING

ZACK

ERY

MIC

HAEL

SITE200

H:\Th

e SITE G

ro

up

\P

ro

jects\Z

MLR

\D

WG

\Z

MLR

_Siteb

ase.d

wg

, 6/11/2018 2:39:58 P

M, A

uto

CA

D P

DF (G

en

eral D

ocu

men

tatio

n).p

c3

Page 23: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

HC

HC

HC

OFF

ICE

BUIL

DING

ZACK

ERY

MIC

HAEL

SITE400

205T-4 FULL CUTOFF

T4

.51 2 3 4

5

Luminaire Schedule

Symbol Qty Label Arrangement LLFDescription

Lum. LumensBUG Rating

0.8505 LED205C_4 SINGLE 0.850 GAN-AE-04-LED-U-T4W 20555 B3-U0-G4T4

Tag

FULL CUTOFF FIXTURE REQUIRED

COMMENTS

H:\Th

e SITE G

ro

up

\P

ro

jects\Z

MLR

\D

WG

\Z

MLR

_Siteb

ase.d

wg

, 6/11/2018 2:42:37 P

M, A

uto

CA

D P

DF (G

en

eral D

ocu

men

tatio

n).p

c3

Page 24: ZACKERY MICHAEL OFFICE BUILDING SR-110-17 · 2019. 8. 12. · SR-110-17 Zackery Michael Office Building 1 City of Raleigh Development Services Department One Exchange Plaza Raleigh,

HC

HC

7

5

OFF

ICE

BUIL

DING

ZACK

ERY

MIC

HAEL

SITE500

H:\Th

e SITE G

ro

up

\P

ro

jects\Z

MLR

\D

WG

\Z

MLR

_Siteb

ase.d

wg

, 6/11/2018 2:43:32 P

M, A

uto

CA

D P

DF (G

en

eral D

ocu

men

tatio

n).p

c3