www.esbi.ie
Challenges Presented byBrownfield Sites to Major Projects
Berlin, Germany
Annraoi Caffrey, ESBI Project Manager & Finbarr Quigley, ESBI Senior Consultant
30th March 2012
www.esbi.ie
ESB International in brief…
• A multi-disciplinary engineering, consultancy and O&M business
• 1,100 employees
• Annual turnover approx €110m
• Projects completed in 115 countries
• Current operations in >20 countries
• Wholly owned by ESB Group (Irish state-owned)
35 Year Track Record in International Consultancy
www.esbi.ie
ESB International - Locations
www.esbi.ie
ESB International - Locations
www.esbi.ie
Dublin Bay Power, Ireland
•412MW CCGT
•Commercial Operation 2002
•Brown Field
Amorebieta, Spain
•755MW CCGT
•Commercial Operation 2005
•Green Field
ESBI Recent Projects
www.esbi.ie
Coolkeeragh, Northern Ireland
•400MW CCGT
•Commercial Operation 2006
•Brown Field
Marchwood, Southampton UK
•840MW CCGT
•Commercial Operation 2009
•Brown Field
ESBI Recent Projects
www.esbi.ie
Aghada, Cork, Ireland
•435MW CCGT
•Commercial Operation 2010
•Brown Field
Carrington, Manchester, UK
•860MW CCGT
•NTP 2012
•Brown Field
ESBI Recent Projects
www.esbi.ie
CoolingExisting Cooling Source
Reduced Capex
Environmental
Residual Site RisksContamination
Existing services and structures
Disruption to existing
industrial stakeholders Suitable for CCR/ SAvailability of land
Benefits vs Challenges of Brown Field
Good infrastructure connectionGas Transmission System
HV Grid
Transport Routes
Good planning contextReusing Brownfield Site
Industrial zoning
Visual impact
Regeneration 800-1500MW
CCGT
www.esbi.ie
The Carrington Project
www.esbi.ie
Original Coal Fired Station
www.esbi.ie
Site Overview
Gas Supply
HV Substation
WaterSource
www.esbi.ie
Proposed Development
www.esbi.ie
Key Challenges Experienced
• Route for Gas Pipeline
• Existing Buried Structures
• Contamination
• Invasive Plant Species
www.esbi.ie
Routing of Routing of
Gas Pipeline Gas Pipeline
www.esbi.ie
Pipeline
Carrington
Power plant site
• 2.4km
• Welded steel
• 600mm dia
• 19.1mm thick
• 70barg
Gas Supply
www.esbi.ie
1.2km
www.esbi.ie
Culvert
Culverts
LandfillCanal
www.esbi.ie
Culvert
Culverts
LandfillCanal
Culverts
Landfill
Canal
www.esbi.ie
Culvert
Culverts
LandfillCanal
www.esbi.ie
Horizontal Directional Drill
www.esbi.ie
CulvertEntry
Horizontal Directional Drill
Exit
Ground Level
Bedrock
30m
Structure
1200m long drill
www.esbi.ie
Pipeline Outcome
Risks successfully addressed prior to award of fixed price construction contract
•Financial Commitment prior to Financial Close
• Engineering Resource Requirement
• Extension of Develop Phase Programme
•Pipeline detailed design contract
•Proved viability of pipeline route
•Detailed design available
•Significant Saving on Pipeline Construction Contract relative to Design & Build
•Risks addressed thus reducing Client’s exposure (time & cost)
•Project Value Increased
www.esbi.ie
Buried Buried
Structures Structures
- Identifying- Identifying
- Removal - Removal
- Mapping - Mapping
www.esbi.ie
Site Issues
• Existing foundations supported on piles
• Inadequate drawings of foundations
• Very limited information on ground conditions
• Contamination Issues– Localised hotspots– Japanese Knotweed – Asbestos
• Existing HV cables and drains crossing the site
www.esbi.ie
Original Coal Fired Station
www.esbi.ie
Site Overview
www.esbi.ie
Solution Options
Option 2 Selected with the following objectives:Provide Information for EPC Contract Negotiation
Prepare Site for handover to EPC Contract
Option 1
Include in EPC Contract scope
Single all inclusive contract
Option 2
Prep work in advance of the EPC Contract
Client invests upfront to manage risk
www.esbi.ie
www.esbi.ie
What we did?
www.esbi.ie
www.esbi.ie
Foundations more extensive than Desktop Study
www.esbi.ie
Additional existing piles - Original estimate 3,500- Final total 5,579
www.esbi.ie
Contract Delivery
• Proven Methodology– Risk Workshops
– Project Risk Logs
– Geotechnical Risk Log
– Lessons Learnt Reviews & Log
– Safety Workshops• Zero LTI Goal
• Safety Initiatives
• Interactive Safety Workshops with Contractors
– High Level Steering Committee
www.esbi.ie
Buried Structures Outcome
Risk successfully addressed prior to award of turnkey fixed price contract
•Financial Commitment prior to Financial Close
• Engineering Resource Requirement
• Extension of Develop Phase Programme
• Significant Saving on Cost relative to that proposed by EPC
• Significant Variation in scope
• Risk addressed thus reducing Client’s exposure (time & cost)
•Proposed Design now Site Specific
•Site Value Increased
www.esbi.ie
Conclusion
Robust Project
Risks mitigated
Fixed price construction contracts
Experience
Lessons Learned
Project Delivery
Methodology
Advance Works