WS-S2A-3-Bang-HoChiMinh-Japan 2011 (TiengAnh).ppt [互換 ......new urban: Th ủ Thiêm,Hi ệ pPh...

9
PEOPLE’S COMMITTEE OF HO CHI MINH CITY DEPARTMENT OF TRANSPORTATION TRANSPORT SYSTEM DEVELOPMENT UP TO 2020 FOR HO CHI MINH CITY 2020 FOR HO CHI MINH CITY 1 HCMC, February 2011 OVERVIEW Position: Located in center of the South, bordered BinhDuong province to the North, TayNinh province to the NorthWest, DongNai province to the East and East-West, BaRia-VungTau to the East-South, LongAn and TienGiang to the West-South, and the East Sea to the south with coast to the West South, and the East Sea to the south with coast of 20km long. Area: 2.095km2. 2 (Ngun: DOT) OVERVIEW Population: The population of HCMC has increased twice since 1989 Year Population 1985 3 706 784 1985 3.706.784 1990 4.118.360 1995 4.640.117 2000 5.169.449 2005 6.239.938 2006 6 424 519 3 (Ngun: DOT) 2006 6.424.519 (excluding 2 million infrequent inhabitants) OVERVIEW Year Population 2007 6 500 000 2007 6.500.000 2008 6.810.461 2009 7 200 000 2009 7.200.000 (excluding 2 million infrequent inhabitants) (excluding 2 million infrequent inhabitants) 4 (Ngun: DOT)

Transcript of WS-S2A-3-Bang-HoChiMinh-Japan 2011 (TiengAnh).ppt [互換 ......new urban: Th ủ Thiêm,Hi ệ pPh...

  • PEOPLE’S COMMITTEE OF HO CHI MINH CITYDEPARTMENT OF TRANSPORTATIONN O NS O ON

    TRANSPORT SYSTEM DEVELOPMENT UP TO 2020 FOR HO CHI MINH CITY2020 FOR HO CHI MINH CITY

    1HCMC, February 2011

    OVERVIEW

    Position: Located in center of the South, bordered BinhDuong province to the North, TayNinh province to the g p , y pNorthWest, DongNai province to the East and East-West, BaRia-VungTau to the East-South, LongAn and TienGiang to the West-South, and the East Sea to the south with coastto the West South, and the East Sea to the south with coast of 20km long.

    Area: 2.095km2.

    2(Nguồn: DOT)

    OVERVIEW

    Population: The population of HCMC has increased twice since 1989

    Year Population1985 3 706 7841985 3.706.7841990 4.118.3601995 4.640.117

    2000 5.169.449

    2005 6.239.938

    2006 6 424 519

    3(Nguồn: DOT)

    2006 6.424.519

    (excluding 2 million infrequent inhabitants)

    OVERVIEW

    Year Population2007 6 500 0002007 6.500.0002008 6.810.4612009 7 200 0002009 7.200.000

    (excluding 2 million infrequent inhabitants)(excluding 2 million infrequent inhabitants)

    4(Nguồn: DOT)

  • OVERVIEW

    Statistical means of road based transport until 2010

    4.480.255 vehicles =

    408.688 cars +

    4.071.567 motorcycles

    5(Nguồn: DOT)

    OVERVIEW

    Transport Infrastructure 3.584 roads with the total length of 3.670 km. Parking area accounts for only 0,1% of urban area compared to

    the number of 10% as requiredthe number of 10% as required. Road transport is nearly the only mode to resolve the need of

    urban transportation.

    6(Nguồn: DOT)

    OVERVIEW

    Thomas K. Wright, the managing director of the American Planning Association, saidthat it is amazing that people can get about in a 8-million- inhabitant-city like HCMC

    Traffic condition

    g p p g yat all.

    Motorbikes or 2-wheel vehicles t l t th d f 10 kil ttravel at the speed of 10 kilometer per hour in afternoon rush hour.

    Cars on major roads travel at the Cars on major roads travel at the speed of 8 kilometer per hour.

    Congestion is increasing seriously.

    7(Nguồn: DOT)

    CURRENT SITUATION

    TRANSPORT SYSTEM Road density and parking area

    are extremely low. The ring road systems are

    incomplete. There are not any urban express

    way. y Seaports are still located inner

    city. There are not any mass-transitThere are not any mass transit

    modes of public transport. Links among different transport

    modes of transport are still

    8

    modes of transport are still weak.

    (Nguồn: DOT)

  • CURRENT SITUATION

    URBAN DEVELOPMENT

    Uncontrolled urban sprawl. Rapid population growthRapid population growth. Cultural infrastructure

    mainly concentrated in citycenter.

    Infrastructure of the city ish l doverwhelmed.

    9

    CURRENT SITUATION

    URBAN STRUCTURE Development Predictions are

    imprecise. Industrial zones are located inIndustrial zones are located in

    residential area, and concentrated in areas adjacent to city boundary. R id i l d l d Residential areas developed spontaneously around industrial areas and transport corridors

    Core urban and satellite urban development are not implemented well

    10

    well.

    (Nguồn: SIUP South)

    CURRENT SITUATION

    TRANSPORT NETWORK

    • Sea port systems are most concentrated in central city.

    • Road based transport system is insufficient and simple.

    • Connection between international airport with other transport centre, industrial zone,… are difficult.

    • City infrastructure has developed y pslowly, compared to the rapid growth of vehicles.

    11

    CURRENT SITUATION

    POPULATION GROWTH• Net-migration rate is still high

    due to Law of Residence which was issued with manywhich was issued with many favorable conditions for immigrants.E i d lt l• Economic and cultural infrastructure such as schools, clinics, etc. for residential

    i i hareas in outer city has not been built in full, so people still tend to prefer living focus

    12

    about center.

  • ORIENTED DEVELOPMENTMODEL

    Multi-pole concentrated

    MODEL

    pwith the central zone’s radius of 30 km and 5 developing poledeveloping pole.

    Better planning control. Industrial centre service Industrial centre, service

    distribute logical. Better and more efficient

    connecting transport network.

    13(Nguồn: SIUP South)

    ORIENTED DEVELOPMENTURBAN SPACE

    Area: 2095,2 km2

    URBAN SPACE

    Population: 10 millions (in which, urban area occupies 8,78 millions people, about 87,8% correlatively)

    Function: centre of economic, culture, science, technology; head of international exchange; industrialinternational exchange; industrial and service centre of the region.

    Space structure: divide into 3 zone:i. Zone I – Centre area: multi-centre urban area. ii. Zone II – CanGio biosphere

    14

    ii. Zone II CanGio biosphere area. iii. Zone III: Satellite urban area.(Nguồn: SIUP South)

    ORIENTED DEVELOPMENTTRANSPORT NETWORKTRANSPORT NETWORK

    National highway system

    Highways system with the capacity of largethe capacity of large vehicles

    Ring road system Radial road systemy Elevated Urban

    expressways system Major urban road

    tsystem Provincial Road system

    15(Nguồn: SIUP South)

    NATIONAL HIGHWAY SYSTEMORIENTED DEVELOPMENT

    Upgrading 6 current radial National Highways

    NA 1A (East side)NH 1KNH 13

    NH 22

    NH (West side)

    NH 50

    16(Nguồn: DOT)

  • ORIENTED DEVELOPMENTORIENTED DEVELOPMENTHIGHWAYS SYSTEM WITH THE CAPACITY OF LARGE VEHICLES

    Building 7 highways with the capacity of large vehicles:

    1. HCM – Vũng Tàu

    2. HCM – Long Thành –gDầu Giây – Đà Lạt3. HCM – Thủ Dầu Một –Chơn Thành4. HCM – Mộc Bài5. HCM – T.Lương – Cần ThơThơ6. HCM – Nhơn Trạch7. HCM phía Nam (Bắc

    17

    p (Nam)

    (Nguồn: DOT)

    O ORING ROAD SYSTEM

    ORIENTED DEVELOPMENT

    Building 3 ringd t li itroads to limit

    transport tocity centery

    18(Nguồn: DOT)

    ORIENTED DEVELOPMENT

    Constructing 2di l b l dradial boulevard:

    East – West: 24.4kmNorth – South: 34.0km

    19(Nguồn: DOT)

    ORIENTED DEVELOPMENTURBAN EXPRESSWAY SYSTEMURBAN EXPRESSWAY SYSTEM

    Bulding 4 urbangexpresswaysNo1, No2, No3and No4Axis 1: 10,8 KmAxis 2: 10,0 KmAxis 3: 7,3 KmA i 4 9 6 KAxis 4: 9,6 Km

    20(Nguồn: DOT)

  • ORIENTED DEVELOPMENTNEW BRIDGE NEW BRIDGE

    Constructing Bridges cross Sai Gon river

    Bridges cross Dong Nai Riverg

    new bridges.

    BinhKhanh BRIDGE PhuocKhanh BRIDGE

    21(Nguồn: DOT)

    ORIENTED DEVELOPMENTNATIONAL RAILWAYNATIONAL RAILWAY

    National railway

    between regions;

    Dedicated railway linking

    seaports; National radial

    railway coordinating

    ith li htwith light railway.

    22(Nguồn: DOT)

    URBAN RAILWAYORIENTED DEVELOPMENT

    URBAN RAILWAY

    U b R il hUrban Railway covers the core center, including:• 6 metro

    3 il + t• 3 monorail + tramway

    23(Nguồn: DOT)

    SEAPORTORIENTED DEVELOPMENT

    SEAPORT

    Focus on moving SaiGon port to Hiep

    h d l i CPhuoc; developing Cat Lai port and Hiep Phuoc port systemPhuoc port system, aiming at reaching the circulation capacity of p y200 millions ton of goods per year in 2020.

    24

  • WATERWAYORIENTED DEVELOPMENT

    WATERWAY

    National waterway

    New Chợ Gạo canal Dredging Vàm cỏ river

    Inner waterway. Urban waterway.

    25(Nguồn: SIUP South)

    ORIENTED DEVELOPMENTAIRPORTAIRPORT

    Tân Sơn NhấtTân Sơn Nhất Airport (circulation

    capacity of 25 millions passengers o s p sse ge s

    per year)

    Long Thành AirportLong Thành Airport (Expected

    circulation capacity of 120 millionsof 120 millions

    passengers per year)

    26(Nguồn: DOT)

    LONG TERM SOLUTIONSPlanning – Region level

    Development cities and link system

    g g

    Construction new cities, making balancein order to move inhabitants: NhơnTrạch, Biên Hòa, Dĩ An, Thủ Dầu Một,ế ếạ ộ

    Bến Cát, Hậu Nghĩa, Đức Hòa, Bến Lức,Tân An…

    Concentrate to complete new urban: Thủ Concentrate to complete new urban: ThủThiêm, Hiệp Phước port, Northwestern,Bình Quới - Thanh Đa, Hi-tech

    Moving ports in Sài Gòn river on time

    27

    LONG TERM SOLUTIONS Planning – City level

    Limited expansion and

    g y

    Limited expansion anddevelopment, gradually movinguniversities, colleges, professionalSecondary Education, largey , ghospitals in the city centre to theoutside of the city: No planning, building new or

    di i it texpanding in city centre. Gradually moving to reduce

    pressure on urban transport. Si lifi d di ti b t Simplified coordination between

    the infrastructure investment andsocial infrastructure in the citycentre.

    28

    centre.

  • LONG TERM SOLUTIONSCity transport

    Focus on hastening construction process of major transport project of the city,particularly:

    y p

    particularly: Constructing North-South and East-West Radial Highways; Constructing urban elevated expressways No.1, No.2, No.3 and No.4; Constructing major intersections; Constructing major intersections; Upgrading, expanding urban roads in accordance with scheme, associated

    with urban upgrading.

    Implementation resources: Capital budget; ODA loans; Capital from domestic and foreign investors; Exploiting the potential value of land for development.

    29

    LONG TERM SOLUTIONSTransport – Management

    Solutions on the implementation of projects andffi

    p g

    traffic managementEnhance the capacity of organizations andindividuals in transport construction (projectp (p jmanagement, design consultancy, consultantsupervision, construction); good coordination incompensation clearance, moving the infrastructure,compensation clearance, moving the infrastructure,ensure implementation project on time

    M d i i th t i f t tModernizing the management infrastructure,traffic, application traffic system with theintelligent operation in ITS and traffic management

    30(Nguồn: DOT)

    LONG TERM SOLUTIONSTransport – Transportation mode

    Restriction private transport and development public transport

    p p

    Strategic development of transport in public is considered as a taskfocus to achieve the rate of passenger transport in public by 2015 is22-26% and 2020 is 47-53% travel needsIn the short term (year 2008 2010) the bus system is the primaryIn the short term (year 2008 - 2010), the bus system is the primarypublic transport. During medium and long term (2011 - 2015 - 2020)when railway network appear, buses will be moved from the role"main transport" to "shipping collection" .p pp gThus, in 2014, Ho Chi Minh city must have public transport whichis the combination urban railway with bus in order to share 12-14%travel needs.Policies to reduce private transport mode: increase entry fees, roadcharges for all kinds of individuals transport modes to increasecapital investment and maintenance road system.

    31

    LONG TERM SOLUTIONSTransport – Capital

    Focused implementation of investment projects under transportationplans in Ho Chi Minh city, especially the period from now to 2010

    p p

    p y, p y p

    Period to 2020: 385,000 billion, equivalent to 24 billion USD

    From now to 2010, Ho Chi Minh City need to implement more than 100j t t d l i f t t ith t t l i t t f 127 th dprojects to develop infrastructure with a total investment of 127 thousand

    billion, equivalent to nearly 8 billion USD.

    The city budget each year only guarantee investments for transport about 5,000billion VND (0.31 billion USD), respectively 12% demand, the rest 88%, arebillion VND (0.31 billion USD), respectively 12% demand, the rest 88%, arefrom various sources

    Mobilizing ODA for 5 metro line 2, 3, 4, 5, 6; the period 2008-2010

    F d t ti t li N 1 N 2 (B Th h Th L )Focused on construction metro line No. 1, No. 2 (Ben Thanh - Tham Luong),the 3a (Ben Thanh - Western Bus) using ODA capital.

    32(Nguồn: DOT)

  • F b f f Vi

    And Ho Chi Minh city

    For a better future of Vietnam

    y

    THANK YOU.

    33