W&RE IC - GET PRAVAS Program - P&M -Reading Material
-
Upload
deepak-garg -
Category
Documents
-
view
219 -
download
0
Transcript of W&RE IC - GET PRAVAS Program - P&M -Reading Material
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
1/14
1
Welcometo
Equipment Managementpresentation
P&M Corporate Centre
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
2/14
2
Session objective
To make the GETs to understand
Eqpt. fleet of L&T Construction
Key functions
Monitoring & control mechanisms
Tips for effective operation
Safe usage of equipment
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
3/14
3
5 Ms of construction
Money
Men
MaterialMethods
Machinery
Very Important Link
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
4/14
4
Life Cycle Management - LCM
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
5/14
5
Total Cost Ownership -- IHC
T C O
Owning Costs O&M Costs
Depreciation
Cost of capital
Insurance
RTA expenses
Fuel / Power
Labour cost
Spares & Repairs
Oil & Lubes
Supervision exp.
Others
Installation costs
Transportation
CO / HQ overheads
Base w/shop exp.
Fuel / Power, transportation, installation costs are borne by project sites
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
6/14
6
Selecting the right equipment
Not recommended - less /over capacity machines
Remember It is not what we produce matters
At what cost we produce matters the MOST !!!!!!
Organize the plant /support equipment /work area for
extracting best possible production.
Let us not run the batching plant for 2 hours and produce 25
m3/hr ;
Instead , plan our resources & let us do it in 1 Hour !!
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
7/14
7
If source is blank ..
LOG SHEET FOR CRANES
ASSET CODE : ASSET DESCRIPTION :
NAME OF OPERATOR : DATE : SHIFT: DAY / NIGHT
WORKING DETAILSPRODUCTION DETAILS
BREAKDOWN IDLE
USER
INFORMATI
ON
COMMENCED COMPLETED
HMR
DIFFERENCE
HOLDING
TIME
WORK DONE QTY PRODUCED
(Ton)
NO OF
LIFTS
AREAUSER
NAME
SIGNATUR
ETIME
HMR /
KMRREADING
TIME
HMR /
KMRREADING
Clock Hrs Clock hrs
B/DOWN HRS. * IDLE HRS. * HMR RUN ** HOLDING HRS. *TOTAL
PRODUCTION
(ton)
TOTAL NO. OF LIFTS FUEL (IN LTRS) @
00
Signature of the
User:
Adobe Acrobat
Document
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
8/14
8
Performance metrics
Availability
UtilityProductivity
Reliability
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
9/14
Availability
Availability is the measure ofuptime of equipment, i.e how much
the equipment is available for use.
Total Hours in a month Breakdown HoursAvailability % = x100
Total Hours in a month
During Nov09 ,a wheel loader was under breakdown for a total of 10 hrs.What is the availability % ?
(24 hrs x 30 days) 10 hrs 720-10Availability = = x 100 = 99%
(24 hrs x 30 days) 720
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
10/14
Utility
Utility is the measure ofactual usage of equipment . It is normally
measured against a target of 12 hrs / day
Hours WorkedUtility % = x100
(26 days x 12 hrs a day) - BD Hrs
During Nov09, same wheel loader had run for 210 hrs. with a breakdown of 10 Hrs. What is the Utility % ?
210 hrs 210Utility % = = x 100 = 70%
(12 hrs x 26 days) 10 (312-10)
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
11/14
Reliability
Reliability is the probability that an equipment performs its
intended function for a stated period of time, under specifiedoperating conditions. It is measured as MTBF.
Hours RunReliability(Hrs) = Mean Time Between Failures =
No. of Breakdowns
In our previous example, wheel loader had run for 210 hrs withBreak down of 10 Hrs. . It was under breakdown for 10 times duringthe month. What is the Reliability ?
210Reliability = =21 hrs
10
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
12/14
Productivity
Output
Time taken
Plant
Productivity
In other words, it isRate of Production
Actual Production
Target Production
Plant
ProductivityThis is used inProcess Plants
IllustrationConcrete planned for Dec09 = 6000 CUM
Actual achieved = 4000 CUMPlant Productivity = 66%
e.g. 25 m3/hr in a CP30 batching plant
(A)
(B)
-
7/28/2019 W&RE IC - GET PRAVAS Program - P&M -Reading Material
13/14
(y)our role in Equipment Management
Projectteam
P&MTeam
Accurate & Timely S -3
Optimal utilization &Resource sharing
Safety in built in Projectplan
Insist for proper usage &upkeep of P&M
Develop & Retain SkilledP&M workforce
WORK TOGETHER
to maximize returns from projects
-