Xtreme Power Storage Solutions
![Page 2: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/2.jpg)
Xtreme Power, Inc.Company Overview
Xtreme Power engineers and integrates power management and energy storage solutions
Founded in 2004 in Austin, Texas; ~ 270 employees
Established Beijing Office
Projects installed, contracted, and in final negotiations: >70 MVA, across 12 projects
US‐based operations in Austin, TX and OK, International presence
Utility industry leadership on Board of Directors
• Pat Wood, Former FERC Chairman, and
• Foster Duncan, Former EVP/CFO of Cinergy
Over $80 MM in funding raised from:
2
![Page 3: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/3.jpg)
The Dynamic Power Resource® (DPR®)
Scalable power solutions: .50 MVA to 500 MVA
Available single system storage capacity (MWh) durations: 5 mins up to 6 hours
Multi‐Storage Architecture
Multiple enclosure options
Fully integrated turnkey product
High round trip efficiency
Accurate, real time response in
< 3 cycles
Re‐deployable
3
Key Product Features
Intelligent Control
Seamless Integration
Proven Performance
![Page 4: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/4.jpg)
Fully Synchronized BMS & PCS Control Seamlessly Interface with the Grid Factory Tested and Field‐Ready Operate 100 Modules as Single System
System Integration
Truly Innovative Solutions
The DPR is an Integrated, Intelligent, Power Management Solutionthat is Configurable, Modular and Scalable.
Programmable, Flexible, and Modular High Reliability & Cyber Security Optimized System Performance Web Based Real Time Monitoring Real‐time Response
XACT ‐ Xtreme Active Control Technology
4
Fast Response Long or Short Duration Multi‐Storage Platform Capabilities Low lifecycle cost Safe and Reliable
Battery Energy Storage
Real and Reactive Power Supply Low Auxiliary Consumption Power Precision within 10 kW Overload to 150% of Nameplate MVA
Power Electronics
![Page 5: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/5.jpg)
XPOC and Test Bay
24/7 Operations Center (XPOC)― Monitors all installations in the field in real time― Collects and stores data to view graphical
representations of historical and live operational data
― Remote access via secure Virtual Private Network
― Option to access through Tablets and Smart Phones
― Redundant Safety Notification Alerts
Test Bay― 12 MVA in‐house test facility― Equipped for Factory Acceptance Tests― Expandable to 20 MVA― Ability to perform full 4 quadrant PQ operation― Verification of control modes such as Ramp
Control, Frequency Regulation, Voltage Regulation, Power Leveling, etc.
5
![Page 6: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/6.jpg)
A Growing Portfolio of Deployed Projects
69 Customers, 5 Applications & 10 Services To Date in Deployed Projects
~ 77 MVA, 154 MW Dynamic Power Range in Deployed Projects
Project Customer Application Power Rating / Duration COD Services
Deployed ProjectsSouth Pole
Telescope (SPT) University of Chicago Microgrid 0.5 MVA, 5 min 4Q 2006 Peak‐Shaving
Kahuku First Wind Renewable Integration 15.0 MVA, 15 min 1Q 2011 Ramp Control, Curtailment Mitigation
Lanai Castle & Cook Renewable Integration 1.1 MVA , 15 min 2Q 2011 Ramp Control, Frequency Response
Ford Michigan Assembly Plant Ford, DTE Energy Demand
Management 0.75 MVA, 60 min 2Q 2011 Load‐Leveling, Ramp Control
KIUC Kaua’i Island Utility Coop Grid Support 1.5 MVA, 15 min 3Q 2011 Frequency Response, VAR Support
Nova Xcel Energy Renewable Integration 1.5 MVA, 15 min 4Q 2011 Ramp Control, Firming & Shaping, Frequency
Response, VAR Support
KWP II (Maui) First Wind Renewable Integration 10.0 MVA, 45 min 2Q 2012 Ramp Control, Responsive Reserves, Grid Services
Ture Classified Renewable Integration 1.5 MVA, 15 minutes 2Q 2012 Ramp Control & VAR Support
Total Operating 8 Customers 4 Applications ~31 MVA 8 Projects 9 ServicesNear‐Term Projects
KIUC II Kaua’i Island Utility Coop Grid Support 1.5 MVA, 15 min 3Q 2012 Responsive Reserves, Ramp Control, Grid Services
KIUC III Kaua’i Island Utility Coop Grid Support 1.5 MVA, 15 min 3Q 2012 Responsive Reserves, Ramp Control, Grid Services
Notrees Duke Energy Merchant Services 36.0 MVA, 15 min 4Q 2012 Responsive Reserves, Regulation Services,
Grid Services
Fosters Classified Microgrid 3.0 MVA, 15 min 4Q 2012 Uninterruptible Power Source
Bear Kodiak Electric Grid Support 3.0 MVA, 15 min 4Q 2012 Frequency response, Responsive Reserves, Voltage Support
Total Near‐Term 3 New Customers 3 Applications 46 MW 5 Projects
![Page 7: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/7.jpg)
Xtreme Power – Examples of Distributed Solutions
7
South Pole Telescope
Lana’i Sustainability Research Project
Ford Motor Company Michigan Assembly Plant
Kaua’i Island Utility Cooperative― Phase I― Phase II
Kodiak Electric
![Page 8: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/8.jpg)
South Pole Telescope6 Years Experience
In collaboration with several centers of higher education, the University of Chicago chose the Xtreme Power DPR to power the 200‐ton South Pole Telescope’s scan cycles without infringing on the station’s life support system. The Telescope requires up to
259,200 cycles/month.
Location South Pole, Antarctica
Segment Microgrid
DPR 0.5 MVA, 5 minute duration
Dynamic Power 1 MW
COD Q4 2006
Services Peak‐shaving, Load‐leveling
8
Project economics were less than 18 month payback given operating costs and associated location.
![Page 9: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/9.jpg)
Lanai Sustainability ResearchDoubling Renewable Output
Location Lanai, HI
Segment Renewable Integration
DPR 1.125 MVA, 15 minute duration
Dynamic Power 2.5 MW
COD Q3 2011
Services Ramp Control, Frequency Response
Initially, Lanai Sustainability Research’s 1.2 MW solar farm was curtailed to 600 kW, due to grid stability concerns for the 4 MW island grid. Since the implementation of the DPR, which can control the ramp to ±360 kW/min, the curtailment limit has been
lifted and the solar facility is currently operating at its fully rated capacity.
9
![Page 10: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/10.jpg)
Lanai Sustainability Research Operational Performance
10
Operational Performance Summary
Operation Period 8/5/2011 – 10/2/2011
Ramp Rate Compliance 99.98%
# Frequency Response Events 421
![Page 11: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/11.jpg)
Ford Michigan Assembly PlantReducing Costs, Increasing Reliability
Location Wayne, MI
Segment Demand Management
DPR 0.75 MVA, 60 minute duration
Dynamic Power 1.5 MW
COD Q3 2011
Services Peak Shaving, Load‐leveling
Ford selected the Xtreme Power DPR to operate with one of the largest solar power generation systems in Michigan. The DPR contributes to the plant’s estimated annual
energy savings of $160,000 by shaving peak demands, leveling load, and reliably integrating 500 kW of solar PV to the critical plant loads.
11
![Page 12: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/12.jpg)
Ford Michigan Assembly PlantOperational Performance
12
Operational Performance Summary
Operation Period 9/4/2011 – 10/2/2011
Ramp Rate Compliance 100.0%
DPR Availability 96.48%
![Page 13: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/13.jpg)
Kaua’i Island Utility CooperativeTaking Advantage of DPR Versatility
Location Kaua’i, HI
Segment Grid Support
DPR 1.5 MVA, 15 minute duration
Dynamic Power 3.0 MW
COD Q4 2011
Services Responsive Reserves,Ramp Control, Frequency and Voltage Response
The KIUC DPR is designed to mitigate the variability of a 3 MW solar PV project for the Kaua’i Island Utility Cooperative, as well as provide grid support services for the island grid. This marks Xtreme Power’s first direct sale to a utility and first project to provide
responsive reserves.
13
![Page 14: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/14.jpg)
Location Kodiak, AK
Segment Microgrid
DPR 3.0 MVA, 15 minute duration
Dynamic Power 6.0 MW
COD Q4 2012
Services Ramp Control, Frequencyand Voltage Response
Kodiak Electric will employ the 3.0 MW DPR to smooth the output of the Pillar Mountain Wind Project, so that the utility can utilize the Terror Lake Hydro facility to manage grid stability and frequency regulation. Additionally, the utilization of the DPR will reduce
diesel fuel consumption by allowing a higher penetration of renewable assets.
14
Kodiak Electric CooperativeExpanding Xtreme Power’s Microgrid Experience
![Page 15: Xtreme Power Storage Solutions - Agrion Power - AGRION... · Xtreme Power Storage Solutions ... Ford selected the Xtreme Power DPR to operate with one of the largest solar power ...](https://reader031.fdocuments.in/reader031/viewer/2022032110/5b8074707f8b9a4c098d7224/html5/thumbnails/15.jpg)
Xtreme Power – The Takeaways
15
Xtreme Power is a Leader in the Power Energy Storage Management Industry
The Dynamic Power Resource is Safe― Autonomous operation, 24/7 monitoring and real time alerts
The System Controls are Reliable― Performance at four sites in Q1 2012 provided 99.99% up time & ramp rate compliance
The Performance is Proven― Over 5 years and 143,000 hours of field operating experience
The Dynamic Power Resource is a Cost Effective Solution― Paybacks can be less than 30 months in certain market segments