Wt4603 risk assessment-2010
-
Upload
joseph-lyster -
Category
Education
-
view
1.095 -
download
0
Transcript of Wt4603 risk assessment-2010
MACHINERISK ASSESSMENT
Name: Group: (circle one)
ID. No.2A
2B
2C
2D
2E
2FCourse:
Materials & Architectural Technology □
Wood Science & Technology □
Lecturer: Mr. Joseph Lyster
TA: Mr. Michael CrehanUniversity of
LimerickSenior
Technicians:
Mrs. Louise Madden
Mr. Joseph Murray
Autumn Semester 2010
Table of Contents
Areas to be addressed:• Introduction
• Nature of Environment Investigated
• Health & Safety Policy (HAS Act 2005/BS4163)
• Machine Provision: Location & Layout (Simple floor plan sketch – identify safe work zones etc…)
• Hazards, Risks & Risk Control Measures
• Risk Assessment Procedure (Cyclical Model)
• Risk Assessment/Risk Magnitude
• Workshop Health and Safety Management – Procedures as displayed
• Safety Signage
• Machine/Power Tool Risk Assessment
– Machine 1
– Machine 2
– Machine 3
– Machine 4
– Machine 5
– Machine 6
– Machine 7
You must apply a proper table of contents here indicating page number etc…
The entire document must be printed in A3 and double sided!Capped at 18 A3 pages Double-Sided
• Introduction• Nature of Environment Investigated• Health & Safety Policy (HAS Act
2005/BS4163)
ON THIS PAGE
• Machine Provision: Location & Layout (Simple floor plan sketch – identify safe work zones etc…)
ON THIS PAGE
• Hazards, Risks & Risk Control MeasuresON THIS PAGE
• Risk Assessment Procedure (Cyclical Model)• Risk Assessment/Risk Magnitude
ON THIS PAGE
• Workshop Health and Safety Management – Procedures as displayed• Safety Signage
ON THIS PAGE
ON THIS PAGE
Example i.e. Machine 1
• Describe purpose/function
• Pictures of machine
– Label parts
• List Hazards
• List Risk Control Measures
ON THIS PAGE
HAZARDS RISK CONTROL MEASURES
Example
RISK ASSESSMENT 1
Location: SR2-047 Date: 24-09-2010 Assessment Carried out by: Mr. Joe Lyster
Assessment of: PILLAR DRILL CE Marking (Machines): Yes □ No □
Page 1 of 1 Assessment Review Date: 24-09-2010
HAZARD RISK MAGNITUDE PERSONS AT RISK EXISTING CONTROLS REQUIRED CONTROLS PERSONS RESPONSIBLE TARGET DATE
1. Entanglement
2. Violent Ejection
3. Piece Spinning
4. Electric Shock Hazards
5. Cuts
6. Inadvertent Starting
7. Space around Machine
8. Tripping/Slipping
9. Pinch Point
10. Falling Table
11. Noise Levels
12. Crushing
Completed Risk Assessment to Appear before Risk Magnitude Matrix
ON THIS PAGE
Max of 6 Risk Magnitudes/Page
No. of Risk Magnitudes Dependent on Machine