Y Canvas Office Landscape and Disassembly for Recycling ... · Z © 2014 Herman Miller, Inc....

15
Z © 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A. Part no. 1BDL2J rev A. TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc. Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products. 1 Y Canvas Office Landscape ® Dock-Based Dock Installation and Disassembly for Recycling Instructions Parts Included: End Foot Cable Clip Shared Foot Dock Frame Support Foot Clamp 1” Spacer 1/2” Spacer 5/8-18 x 3/8 Hex Socket Head Screw Hex Socket Head Screw (FD110) (FD170) (FD117.1B) (FD117.1A) (FD198) (FD119) (FD128) (FD293) Cladding Assembly(2) C D A E F G H J K B Hex Head Cap Screw Spacer Hex Nut Alignment Pin Storage Spacer L M N P R S

Transcript of Y Canvas Office Landscape and Disassembly for Recycling ... · Z © 2014 Herman Miller, Inc....

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    1

    Y Canvas Office Landscape® Dock-Based Dock Installation and Disassembly for Recycling InstructionsParts Included:

    End Foot

    Cable Clip

    Shared FootDock Frame

    Support Foot

    Clamp

    1” Spacer

    1/2” Spacer

    5/8-18 x 3/8 Hex Socket Head Screw

    Hex Socket Head Screw

    (FD110) (FD170) (FD117.1B)(FD117.1A)

    (FD198)(FD119)

    (FD128) (FD293)

    Cladding Assembly(2) C DA

    E

    F

    G

    H

    J

    K

    B

    Hex Head Cap Screw Spacer Hex Nut Alignment Pin Storage

    Spacer

    L

    M N P R S

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    2

    Finished End

    Mounting Bracket (For Wood Storage)

    Mounting Bracket (For Metal Storage)

    Upper Support

    Lower Support

    (FD292.W)

    (FD16A)

    (FD292.M)

    X

    T V

    Y

    Z

    Taptite Screws(3)

    Ucut Hd Self Drilling Screw (2)Flat Hd Tapping

    Screw (2)

    AA

    WUHardware Pack

    Hardware Pack

    Tools Required:

    Power Driver #2 Phillips Bit 1/4” Allen Wrench

    Ratchet Wrench 9/16” Socket 9/16” Wrench

    LevelTorque Wrench 1/8” Drill Bit

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    3

    1. Place dock structure in run with architectural foot and low storage or structural foot for temporary support. 2. Place remaining docks in run with architectural foot and/or support foot. Level.3. Place dock electrical harnesses, power jumpers, power entry. Pull data cables at this point.4. Install bottom of dock power modules.5. Install fi nished end trim.6. Punch out knockouts in cladding where needed. Install grommets. Install cladding and connect under surface power modules through cladding into harness blocks. Pull data cables through cladding holes. Install cable clips if required.7. Install any surfaces that get under surface power modules using work surface teathers and legs.8. Install dock to surface cable manager. Fasten under surface power module to surface.9. Install any remaining low storage. Remove and reinstall original support low storage (step 1) after cladding and electrical are installed.10. Install upper storage stanchions and dock-mounted storage cabinet.Note: If 46” high dock mounted storage cabinets are being installed, they should be installed prior to any dock supported surfaces that are mounted in same area.11. Install dock mounted screens, both fabric and acrylic.12. Install secondary and bridge surfaces along with any peninsula surfaces and other surfaces that did not have under surface power attached to them.13. Install marker boards.

    Order of Installation

    Electrical HarnessesPower JumpersPower EntryPower ModulesData Cables

    Cable ManagerPower Module

    Finished End Cladding

    Dock

    Peninsula

    ScreenMarker Board

    Work Surface

    Storage Cabinet

    Bridge Surface

    Secondary Surface

    Low Storage

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    4

    1. Loosen hex socket head cap screws on end foot (C) and shared foot (E).2. Slide end foot (C) onto dock frame (A). Make sure closed end of foot faces outside and notched end of foot faces inside. Tighten screws.3. Slide shared foot (D) onto other end of dock frame. Tighten screws.

    A

    A

    D

    C

    Screws

    Screws

    Outside of Foot Inside of Foot

    Notch

    C

    D

    Dock Installation

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    5

    U

    Leg Bracket

    Pilot Holes

    Slot

    Hook

    4. Install wood low storage mounting brackets: - Remove low storage top. - Position mounting brackets (T) onto low storage with bottom hooks engaged into slots in leg brackets and body of bracket tight against the back of low storage. - With bracket plumb and using as a template, drill two 1/8” pilot holes into inner top at screw locations. - Install 2 fl at head tapping screws (U) into pilot holes. - Return top to low storage.

    Top

    T

    T

    TopWood Low Storage

    2”

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    6

    4. Install metal low storage mounting brackets: - Remove low storage top. - Position mounting brackets (V) onto low storage with bottom hooks engaged onto bottom rail of base and body of bracket tight against the back of low storage. - Slide bracket 2” from end of cabinet. - Install 2 self drilling screws (W) into cabinet. - Return top to low storage.

    Note: For storage units mounted perpendicular to dock, light seal and J-strip may need to be trimmed.

    2”

    2”

    2”

    2”

    Bottom Rail

    V

    V

    Hook

    W

    Top

    Metal Low Storage

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    7

     7. Loosen draw rod so nut is near bottom of rod. Capture bottom rail with bottom clip on mounting bracket.8. Engage draw block on mounting bracket onto top rail. Repeat for other mounting bracket on low storage. 9. Tighten draw rods ensuring that top and bottom draw blocks are properly engaged. Torque draw rods to 100-150 in-lbs.

    Top RailNutDraw Block Draw Rod

    Bottom Clip

    Bottom Rail

    Supporting Low Storage Low Storage

    Low StorageLow Storage

    Dock Frame

    Dock

    Draw Rod

    5. Stand dock frame upright at desired location. Level dock frame. 6. Position one supporting low storage up to dock. Level low storage at this time. Top of low storage should align with top of dock. Note: In general, low storage are centered on dock approximately 1/8” in from end of dock and 1/4” space between low storage.

    1/8”

    1/4”

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    8

    10. Set dock frame (A) onto support foot (E). In order to level dock beyond what  guides will allow, place 1” spacer (G) and/or 1/2” spacer (H) as required  between dock frame and support foot.11. Position clamp (F) between bottom rails in dock frame.12. Insert 2 hex socket head screws (K) into clamp. Start screws into support foot.13. For foot at end of run: push in foot to end of frame. Install four 3/8” long hex socket head screws (J) into second set of holes in clamp. For foot between frames: Center foot with end of frame. Install four 3/8” long hex socket head screws (J) into fi rst set of holes in clamp.

    End of Run Support Foot Location Mid-Run Support Foot Location

    K

    F GH

    J J

    E

    J J

    A

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    9

    J

    JK

    14. Position adjoining frame to frame with foot attached. 15. Connect dock frames together as follows: - Install alignment pins (R) into top rail. - Slide dock frame into position capturing alignment pins into top rail and  slots in bottom rail with screws in shared foot. - Place spacer (N) between stiles. Secure in place with hex head cap screw (M) and hex nut (P). - Level dock frame. - Tighten hex head cap screw. 16. Install four 3/8” long hex socket head screws (J) into fi rst set of holes in clamp.17. Tighten long hex socket head screws (K) at top of clamp until lock washers are fl attened plus 1/4 turn.18. Put long straight edge across top of dock at joint to ensure that it is straight.

    R

    MN

    P

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    10

    19. Assemble feet as needed to remaining dock frames.20. Connect dock frames together as follows: - Install alignment pins (R) into top rail. - Slide dock frame into position capturing alignment pins into top rail and  slots in bottom rail with screws in shared foot. - Place spacer (N) between stiles. Secure in place with hex head cap screw (M) and hex nut (P). - Level dock frame. - Tighten hex head cap screw then screws in shared foot. 21. Put long straight edge across top of dock at joint to ensure that it is straight.22. Move on to next dock frame. Repeat steps 19 and 20 until all dock frames are installed in run.

    P

    M

    N

    R

    Shared Foot

    Screw

    Slot

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    11

    23. Install upper support (Y) and lower support (Z) onto dock frame using 3  taptite screws (AA).24. Start clips on fi nished end (X) onto supports. Push down on fi nished end while pulling out on top. Let dowels at top of end trim engage into top rail when aligned with slots in top rail.

    AA

    AAY

    Z

    X

    X

    Dowel Pins

    Slots

    Clip

    Clip

    Top Rail

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    12

    25. Assemble cladding (B) to dock frames by hooking top of tile onto top rail and engaging clips onto bottom rail.

    NOTE: Before installing cladding, install electrical components to dock. See instruction sheet 1BDM5K for details.

    B

    B

    B

    Top Rail

    Clip

    Bottom RailTile

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    13

    26. Where cable management is needed; insert cable clips (L) up into bottom rail of dock frame. Turn clip 90 degrees to engage top of clip onto top of rail.Note: If cable management is not desired on side of dock where wall may be exposed, break one end of clip off at break line before installing.

    27. Install all supporting low storage onto dock as described above.Note: When installing thin top on low storage at end of run, thin top should be fl ush with side panel. In all other locations thin top should be centered on low storage.28. Remove fi rst low storage installed. Install cladding (B). Re-install low storage.

    Break LineBottom Rail

    Thin Top

    Side Panel

    (View shown with cladding removed for clarity.)L

    BFlush

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    14

    Cladding

    Low Storage

    29. For non-supporting low storage; Set 2 storage spacers (S) onto top edge of cladding. Position approximately 2” from where ends of low storage will be.30. Slide low storage to spacers.

    S

    S

  • Z© 2014 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.

    Part no. 1BDL2J rev A.TM Y, L, Canvas Office Landscape are among the trademarks of Herman Miller, Inc.

    Illustrations and specifications are based on the latest product information available at the time of publication. The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.

    15

    Disassembly for Recycling:

    Materials Identifi cation and Segregation:Where possible, plastic components are marked with ASTM recycling codes.Use these codes to identify material type for recycling. Non marked componentsshould be treated as mixed plastic. Ferrous metals can be identifi ed using asmall magnet for recycling. Non-ferrous metals should be separated and recycledseparately.To disassemble product, reverse the above installation steps.