Www.bmci.by THE ECOLOGICAL MONITORING CENTER. 2 JSC “Belgorkhimprom” Activity.
-
Upload
jean-hardy -
Category
Documents
-
view
215 -
download
1
Transcript of Www.bmci.by THE ECOLOGICAL MONITORING CENTER. 2 JSC “Belgorkhimprom” Activity.
2
JSC “Belgorkhimprom” Activity
JSC “Belgorkhimprom”
Scientific part Design partScientific development
and research
Project documentation
- Work package for ore-dressing plant;
- Ecological package plan within project boundaries;- Topographic works;- Mine’s ecological installation and lift diagnosis;- Conveyor belt testing on fire hazard and fire resistance;
- Scientific and technical activity on ensuring fire safety.
- Work package for ore-dressing plant;
- Ecological package plan within project boundaries;- Topographic works;- Mine’s ecological installation and lift diagnosis;- Conveyor belt testing on fire hazard and fire resistance;
- Scientific and technical activity on ensuring fire safety.
- Design and survey works general designer’s functions realization;
- Design of mineral deposits development objects;
- Productions’ and objects’ design in highly explosive environment and with harmful substances;
- Design: gas-supply system boiler room with steam and water-heating boilers mining equipment spring lift automatic fire alarm and automatic firefighting systems local telephony line structure and electrical installation for mining production
- Design and survey works general designer’s functions realization;
- Design of mineral deposits development objects;
- Productions’ and objects’ design in highly explosive environment and with harmful substances;
- Design: gas-supply system boiler room with steam and water-heating boilers mining equipment spring lift automatic fire alarm and automatic firefighting systems local telephony line structure and electrical installation for mining production
3
EMC Work Direction
JSC “Belgorkhimprom”
(EMC)
Collaboration with foreign investors in energetic and
ecological field
Investment projects realization on introduction of present-day technology
Investment projects realization on increasing of renewable energy sources
usage
Designing of joint implementation projects,
projects on mechanism of clean development, quota
trade and project on mechanism of voluntary
emission reduction
Studying and introduction of the newest scientific
studies in the energy and energy efficiency spheres
Realization of waste products utilization projects
5
PRL of Project “PA “Belaruskali”
2хГМ-50-14/250
3хБ-25-15/350
Modular boiler room
2хПТВМ-30м
Replacement
Natural gas
BOILER ROOM
Switching of existing fuel (black
oil)
GAS SUPPLYGAS SUPPLY OF THE OF THE 22ndnd OREORE DEPARTMENT OF RUEDEPARTMENT OF RUE ««PAPA « «BelaruskaliBelaruskali»»
Project proponent:
TECHNOLOGICAL EQUIPMENT
Drum dryer fire chamber 5хСБ 3,2х22м
Furnace 3хСКС-6 (Granulation department №2)
Furnace 3хСКС-6(Granulation department №3)
Fire chamber area for upgrading junction dryer СУ-1
Switching of existing fuel (black
oil)
Natural gas Carbon finance share –
from 8,6% to 11,5% from the project cost
Greenhouse gases emission reduction –
20 353 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
81 412 t СО2
Project realization costs -
7 088,2 thousand €
6
BOILER ROOM
КВГМ-50
ГМ-50-14/250
ГМ-50-14
2хДЕ-25-14
Switching of existing fuel (black
oil)
Natural gas
PRL of Project “PA “Belaruskali”
GASGAS SUPPLYSUPPLY OF THE OF THE 33nd nd ORE DEPARTMENT OF RUEORE DEPARTMENT OF RUE ««PAPA “BELARUSKALI”“BELARUSKALI”
Project proponent:
TECHNOLOGICAL EQUIPMENT
5хАКС-10 (Drying department)
4хАКС-6,3 (Granulation department)
Heating for upgrading junction dryer 2хСУ-1
Switching of existing fuel (black
oil)
Natural gas Carbon finance share –
From 4,8% to 6,4% from project cost
Greenhouse gases emission reduction –
19 879 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
60 000 t СО2
Project realization costs -
9 339 thousand €
7
PRL of Project “PA “Belaruskalii”
CO-GENERATIONAL ENERGYGENERATING INSTALLATION CO-GENERATIONAL ENERGYGENERATING INSTALLATION CONSTRUCTION WITH RECOVERY BOILERS ON THE TERMAL POWER CONSTRUCTION WITH RECOVERY BOILERS ON THE TERMAL POWER
PLANTPLANT OF THE 1OF THE 1stst ORE DEPARTMENT ORE DEPARTMENT
Greenhouse gases emission reduction in 2012–
38 219 t СО2/year
Project realization costs -
12 120 thousand €
Carbon finance share –
from 2,4% to 3,2% from the project cost
Gas-turbine unit(Siemens SGT-300,
7,9 МW)
Gas-turbine power plant
Gas-turbine unit(Siemens SGT-300,
7,9 МW)
Project proponent:• Own electricity production increase in more than 2 times.
• Actual annual fuel economy on replacement of electrical power system - 19 923 000 n. m3 gas.
• Reduce of contaminant emissions to the atmosphere in quantity of 79,841 t/year.
8
JSC “Grodno Khimvolokno” project
IMPLEMENTATION OF 4,5-6 MW DEFINED CAPACITY WIND-DRIVEN IMPLEMENTATION OF 4,5-6 MW DEFINED CAPACITY WIND-DRIVEN POWER PLANTPOWER PLANT
In the result of wind-driven power plant implementation producing of In the result of wind-driven power plant implementation producing of electric energy without electric energy without СОСО22 is assumed
Annual income from generated ERU sale –
from 22 050 € to 29 400 €
Greenhouse gases emission reduction–
2 940 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
5 880 t СО2
Project realization costs -
6 750-9 000 thousand €
BASIC PROJECT DATA
Wind power plant annual electricity
production would be 10 500 МW*h
Wind plant life cycle – not less than
30 years
Power plant work cycle would estimate 8 600 hours
9
JSC “Grodno Khimvolokno” project
ENERGY COMPLEX RECONSTRUCTIONENERGY COMPLEX RECONSTRUCTION USING POWER EFFICIENT USING POWER EFFICIENT
TECHNOLOGYTECHNOLOGY
Greenhouse gases emission reduction–
57 384 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
229 536 t СО2 Project realization costs -
15 000-16 000 thousand € Carbon finance share (a year) –
from 2,7% to 3,6% from the project cost
JSC “Grodno Khimvolokno” energy complex reconstruction
I turn
Gas powered aggregates installation №1-4
Absorptive refrigerators installation №1-2
Gas powered aggregates installation №5-8
Absorptive refrigerators installation №3-4
II turn
III turn Gas powered aggregate installation №9
10
Facility “Polimir” JSC “Naftan” project
CONSTRUCTION 0FCONSTRUCTION 0F 9 9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT MW ENERGOTECHNOLOGICAL COGENERATION UNIT
WORKING ON THERMALWORKING ON THERMAL WASTE ENERGYWASTE ENERGY
Annual income from generated ERU sale –
from 116 557,5 € to 155 410 €
Greenhouse gases emission reduction –
15 541 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
46 623 t СО2
Project realization costs -
11 322 thousand €
GPU
Cyclone furnace
Exhaust-heat boiler
Exhaust gases
Fuel gas
Gases
Steam
GPU GPU GPU
Smoke fumes
Gas-pumping unit (GPU) utilization involves usage of Gas-pumping unit (GPU) utilization involves usage of 757 757 mm33//h of natural gas. Fuel h of natural gas. Fuel gas (mixture of gas (mixture of МВФМВФ 93.7% and natural gas – 6,3%) usage will remain at the same 93.7% and natural gas – 6,3%) usage will remain at the same
level as beforelevel as before project realization. project realization.
11
JSC “Belshina” project
ENERGY LARGE-SIZE TYRE PLANT COMPLEX ENERGY LARGE-SIZE TYRE PLANT COMPLEX RECONSTRACTIONRECONSTRACTION BASED ON CO-GENERATIONBASED ON CO-GENERATION ENERGOTECHNOLOGICAL INSTALATIONSENERGOTECHNOLOGICAL INSTALATIONS
Greenhouse gases emission reduction –
27 761 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
55 522 t СО2
Project realization costs -
5 493 thousand €
Annual income from generated ERU sale –
from 208 207,5 € to 277 610 €
SMALL HEAT STATIONS CONSTRUCTION ACCORDING TO THE PROJECT
GPU
GPU
GPU
Exhaust-heat boiler
Exhaust-heat boiler
Exhaust-heat boiler
The following units are to be installed:
- three gas-powered aggregates 3,9 MW electrical power each;
- three exhaust-heat boilers 8t/h total power.
12
JSC “Polotsk-Svetlovolokno” project
GLASS-WORKED ARC GLASS-WORKED ARC №4 №4 MODERNIZATIONMODERNIZATION
Greenhouse gases emission reduction –
5 619 t СО2/year
Greenhouse gases emission reduction in a period from 2009 to 2012 –
11 238 t СО2
Project realization costs -
1 916 thousand € (costs of 2006 )
Carbon finance share (in a year) –
from 2,2% to 2,9% from project cost
Implementation of electric heating additional system on existing direct-fire kiln Implementation of electric heating additional system on existing direct-fire kiln for increasing arc efficiencyfor increasing arc efficiency..
Advantages of electricity introduction in furnace with help of
ground vertical electrodes in comparison with flaming boiling
Temperature reduction in under-arc space to improve
furnace campaignRecuperator’s wear reduction
Bath furnace’s heat regime stabilization
Glass-worked furnace efficiency increase
Improvement of liquid glass quality
Increase in melting chamber pull rate
13
JSC “Grodno Azot” project
16 MW (2x8 MW) GAS TURBINE POWER PLANT 16 MW (2x8 MW) GAS TURBINE POWER PLANT CONSTRUCTIONCONSTRUCTION. . SECOND PHASESECOND PHASE
Greenhouse gases emission reduction –
10 915 t СО2/year
Greenhouse gases emission reduction in a period from 2010 to 2012 –
32 745 t СО2
Project realization costs -
24 800 thousand €
Cogeneration unit
Turbogenerator Exhaust-heat boiler
Electric power– 8 MW
Steam capacity – 25 t/h
Heat power on termal-clamping water heating
– 6,78 MW
Cogeneration unit
Exhaust-heat boiler
Gas-turbine power plant
Turbogenerator
Electric power– 8 MW
Steam capacity – 25 t/h
Heat power on termal-clamping water heating
– 6,78 MW
Annual income from generated ERU sale
from 81 862 € to 109 150 €
14
JSC “Grodno Azot” project
As the result of project secondary decomposition As the result of project secondary decomposition catalyst installation in nitric acid production reactor at enterprise catalyst installation in nitric acid production reactor at enterprise
would be installedwould be installed. .
NITROUS OXIDE GENERATION SUPPRESSIONNITROUS OXIDE GENERATION SUPPRESSION ( (NN22OO))
Greenhouse gases emission reduction –
2009: 238 253 tons СО2
2010: 235 745 tons СО22011: 233 237 tons СО22012: 230 733 tons СО2
Greenhouse gases emission reduction in a period to 2012 –
937 968 t СО2
Project realization costs -
2 500 thousand € (costs of 2006 )
Annual income from generated ERU sale
from 1,8 million € to 3,05 million €
Secondary catalyst is installed in basket under metal platinum net in the oxidizing reactor on nitric
acid production
Secondary catalyst stably works at temperature conditions 820-
900 оС
Nitrous oxide decomposition on catalyst at the first year of
operation will proceed with 95% efficiency. At a later date
efficiency will reduce by 1% a year
Catalyst is replaced every 3-4 years
BASIC PROJECT DATA
15
СО2 emission reduction on the projects of 2007-2008
2008 2009 2010 2011 2012Total over a period
RUE «PA “Belaruskali”
Gas supply of the 2nd ore department
- 20 353 20 353 20 353 20 353 81 412 10 814 120
RUE «PA “Belaruskali”
Gas supply of the 3nd ore department
- - - 19 879 19 879 39 758 10 397 580
JSC “Grodno Khimvolokno”
Implementation of 4,5-6 MW defined capacity wind-driven power plant
- - - 2 940 2 940 5 880 10 58 800
JSC “Grodno Azot”
16 MW (2x8 MW) gas turbine power plant construction on JSC “Grodno Azot”. Second phase
- - 10 915 10 915 10 915 32 745 10 327 450
JSC “Grodno Azot”
Nitrous oxide generation
suppression (N2O)- 238 253 235 745 233 237 230 733 937 968 18 16 883 424
1 097 763 18 481 374
General amount cost of
ERU, USA dollars
TOTAL
Organization Project
Greenhouse gases emission reduction, t CO2 Cost per unit ERU,
USA dollars
16
СО2 emission reduction on the projects of 2007-2008
81 412
814 120
39 758
397 580
5 88058 800
32 745
327 450
937 968
16 883 424
0
100 000
200 000
300 000
400 000
500 000
600 000
700 000
800 000
900 000
1 000 000
RUE «PA“Belaruskali” (2 ore department)
RUE «PA“Belaruskali” (3 ore department)
JSC “GrodnoKhimvolokno”
(Wind power plant)
JSC “Grodno Azot”(2х8MW)
JSC “Grodno Azot”(N2O)
t СО2
USAdollars
Emissions reduction structure amongst organizations
85%
7%4% 1% 3% RUE «PA “Belaruskali” (2 ore department)
RUE «PA “Belaruskali” (3 ore department)
JSC “Grodno Khimvolokno” (Wind power plant)
JSC “Grodno Azot” (2х8MW)
JSC “Grodno Azot” (N2O)
17
СО2 emission reduction on the projects of 2009
2008 2009 2010 2011 2012Total over a
period
JSC “Grodno Khimvolokno”
Energy complex reconstruction using power efficient technology
- 57 384 57 384 57 384 57 384 229 536 10 2 295 360
Facility “Polimir” JSC “Naftan”
Construction of 9 MW energotechnological cogeneration plant working on thermal waste energy. Block №1
- - 15 541 15 541 15 541 46 623 10 466 230
JSC “Belshina”
Energy large-size tyre plant complex reconstruction based on energotechnological installations co-generation on JSC “Belshina”
- - - 27 761 27 761 55 522 10 555 220
RUE “PA “Belaruskali”
Energy generating installations construction with recovery boilers on the thermal power
plant of the 1st ore department
- - - - 38 219 38 219 10 382 190
JSC “Polotsk-Svetlovolokno”
Glass-worked arc №4 reconstruction (efficiency increasing)
- - - 5 619 5 619 11 238 10 112 380
381 138 3 811 380
General amount cost of ERU, USA dollars
ИТОГО
Organization Project
Greenhouse gases emission reduction, t CO2Cost per
unit ERU, USA
dollars
18
СО2 emission reduction on the projects of 2009
229 536
2 295 360
44 277
442 770
55 522
555 220
38 219
382 190
11 238
112 380
0
200 000
400 000
600 000
800 000
1 000 000
1 200 000
1 400 000
1 600 000
1 800 000
2 000 000
JSC “GrodnoKhimvolokno” (Energy
complex)
Facility “Polimir” JSC“Naftan” (9MW)
JSC “Belshina” (Energycomplex)
RUE «PA “Belaruskali” (1 ore department)
JSC “Polotsk-Svetlovolokno” (Furnace
№4)
t СО2
USAdollars
Emissions reduction structure amongst organizations
60%
3%
10%15%
12%
JSC “Grodno Khimvolokno” (Energy complex)
Facility “Polimir” JSC “Naftan” (9MW))
JSC “Belshina” (Energy complex)
RUE «PA “Belaruskali” (1 ore department)JSC “Polotsk-Svetlovolokno” (Furnace №4)
19
Our offers
Adoption and implementation of new power-efficient ecological technologies in realizable projects. Application of the latest process plants of the institute in mining and chemical field in the projects implemented by our partners.Application of the latest technologies of wind, solar energy, biogas and biomass usage in different projects.Joint research activities aimed at the creation of new technologies in the field of power engineering and energy efficiency.Joint implementation of projects within the framework of Kyoto protocol and the mechanism of voluntary greenhouse gas emission reduction.Energy inspection and audit.Protection of patent rights on the technologies and their usage.Joint participation in European ecological programmes.
20
Contact information
JSC “Belgorkhimprom”JSC “Belgorkhimprom”
The Ecological Monitoring CenterThe Ecological Monitoring Center
220029 Masherov avenue, 17
Telephone: (8017) 334-69-92
Fax: (8017) 334-70-25E-mail: [email protected]: www.bmci.by
Telephone: (8017) 334-79-88
E-mail: [email protected]