www.dot.state.pa.us
Pilot Project Report
PENNSYLVANIAASPHALTIMPROVEMENTNETWORK(PASIN)
![Page 2: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/2.jpg)
www.dot.state.pa.us
Intent
Pennsylvania ASphalt Improvement Network (PASIN)
an initiative to develop, pilot and implement an ISO 9000-2000 based Quality Management System (QMS) from pavement design through qualification, procurement, manufacture, delivery of materials, installation, acceptance testing and maintenance of asphalt pavement
![Page 3: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/3.jpg)
www.dot.state.pa.us
Intent
• The objective of the Phase 1 PASIN Pilot effort was to test the construction portion of the overall Asphalt Pavement Delivery Process during the 2007 construction season.
• This effort continued with Phase 2 PASIN Pilots, applying lessons learned from 2007 to projects in the 2008 construction season.
![Page 4: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/4.jpg)
www.dot.state.pa.us
Who was involved Phase 1 2007
• ECMS No. 75816, Schuylkill County I 81-07M in District 5-0.
Eastern Industries, Inc.
• ECMS No. 57791, Jefferson Co. SR 28 Section 510 Game School Road 3R in District 10-0.
HRI, Inc.
PAPA
![Page 5: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/5.jpg)
www.dot.state.pa.us
Who was involved Phase 2 2008
• ECMS No.79105, Lycoming County, SR 15 Section A20/A30 NB, in District 3-0.
Glenn O. Hawbaker, Inc.
• ECMS No. 80092, Fayette County, SR 21 Betterment in District 12-0.
A. Folino / Hansen
PAPA
![Page 6: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/6.jpg)
www.dot.state.pa.us
PASIN Implementation Process
1. Say what you
do
2. Do what you
say
3. Prove it
4. Improve it
![Page 7: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/7.jpg)
www.dot.state.pa.us
Quality Management System Components
• 1 Control of Documents• 2 Control of Quality Records• 3 Control of Nonconforming Product• 4 Customer Complaints• 5 Corrective and Preventative Actions• 6 Internal Audit• 7 Management Review
![Page 8: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/8.jpg)
www.dot.state.pa.us
Quality Manager
PASIN Steering
Team
Company Mgt. Team
Best Practices Support
Internal Audit Team
PASIN Impl. Team
External Audit Team
PASIN Implementation Teams
![Page 9: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/9.jpg)
www.dot.state.pa.us
Process Overview
• Review the Requirements of the Contract
– Special Provision requirements– Links to 408 requirements
• Assign Quality Manager Responsibilities
– Authority over plant and field processes– Develop quality management processes– Assign documentation responsibilities
![Page 10: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/10.jpg)
www.dot.state.pa.us
Process Overview
• Develop HMA Production & Paving Plan– Incorporate the Production Best Practices (74) – Incorporate the Paving Best Practices (42) – Establish methods to monitor the key controls– Incorporate capturing metrics data – Address the Quality Management System
Components
![Page 11: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/11.jpg)
www.dot.state.pa.us
Process Overview
• Establish a Management Review Team
• Implement HMA Production and Paving Plan
– provided training to the plant and field personnel on the Best Practices and Key Control Points.
– provided training on new checklists, log reports, maintenance of records, etc.
![Page 12: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/12.jpg)
www.dot.state.pa.us
Process Overview
• Conduct Internal Audits– made up of contractor employees – trained by PASIN Implementation Team
• Report Outcomes– Metrics data– Records of system implementation results
• Internal audits• Corrective and Preventative Action Reports (CPAR)
– Participate in an After Action Review
![Page 13: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/13.jpg)
www.dot.state.pa.us
Results
• Process successfully implemented– Implementation Plan Template was an
improvement• Management closely involved
– But could play a larger role• Communication links improved• Documentation improved
– Non-conformances– Customer Complaints
![Page 14: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/14.jpg)
www.dot.state.pa.us
Hawbaker Plant
![Page 15: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/15.jpg)
www.dot.state.pa.us
Hawbaker Field Operations
![Page 16: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/16.jpg)
www.dot.state.pa.us
Better Materials Plant
![Page 17: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/17.jpg)
www.dot.state.pa.us
A. Folino Paving
![Page 18: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/18.jpg)
www.dot.state.pa.us
Conclusions
The production processes were not altered much Best Practices and Key Controls guide to
success
The documentation effort was greatly increased over normal procedures Uniform processes Reminders to stay on track Learning tools
Electronic documentation is easily accessible company wide
![Page 19: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/19.jpg)
www.dot.state.pa.us
Barriers
• Industry partners must – Understand the requirements– Recognize the need to improve– be willing to adopt the system
• Department staff needs to– Understand the process the contractor is undergoing– Audit the QC plan implementation– Build a comfort level that QC is improved
![Page 20: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/20.jpg)
www.dot.state.pa.us
Next Steps
• Finalizing the report
• Recommending additional pilots in 2009
• Expanding to all Districts in 20??
• Companies applying system throughout their organization
• Becoming the standard procedure
![Page 21: Www.dot.state.pa.us Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)](https://reader035.fdocuments.in/reader035/viewer/2022062516/56649e715503460f94b6f7a3/html5/thumbnails/21.jpg)
www.dot.state.pa.us
Thank You for your attention
2008 PASIN Quality Managers