PEOPLE’S COMMITTEE OF HO CHI MINH CITYDEPARTMENT OF TRANSPORTATIONN O NS O ON
TRANSPORT SYSTEM DEVELOPMENT UP TO 2020 FOR HO CHI MINH CITY2020 FOR HO CHI MINH CITY
1HCMC, February 2011
OVERVIEW
Position: Located in center of the South, bordered BinhDuong province to the North, TayNinh province to the g p , y pNorthWest, DongNai province to the East and East-West, BaRia-VungTau to the East-South, LongAn and TienGiang to the West-South, and the East Sea to the south with coastto the West South, and the East Sea to the south with coast of 20km long.
Area: 2.095km2.
2(Nguồn: DOT)
OVERVIEW
Population: The population of HCMC has increased twice since 1989
Year Population1985 3 706 7841985 3.706.7841990 4.118.3601995 4.640.117
2000 5.169.449
2005 6.239.938
2006 6 424 519
3(Nguồn: DOT)
2006 6.424.519
(excluding 2 million infrequent inhabitants)
OVERVIEW
Year Population2007 6 500 0002007 6.500.0002008 6.810.4612009 7 200 0002009 7.200.000
(excluding 2 million infrequent inhabitants)(excluding 2 million infrequent inhabitants)
4(Nguồn: DOT)
-
OVERVIEW
Statistical means of road based transport until 2010
4.480.255 vehicles =
408.688 cars +
4.071.567 motorcycles
5(Nguồn: DOT)
OVERVIEW
Transport Infrastructure 3.584 roads with the total length of 3.670 km. Parking area accounts for only 0,1% of urban area compared to
the number of 10% as requiredthe number of 10% as required. Road transport is nearly the only mode to resolve the need of
urban transportation.
6(Nguồn: DOT)
OVERVIEW
Thomas K. Wright, the managing director of the American Planning Association, saidthat it is amazing that people can get about in a 8-million- inhabitant-city like HCMC
Traffic condition
g p p g yat all.
Motorbikes or 2-wheel vehicles t l t th d f 10 kil ttravel at the speed of 10 kilometer per hour in afternoon rush hour.
Cars on major roads travel at the Cars on major roads travel at the speed of 8 kilometer per hour.
Congestion is increasing seriously.
7(Nguồn: DOT)
CURRENT SITUATION
TRANSPORT SYSTEM Road density and parking area
are extremely low. The ring road systems are
incomplete. There are not any urban express
way. y Seaports are still located inner
city. There are not any mass-transitThere are not any mass transit
modes of public transport. Links among different transport
modes of transport are still
8
modes of transport are still weak.
(Nguồn: DOT)
-
CURRENT SITUATION
URBAN DEVELOPMENT
Uncontrolled urban sprawl. Rapid population growthRapid population growth. Cultural infrastructure
mainly concentrated in citycenter.
Infrastructure of the city ish l doverwhelmed.
9
CURRENT SITUATION
URBAN STRUCTURE Development Predictions are
imprecise. Industrial zones are located inIndustrial zones are located in
residential area, and concentrated in areas adjacent to city boundary. R id i l d l d Residential areas developed spontaneously around industrial areas and transport corridors
Core urban and satellite urban development are not implemented well
10
well.
(Nguồn: SIUP South)
CURRENT SITUATION
TRANSPORT NETWORK
• Sea port systems are most concentrated in central city.
• Road based transport system is insufficient and simple.
• Connection between international airport with other transport centre, industrial zone,… are difficult.
• City infrastructure has developed y pslowly, compared to the rapid growth of vehicles.
11
CURRENT SITUATION
POPULATION GROWTH• Net-migration rate is still high
due to Law of Residence which was issued with manywhich was issued with many favorable conditions for immigrants.E i d lt l• Economic and cultural infrastructure such as schools, clinics, etc. for residential
i i hareas in outer city has not been built in full, so people still tend to prefer living focus
12
about center.
-
ORIENTED DEVELOPMENTMODEL
Multi-pole concentrated
MODEL
pwith the central zone’s radius of 30 km and 5 developing poledeveloping pole.
Better planning control. Industrial centre service Industrial centre, service
distribute logical. Better and more efficient
connecting transport network.
13(Nguồn: SIUP South)
ORIENTED DEVELOPMENTURBAN SPACE
Area: 2095,2 km2
URBAN SPACE
Population: 10 millions (in which, urban area occupies 8,78 millions people, about 87,8% correlatively)
Function: centre of economic, culture, science, technology; head of international exchange; industrialinternational exchange; industrial and service centre of the region.
Space structure: divide into 3 zone:i. Zone I – Centre area: multi-centre urban area. ii. Zone II – CanGio biosphere
14
ii. Zone II CanGio biosphere area. iii. Zone III: Satellite urban area.(Nguồn: SIUP South)
ORIENTED DEVELOPMENTTRANSPORT NETWORKTRANSPORT NETWORK
National highway system
Highways system with the capacity of largethe capacity of large vehicles
Ring road system Radial road systemy Elevated Urban
expressways system Major urban road
tsystem Provincial Road system
15(Nguồn: SIUP South)
NATIONAL HIGHWAY SYSTEMORIENTED DEVELOPMENT
Upgrading 6 current radial National Highways
NA 1A (East side)NH 1KNH 13
NH 22
NH (West side)
NH 50
16(Nguồn: DOT)
-
ORIENTED DEVELOPMENTORIENTED DEVELOPMENTHIGHWAYS SYSTEM WITH THE CAPACITY OF LARGE VEHICLES
Building 7 highways with the capacity of large vehicles:
1. HCM – Vũng Tàu
2. HCM – Long Thành –gDầu Giây – Đà Lạt3. HCM – Thủ Dầu Một –Chơn Thành4. HCM – Mộc Bài5. HCM – T.Lương – Cần ThơThơ6. HCM – Nhơn Trạch7. HCM phía Nam (Bắc
17
p (Nam)
(Nguồn: DOT)
O ORING ROAD SYSTEM
ORIENTED DEVELOPMENT
Building 3 ringd t li itroads to limit
transport tocity centery
18(Nguồn: DOT)
ORIENTED DEVELOPMENT
Constructing 2di l b l dradial boulevard:
East – West: 24.4kmNorth – South: 34.0km
19(Nguồn: DOT)
ORIENTED DEVELOPMENTURBAN EXPRESSWAY SYSTEMURBAN EXPRESSWAY SYSTEM
Bulding 4 urbangexpresswaysNo1, No2, No3and No4Axis 1: 10,8 KmAxis 2: 10,0 KmAxis 3: 7,3 KmA i 4 9 6 KAxis 4: 9,6 Km
20(Nguồn: DOT)
-
ORIENTED DEVELOPMENTNEW BRIDGE NEW BRIDGE
Constructing Bridges cross Sai Gon river
Bridges cross Dong Nai Riverg
new bridges.
BinhKhanh BRIDGE PhuocKhanh BRIDGE
21(Nguồn: DOT)
ORIENTED DEVELOPMENTNATIONAL RAILWAYNATIONAL RAILWAY
National railway
between regions;
Dedicated railway linking
seaports; National radial
railway coordinating
ith li htwith light railway.
22(Nguồn: DOT)
URBAN RAILWAYORIENTED DEVELOPMENT
URBAN RAILWAY
U b R il hUrban Railway covers the core center, including:• 6 metro
3 il + t• 3 monorail + tramway
23(Nguồn: DOT)
SEAPORTORIENTED DEVELOPMENT
SEAPORT
Focus on moving SaiGon port to Hiep
h d l i CPhuoc; developing Cat Lai port and Hiep Phuoc port systemPhuoc port system, aiming at reaching the circulation capacity of p y200 millions ton of goods per year in 2020.
24
-
WATERWAYORIENTED DEVELOPMENT
WATERWAY
National waterway
New Chợ Gạo canal Dredging Vàm cỏ river
Inner waterway. Urban waterway.
25(Nguồn: SIUP South)
ORIENTED DEVELOPMENTAIRPORTAIRPORT
Tân Sơn NhấtTân Sơn Nhất Airport (circulation
capacity of 25 millions passengers o s p sse ge s
per year)
Long Thành AirportLong Thành Airport (Expected
circulation capacity of 120 millionsof 120 millions
passengers per year)
26(Nguồn: DOT)
LONG TERM SOLUTIONSPlanning – Region level
Development cities and link system
g g
Construction new cities, making balancein order to move inhabitants: NhơnTrạch, Biên Hòa, Dĩ An, Thủ Dầu Một,ế ếạ ộ
Bến Cát, Hậu Nghĩa, Đức Hòa, Bến Lức,Tân An…
Concentrate to complete new urban: Thủ Concentrate to complete new urban: ThủThiêm, Hiệp Phước port, Northwestern,Bình Quới - Thanh Đa, Hi-tech
Moving ports in Sài Gòn river on time
27
LONG TERM SOLUTIONS Planning – City level
Limited expansion and
g y
Limited expansion anddevelopment, gradually movinguniversities, colleges, professionalSecondary Education, largey , ghospitals in the city centre to theoutside of the city: No planning, building new or
di i it texpanding in city centre. Gradually moving to reduce
pressure on urban transport. Si lifi d di ti b t Simplified coordination between
the infrastructure investment andsocial infrastructure in the citycentre.
28
centre.
-
LONG TERM SOLUTIONSCity transport
Focus on hastening construction process of major transport project of the city,particularly:
y p
particularly: Constructing North-South and East-West Radial Highways; Constructing urban elevated expressways No.1, No.2, No.3 and No.4; Constructing major intersections; Constructing major intersections; Upgrading, expanding urban roads in accordance with scheme, associated
with urban upgrading.
Implementation resources: Capital budget; ODA loans; Capital from domestic and foreign investors; Exploiting the potential value of land for development.
29
LONG TERM SOLUTIONSTransport – Management
Solutions on the implementation of projects andffi
p g
traffic managementEnhance the capacity of organizations andindividuals in transport construction (projectp (p jmanagement, design consultancy, consultantsupervision, construction); good coordination incompensation clearance, moving the infrastructure,compensation clearance, moving the infrastructure,ensure implementation project on time
M d i i th t i f t tModernizing the management infrastructure,traffic, application traffic system with theintelligent operation in ITS and traffic management
30(Nguồn: DOT)
LONG TERM SOLUTIONSTransport – Transportation mode
Restriction private transport and development public transport
p p
Strategic development of transport in public is considered as a taskfocus to achieve the rate of passenger transport in public by 2015 is22-26% and 2020 is 47-53% travel needsIn the short term (year 2008 2010) the bus system is the primaryIn the short term (year 2008 - 2010), the bus system is the primarypublic transport. During medium and long term (2011 - 2015 - 2020)when railway network appear, buses will be moved from the role"main transport" to "shipping collection" .p pp gThus, in 2014, Ho Chi Minh city must have public transport whichis the combination urban railway with bus in order to share 12-14%travel needs.Policies to reduce private transport mode: increase entry fees, roadcharges for all kinds of individuals transport modes to increasecapital investment and maintenance road system.
31
LONG TERM SOLUTIONSTransport – Capital
Focused implementation of investment projects under transportationplans in Ho Chi Minh city, especially the period from now to 2010
p p
p y, p y p
Period to 2020: 385,000 billion, equivalent to 24 billion USD
From now to 2010, Ho Chi Minh City need to implement more than 100j t t d l i f t t ith t t l i t t f 127 th dprojects to develop infrastructure with a total investment of 127 thousand
billion, equivalent to nearly 8 billion USD.
The city budget each year only guarantee investments for transport about 5,000billion VND (0.31 billion USD), respectively 12% demand, the rest 88%, arebillion VND (0.31 billion USD), respectively 12% demand, the rest 88%, arefrom various sources
Mobilizing ODA for 5 metro line 2, 3, 4, 5, 6; the period 2008-2010
F d t ti t li N 1 N 2 (B Th h Th L )Focused on construction metro line No. 1, No. 2 (Ben Thanh - Tham Luong),the 3a (Ben Thanh - Western Bus) using ODA capital.
32(Nguồn: DOT)
-
F b f f Vi
And Ho Chi Minh city
For a better future of Vietnam
y
THANK YOU.