X 904 Inspections

4

Click here to load reader

Transcript of X 904 Inspections

Page 1: X 904 Inspections

7/23/2019 X 904 Inspections

http://slidepdf.com/reader/full/x-904-inspections 1/4

  (361) 884-9351 • CORPUS CHRISTI, TE

Excellence in offshore personnel safety

www.billypugh.com

Excellence in offshore personnel safety

www.billypugh.com

X-904Inspections

Page 2: X 904 Inspections

7/23/2019 X 904 Inspections

http://slidepdf.com/reader/full/x-904-inspections 2/4

Excellence in offshore personnel safety

  (361) 884-9351 • CORPUS CHRISTI, TEXAS • 6 MONT

www.billypugh.com

  (361) 884-9351 • CORPUS CHRISTI, TEXAS • DAIL(361) 884-9351 • CORPUS CHRISTI, TEXAS • DAILY INSPECTION

*Inspect the stainless quick release clips. Regularly spray with a lubricant(i.e. WD-40) to protect from corrosion.  

Comments:

***If any load bearing area of the X-904 is worn or defective in any way, take the unit out of

service immediately.

***If the X-904 is to be used to transfer personnel in rough sea conditions, we recommend a

 JSA be completed before the lift is conducted.

***API denition of “Qualied Person” – A person designated by the employer who has the

experience and formalized training to safely operate the crane, rigging, and associated liftin

devices assigned at the work location.

Notes:Satisfactory Non-Satisfactory

Check for any damage of defect on all parts of the unit.

omments:

Visually inspect safety load line when attaching the X-904 to the crane hook.his includes the 4-part sling and all hardware as well as the load line and fabricovered stabilizer. Look for crimps, broken wires or excessive wear or rust.f any of these problems exist, take the unit out of service immediately andeplace the sling. Inspect crane hook positive locking device for function andhysical condition.

omments:

Visually inspect all the load bearing areas of the X-904 for excessive wearr damage, paying close attention to the rigging lines (inner and outer).  

omments:

Visually inspect the aluminum center section for damage, cracks, orxcessive wear.  

omments:

Daily InspectionDaily inspection of X-904 procedure (by ***Qualified Inspector)

rial #: Date of Inspection:

ork Order #: Signature of Qualified Inspector:

Page 3: X 904 Inspections

7/23/2019 X 904 Inspections

http://slidepdf.com/reader/full/x-904-inspections 3/4

Excellence in offshore personnel safetywww.billypugh.com

(361) 884-9351 • CORPUS CHRISTI, TEXAS • 6 MONTH INSPECTION (361) 884-9351 • CORPUS CHRISTI, TEXAS • 6 MONT

*Inspect top and bottom of powder coated aluminum frame including top andbottom ring, expanded metal top and center pole. Look for excessive wear,cracks, or corrosion.

Comments:

*Turn center pole (at least 3 full turns) loosening and then tightening. Swab thethreads with lubricant to prevent seizing.  

Comments:

*Inspect top and bottom outer otation ring covers for damage. Comments:

*Inspect the rubber feet on the bottom frame for deterioration, damage, ormissing feet.  

Comments:

*Inspect for modications or non OEM supplied components. Non OEM compo -nents or modications should be removed.  

Comments:

*Defective or worn parts should be replaced by a qualiedindividual as required.  

Comments:

*Inspect the pad eyes on the upper ring of the X-904. There should be no cracksor damage to the welds. The hole in the pad eye should still be round and notelongated by more than 5%. The angle of the pad eye from the upper ringshould be 20 degrees inside of vertical (see drawing). Some wear of the coatingis expected and acceptable but there should not be excessive wear of metal.

Comments:

Satisfactory Non-Satisfactory

Check for any damage of defect on all parts of the unit.

omments:

Visually inspect safety load line, four part sling and all hardware (paying closettention to broken wires, attened sections, crimps, rust etc). This should fol-

ow API sling inspection guidelines.

omments:

Inspect fabric covered stabilizer for tears or excessive wear. Replace if innerubbers have been damaged, broken, or have lost elasticity.  

omments:

Inspect vertical rigging ropes and the nuts and bolts that hold them for su-

ient and consistent tension. 

omments:

6 Month Inspection6 month inspection of X-904 procedure (by ***Qualified Inspector)

rial #: Date of Inspection:

ork Order #: Signature of Qualified Inspector:

Page 4: X 904 Inspections

7/23/2019 X 904 Inspections

http://slidepdf.com/reader/full/x-904-inspections 4/4

  (361) 884-9351 • CORPUS CHRISTI, TE

Excellence in offshore personnel safety

www.billypugh.com

BILLY PUGH COMPANY RECOMMENDS THAT A TWO YEAR INSPECTION BE CONDUCTED BY THE

MANUFACTURER (OR APPROVED REPRESENTATIVE) AND A NEW CERTIFICATE OF CONFORMITY BE ISSUED

AT THAT TIME. THIS WILL NORMALLY ENTAIL A REFURBISHMENT OF THE UNIT.

***API denition of “Qualied Inspector” – A person so designated by the employer who by reason

of a appropriate experience and training, in addition to meeting requirements of a qualied person

has attended formal training in inspection, maintenance, and troubleshooting of cranes, rigging,

and lifting devices.

0.50"20˚

90˚

12.5MM

6"

4"

102.0MM

152.4MM

38MM

54MM

25MM / 1"

25MM

DIA.

1.50"

1"

2.125"

900 SERIES TRANSFER NET PAD EYES SPECIFICATIONS