Y-I 2 OAK RIDGE v-I 2 PLANT LOCKWEED M ARTIN 7+ FilANAGED BY LOCKHEED MARTIN ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY UCN-13672 (26 585) Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 I I , Prepared by AJA TECHNICAL SERVICES, INC Under Subcontract 70Y-MVM64V September 1998 for the Environmental Compliance Department Environment, Safety, and Health Organization Oak Ridge Y-12 Plant Oak Ridge, Tennessee 37831 Managed by LOCKHEED MARTIN ENERGY SYSTEMS, INC. for the U.S. DEPARTMENT OF ENERGY under contract No. DE-AC05-840R21400

Transcript of Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER...

Page 1: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Y-I 2 OAK RIDGE v-I 2 PLANT

L O C K W E E D M A R T I N 7+

FilANAGED BY LOCKHEED MARTIN ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY

UCN-13672 (26 585)

Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER

SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999

I I ,

Prepared by

AJA TECHNICAL SERVICES, INC Under Subcontract 70Y-MVM64V

September 1998

for the

Environmental Compliance Department Environment, Safety, and Health Organization

Oak Ridge Y-12 Plant Oak Ridge, Tennessee 37831

Managed by

LOCKHEED MARTIN ENERGY SYSTEMS, INC. for the U.S. DEPARTMENT OF ENERGY under contract No. DE-AC05-840R21400

Page 2: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

DISCLAIMER This report was prepared as an account of work sponsored by an agency of t h e United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal lizbility or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, o r service by trade name, trademark, manu- facturer, o r otherwise, does not necessarily constitute o r imply its endorsement, recommendation, o r favoring by the United States Government o r any agency thereof. The views and opinions of authors expressed herein d o not necessarily state or reflect those of the United States Government or any agency thereof.

J

i

Page 3: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

DISCLAIMER

I Portions of this document may be illegible electronic image products. Images are produced from the best available original document.

Page 4: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER

SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999

Prepared by

MA TECHNICAL SERVICES, INC Under Subcontract 70Y-MVM64V

September 1998

for the

Environmental Compliance Department Environment, Safety, and Health Organization

Oak Ridge Y-12 Plant Oak Ridge, Tennessee 3783 1

Managed by

LOCKHEED MARTIN ENERGY SYSTEMS, INC. for the U.S. DEPARTMENT OF ENERGY under contract No. DE-AC05-840R21400

Page 5: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

TABLE OF CONTENTS

Section

List of Figures ............................................................... ii List of Tables ................................................................ iii List of Acronyms and Abbreviations .............................................. iv

...

1.0 INTRODUCTION ....................................................... 1-1

2.0 MONITORING LOCATIONS .............................................. 2-1

3.0 SAMPLE COLLECTION.. ................................................ 3-1

4.0 ANALYTICAL PARAMETERS ............................................ 4-1

5.0 REFERENCES .......................................................... 5-1

APPENDICES:

A Figures B Tables

i

Page 6: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Fimue

1

2

3

4

. . ,' . - I : - .... -~ ......... - ..... .. _ _ ..... . . ~- ...... -~ ..

List of Figures

Page

Hydrogeologic Regimes at the Y-12 Plant ................................. A-1

Sampling Locations in the Bear Creek Hydrogeologic Regime, CY 1999 ......... A-2

Sampling Locations in the Chestnut Ridge Hydrogeologic Regime, CY 1999 ...... A-3

Sampling Locations in the Upper East Fork Poplar Creek Hydrogeologic Regime, CY 1999 ........................................ A-4

ii

Page 7: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

List of Tables

Table Page

1 Sampling Sequence, Frequency, and Analytical Parameters for Groundwater and Surface Water Monitoring During CY 1999 ............................. B:l

2 Field Measurements and Laboratory Analytes for CY 1999 Groundwater and Surface Water Samples .............................................. B-8

iii

Page 8: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

AS0 BC CR CY DOE EF GWPP IWQP SESD SWDF

List of Acronyms and Abbreviations

Analytical Services Organization Bear Creek Hydrogeologic Regime Chestnut Ridge Hydrogeologic Regime Calendar Year U.S. Department of Energy Upper East Fork Poplar Creek Hydrogeologic Regime Groundwater Protection Program Integrated Water Quality Program Sampling and Environmental Support Department Solid Waste Disposal Facility

, iv

Page 9: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

1.0 INTRODUCTION

This plan provides a description of the groundwater and surface water quality monitoring

activities planned for calendar year (CY) 1999 at the U.S. Department of Energy (DOE) Y-12 Plant

that will be managed by the Y-12 Plant Environment, Safety, and Health Organization through the

Y-12 Plant Groundwater Protection Program (GWPP). Groundwater and surface water monitoring

- during CY 1999 will be pefiorrned in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek

I Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic

Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut

Groundwater and surface water monitoring performed under the auspices of the Y-12 Plant

Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge I

I Ridge Regime is located south of the Y-12 Plant (Figure 1).

1 I

GWPP during CY 1999 will comply with:

0 Tennessee Department of Environment and Conservation regulations governing detection monitoring at nonhazardous Solid Waste Disposal Facilities (SWDF); and

DOE Order 5400.1 surveillance monitoring and exit pathway/perimeter ~. monitoring.

Some of the data collected for these monitoring drivers will also be used to meet monitoring

requirements of the Integrated Water Quality Program (IWQP), which is managed by Bechtel Jacobs

Company LLC. Data fiom five sampling locations collected for SWDF monitoring in the Chestnut

Ridge Regime will be used to comply with requirements specified in Resource Conservation and Recovery Act post-closure permit regarding corrective action monitoring. Also, data from sampling

locations in each regime will be provided to the IWQP as requested.

Modifications to the CY 1999 monitoring program may be necessary during implementation. Changes in regulatory or programmatic requirements may alter the analytes specified for selected

monitoring wells, or wells could be added or removed fiom the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 Plant GWPP manager and

documented as addenda to this sampling and analysis plan.

1-1

Page 10: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

2.0 MONITORING LOCATIONS

Groundwater samples will be collected fiom a total of 80 monitoring wells, including 32

wells located in the Bear Creek Regime (Figure 2), 17 wells located in the Chestnut Ridge Regime

(Figure 3), and 31 wells located in the East Fork Regime (Figure 4). Samples of groundwater

discharging fkom 10 natural springs also will be collected, including four springs (SS-1, SS-4, SS-5,

and SS-6) in the Bear Creek Regime (Figure 2) and six springs (SCR2.1SPY SCR2.2SPY SCR3.4SPY SCR4.3SPY SCR5.1SPY and SCR5.4SP) in the Chestnut Ridge Regime (Figure 3).

Surface water samples will be collected fiom a total of 12 sampling locations during CY

1999, including 11 locations in the Bear Creek Regime and one location in the East Fork Regime.

In the Bear Creek Regime, samples will be collected fiom Bear Creek at six sampling stations

located fiom about 0.6 to 12 kilometers upstream of the confluence of Bear Creek and East Fork

Poplar Creek @CK-OO.63 to BCK-11.97), and fiom five sampling stations along northern tributaries

to Bear Creek (NT-01, NT-02, NT-06, NT-07, and NT-08) (Figure 2). In the East Fork Regime,

samples will be collected fiom the Lake Reality Emergency Spillway (LRSPW) (Figure 4).

2-1

Page 11: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

3.0 SAMPLE COLLECTION

, --

Groundwater and surface water samples will be collected by personnel from the Sampling and Environmental Support Department (SESD) of the Analytical Services Organization (ASO). Groundwater sampling will be performed in accordance with the most recent version of the technical procedure approved by the Y-12 Plant GWPP Manager: Groundwater Sampling (Lockheed Martin Energy Systems, Inc. 1997). Procedures for obtaining field measurements and for surface water sampling are contained in Environmental Surveillance Procedures Quality Control Manual (Lockheed Martin Energy Systems, Inc. 1988). Sample collection, handling, analysis, and surveillance will be performed in accordance with the GWPP Quality Program Plan (Science Applications International Corporation 1994), and the AS0 Laboratory Quality Assurance Project Plan for groundwater monitoring at the Y-12 Plant (Martin Marietta Energy Systems 1991).

Monitoring wells, springs, and surface water stations are subdivided into sample groups based on hydrogeologic regimes. These sample groups, located in the Bear Creek (BC), Chestnut Ridge (CR), and East Fork (EF) hydrogeologic regimes, will be sampled in the sequence shown on Table 1. The sampling sequence is generally fiom least contaminated wells to most contaminated wells at each location within each sampling group. Groundwater samples will be collected using dedicated sampling equipment (well Wizard bladder pumps) unless a well is scheduled for one- time sampling. For monitoring wells that are nested closely together or that are equipped with a Westbaym multiport sampling system, the collection sequence is fiom shallowest to deepest monitored interval. For surface water and springs along Bear Creek, sampling is fiom the furthest downstream locations to the upstream location closest to the S-3 Site (Table 1).

Samples will be collected semiannually fkom all of the monitoring wells, springs, and surface water stations in each regime, with the exception of sampling groups BC-4(eight wells and four surface water stations), BC-WB (eight sampling ports of Westbaym well GW-726), and EF-4 (two wells) that are scheduled for one-time sampling during CY 1999. As summarized below, the number of samples to be collected during each quarter will range fkom 36 to 80, for an annual total of 214

samples.

3-1

Page 12: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Groundwater samples from all monitoring wells, except those equipped with a Westbaym multiport sampling system, will be collected using the low-flow minimal drawdown purging and sampling method. Sample collection using this method began & October 1997 and initial results show a significant reduction in sample turbidity and increased similarity between total (unfiltered) and dissolved (filtered) metal concentrations. Beginning in CY 1999, filtered samples will be collected only from specified wells (Table l), including all of the sample groups in the Chestnut Ridge Regime and sample groups BC-4, BC-WB, EF-3, and EF-WB.

In addition to the groundwater and surface water samples, field blanks and equipment rinsate

samples will be collected at the fiequencies and analyzed for the parameters specified on Table 1. Field blank samples will be collected fiom at least 10% of the sample groups. Equipment rinsate samples will be collected fiom wells in sample groups with nondedicated sampling equipment (BC-4) or with Westbaym multiport sampling systems (BC-WB and EF-WB). The h a t e sample will be collected at the last sampling port (Westbay?") or the last well sampled with each pump immediately following the field cleaning procedure.

Trip blank samples, field duplicate samples, and laboratory quality assurance samples will be prepared and analyzed as specified in the AS0 Laboratory Quality Assurance Project Plan (Martin Marietta Energy Systems, Inc. 1991) using applicable analytical procedures. The location (building and room number) where the trip blank samples are prepared will be recorded on the field data sheets. Trip blank samples will be prepared for each cooler used to transport samples for volatile organic analyses. Duplicate samples will be collected from at least 10% of the sampling locations. A total of 26 field duplicate samples will be collected during CY 1999, including eight in the Bear Creek Regime, ten in the Chestnut Ridge Regime, and eight in the East Fork Regime (Table 1).

3-2

Page 13: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

4.0 ANALYTICAL PARAMETERS

The monitoring drivers for CY 1999 require an extensive list of analytes (Table 2). For this Sampling and Analysis Plan, specific analytes are grouped by analytical method or by type (e.g., metals) and referenced as analytical parameters. All groundwater and surface water samples will be analyzed for the following suite of parameters (identified as the Standard Administrative Parameter Group):

field measurements - water level (monitoring wells), temperature, pH, conductivity, dissolved oxygen, and oxidation-reduction potential;

0

0

0

0

0

miscellaneous laboratory analytes - pH, conductivity, turbidity, total suspended solids, and total dissolved solids;

major anions;

trace metals (includes major cations);

a comprehensive suite of organic compounds; and

gross alpha and gross beta activity.

The Y-12 Plant National Pollution Elimination System Program requested results for several radionuclides in addition to the analytes included in the Standard Administrative Parameter Group for surface water samples fiom BCK-11.97 in BC-3 (Table 1). Additional radionuclides also will be reported for groundwater samples fiom the wells scheduled for one-time sampling in EF-4 (Table 1).

4-1

Page 14: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

5.0 REFERENCES

Martin Marietta Energy Systems, Inc. 1991. Laboratory Quality Assurance Project Plan for the

Sampling and Analysis of Groundwater Wells at the Y-12 Plant Site on the Oak Ridge

Reservation. Prepared by Analytical Chemistry Department Technical Division,

QAP: 04-90-0014.

Lockheed Martin Energy Systems, Inc. 1988. Environmental Surveillance Procedures Quality Control Manual. (ES/ESH/INT-14).

Lockheed Martin Energy Systems, Inc. 1997. Groundwater Sampling. Prepared by the Analytical Services Organization (SESD-TP-8204, Rev. 3).

Science Applications International Corporation. 1994. Groundwater Protection Program Quality Program Plan. Prepared for Martin Marietta Energy Systems, Inc. (Y/SUB/94-99069C/Y13/1).

U.S. Environmental Protection Agency. 1983. Methods for Chemical Analysis of Water and Wastes.

U.S. Environmental Protection Agency. 1986. Test Methods for Evaluating Solid Waste PhysicalKhemical Methods.

5-1

Page 15: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

i

I--

! ?

c -, i'

APPENDIXA

Figures

Page 16: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

UPPER EAST FORK

REPARED FOR: LOCKHEED MARTIN ENERGY SYSTEMS, INC.

PREPARED BY: AJA TECHNICAL SERVICES, INC.

BEAR CREEK HYDROGEOLOGIC

OAK RIDGE RES ERVATl 0 N

FIGURE 1

HYDROGEOLOGIC REGIMES AT M E Y-12 PLANT

Y-12 PLANT L°CAT'oN: OAK RIDGE, TN.

DOC NUMBER: MVM64V/4 DWG ID.: HJC97-007

DATE: 9-1 5-98

\ NASHVILLE OAK RI

0 TENNESSEE

CHESTNUT RIDGE HY D ROG EO LOG I C

REGIME

SCALE (MILES)

CHATTANOOGA 0

Page 17: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

32,000

m ” 0

0

m L

D 0

m

L

0

0

1

EXP-A

I I I I 1 1 I I I 1 I m m m m m m m m m m m W 0

0 0 0

N

0 0 0

m N

0 0 0

m N . N N

-N 38,000, \

w e 0 0 0

w

0 0 0

m u

0 0 0

m e 0

0 0 b

L N

0 0 b

SPRINGS AND SURFACE WATER SAMPLING LOCATlj

SCALE (ft)

Page 18: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

AR CREEK \L GROUNDS

ABOVE GRADE LOW-LEVEL

EXP-C

EXPLANATION OIL LANDFARM

W - Water Table Monitoring Well

- Bedrock Monitoring Well

A - Spring or Surface Water Sampling Station

EXP-C - Exit Paihway. Maynardville Limestone Picket

___-_- - Surface Drainage Feature

NT-5 - Nodh Tributary

AQT - Aquitprd

- Approximafe Nalichucky Sholc\Maynardville Limestone Contact ----- e

AQF - Aquifer

PREPARED FOR: LOCKHEED MARTIN ENERGY SYSTEMS, INC.

PREPARED BY: AJA TECHNICAL SERVICES, INC.

FIGURE 2

SAMPLING LOCATIONS Y-12 PLANT

L°CAT'oN: OAK RIDGE, TN.

- DWG ID.: 96-028 HYDROGEOLOGIC REGIME, CY 1999 DOC NUMBER: MVM64V/4 IN THE BEAR CREEK

DATE: 9-15-98

Page 19: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

0 . /

'REPARED FOR: LOCKHEED MARTIN ENERGY SYSTEMS, INC.

PREPARED BY: AJA TECHNICAL SERVICES, INC.

I

FIGURE 3

SAMPLING LOCATIONS Y-12 PLANT

OAK RIDGE, TN.

DOC NUMBER: MVM64V/4 IN M E CHESTNUT RIDGE DWG ID.: HJC96-033 HYDROGEOLOGIC REGIME, CY 1999

DATE: 9-1 5-98

0oO-w

I I I 6- I

r---

I I m .

I I I I

I

Page 20: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

I

I

I I " ll I I?

I I I I

I

I I

I

= -Water Tablei 1 -Bedrock Mor'

o -Well With W * -Surface Wati

1 ~ * m - Lake Reality;

EXP-E - Exit Pathwa)' i t

1 - Comprehensl

!

cn - NOLICHUCKY i a n - MAYNARDVILLE

O€k - KNOX GROUP

i

Page 21: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

EX P LAN AT1 0 N

lonitoring Well

oring Well

tbay Multiport Monitoring System (1 0 Sampling Locations)

Sampling Location

Imergency Spillway

Maynardville Limestone Picket

PREPARED FOR: LOCKHEED MARTIN ENERGY SYSTEMS. INC.

PREPARED BY: A JA TECHNICAL SERVICES, INC.

! Groundwater Monitoring Grid

FIGURE 4

SAMPLING LOCATIONS Y-12 PLANT

L°CAT'oN: OAK RIDGE, TN.

DOC NUMBER: MVM64V/4 INMEUPPEREASTFORKPOPLARCREEK DWG ID.: 96-075 HYDROGEOLOGIC REGIME, CY 1999

DATE: 9-15-98

Q

SCALE ( f t ) ALE- AQUITARD I M ESTON E > AQUIFER

Page 22: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

I-

APPENDIXB

Tables

Page 23: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1. Sampling Sequence, Frequency, and Analytical Parameters for Groundwater and Surface Water Monitoring During CY 1999 I

-- , . . . ~ ... . . . . . ... . . . . . _ . . . - . . . _ . _ . . . .. . . , , . .. ..................... .:.:.. : .::. : . .

. . . . ..

Bear Creek Hydrogeologic Regime

BC-1

(41,431

EXP-A

EXP-A

EXP-A

EXP-A

EXP-B

EXP-B

EXP-B

EXP-B

EXP-B

EXP-C

EXP-C

EXP-C

EXP-C

BG

BG

BG

BG

SPI

Rs

OLF

OLF OLF

OLF

GW-056

GW-685

GW-684

GW-683

GW-621

GW-695

GW-703

GW-704

GW-706

GW-740

GW-738

GW-724

GW-725

GW-287

GW-653

GW-053

GW-627

GW-315

GW-3 1 1

GW-829

GW-085

GW-537

GW-226

43

Q1

43

Y

Y

Y

Y

Y

Y

Y Y

Y

Y

Y

Y

Y

Y

Y

Y

Y

Y

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

S M P

S M P

S M P

S M P

S M P

S M P

S M P

S M P

S M P

S M P

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD . STD

STD

STD

STD

STD

STD

STD

B-1

Page 24: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

BC-3 Exp-sw (QL 43) EXP-SW

EXP-SW.

EXP-SW

EXP-SW

EXP-SW

EXP-SW

EXP-SW

EXP-SW

EXP-SW

EXP-SW

BC-4

(Q1)

BC-WB

(Q1)

BCK-00.63

BCK-04.55

SS-6

BCK-07.87

ss-5 BCK-09.40

ss-4 BCK-10.60

BCK-11.97

ss-1

NT-0 1

EXP-SW NT-OS

EXP-SW NT-07

EXP-SW NT-06

EXP-SW NT-02

BG GW-126

BG GW-082

BG GW-242

OLF GW-601

s 3 GW-345

s3 GW-346

s 3 GW-526

OLF GW-087

FUNSATE SAMPLE

BG

BG BG

BG

GW-726-23

GW-726-20 GW-726- 16

GW-726-12

Q1 .

4 3

Y

Y

Y

Y

Y

Y

Y

Y

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

SMP

S M P

S M P

SMP

S M P

SMP

SMP

S M P

SMP

S M P

SMP

SMP

SMP

SMP S M P

SMP

STD

STD

STD

STD

STD

STD

STD

STD

STD, RAD(2,3,4,5,8,13)

STD

STD

STD

STD

STD

STD

STDF

STDF

STDfF

STDE

STDF

STDF

STDF

STDF

STD

STDE

STDIF STDfF

STDF

B-2

Page 25: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

BC-WB (cont'd) BG

BG

BG

BG

CR-1 LIV

(41243) LIV

LIV

LIV

LIV

CR-2 LV

(41,431 LV

LV

LV

LV

LV

GW-726-09 4 1 SMP STDE

GW-726-0 6 SMP STDE

GW-726-04 S M P STDE

GW-726-02 SMP STDF FIELD BLANK VOC( 1)

RTNSATE SAMPLE STD

Chestnut Ridge Hydrogeologic Regime

GW-217

GW-141

GW-521

GW-522

GW-305

GW-557

GW-799

GW-797

GW-796

GW-801

SCR4.3SP

FIELD BLANK

CR-3 EXP-SW SCR2.1SP

(41943) EXP-SW SCR2.2SP

EXP-SW SCR3.4SP EXP-SW SCR5.lSP

EXP-SW SCR5.4SP

CR-4 LII GW-540

(42944) LII GW-709

LII GW-757

41

43

41

43

Q1

43

42

4 4

SDM

SDM

SDWCMP

SDM

SDM

SDM/CMP

SDWCMP

SDM

SDWCMP

SDWCMP

SDM

EXP

EXP

EXP EXP

EXP

SDM

SDM

SDM

STDE

S T D F

STDE

S T D F

STDF

S T D F

STDE

STDE

STDE

STDE

STDF

VOC(1)

STDIF

S T D F

STDF STDE

STDE

STDF

STDE

STDE

B-3

Page 26: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

CR-5

(42,441

EF- 1

(42,441

EF-2

(42,441

EF-3

(42,441

CDLVI GW-827

CDLVI GW-542

CDLVI GW-543

CDLVI GW-544

4 2 SDM

4 4 SDM

SDM

SDM

Upper East Fork Poplar Creek Hydrogeologic Regime

GRIDF3 GW-789

GRIDF3 GW-788

GRIDG3 GW-770

GRID G3

GRID H3

GRIDH3

GRID E3

GRID E3

GRID E3

GRID D2

GRID D2

B4

EXP-E

s 2

FTF GRIDJP

NI-P NI-P NI-P

NHP NHP

EXP-SW

EXP-SR

EXP-SR

EXP-SR

GW-769

GW-776

GW-775

GW-783

GW-782

GW-781

GW-792

GW-79 1

GW-192

GW-618

GW-25 1

GW-620

GW-763

GW-148

GW-153

GW-380

GW-220 GW-383

LRSPW

GW-207

GW-208

GW-816

42

4 4

42

4 4

42

B-4

Y

Y

Y

Y

Y

Y

Y

Y

Y

Y

Y Y Y

Y

Y

Y Y

S M P

SMP

S M P

S M P

S M P

SMP

SMP

SMP

SMP

SMP

S M P

SMP

EXP

EXP

EXP

SMP

SMP

EXP

EXP

EXP SMP

EXP

EXP

EXP

EXP

STDF

STDF

STDF

STDF

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD

STD STD

STD

STD

STD

STD STD

S T D R STDF STDE STDF

Page 27: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

EF-3 (cont'd) GRlDK1 GW-744

GRJDK2 GW-747

EXP-J GW-735 EXP-J GW-750

EF-4

(44)

uov uov

GW-218

GW-2 19

4 4

4 4

EF-WB

(41,431

Q1

4 3

Y

Y

S M P STDIF

S M P STDIF EXP STDIF

EXP STDIF

S M P

S M P

STDR, RAD(2,3,4,5,8)

STDIF, RAD(2,3,4,5,8)

EXP-J GW-722-33 STDIF

EXP-J GW-722-32 STDIF

EXP-J GW-722-30 STDIF

EXP-J GW-722-26 STDIF

EXP-J GW-722-22 STDIF

EXP-J GW-722-20 STD/F

EXP-J GW-722-17 STDIF

EXP-J GW-722- 14 STDIF

EXP-J GW-722-10 STDIF

EXP-J GW-122-0 6 STD/F FIELD BLANK VOC( 1)

RTNSATE SAMPLE STD

Wotes:

1

2

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

Samples will be collected during the calendar year quarter as specified (e.g., Ql). Surface water and spring samples in BC-3 will be collected on or about the same day as groundwater samples will be collected from wells GW-683 and GW-684 in BC-1.

Bear Creek Regime

BG EXP

- Bear Creek Burial Grounds Waste Management Area - Exit Pathway Monitoring Location:

Maynardville Limestone Picket (-Ay -By -C) Spring or Surface Water Location (-SW)

OLF - Oil Landfarm Waste Management Area RS - Rust Spoil Area S3 - S-3 Site

SPI - SpoilAreaI

B-5

Page 28: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

Fotes (cont'd):

Chestnut Ridge Regime

CDLVI - ConstructiodDemolition Landfill VI EXP-SW - Exit Pathway Monitoring Location (spring)

LII - Industrial Landfill I1 LIV - Industrial Landfill IV

' LV - Industrial Landfill V

East Fork Regime

B4 - Beta-4 Security Pits EXP - Exit Pathway Monitoring Location:

Maynardville Limestone Picket (-E, -J) Along Scarboro Road in the gap through Pine Ridge (-SR)

FTF - Fire Training Facility GRID - Comprehensive Groundwater Monitoring Plan Grid Location NHP - NewHopePond UOV - Uranium Oxide Vault

S2 - S-2 Site

3 BCK - Bear Creek Kilometer (Surface Water Sampling Station)

LRSPW - Lake Reality Spillway (Surface Water Sampling Station) GW - Groundwater Monitoring Well

NT - North Tributary to Bear Creek

SS - Spring Sampling Location: South Side of Bear Creek SCR - South Chestnut Ridge (Spring Sampling Station)

4 Q - Field duplicate samples will be collected at these locations during the quarter specified.

5 Y - All purged groundwater will be contained at these locations.

6 CMP - RCRA Post-Closure Corrective Action Monitoring EXP - DOE Order 5400.1 Exit Pathway Monitoring SDM - SWDF Detection Monitoring S M P - DOE Order 5400.1 Surveillance Monitoring

7 Table 2 provides a comprehensive list of analytes and analytical methods grouped by parameter.

/F - Filtered sample for dissolved metal concentrations. STD - Standard administrative parameter group.

See the following list of parameters that apply to CY 1999 samples.

B-6

Page 29: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 1 (cont'd)

Fetes (cont'd):

, - -

i

Standard Administrative Parameter Group:

FLD - Field measurements CHEM - Miscellaneous laboratory analytes (e.g., pH) and anions

MET( 1) - Metals; analyzed by inductively coupled plasma spectrometry, except those analyzed by: 0 plasma mass spectrometry

0 cold vapor atomic absorption antimony, arsenic, cadmium, lead, thallium, and uranium

mercury VOC(1) - Volatile organic compounds RAD( 1) - Gross alpha and gross beta

Additional Radionuclides:

RAD(2) - Strontium-89/90, technetium-99, and tritium W ( 3 ) - Uranium-234, -235, and -238 RAD(4) - Americium-241 , iodine-129, neptunium-237, plutoniym-238 and -239/240 RAD(5) - Radium-223/224/226 RAD(8) - Thorium-228, -230, -232, and -234

RAD(13) - Total uranium and weight percent U-235

B-7

Page 30: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 2. Field Measurements and Laboratory Analytes

for CY 1999 Groundwater and Surface Water Samples

Depth to Water ESP 302-1 NA Water Temperature ESP 307-1 NA

PH ESP 307-1 NA Conductivity ESP 307-1 NA

Dissolved Oxygen ESP 307-3 NA Oxidation-Reduction Potential ESP 307-5 NA

f t l

I ' I EPA-160.1 I 1 Total Dissolved Solids I

Beryllium I EPA-60 1 OA 0.0003 I I

B-8

Page 31: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 2 (cont’d)

Acrylonitrile Benzene

Bromochloromethane Bromodichloromethane

Bromoform Bromomethane

2-Butanone

I Acetone I EPA-8260 I 10

EPA-8260 10 EPA-8260 5 EPA-8260 10 EPA-8260 5 EPA-8260 5 EPA-8260 10 EPA-8260 10

t I 10 Acrolein I EPA-8260

Chloroethane 2-Chloroeth~l vinyl ether

EPA-8260 10 EPA-8260 10

I Carbon disulfide I EPA-8260 I 5 .

~~

Chloroform Chloromethane

Dibromochloromethane 1,2-Dibromo-3-chloropropane

I Carbon tetrachloride 1 EPA-8260 I 5

EPA-8260 5 EPA-8260 10 EPA-8260 5 EPA-8260 10

t . I 5 Chlorobenzene I EPA-8260

lY2-Dibromoethane Dibromomethane

EPA-8260 5 EPA-8260 10

lY2-Dichlorobenzene 1,4-Dichlorobenzene

EPA-8260 5 EPA-8260 5

1,4-Dichloro-2-butene trans- 1,4-Dichlor0-2-butene

Dichlorodifluoromethane 1,l-Dichloroethane 1,2-Dichloroethane 1,l-Dichloroethene 1,2-Dichloroethene

EPA-8260 5 EPA-8260 5 EPA-8260 5 EPA-8260 5 EPA-8260 5 EPA-8260 5 EPA-8260 5

Units3

m g n mgn

m g n mgn

m g n m g n m g n - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . .

B-9

Page 32: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 2 (cont’d)

VOC(1) - VoiatiieOrganic Cornpouniis : (cont’d) 1 Analytical Methodl-I CRQL’

Methylene chloride EPA-8260 5 P g n Styrene EPA-8260 5 Pgn

1 1 1 ,2-Tetrachloroethane EPA-8260 10 P g n 1 ly2,2-Tetrachloroethane EPA-8260 5 Pgn .

Tetrachloroethene EPA-8260 5 U d L Toluene EPA-8260 5 Pgn

1.1.1-Trichloroethane EPA-8260 5 U d L

Technetium-99 YP65-7154 10 pein TritillIIl EPA-906.0 300 p c i n

RAD(3) Uranium-234,235, & 238 AC-MM-2-22012 0.4 ucin Americium-241 AC-MM-2-22012 0.4 p c i n

RAD(4) Iodine- 129 EPA-90 1.1 3.0 DCZ W ( 4 ) Neptunium-237 YP65-7206 0.4 pCi/L W ( 4 ) Plutonium-238 & 2391240 AC-MM-2-22012 0.4 p c i n RAD(5) Radium-22312241226 EPA-903.0 - 904.0 0.5 p c i n W ( 8 ) Th0riUm-228,230.232. & 234 YP65-7206 0.4 uca

RAD(13) Total Uranium and weight % U-235 I YP65-8044 I NA I m g n I

B-10

Page 33: Y-I 2/67531/metadc667272/m2/1/high_re… · Y-12 PLANT GROUNDWATER PROTECTION PROGRAM GROUNDWATER AND SURFACE WATER SAMPLING AND ANALYSIS PLAN FOR CALENDAR YEAR 1999 , I I Prepared

Table 2 (cont’d)

Notes:

1 Analyticalheld methods/procedures fkom:

Test Methods for Evaluating Solid Waste PhysicaKhemical Methods (US.

Methods for Chemical Analysis of Water and Wastes (U.S. Environmental

Environmental Surveillance Procedures Quality Control Manual (Lockheed

Environmental Protection Agency 1986)

Protection Agency 1983)

Martin Energy Systems, Inc. 1988) Lockheed Martin Energy Systems AS0 radiological methods

2 NA - not applicable

3 ft - feet pg/L - micrograms per liter

pmho/cm - micromhos per centimeter mg/L - milligrams per liter mV - millivolts

NTU - nephelometric turbidity Units ppm - parts per million

p C X - picocuries per liter

4 Filtered samples will be collected only at specified locations (see Table 1). Groundwater samples for dissolved metals analysis collected with dedicated sampling equipment or portable pumps will be filtered in the field; samples collected with bailers and surface water samples will be filtered in the laboratory.

5 CRQL - contract-required quantitation limit

6 MDA - minimum detectable activity. The target MDA may be obtained under optimal analytical conditions; actual MDAs are sample-specific and may vary significantly fiom the target value.

B-11