• In the production economics of a spinning mill, yarn realisation plays a significant role.

• To illustrate, in the prevailing cotton cost and

yarn selling price, even an 1% improvement in yarn realisation would lead to a saving of Rs 20 lakhs per year for a 30000 spindle mill manufacturing 40s yarn.

Page 3: Yarn Realisation

• Besides controlling process wastes such as

– blowroom and card droppings, – flat strips, – comber noil, – sweep waste and yarn waste,

• equal emphasis should also be laid on the control of reusable wastes (soft waste) such as

– lap bits, – sliver bits, – roving ends and pneumafil– roller waste.

• This is because, apart from loss in production, reprocessing of soft wastes involves extra handling and deteriorates yarn quality.

Page 4: Yarn Realisation

• Establishment of norms for wastes is a pre-requisite for a successful waste control in a mill.

• Yarn realisation (YR) is largely governed by the level of trash in cotton, expected yarn quality and type of machinery.

Page 5: Yarn Realisation

Achievable yarn realisation can be obtained using the following formulae

A. For mills reusing the entire usable wastes in the same mixing

Where t = trash in mixing (%)Wk = card waste (%)Wc = comber noil (%)Wh = yarn waste (%)Wu = usable waste (%)

Page 6: Yarn Realisation

• For example, For t = 3%, Wk = 7% and Wh = 0.5%,

The expected yarn realisation is 87%. In the above case,

• If the mill produces combed yarn with a noil extraction of 18%, then the expected yarn realisation will be 70.8%.

• In both the cases, it is assumed that the mill would reuse the usable wastes in the same mixing.

Page 7: Yarn Realisation

B.For mills not reusing the usable wastes in the same mixing

Where t = trash in mixing (%)Wk = card waste (%)Wc = comber noil (%)Wh = yarn waste (%)Wu = usable waste (%)

Page 8: Yarn Realisation

• For example, For t = 3%, Wk = 7% and Wh = 0.5%,

• The expected yarn realisation is 87%.

• In the above case,• If the mill produces combed yarn with a noil

extraction of 18%, then the expected yarn realisation will be 70.8%.

• In both the cases, it is assumed that the mill would reuse the usable wastes in the same mixing.

Page 9: Yarn Realisation

NORMS FOR WASTESNorms for different categories of wastes are summarized in Tables 1 and 2.

Page 10: Yarn Realisation
Page 11: Yarn Realisation

PROCESS WASTE Blow room

• Amount of waste extracted in blow room is mostly determined by the trash level in cotton.

• In modern blow room lines, greater importance is attached to the opening of cotton than cleaning.

• Hence, cleaning efficiency of about 60% in cottons with high trash content and 50% in cottons with low trash level can be considered to be quite satisfactory in these lines.

Page 12: Yarn Realisation

Blow room CONTI..

• For good cleaning efficiency, the waste extracted in blow room should be same as the trash in mixing.

• If, however, the cleaning efficiency achieved is less than 50% 60%, then the total waste extracted should also be low.

• It should be ensured that the overall lint in waste is no more than 40% in cottons with high amount of trash and 50% for cottons with low level of trash.

Page 13: Yarn Realisation

Blow room CONTI..

• The expected lint loss can be estimated using the following formula:

t = trash in mixing (%)t L = trash in lap (%)

Wb = waste extracted in blow room (%)L = % lint in waste

Illustrative Examples1. Trash in mixing : 3.5%Trash in lap : 1.5%Waste extracted : 3.2%

Calculate the lint loss in waste.Refer equation (2),

Page 14: Yarn Realisation

Blow room CONTI..

2) Trash in mixing : 5%Trash in lap : 2%Expected lint loss : 40%Estimate the amount of waste to be extracted in blow room

Page 15: Yarn Realisation

Blow room CONTI..

• Presently, many mills are using Automatic Waste Evacuation System (AWES) in blow room, cards and combers, which removes wastes from these machines either continuously or intermittently.

• This system not only reduces the man power required to collect and transport wastes but also helps to control the incidence of fly and fluff generation in these departments and improves yarn quality, particularly short thick faults.

Page 16: Yarn Realisation

Blow room CONTI..

• In mills not equipped with filters in blow room, a proper estimate of gutter waste should be made, since gutter cleaning is not done regularly at the end of every month.

• The estimate of gutter waste could be made based on the quantum of waste collected and number of days the blow room has worked.

Page 17: Yarn Realisation

Cards• Waste extracted in cards is usually in the range of 4% to 7% depending upon

the type of card and mixings.

• Between same type of cards and mixing, the waste % should not vary more than 0.5% from the average.

• The card waste is also governed by the cleaning efficiency achieved in blow room.

• Thus, while assessing the waste, combined waste extracted in blow room

and cards should be taken into account.

• The combined cleaning efficiency will be generally in the range of 90% to 98% with modern cards.

• To illustrate, for 4% trash in cotton and 0.12% trash in sliver, the combined cleaning

efficiency is 97%.

Page 18: Yarn Realisation

Combers

• Generally, all cottons respond well to combing for noil extraction up to 16%.

• For levels beyond 16%, the law of diminishing returns operates and the improvement in yarn quality is not commensurate with the additional cost of production.

Page 19: Yarn Realisation

COMBERS CONTI…

• Higher levels of waste should be extracted only in such cottons where combing performance is satisfactory or where the end use requires yarns of very high quality.

• Under good working, for every 1% increase in comber waste, yarn lea strength will increase by 1% and evenness is expected to improve by 0.15 U%.

• Variation in noil % between combers must be maintained

within 0.5% and between heads it must be within 1.5%.

Page 20: Yarn Realisation

Yarn waste

• Yarn waste in a spinning mill should not normally exceed 0.1% with conventional cone winding.

• In the case of automatic cone winding, the yarn waste generally varies from 0.5% in winders fitted with magazine feed to 0.8% in winders with auto bobbin feed system.

• However, if the yarn under goes additional processes in post spinning such as reeling, doubler winding and TFO twisting/ring twisting, the waste would be somewhat higher.

Page 21: Yarn Realisation

Yarn waste CONTI..

• A high incidence of yarn waste, apart from leading to a loss of Rs 6 to Rs 15 per spindle per year for every 0.1% waste, is an indication of poor machinery condition and maintenance, and inappropriate work practices of operatives.

Page 22: Yarn Realisation

Yarn waste CONTI..

• A number of factors such as • vibrating spindles,• spindles out of center, • soft cops, • oil stain on yarn, • improperly built cop bottom,• yarn left over in cops during winding • operatives using excess length while piecing,

leads to high yarn waste.

Page 23: Yarn Realisation

Sweep waste

• Sweep waste in all the departments of a spinning mill together should be within 1%.

• A high sweep waste arises invariably due to operatives throwing away the wastes like roller waste, lap bits, sliver bits, roving ends, etc. on the floor and generation of fly and fluff.

Page 24: Yarn Realisation

Sweep waste conti….

• The fly frame and ring frame tenters should be provided with hip bags and it should be ensured that the roller waste and roving ends are deposited in the bags after piecing the broken ends.

Page 25: Yarn Realisation

Sweep waste conti….

• Good waste, if any, should be picked before sweeping instead of sorting out the waste later.

• A high price fetched for sweep waste would give an indication of the presence of good fibers in the waste.

Page 26: Yarn Realisation

INVISIBLE LOSS

Invisible loss in a spinning mill occurs due to a number of factors such as short fibers (fluff) escaping from the departments, improper accounting of wastes produced, weighment errors in cotton purchased and wastes sold, excess give away of yarn and inaccuracies in the estimates of stock held in process.

Page 27: Yarn Realisation

INVISIBLE LOSS conti…….

• Since it would be difficult to accurately assess the process stock, it is suggested that the invisible loss be assessed only once in 4 months for control purposes.

• This will help in minimising the variation in invisible loss due to errors in process stock estimate.

• From the data compiled every month, a cumulative average could also be taken for control purpose.

• • However, not much importance should be given for estimates made

from data less than 4 months.

Page 28: Yarn Realisation

INVISIBLE LOSS conti…….

• To maintain the invisible loss within 0.5%, mill should also ensure that moisture content in the finished goods is at par with the level prevailed in cotton at the time of purchase.

Page 29: Yarn Realisation

USABLE WASTE

•By exercising good control over

end breaks in various machines► material handling and storage and ► work practices of operatives ►

a mill could maintain the usable waste below 5%.

Page 30: Yarn Realisation

CONCLUSIONIn many mills, there is good scope for improving yarn realisation and reducing wastes.

The following 4 steps would be helpful to improve yarn realisation.

Step 1: Calculate actual yarn realisation and different categories of wastes

Step 2: Using the formulae given in this article, estimate the expected yarn realisation for the existing working conditions.

Page 31: Yarn Realisation

• Step 3: Compare the actual yarn realisation with the expected value and actual wastes with norms.

• Step 4: Analyse the causes for deviation and initiate corrective action. Create awareness among the workers and technical staff about the importance of waste control. Good supervision and proper maintenance of machinery would help to reduce the waste.