2 Content
• Cherbourg: – What has been done– Next steps
• Rotterdam– RET & CONNEXXION– Next steps
• London & Roma• Contemplated new sites• Deliverables• HRI Cherbourg – Design and layout• HRI commissioning: decisions pending
3 Cherbourg
• What as been done: – ALAT budget and HRI design agreed with ALAB
– LOI signed in February 2014 between ALAB and CG50
– Draft contract with KEOLIS proposed and discussed in 2015
– Layout and design of the HRI agreed with CUC and Keolis
• Next steps– Finalise the industrial organisation and budget
– Organise the tender if a tender is required
– Sign the contract between KEOLIS and ALAB if ALAB if selected
4 Rotterdam
• RET : – 2 busses ordered ; to be
refueled during the night at Rhoon HRS
– Contract close to signature with AL-Benelux
– Bus communication to add
• CONNEXXION– 4 busses– Modifications required @ Rhoon (storage and dedicated
dispenser) à costs to be added in 3EMotion– H2 price will depend on the operation contract duration
(3,5Y, 6Y, 8Y)
5 Rotterdam
• RHOON HRS modification for CONNEXXION
6 London and Roma
• LONDON : – No change required, HRI compatible for 2 additional busses
• ROMA– ?
7 Contemplated new sites
• Leveraging cars HRS• VERSAILLES :
– HRS in the frame of H2ME2 located at AL R&D center– Modifications to be brought (similar to Rhoon) à costs to be
added in 3EMotion– 3 busses are envisioned
• Denmark – Nord Jutland– 2 busses considered @ Aalborg– 2 busses considered @ Mariagerfjord (Hobro)– HRS Aalborg to be modified (operated by CHN, an AL company)– HyBalance to be fitted with a bus dispenser @ Hobro– Modification costs to be added in 3EMotion
8 WP2 Tasks in the project
• T2.1 – Technical specifications– Specifications for HRI done, design and layout agreed with CUC– LONDON and RET: no HRI– Roma: HRI that need to be upgraded
• T2.2 – HRI Commissioning– Cherbourg: lead time < 15 months. No contract signed– All HRI decisions are pending
• T2.3 – Implementation and/or upgrading the HRI’s– CONNEXXION upgrading: solution is defined– Futur possible sites: 3 upgradings to be foreseen (Versailles,
HyBalance and Aalborg – CHN)• T2.4 – Regular operations and on-going measurements
– London only• T2.5 – Infrastructure scale-up and commercialisation
9 Deliverables WP2
D2.1:• Cherbourg HRS and modification for CONNEXXION have been defined. However the
final approval are still pending (cf next slide for Cherbourg)• Other sites: go / no-go decision still pendingD2.2:• No contracts signed up to now with ALAB• London ?
N° WP Description Responsible Reviewer DateOriginal
planned dateScheduled
Date of publication
PP Status
D2.1 2 HRI Procurement specifications Air Liquide PT's 3 31/03/2015 31/12/2015 in progressD2.2 2 HRI Comissioning VVM De Lijn/ CIRPS/ ALATALAT/ Cherbourg 6 30/06/2015 31/01/2016D2.3 2 HRI Manufacuring and delivery Air Liquide CUC 18 30/06/2016 30/06/2016
D2.4 2Operational HRI performance, including costs I Air Liquide PT's 26 28/02/2017 28/02/2017
D2.5 2Operational HRI performance, including costs II Air Liquide PT's 38 28/02/2018 28/02/2018
D2.6 2Operational HRI performance, including costs II Air Liquide PT's 50 28/02/2019 28/02/2019
D2.7 2Operational HRI performance, including costs IV Air Liquide PT's 60 31/12/2019 31/12/2019
D2.8 2Stakeholders' position paper on HRI Commercialisation package Air Liquide PT's 50 1/03/2019 1/03/2019
D2.9 2HRI Scale-Up and Recommendations for HRI commercialistion Air Liquide PT's 54 1/07/2019 1/07/2019
10 D2.1 HRI Cherbourg (in French)
■ Performances¦ Nominal 200 kg/j– Temps de remplissage – plein de 30 kg
¦ 13 à 18 min = Moyenne de 15 min¦ 3 back to back¦ Temps de recompression = 5 heures
¦ Pression cible : 350bar @ 15°C (max 438bar@85°C)
■ Schéma de remplissage envisagé¦ 5 bus par jour
¦ 3 remplissages le matin¦ 2 remplissages le soir
■ Fourniture H2¦ Semi-remorque de 300 kg disponible
■ Pression entrée compresseur H2¦ 30 – 200 bar (semi-remorque)
■ Utilités¦ Skid Compression : 400V ¦ Instrument air system : Air compresseur (10 barg; dew point: -20°C)¦ Gas utility : GN2 bundle for maintenance
11 Cherbourg layout
12 Cherbourg layout
13 D2.2 HRI Commissioning
Decisions pending