    1 Client name2

    3

    4 Statutory code

    Sr.

    No.

    Description CE Marking

    re uirement1 PA, FD & ID fans

    A List of Items which need CE

    marking :-

    1) Rotating assembly including

    rotor, impeller, bearing,

    coupling, cooling disc etc.

    2) All instrumentation, electric

    actuators for inlet & outlet

    damper, fan oil lubrication

    system etc.

    Yes

    B List of Items which does notneed CE marking :-

    1) Static componenets like

    casing, silencer, rainhood,

    birdscreen, suction box,

    suction cone, base frame,

    No

    2

    A List of Items which need CE

    marking :-

    1) Rotary feeder with motor

    and VFD, limestone feed

    blowers with motors,

    conveying system from blower

    discharge upto furnace

    including piping, fitting

    ,valves, intake tee etc.

    2) All instrumentation,

    actuators etc.

    Yes

    B List of Items which does not

    need CE marking :-

    1) Limestone silo, Limestone

    gravity feeding upto rotary

    feeder hardware etc.

    No

    3

    Broad CE Marking requirements

    Type of Boiler / Equipment

    Installation country

    Limestone Feeding system

    Coal Feeding system

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    2/15

    A List of Items which need CE

    marking :-

    1) Gravimetric feeders with

    motor and VFD, Distribution

    conveyors with motor, rotary

    air lock feeders with motor,

    etc.2) All instrumentation, electric

    / pneumatic operated

    actuators etc.

    Yes

    B List of Items which does not

    need CE marking :-

    1) Static componenets like

    Coal silo, downspout / chute

    from silo to feeder and feeder

    to furnace, hardware etc.

    No

    4A List of Items which need CE

    marking :-

    1) All instrumentation, AC

    drive motor, Air motor,

    actuators for sealing system,

    RAPH rotor, bearing and its

    lubrication system etc.

    Yes

    B List of Items which does not

    need CE marking :-1) Static componenets like

    RAPH casing, heating

    elements, ducts, hardware

    No

    5

    A List of Items which need CE

    marking :-

    1) Bed ash system -

    Conveying compressor with

    motor, rotary feeder with

    motor, Drag chain conveyors

    with motor (06 nos), main ashconveyors with motor (02

    nos), bucket elevator with

    motor (01 nos), conveying

    vessel / pump, piping, fitting

    valve, instrumentation,

    Ash Handling System

    Regenerative Air Preheater

    Yes

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    3/15

    B List of Items which need CE

    marking :-

    1) Air Preheater ash system -

    Conveying compressor with

    motor, Conveying vessel /

    pump, piping, fitting valve,

    instrumentation, dedusting

    C List of Items which need CE

    marking :-

    1) MDC ash system -

    Conveying compressor with

    motor, MDC surge bin,

    Conveying vessel / pump,

    piping, fitting valve,

    instrumentation,dedusting

    D List of Items which does not

    need CE marking :-

    1) Crush bed ash surge bin,

    inert bed silo, MDC surge bin,hardware etc.

    No

    6

    A List of Items which need CE

    marking :-

    1) All instrumentation,

    actuators etc.

    List of Items which does not

    need CE marking :-

    1) frame. Blade. Seals etc.

    Yes

    B List of Items which does not

    need CE marking :-

    1) frame. Blade. Seals,

    hardware etc.

    No

    Dampers in air and Flue Gas path

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    4/15

    Yildrim

    1 x 300 MW TPH CFBC Boiler

    Turkey

    ASME With CE Marking

    Applicable EC Directive

    2006/42/EC - Machinery Directive

    2006/95/EC - Low Voltage Directive

    2004/108/EC- Electromagnetic Compatibility

    -

    2006/42/EC - Machinery Directive

    2006/95/EC - Low Voltage Directive

    97/23/EC - Pressure Equipment Directive

    2004/108/EC - Electromagnetic Compatibility

    -

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    5/15

    2006/42/EC - Machinery Directive

    2006/95/EC - Low Voltage Directive

    2004/108/EC - Electromagnetic Compatibility

    -

    2006/42/EC - Machinery Directive

    2006/95/EC - Low Voltage Directive

    2004/108/EC - Electromagnetic Compatibility

    -

    2006/42/EC - Machinery Directive

    2006/95/EC - Low Voltage Directive

    2004/108/EC - Electromagnetic Compatibility

    2009/105/EC - Simple Pressure Vessels

    97/23/EC - Pressure Equipment Directive

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    6/15

    -

    2006/42/EC - Machinery Directive

    -

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    7/15

    Applicable Documentation & Certification

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual Machinery

    Directive is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,

    joined together for specific application.

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual Machinery

    Directive is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,

    joined together for specific application.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    8/15

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual MachineryDirective is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,

    joined together for specific application.

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual Machinery

    Directive is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,

    joined together for specific application.

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual MachineryDirective is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,

    joined together for specific application.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    9/15

    Release of Engineering Specification

    DOC- Declaration of Conformity by Manufacturer

    alongwith Declaration of Incorporation for assembly,

    Manufacturers Test Certificate as per BS EN 10204.

    DOC- Declaration of Conformity by Assembler alongwith

    Backup of DOC of Motor, Actuator & Valve.

    Operation & Maintanance Instruction Manual Machinery

    Directive is applicable to Partly Supplied or assembled

    parts or components, at least one of which moves, with

    the appropriate actuators, control and power circuit etc.,joined together for specific application.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    10/15

    Vendors Responsibility for CE Marking

    Individual sub assemblies of the total asssembly will have

    CE marking as supplied by vendor.

    For assembly at site, vendor shall provide technical

    advisory services during erection.

    The responsibility of assembling entire system conforming

    to CE requirement and obtaining CE certification including

    documentation if any is not considered in vendor scope.

    Individual sub assemblies of the total asssembly will have

    CE marking as supplied by vendor.

    For assembly at site, vendor shall provide technical

    advisory services during erection.

    The responsibility of assembling entire system conforming

    to CE requirement and obtaining CE certification including

    documentation if any is not considered in vendor scope.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    11/15

    Individual sub assemblies of the total asssembly will have

    CE marking as supplied by vendor.

    For assembly at site, vendor shall provide technical

    advisory services during erection.

    The responsibility of assembling entire system conformingto CE requirement and obtaining CE certification including

    documentation if any is not considered in vendor scope.

    Individual sub assemblies of the total asssembly will have

    CE marking as supplied by vendor.

    For assembly at site, vendor shall provide technical

    advisory services during erection.

    The responsibility of assembling entire system conforming

    to CE requirement and obtaining CE certification including

    documentation if any is not considered in vendor scope.

    Individual sub assemblies of the total asssembly will have

    CE marking as supplied by vendor.

    For assembly at site, vendor shall provide technical

    advisory services during erection.

    The responsibility of assembling entire system conformingto CE requirement and obtaining CE certification including

    documentation if any is not considered in vendor scope.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    12/15

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    13/15

    B & W Reply / Comment dt.

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    14/15

  • 8/14/2019 Yildrim CE Marking Requirements.xls

    15/15