SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION
TABLE OF CONTENTS
NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
1
14
DRAWN
CHECKED
APPROVED
C2 - APPROVED CANDIDATE NUMBER
COORDINATESLATTITUDE
LONGITUDE
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
LOCATION / VICINITY PLAN & GOOGLE MAP WITH COORDINATES
DRAWING NO.
1
NO. DESCRIPTION
OUTDOOR GREENFIELD SITEDETAILED DESIGN DRAWINGS FOR (SITE ID: YN0878_YAT20212)
IGT-MYANMAR GSM ROLLOUT PROJECT
2
3
4
5
6
SITE LAYOUT
TOWER ELEVATION LAYOUT
TOWER FOUNDATION DESIGN DRAWING
EARTHING TEST PIT
TOWER EARTHING LAYOUT
12
7
13
UNION REPUBLIC OF MYANMAR
TABLE OF CONTENTSIGT_C2_TABLE OF CONTENTS_REV_01
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
SITE EARTHING LAYOUT
OUTDOOR BTS PAD
GENSET PAD
SINGLE LINE DIAGRAM
8
CABLE TRAY AND CABLE LADDER DETAIL DRAWING
9
11
10
TOWN
DISTRICT
REGION
::
:
FENCE DETAILED DRAWING
APPROVEDCANIDATE
IGT_C2_LOCATION MAP_REV_01
IGT_C2_SITE LAYOUT_REV_01
IGT_C2_TOWER ELEVATION_REV_01
IGT_C2_SITE_EARTHING_REV_01
IGT_C2_TOWER EARTHING_REV_01
KRISHAN TANEJA
GENERAL NOTES
IGT_STD_TOWER FOUNDATION_REV_01
IGT_STD_OUTDOOR BTS PAD_REV_01
IGT_STD_GENSET PAD_REV_01
IGT_STD_CABLE LADDER/TRAY_REV_01
IGT_STD_FENCE DETAIL_REV_01
IGT_STD_EARTHING TEST PIT_REV_01
IGT_STD_SINGLE LINE DIAGRAM_REV_01
STD - STANDARD DRAWING
DWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
(INCLUDING DUCTING FOR ELECTRICAL CABLES)
MYINT MYAT
14 EKI_37m_150KPA_195KMPH_AccessIGT_STD_TOWER TEMPLATE
IGT_C2_TABLE OF CONTENTS_REV_01
13 Oct 2015
SITE ID: YN0878_YAT20212
U Zaw Win
C2
YAT20212_KunChanKone
Yangon
09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
_KunChanKone
96.1625°
16.33931°
KRISHAN TANEJA
![Page 2: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/2.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION
LOCATION PLAN
NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
2A
14
DRAWN
CHECKED
APPROVED
C2 - APPROVED CANDIDATE NUMBER
COORDINATESLATTITUDE
LONGITUDE
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
TOWN
DISTRICT
REGION
::
:
APPROVEDCANIDATE
KRISHAN TANEJA
GENERAL NOTES
STD - STANDARD DRAWING
DWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
MYINT MYAT
IGT_C2_LOCATION PLAN_REV_00
KRISHAN TANEJA
13 Oct 2015
SITE ID: YN0878_YAT20212
U Zaw Win
C2
YAT20212_KunChanKone
Yangon
09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
_KunChanKone
96.1625°
16.33931°
![Page 3: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/3.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION
GOOGLE MAP WITH COORDINATES
NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
2B
14
DRAWN
CHECKED
APPROVED
C2 - APPROVED CANDIDATE NUMBER
COORDINATESLATTITUDE
LONGITUDE
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
TOWN
DISTRICT
REGION
::
:
APPROVEDCANIDATE
KRISHAN TANEJA
GENERAL NOTES
STD - STANDARD DRAWING
DWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
MYINT MYAT
IGT_C2_GOOGLE MAP_REV_00
KRISHAN TANEJA
13 Oct 2015
SITE ID: YN0878_YAT20212
U Zaw Win
C2
YAT20212_KunChanKone
Yangon
09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
_KunChanKone
96.1625°
16.33931°
![Page 4: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/4.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
DRAWN
CHECKED
APPROVED
C2 - APPROVED CANDIDATE NUMBER
COORDINATESLATTITUDE
LONGITUDE
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
TOWN
DISTRICT
REGION
::
:
APPROVEDCANIDATE
KRISHAN TANEJA
STD - STANDARD DRAWING
DWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
MYINT MYAT 13-Oct-2015
HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGE DURING
CONTRACTOR PRIOR TO INSTALLATION OF ANTENNA
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
MAGNETIC NORTH TO BE VERIFIED ON THE SITE BY THE
EXCAVATION BY PROVIDING PROPER SHORING.4.
6.
5.
ALL ELEVATIONS ARE IN METERS.
1.
3.2.
OTHERWISE NOTED.
MOUNTS.
CABLE TRAY/LADDER SHALL BE HOT DIP GALVANIZED.
HOT WORKS LIKE WELDING ON TOWER FOUNDATIONSIS NOT ALLOWED ON SITE UNLESS OTHERWISE APPROVEDBY ENGINEERING DEPARTMENT.
CONSTRUCTION NOTES
SITE LAYOUTEKI TYPE TOWER
(37m,195Kmph,150Kpa)Access
IGT_C2_SITELAYOUT_REV_01 14
3
SITE ID: YN0838_YAT20212
U Zaw Win
96.1625°
16.33931° C2
YAT20212_KunChanGone
YANGON
09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
-Kun Chan Kone KRISHAN TANEJA
![Page 5: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/5.jpg)
SHEET CONTENTS: SHEET NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
4B
14
C2 - APPROVED CANDIDATE NUMBER
AZ - AZIMUTH
EL - ELEVEATION
MW - MW ANTENNA
FGL - FINISHED GRADE LINE
DWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
CONSTRUCTION NOTES
ELEVATION LAYOUT
IGT_C2_ELEVATION_REV_01
HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGE DURING
CONTRACTOR PRIOR TO INSTALLATION OF ANTENNA
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ANTENNA ELEVATIONS SHOULD BE MEASURED FROM
MAGNETIC NORTH TO BE VERIFIED ON THE SITE BY THE
BACKFILL MATERIALS TO BE PLACED IN 150MM LAYERSAND COMPACTED TO 95% OF THE MAX. DRY DENSITY IN
EXCAVATION BY PROVIDING PROPER SHORING.
7.
4.
6.
5.
ALL ELEVATIONS ARE IN METERS.
1.
3.2.
OTHERWISE NOTED.
MOUNTS.
TOWER BASE PLATE.
ACCORDANCE WITH ASTM D1556.
8.
USE IMPORTED BACKFILLING MATERIALS OR ANY OTHERSUITABLE MATERIALS SUBJECT FOR APPROVAL FROM
9.
IGT-ENGINEERING DEPARTMENT.
CABLE TRAY/LADDER SHALL BE HOT DIP GALVANIZED.
HOT WORKS LIKE WELDING ON TOWER FOUNDATIONSIS NOT ALLOWED ON SITE UNLESS OTHERWISE APPROVEDBY ENGINEERING DEPARTMENT.
(37m,195Kmph,150 kpa)AccessEKI TYPE TOWER
DATE IGT APPROVAL
SITE NAME:
SIGNATURENAME
LAND OWNER
SITE INFORMATION NAME ADDRESS CONTACT NO.
DRAWN
CHECKED
APPROVEDCOORDINATESLATTITUDE
LONGITUDETOWN
DISTRICT
REGION
::
:
APPROVEDCANIDATE
KRISHAN TANEJA
MYINT MYAT
-KRISHAN TANEJA
YANGON
SITE ID: YN0838_YAT20212
U Zaw Win
96.1625°
16.33931° C2
YAT20212_KunChanGone09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
Kun Chan Kone
13-Oct-2015
![Page 6: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/6.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
4B
14
DRAWN
CHECKED
APPROVED
C2 - APPROVED CANDIDATE NUMBER
COORDINATESLATITUDE
LONGITUDE
AZ - AZIMUTH
EL - ELEVEATION
MW - MW ANTENNA
FGL - FINISHED GRADE LINE
TOWN
DISTRICT
REGION
::
:
APPROVEDCANDIDATE
KRISHAN TANEJADWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
CONSTRUCTION NOTES
ELEVATION LAYOUT
IGT_C2_ELEVATION_REV_01
HIGH CARE TO BE TAKEN TO AVOID ANY DAMAGE DURING
CONTRACTOR PRIOR TO INSTALLATION OF ANTENNA
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ANTENNA ELEVATIONS SHOULD BE MEASURED FROM
MAGNETIC NORTH TO BE VERIFIED ON THE SITE BY THE
BACKFILL MATERIALS TO BE PLACED IN 150MM LAYERSAND COMPACTED TO 95% OF THE MAX. DRY DENSITY IN
EXCAVATION BY PROVIDING PROPER SHORING.
7.
4.
6.
5.
ALL ELEVATIONS ARE IN METERS.
1.
3.2.
OTHERWISE NOTED.
MOUNTS.
TOWER BASE PLATE.
ACCORDANCE WITH ASTM D1556.
8.
USE IMPORTED BACKFILLING MATERIALS OR ANY OTHERSUITABLE MATERIALS SUBJECT FOR APPROVAL FROM
9.
IGT-ENGINEERING DEPARTMENT.
CABLE TRAY/LADDER SHALL BE HOT DIP GALVANIZED.
HOT WORKS LIKE WELDING ON TOWER FOUNDATIONSIS NOT ALLOWED ON SITE UNLESS OTHERWISE APPROVEDBY ENGINEERING DEPARTMENT.
:
MYINT MYAT
KRISHAN TANEJAEKI TYPE TOWER
(37m,195Kmph,150Kpa)Access
-YANGON
SITE ID: YN0838_YAT20212
U Zaw Win
96.1625°
16.33931° C2
YAT20212_KunChanGone09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
Kun Chan Kone
13-Oct-2015
![Page 7: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/7.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION NAME ADDRESS CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
5
14
DRAWN
CHECKED
APPROVEDCOORDINATESLATITUDE
LONGITUDE
TOWN
DISTRICT
REGION
::
:
APPROVEDCANDIDATE
KRISHAN TANEJADWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONEOF PROTECTION TO THE ANTENNA OF THE TOWER.
5.
THE RESISTANCE TO EARTH SHALL BE TESTED IN AFTER THE INSTALLATION OF THE EARTHING SYSTEM
EQUIPMENT AND AT THE TOWER.
ALL DIMENSIONS SHALL BE IN MILLIMETERS UNLESS
CABLE GANTRY SHALL BE EARTHED/BOUNDED AT THE
ACCORDANCE WITH EARTHING TEST PROCEDURE FOR
ANTI-CORROSION COMPOUND SHALL BE APPLIED AFTER TERMINATION AND MECHANICAL WELD CONNECTION.
4.
3.
1.
2.
OTHERWISE NOTED.
GSM SITES.
- EARTHING INSPECTION PIT WITH EARTH ROD
- BOLTED CONNECTION
- MECHANICAL WELD CONNECTION
- 25mmX3mm COPPER TAPE
- EARTHING BUS BAR
- EARTH ROD, 2400mm LONG x 3/4' DIA.
CONSTRUCTION NOTES
SITE EARTHING LAYOUT
IGT_C2_TOWER EARTHING_REV_01
GROUNDING TEST RESISTANCE SHOULD BE< OR = TO 5 OHMS.
6.
- EARTH ROD 1200/1500mm LONG
MYINT MYAT
KRISHAN TANEJA
EKI TYPE TOWER(37m,195Kmph,150Kpa)Access
-YANGON
SITE ID: YN0838_YAT20212
U Zaw Win
96.1625°
16.33931° C2
YAT20212_KunChanGone09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
Kun Chan Kone
13-Oct-2015
![Page 8: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/8.jpg)
SHEET CONTENTS:DATE SHEET NO.IGT APPROVAL
SITE NAME:SIGNATURENAME
LAND OWNER
SITE INFORMATION NAME CONTACT NO.
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
6
14
DRAWN
CHECKED
APPROVEDCOORDINATESLATITUDE
LONGITUDE
TOWN
DISTRICT
REGION
::
:
APPROVEDCANDIDATE
KRISHAN TANEJADWG. NO.
RELEASED PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONFOR
LIGHTNING ROD SHALL BE PROVIDED WITH A 45° CONEOF PROTECTION TO THE ANTENNA OF THE TOWER.
5.
THE RESISTANCE TO EARTH SHALL BE TESTED IN AFTER THE INSTALLATION OF THE EARTHING SYSTEM
EQUIPMENT AND AT THE TOWER.
ALL DIMENSIONS SHALL BE IN MILLIMETERS UNLESS
CABLE GANTRY SHALL BE EARTHED/BOUNDED AT THE
ACCORDANCE WITH EARTHING TEST PROCEDURE FOR
ANTI-CORROSION COMPOUND SHALL BE APPLIED AFTER TERMINATION AND MECHANICAL WELD CONNECTION.
4.
3.
1.
2.
OTHERWISE NOTED.
GSM SITES.
- EARTHING INSPECTION PIT WITH EARTH ROD
- BOLTED CONNECTION
- MECHANICAL WELD CONNECTION
- 25mmX3mm COPPER TAPE
- EARTHING BUS BAR
- EARTH ROD, 2400mm LONG x 3/4' DIA.
- 25mm Y/G GROUNDING WIRE
CONSTRUCTION NOTES
TOWER EARTHING LAYOUT
GROUNDING TEST RESISTANCE SHOULD BE< OR = TO 5 OHMS.
6.
IGT_C2_ELEVATION_REV_01
ADDRESS
MYINT MYAT
KRISHAN TANEJAEKI TYPE TOWER
(37m,195Kmph,150Kpa)Access
-YANGON
SITE ID: YN0838_YAT20212
U Zaw Win
96.1625°
16.33931° C2
YAT20212_KunChanGone09-420017477447, Ywar Street, Lat KhoteKone,KunChanKone Tsp.
Kun Chan Kone
13-Oct-2015
![Page 9: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/9.jpg)
![Page 10: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/10.jpg)
![Page 11: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/11.jpg)
![Page 12: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/12.jpg)
![Page 13: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/13.jpg)
EQUIPMENT PLATFORMAS PER DRAWING
3500
1500
TO T
OW
ER
TOP VIEW
Ø8mm @ 300 c/c TS2
8NOS Ø10mm TS1
M12x25
12mm HOLE GROUNDING
TOGROUNDINGRING
FRONT VIEW SIDE VIEW
100
350
650
400
8080
TS1-Ø10mm TS2-Ø8mm
FGL
5035
0
100
200
700
450
300
FGL
GENERIC HORIZONTAL CABLE TRAY LAYING PLAN (CABLE TRAY WIDTH - 450mm)
45x45x4
800700450100 100
2525
45x45x4
FLAT40mm x 4mm
RCCPedestalRCC Pedestal
RCCPedestal
250
450
45
300
M12 bolts
Angle Cleat( 50x50x5mm , 100mm Long)
12mmx75mm LongAnchor fastener 2Nos A
Detail A
2525
300
25
PLAN VIEW
Ø 13.5
150
25
45
3000
40
45
HORIZONTAL CABLE TRAY
SIDE VIEW
HORIZONTAL CABLE TRAY
2200
MAX
450
45x45x4FLAT 40mm x 4mm
B
Detail B
70x70x4, 45mm LONG
M12 BOLTS
1650400
400
45
500
500500
500
SHEET CONTENTS: SHEET NO.
HORIZONTAL CABLE TRAY
LEGEND
CONSULTANT APPROVAL STAMP
1
1
C1 - APPROVED CANDIDATE NUMBER
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS1.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN2.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.
ANY CHANGES ON THE EXECUTION OF WORK AND SITE 3.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY4.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
GENERAL NOTES
DATE IGT APPROVAL SIGNATURENAME
DRAWN
CHECKED
APPROVED KRISHAN TANEJA
YAN NAING
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONDETAIL DRAWING
DRAWING NUMBER
STANDARD DRAWING
STD - STANDARD DRAWING
IGT_STD_HORIZONTAL CABLE TRAY-GBT_REV_01
CDC APPROVAL STAMP
![Page 14: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/14.jpg)
150
1800
ENTRY GATE 3m
GATE RAMP
A
A
FENCE POLEFOUNDATION
SITE RING BEAM
SECTION A - A
15m
500
400
150
150
25mm CHAMFER
3000
50
150
450
2325
158
80
12mm HOLE
50
5
1.5m 1.5m 1.5m 1.5m 1.5m1.5m1.5m
45x45x5 IS ANGLE
1.5m
DETAIL (M)
INCLINED SUPPORT MEMBER(M)IS ANGLE 40x40x5
450
DETAIL A
400
70
250150
BARREL BOLTDE Ø25.4mm
WELDED60-13 IN LINE
DE1/16
PCC ( 1 : 2 : 4 )
50
50
NGL
30
BS1
Ø8mm @ c/c 250 mm
GATE RAMP
12mm DROP BOLT
200
1400
200
150mm HINGE3Nos EACH SIDE
1425 137517 50
3000
DETAIL A
FGL
150
SECTION B - B
B
B
DETAIL C
DETAIL C
WEEP HOLEPVC PIPE Ø50mm
100
100
Ø 10mm x 4
STIRRUPS(BS1)Ø8mm @ 250mm c/c
30
WEEP HOLE PVC PIPE, Ø50mm WELD WIRE MESH 3.5mm THICK WITHAPPERTURE 65mm x 65mm
GRAVEL LAYER50mm THICKNESS
WEEP HOLE PVC PIPE, Ø50mm
150
150
150
25x3 GI FLAT BOLTED(M10x80)@EVERY 300mm c/cTO HOLD WIRE MESH
WIRE MESH GROUTED 25mmIN CONCRETE BEAM
9 Gauge Tension Wire,Knit Through the Fence atTop & Middle with Strainerat Each End
COMPACTEDBACKFILL 100mmbelow gravel bed
500
400
150
150
25mm CHAMFER
PCC ( 1 : 2 : 4 )
50
DETAIL C
DETAIL D
50mm PVC PIPE100mm COMPACTED EARTHBACKFILL(EXTRA)
50mm GRAVEL LAYER
PCC(1:5:10) 230mm thickness BRICKWORKIN CM 1:5
NOTE : ONLY GALVANIZED IRON TO BE USED FOR FENCE MATERIAL
40x40x5 IS ANGLE
40x40x5 IS ANGLE50
50
5045
015
018
00
50
450
3000
SHEET CONTENTS: SHEET NO.
FENCING
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
1
1
C1 - APPROVED CANDIDATE NUMBER
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
GENERAL NOTES
DATE IGT APPROVAL SIGNATURENAME
DRAWN
CHECKED
APPROVED KRISHAN TANEJA
YAN NAING
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONDETAIL DRAWING
DRAWING NUMBER
STANDARD DRAWING
STD - STANDARD DRAWING
IGT_STD_FENCING_REV_01
75mm
75mm
![Page 15: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/15.jpg)
SHEET CONTENTS: SHEET NO.
EARTHING /GROUNDING
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
1
1
C1 - APPROVED CANDIDATE NUMBER
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
GENERAL NOTES
DATE IGT APPROVAL SIGNATURENAME
DRAWN
CHECKED
APPROVED KRISHAN TANEJA
May Thu Aung IGT_STD_EARTHING TEST PIT_REV_01
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONTEST PIT
DRAWING NUMBER
STANDARD DRAWING
STD - STANDARD DRAWING
![Page 16: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/16.jpg)
ATS
MCB4x25A
Genset Control
5x6mm²
Emergency Stop
L1
2x1,5mm²
MCB4x25A
HeliocentrisEnergymanager
2x1,5mm²
(RectifierConfiguration seepage 2)
Rectifier
AC Socketwith RCB16A/30mA
Battery packEnersys4x12 VoltAGM 4x190 Ah
Eltek Power andBattery Cabinet
GSM Antenna
4xSPD, Type 220kA/40kA(8/20μs)
2x35mm² each
FCU
2x1,5mm²
2x25mm²
2x16mm²
2x1,5mm²
2x25mm²
2x1,5mm²
AC Socketwith RCB16A/30mA
AC Socketwith RCB16A/30mA
Customer 1 PDU
Customer 2 PDU
BTS Load High Prio
BTS Load Low Prio
BTS Load High Prio
BTS Load Low Prio
L2L3N
FueltankSubsystem #3
Integrated inGenset
Gensetsubsystem #2
GEKO 20kVA
SHEET CONTENTS: SHEET NO.
SINGLE LINE DIAGRAM
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
1
2
C1 - APPROVED CANDIDATE NUMBER
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
GENERAL NOTES
DATE IGT APPROVAL SIGNATURENAME
DRAWN
CHECKED
APPROVED KRISHAN TANEJA
YAN NAING
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONDETAIL DRAWING
DRAWING NUMBER
STANDARD DRAWING
STD - STANDARD DRAWING
IGT_STD_SINGLE LINE DIAGRAM_=REV_01
![Page 17: YN0878_C2_YAT20212_DP(1).pdf](https://reader033.fdocuments.in/reader033/viewer/2022051622/5695d0c81a28ab9b0293d91b/html5/thumbnails/17.jpg)
Overview of theRectifier Configuration
3x3kWRectifier
-48V GND
L1
L2
L3
N
LVBD
MCCB100A Batt 1
MCCB100A
MCCB100A
MCCB100A
Batt 2
Batt 3
Batt 4
GND Bus
Cabinet light
MCB4A
MCB2A
MCB2A
MCB6A
MCB6A
MCB6A
MCB2A
FCU
Smoke detector
AWL
Outdoor light
EM
LAN switch
1xSPD, Type15kA/30kA(8/20 μs)
LVLD
GND Bus
1xSPD, Type15kA/30kA(8/20 μs)
1xSPD, Type15kA/30kA(8/20 μs)
1xSPD, Type15kA/30kA(8/20 μs)
1xSPD, Type15kA/30kA(8/20 μs)
AC Socketwith RCB16A/30A
AC Socketwith RCB16A/30A
MCB63A
MCB63A
MCB32A
MCB32A
MCB63A
MCB63A
MCB32A
MCB32A
Customer 2 PDU
Customer 1 PDU
Customer2LP 2
Customer2
Customer2
Customer2
LP 1
HP 2
HP 1
GND Bus
TeleNor LP 2
TeleNor LP 1
TeleNor HP 2
TeleNor HP 2
GND Bus
~=
~=
~=
SHEET CONTENTS: SHEET NO.
SINGLE LINE DIAGRAM
CDC APPROVAL STAMP
LEGEND
CONSULTANT APPROVAL STAMP
1
2
C1 - APPROVED CANDIDATE NUMBER
REV - REVISION NO.
IGT - IRRAWADDY GREEN TOWERS
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
ALL ELEVATIONS ARE IN METERS.
1.
2.OTHERWISE NOTED.
CONTRACTOR SHALL ENSURE THAT ALL EXISTING UNDER1.GROUND & ABOVEGROUND SERVICES & UTILITIES FOUNDWITHIN THE SITE PERIMETER AND NOT INDICATED IN THEDETAILED DESIGN DRAWING SHALL BE REPORTED TO THEPROPER MANAGEMENT AND PROTECTED FROM ANYFURTHER DAMAGES DURING CONSTRUCTION.ALL HEALTH & SAFETY POLICIES AND PROCEDURES SHALL2.BE STRICTLY IMPLEMENTED DURING CONSTRUCTION.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES3.FOR THE USE OF TOOLS AND EQUIPMENTS ON SITE, WHICHMAY AFFECT THE STRUCTURAL SOUNDNESS OF ANYADJACENT STRUCTURES.ALL REFERENCES FOR AZIMUTH READING AND ANGULAR4.POSITIONS SHALL BE FROM TRUE GEOGRAPHICAL NOTH.
ALL EXCESS MATERIAL ON SITE SHALL BE DISPOSED OFF5.TO PROPER LOCATIONS AFTER CONSTRUCTIONS.
CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IN3.ADVANCE OF ANY CHANGES ON SITE THAT DO NOTCONFORM TO THE DESIGN SPECIFICATIONS ANDREQUIREMENTS IN THE DETAILED DETAIL DESIGN DWGS.ANY CHANGES ON THE EXECUTION OF WORK AND SITE 4.METHODOLOGY SHALL BE CARRIED OUT ONLY UPONWRITTEN APPROVAL FROM AN ENGINEER.
NO WORKS SHALL BE EXECUTED UNLESS ALL NECESSARY5.CONSTRUCTION PERMITS ARE OBTAINED AND APPROVEDBY THE CUSTOMER.
CONSTRUCTION NOTES
GENERAL NOTES
DATE IGT APPROVAL SIGNATURENAME
DRAWN
CHECKED
APPROVED KRISHAN TANEJA
YAN NAING
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTIONDETAIL DRAWING
DRAWING NUMBER
STANDARD DRAWING
STD - STANDARD DRAWING
IGT_STD_SINGLE LINE DIAGRAM_=REV_01