Your Lean Can No Be Without BIM

25
YOUR PROCESS CAN NOT BE LEAN WITHOUT BIM Otto Alhava, Sakari Pesonen

Transcript of Your Lean Can No Be Without BIM

Page 1: Your Lean Can No Be Without BIM

YOUR PROCESS CAN NOT BE LEANWITHOUT BIM

Otto Alhava, Sakari Pesonen

Page 2: Your Lean Can No Be Without BIM

WHO WE ARE?

Fira 2009 - 2013

”..and then you arefree to increaseproductivity with IT”

Domestic service and construction company

16 MEUR

80 MEUR

Page 3: Your Lean Can No Be Without BIM

WHAT IS OUR VISION?

FIRA 2030:European service and constructioncompany, revenue 1 MRD EUR

Page 4: Your Lean Can No Be Without BIM

LEAN MANUFACTURING

5S System Lot Size Reduction

Visual Management

Standardized work Quick Set-Up

Built in QualityPull/Kanban/Flow

Root Cause Analyses

AndonValue StreamMapping

Kaizen – ContinuousImprovement DMAIC / PDCA

System Inteligence

JIT – Just In Time

Gemba Walk

Page 5: Your Lean Can No Be Without BIM

LEAN CONSTRUCTION

• BIM complies perfectly with Lean principles

Page 6: Your Lean Can No Be Without BIM

CONSTRUCTION BUSINESS HAS FAILED INDEVELOPMENT OF PRODUCTIVITY

Industry

Construction

We can not afford this anymore.

Page 7: Your Lean Can No Be Without BIM

CONSTRUCTION BUSINESS: NOW IT’S TIME TOMAKE THE CHANGE

We are #1 in EU(sadly, it’s aging)

Page 8: Your Lean Can No Be Without BIM

Construction business is worth of 25 MRD EUR in Finland.

If we would have increased productivitysay 3 % per year, we would be thinkingwith Norwegians where to put all the

money.

Page 9: Your Lean Can No Be Without BIM

BIM HAS BEEN HERE FOR MORE THAN 10 YEARAND LEAN MORE THAN 40

Source: Will Lichtig

We are still in siloes.

Page 10: Your Lean Can No Be Without BIM

SO, BACK TO LEAN AND BIM..WHERE ARE WE?

BIMLean Construction

This is whereMarket Changes

”revolution”

Page 11: Your Lean Can No Be Without BIM

LEAN IS CONTINUOUS IMPROVEMENT

So, Sakari, show me theROOT CAUSEpreventing us to benefitLEAN and BIM in Construction Industry and COUNTERMEASURES.

Source: The Toyota Way to Lean Leadership: Achieving and Sustaining Excellence through Leadership Development

Page 12: Your Lean Can No Be Without BIM

BIM

Lean Construction

Page 13: Your Lean Can No Be Without BIM

SUTTER HEALTH - PAMF SAN CARLOS

INTEGRATED FORM OF AGREEMENT (IFOA)

Page 14: Your Lean Can No Be Without BIM

Source: Prof. Fritz Gehbauer, Helsinki 26.1.2009

Karlsruher Instituts für Technologie (KIT)

Page 15: Your Lean Can No Be Without BIM

Source: Prof. Fritz Gehbauer, Helsinki 26.1.2009

Karlsruher Instituts für Technologie (KIT)

Page 16: Your Lean Can No Be Without BIM

BIM

Lean Construction

Commercial motivations areopposite. Causes suboptimization,hinders the eagerness toimplement BIM Lean

Page 17: Your Lean Can No Be Without BIM

BIM

Lean Construction

Commercial motivations areopposite. Causes suboptimization,hinders the eagerness toimplement BIM Lean

IFOAAlliance

ContractAligned

commercialmotivation

Page 18: Your Lean Can No Be Without BIM

ALLIANCE CONTRACT BY FIRA OY

Owner

DesignBuild

Architect

Structural

Alliance Contract

Jaakob Solla Sakari Pesonen Atte Leppänen Topi LaineKonkret Oy Fira Oy Finnmap Fira Oy Big Room Design management

Fira Oy

HVACElectrical

Trade partner

Trade partner

Trade partner

Trade partner

March 2014 ->

Page 19: Your Lean Can No Be Without BIM

CONVENTIONAL VS. ALLIANCE PROJECT

Value for the money thinkingDesign

Excessive use of BIM

Last Planner System

Built in Quality

Early involmentMaster Schedule

Flow line Scheduling

Target Value Design(TVD)

Kaizen – ContinuousImprovement

Procurement

Construction

Big Room Design Management

Page 20: Your Lean Can No Be Without BIM

BIM

Lean Construction

Commercial motivations areopposite. Causes suboptimization,hinders the eagerness toimplement BIM Lean

IFOAAlliance

ContractAligned

commercialmotivation

Page 21: Your Lean Can No Be Without BIM

GET RID OF THE ”CHASM”, INTRODUCE…

This is whereMarket Changes

”revolution”

”THE BRIDGE”IFOA / Alliance

Contract Lean Construction

BIM

Page 22: Your Lean Can No Be Without BIM

STATEMENTS

• Your process can’t be Lean without BIM• Deployment of Lean and BIM is extremely

difficult without alignment of revenuesharing

• Revenue sharing is possible by adoptingAlliance/IFOA –contract

• Build ”The Bridge”

Page 23: Your Lean Can No Be Without BIM

WE MAKE A MODEL OF OUR PRODUCT, BUT WEDO NOT MODEL OUR BUSINESS

Source: Alexander Osterwalder, busines model canvas

Alliance model will change or have a significant impact to everypart of our business model

Page 24: Your Lean Can No Be Without BIM

Thank You!

”The Brigde”

Page 25: Your Lean Can No Be Without BIM

AMAZING RACE (TO BE CONTINUED)

UK 2016

Finland2016