Www.uni-stuttgart.de 06/13 Stuttgart – the City and the Region.
Www.ibl.uni-stuttgart.de Institute of Construction Management European Real Estate Conference 2011...
-
Upload
benjamin-hurley -
Category
Documents
-
view
213 -
download
1
Transcript of Www.ibl.uni-stuttgart.de Institute of Construction Management European Real Estate Conference 2011...
ww
w.i
bl.
un
i-st
utt
gar
t.d
eInstitute of Construction Management
European Real Estate Conference 2011
University of Stuttgart
To the term efficiency by Public Private Partnerships
Dipl.-Ing. Hans Christian Jünger
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
2
University of StuttgartInstitute of Construction Management
Institute of Construction Management, University of Stuttgart
• Faculty 2: Civil- and Environmental Engineering
• Foundation: 1964
• Principle: research and teaching with practical relevance
• 7 Assistants: everyone at least 1 year of experience in the
industry
• Courses of studies: “Civil Engineering“ and “Real Estate
Engineering and Management“
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
3
University of StuttgartInstitute of Construction Management
Public procurement
Need of procurement through difference between objectives and reality.
Result or effect (Outcome) compared with objectives
Input, e. g. information, capital, knowledge
Product, service provided e.g. school building (Output)
Definition of objectives
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
4
University of StuttgartInstitute of Construction Management
Relationship of terms
objectives
Input Output
?Outcome=
efficiency
effectiveness = doing right things
= doing things right
effectiveness of measure
effectiveness of execution
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
5
University of StuttgartInstitute of Construction Management
Placing of Public Private Partnership
Placing according to act against restraints of competition (§97 GWB):
„… in a transparent procedure to the most efficient offer…“
Efficiency is a diffuse term in public procurement!
No standardised and structured identification of efficiency!
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
6
University of StuttgartInstitute of Construction Management
Public Private Partnership (PPP)
• Lifecycle approach :
- Building realisation (planning and construction)
- Building services (Facility Management)
- Organisation (owner duties, contact person for client)
- Financing (bridge, long term)
• Ressources (e. g. employees, equipment, capital) in common organisation context
• Project risks distributed according to competence in risk management
• Procurement model for public real estate and related services
• Long-term cooperation regulated by contract (>20 years)
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
7
University of StuttgartInstitute of Construction Management
Complexity of PPP
• Duration, long running project
Efficiency of PPP bids not obviously!
• Different interests
• Multiplicity of persons involved by client and private partner
… because PPP contracts are complex due to:
• Mutual influences and dependencies of services
• Diversity of services
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
8
University of StuttgartInstitute of Construction Management
Definition of efficiency
• Minimum rule/ maximum rule/ optimum rule of efficiency
• Efficiency is the most sustainable advantageous ratio between achievement of objectives and consumption of resources
efficiency =cost
=degree of objective achievement
consumption of resources
• Minimum rule due to necessity of thrift by public authorities
problem: benefit measurement and cost calculation!
benefit
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
9
University of StuttgartInstitute of Construction Management
Benefit measurement by quality
• Degree of quality measurable, e.g. by system of points
• Benefit as quality of PPP product?
quality = realised characteristics to required characteristics.
required characteristics (Input)
compared to
realised characteristics (Output)
enables to indirect measurement of benefit!
• Substitution of term benefit by term quality:
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
10
University of StuttgartInstitute of Construction Management
Research project:
Standardised method for PPP total cost calculation
• duration: December 2007 to May 2009
• research objective:
- cost by cause calculation over life cycle
- transparency especially by building service costs
Cost calculation
• research partners and advisory board:
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
11
University of StuttgartInstitute of Construction Management
• standard term definitions
Research results of standardised PPP total cost calculation
see also website:
www.ppp-kalkulation.de
• list of all standard-services
• schematical procedure of calculation
• continous risk management
• display of comparable results
PPP servicesorigin
DIN 276KG 100 …KG 200 …KG 300 FassadeKG 400 …KG 500 …KG 760 Finanzierung
GEFMA 200……Reinigung……
DIN 18960……Reinigung……
weitere……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
DIN 276KG 100 …KG 200 …KG 300 claddingKG 400 …KG 500 …KG 760 financing
GEFMA 200……cleaning……
DIN 18960……cleaning……
others……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
realisation
operating
organisation
financing
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
planning
construction
operating preparation
operating
construction servicing
realisation phase
utilisation phase
long term financing
operating during constr.
bridge financing
origin
DIN 276KG 100 …KG 200 …KG 300 FassadeKG 400 …KG 500 …KG 760 Finanzierung
GEFMA 200……Reinigung……
DIN 18960……Reinigung……
weitere……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
DIN 276KG 100 …KG 200 …KG 300 claddingKG 400 …KG 500 …KG 760 financing
GEFMA 200……cleaning……
DIN 18960……cleaning……
others……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
realisation
operating
organisation
financing
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
planning
construction
operating preparation
operating
construction servicing
realisation phase
utilisation phase
long term financing
operating during constr.
bridge financing
PPP servicesorigin
DIN 276KG 100 …KG 200 …KG 300 FassadeKG 400 …KG 500 …KG 760 Finanzierung
GEFMA 200……Reinigung……
DIN 18960……Reinigung……
weitere……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
DIN 276KG 100 …KG 200 …KG 300 claddingKG 400 …KG 500 …KG 760 financing
GEFMA 200……cleaning……
DIN 18960……cleaning……
others……
Objekt-realisierung
Objekt-betrieb
Organisation
Finanzierung
realisation
operating
organisation
financing
Planen
Bauen
Betriebsvorbereitung
Betrieb
Baulicher Unterhalt
Objektrealisierung
Nutzungsphase
Endfinanzierung
Betrieb Bauphase
Zwischenfinanzierung
planning
construction
operating preparation
operating
construction servicing
realisation phase
utilisation phase
long term financing
operating during constr.
bridge financing
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
12
University of StuttgartInstitute of Construction Management
Conclusion and prospectConclusion and prospect
• cost calculation by standardised PPP total cost calculation
• benefit becomes measureable by the term quality!
• ratio of benefit to cost is relevant!
efficiency transparent measurable for placing of PPP contract!
• efficiency is diffuse term in public procurement!
• there is no structured and standardised identification of efficiency!
ww
w.i
bl.
un
i-st
utt
gar
t.d
e
15th June 2011 ERES Conference 2011, Eindhoven
To the term efficiency by Public Private Partnership
13
University of StuttgartInstitute of Construction Management
Questions?Questions?
Thank you for your attention!Thank you for your attention!