WP 09Monitoring & Forecasting
Thematic & Assemby Center for IBI
MyOcean2 V4.1 Acceptance & V5 Design Workshops – June 2014
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
List of PUs / Du
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Products evolution in V4.1
Product Customer Name Status
IBI-ANALYSIS-FORECAST-PHYS-005-001-b BaU
IBI_REANALYSIS_PHYS_005_002 New
IBI_REANALYSIS_BIO_005_003 New
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Products evolution in V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
IBI_ANALYSIS_FORECAST_PHYS_005_001 dataset-ibi-analysis-forecast-phys-005-001-hourly dataset-ibi-analysis-forecast-phys-005-001-daily
IBI_REANALYSIS_PHYS_005_002 dataset-ibi-reanalysis-phys-005-002-hourly-regulargrid dataset-ibi-reanalysis-phys-005-002-daily-regulargrid dataset-ibi-reanalysis-phys-005-002-monthly-regulargrid dataset-ibi-reanalysis-phys-005-002-monthly-nativegrid
IBI_REANALYSIS_BIO_005_003 dataset-ibi-reanalysis-bio-005-003-monthly-regulargrid dataset-ibi-reanalysis-bio-005-003-monthly-nativegrid
BGC Vars: Chl,Fer,NH4,NO3,O2,PO4,Si,Phytoplanckton, primary production & euphotic zone depth
PHY Vars: Tmp, Sal, U, V, SSH
Model: NEMO (v2.3) Resolution: 1/12º (6Km)/75levAtm. forcing: 3h - ERAinterim Ocean BC & IC: MyO GLO-ReanalysisTidal forcing: 11 harmonic components (FES2004 & TPXO7.1)River discharges: flowrates for 33 rivers, using climatological data
IBI-REA System
04/2011 Today…IBIop-PHY
IBIre-BGQ
12/2011
IBIre-PHY
02/2002
IBI-REA & IBI-OP Systems: Analogies & differences…
Model: NEMO (v3.4) Resolution: 1/36º (2Km)/50levAtm. forcing: 3h ECMWF ModelOcean BC & IC: MyO GLO Forecast SystemTidal forcing: 11 harmonic components (FES2004 & TPXO7.1)River discharges: flowrates for 33 rivers, using PREVIMER obs, SMHI E-HYPE model & clim data
Data Assimilation component SAM2 (Mercator-Ocean; Lellouche et al., 2013), Reduced-order Kalman filter (SEEK or Singular Extended Evolutive Kalman filter). Observations:SST: AVHRR + HR Multi-Sat SLA: all sat data availableIn-situ OBS: CORA3.4 (including ARGO T&S obs)
Products evolution in V4.1
IBI-OP Ocean Forecast System
Interfaces evolution in V4.1
IBI Interface tests performed for V4.1 Interfaces tested: DGF/SUBS/WMS
No MyO-FTP used for IBI product dissemination Datasets tested: new V4.1 IBI REA products
IBI DU Interface tests done in a testing environment DU testing environment independent from the Operational DU
(as in previous Vx Reviews). Virtual machine used for testing, analogous (in terms of resources &
communication facilities) to the operational one. Adequate extrapolation of performance result from test environemnt to
future operational ones.
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
DU OP Dissemination (V4 & future V4.1): http://puertos.cesga.es/mis-gateway-servlet/Motu While testing environment: http://test-puertos.cesga.es/mis-gateway-servlet/Motu
Technical tests on Interfaces for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
IBI DU pass successfully the performance test Both in terms of processing time, download rate and number of
simultaneous connexions.Dataset and Volume/time per Data access service FTP Direct get file Subsetter DataSet Size
Downloading time Processing time Downloading time Total time Processing time Downloading time Total time
Tests 1.1.1 N/A
Tests 1.1.2 00:00:24.94 00:00:04.20 00:00:29.25 58,2MB
Tests 1.1.3 00:00:06.10 00:00:04.34 00:00:10.44 60,1MB
Tests 1.2.1 N/A
Tests 1.2.2 00:00:29.46 00:00:04.64 00:00:34.10 50,5MB
Tests 1.2.3 00:00:05.47 00:00:04.24 00:00:09.71 62,6MB
Tests 2.1.1 N/A
Tests 2.1.2 00:01:47.40 00:00:18.28 00:01:53.43 209MB
Tests 2.1.3 00:00:19.82 00:00:19.90 00:00:39.72 160MB
Tests 2.2.1 N/A
Tests 2.2.2 00:01:47.40 00:00:18.28 00:02:05.69 202MB
Tests 2.2.3 00:01:06.79 00:00:27.10 00:01:33.89 220MB
Tests 3.1.1 N/A
Tests 3.1.2 00:05:43.24 00:00:57.61 00:06:40.85 829MB
Tests 3.1.3 00:02:45.39 00:01:49.11 00:04:34.50 1GB
Tests 3.2.1 N/A
Tests 3.2.2 00:06:27.64 00:01:15.04 00:06:56.76 645MB
Tests 3.2.3 00:04:57.61 00:04:57.61 00:04:57.61 1,3MB
Technical tests on Interfaces for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
However, a last-minute “surprise” when testing!: Problem to disseminate IBI-REA datasets in native grid through
SUBS interface. Problem seems related to have in the same file variables defined in
different grids (native grid is a staggered ARAKAWA-C): netcdf IBIreV1r1_PHYNA_01mav_20040201_20040229_R20131106_RE01 {
dimensions: depth = 75 ; latitude = 504 ; longitude = 296 ; longitude_U = 297 ; latitude_V = 503 ; time = 1 ;
Dimensional variables:float time(time) ;float depth(depth) ;float latitude(latitude, longitude) ;float latitude_U(latitude, longitude_U) ;float latitude_V(latitude_V, longitude) ;float longitude(latitude, longitude) ;float longitude_U(latitude, longitude_U) ;float longitude_V(latitude_V, longitude) ;
Variables:short temperature(time, depth, latitude, longitude) ;short salinity(time, depth, latitude, longitude) ;short ssh(time, latitude, longitude) ;short u(time, depth, latitude, longitude_U) ;short v(time, depth, latitude_V, longitude) ;
Technical tests on Interfaces for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Problem limited to MOTU SUBS. IBI-REA Nativegrid files OK with: THREDDS (Catalog OK). OpenDap / Subsetter services WMS
IBI-REA Nativegrid datasets served through DGF without problems. SUBS Issue scaled to CIS-Op Team. Waiting for advise, in the
meantime, Natrivegrid datasets declared in the EPST as ….
IBI WP9 SUBS DGF WMS IBI_REANALYSIS_PHYS_005_002 dataset-ibi-reanalysis-phys-005-002-hourly-regulargrid
IBI WP9 SUBS DGF WMS IBI_REANALYSIS_PHYS_005_002 dataset-ibi-reanalysis-phys-005-002-daily-regulargrid
IBI WP9 SUBS DGF WMS IBI_REANALYSIS_PHYS_005_002 dataset-ibi-reanalysis-phys-005-002-monthly-regulargrid
IBI WP9 DGF WMS IBI_REANALYSIS_PHYS_005_002 dataset-ibi-reanalysis-phys-005-002-monthly-nativegrid
IBI WP9 SUBS DGF WMS IBI_REANALYSIS_BIO_005_003 dataset-ibi-reanalysis-bio-005-003-monthly-regulargrid
IBI WP9 DGF WMS IBI_REANALYSIS_BIO_005_003 dataset-ibi-reanalysis-bio-005-003-monthly-nativegrid
Product Content Verifications for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Product specification & dataset/Dataset Status CF Checker NetCDF File Title Date in the WMS
ibi-analysis-forecast-phys-005-001 Ok Ok Ok
dataset-ibi-analysis-forecast-phys-005-001-daily Ok Ok Ok
dataset-ibi-analysis-forecast-phys-005-001-hourly Ok Ok Okdataset-ibi-reanalysis-phys-005-002 dataset-ibi-reanalysis-phys-005-002-hourly-regulargrid Ok Ok Ok dataset-ibi-reanalysis-phys-005-002-daily-regulargrid Ok Ok Ok dataset-ibi-reanalysis-phys-005-002-monthly-regulargrid Ok Ok Ok dataset-ibi-reanalysis-phys-005-002-monthly-nativegrid Ok Ok Ok dataset-ibi-reanalysis-bio-005-003 dataset-ibi-reanalysis-bio-005-003-monthly-regulargrid KO* Ok Ok dataset-ibi-reanalysis-bio-005-003-monthly-nativegrid KO* Ok Ok
CF Inconsistency in BIO datasets 2 errors found in monthly BIO files
Variable name for Euphotic Zone Depth var Units for the Primary Production variable
Consultation to CF-metadata mailing list
http://mailman.cgd.ucar.edu/mailman/listinfo/cf-metadata Evolving situation in CF convention for the 2 BGQ variables (name/unit).
currently, not rightly included in the Reference Table (v26). But should be OK in the following CF Table update (v27).
Scientific reporting for V4.1
Product validated & Validation Tasks:
IBI_REANALYSIS_PHYS_005_002 Validation focused on monthly data
MO PU (producer of the IBI-REA) Validation focused on high-frequency data
PdE PC
IBI_REANALYSIS_BIO_005_003 Validation based on metrics computed from monthly data (MO PU)
Overview & Results on the IBI-REA Validation Activities
in:
MYO2-ScVR-REA-IBI-v1.0 MYO2-IBI-QUID-REA-005-002 (PHY) MYO2-IBI-QUID-REA-005-003 (BGQ)
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Scientific reporting for V4.1
IBI_REANALYSIS_PHYS_005_002
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
T-CLASS1-SST-MEAN
IBI-REA Vs AVHRR (2002-2011)
T-CLASS1-SST-TREND
This kind of IBI-REA metric will be included in the OSR
Scientific reporting for V4.1
IBI_REANALYSIS_PHYS_005_002
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
T-CLASS4-LAYER S-CLASS4-LAYER
Regional IBI-REA improves significantly Climatology & provides some added value regarding global GLO REA
Scientific reporting for V4.1
IBI_REANALYSIS_PHYS_005_002
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Estimated Accuracy Number computation: Variable Mean RMS error
Temperature (°C) 0-5m 0.16 0.84
Temperature (°C) 5-200m 0.02 0.56
Temperature (°C) 200-600m 0.07 0.40
Temperature (°C) 600-1500m 0.09 0.48
Temperature (°C) 1500-2000m 0.06 0.37
Temperature (°C) 0-2000m 0.07 0.45
Salinity (psu) 0-5m -0.05 0.29
Salinity (psu) 5-200m -0.02 0.15
Salinity (psu) 200-600m 0.01 0.05
Salinity (psu) 600-1500m 0.01 0.08
Salinity (psu) 1500-2000m 0.01 0.06
Salinity (psu) 0-2000m 0.00 0.09
Scientific reporting for V4.1
IBI_REANALYSIS_PHYS_005_002 Example of IBI-REA Validation on monthly basis
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
UV-CLASS1-15m_MEAN
Information from a long list of metrics based on monthly data (> 20) available in the QUID….
Scientific reporting for V4.1
High frequency IBI REA Val with in-situ data from moorings (PdE PC)
Remark: This validation exercise is performed with independent in-situ observational data (in the sense of non-assimilated in the IBI-REA system).
Quite valuable exercise to evaluate the skill of the IBI-REA system in coastal areas.
Metrics computed using high frequency (1-h) in-situ measured data over the 10-yr period across 14 moorings from the Puertos del Estado Network.
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
IBI_REANALYSIS_PHYS_005_002 High frequency IBI REA Val with data from moorings
SST-CLASS2-HF-MOORINGS
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
SSTBuoy Year N Obs IBIre Bias RMSE R SI
Bares
2002 6330 15.75 15.26 -0.48 0.80 0.96 0.052003 2653 16.59 16.42 -0.17 0.45 0.99 0.032004 7913 16.15 15.81 -0.34 0.58 0.99 0.042005 6375 17.20 16.90 -0.30 0.55 0.99 0.032006 7285 16.39 16.07 -0.32 0.55 0.99 0.032007 4814 16.29 15.95 -0.35 0.58 0.98 0.042008 7125 16.59 16.32 -0.27 0.49 0.99 0.032009 6317 16.17 15.75 -0.42 0.72 0.99 0.042010 408 20.54 20.28 -0.26 0.46 0.60 0.022011 6406 17.33 16.88 -0.44 0.58 0.98 0.03
Bilbao
2006 345 15.64 15.18 -0.46 0.52 0.54 0.032007 8752 16.78 16.35 -0.43 0.77 0.98 0.052008 5535 16.19 15.73 -0.46 0.67 0.99 0.042009 3116 15.92 15.46 -0.46 0.67 0.99 0.042010 8593 16.96 16.41 -0.55 0.75 0.99 0.042011 8544 17.54 16.98 -0.56 0.71 0.99 0.04
Peñas
2002 4383 14.87 14.18 -0.69 0.97 0.87 0.072003 3341 13.68 13.09 -0.60 0.70 0.85 0.052004 6946 15.84 15.29 -0.55 0.73 0.99 0.052005 5974 15.89 15.24 -0.65 0.91 0.98 0.062006 4066 18.08 17.61 -0.47 0.77 0.99 0.042007 6976 15.72 15.43 -0.29 0.61 0.98 0.042008 7071 17.10 16.33 -0.78 0.99 0.98 0.062009 7142 16.79 16.27 -0.52 0.85 0.97 0.052010 6025 15.90 15.19 -0.71 1.18 0.96 0.072011 7921 17.07 16.62 -0.45 0.68 0.98 0.04
IBI_REANALYSIS_PHYS_005_002 High frequency IBI REA Val with data from moorings
SST-CLASS2-HF-MOORINGS
SSTBuoy Year N Obs IBIre Bias RMSE R SI
Alborán
2002 6369 20.04 17.30 -2.73 3.39 0.71 0.172003 2154 17.47 16.33 -1.14 1.40 0.96 0.082004 641 17.09 15.70 -1.38 1.43 0.48 0.082005 5696 17.17 16.11 -1.06 1.54 0.88 0.092006 1342 15.21 15.07 -0.14 0.35 0.39 0.022009 8735 21.00 21.12 0.12 0.49 0.98 0.02
Cádiz
2002 4618 19.99 19.32 -0.67 1.46 0.86 0.072003 6083 19.56 18.66 -0.90 1.32 0.97 0.072004 5452 20.03 19.30 -0.74 1.23 0.93 0.062005 7095 20.07 19.53 -0.54 0.72 0.98 0.042006 6954 19.65 18.92 -0.73 0.89 0.99 0.052007 7474 19.00 18.55 -0.45 0.77 0.97 0.042008 7675 19.17 18.62 -0.55 0.87 0.96 0.052009 7735 20.02 19.62 -0.40 0.76 0.97 0.042010 4957 20.32 20.10 -0.22 0.56 0.97 0.032011 8568 20.18 19.74 -0.43 0.76 0.97 0.04
Gata
2002 3583 21.99 21.14 -0.85 1.57 0.83 0.072003 4993 20.47 19.91 -0.56 1.23 0.95 0.062004 6709 19.50 18.72 -0.78 1.15 0.98 0.062005 5935 20.03 19.36 -0.67 1.23 0.96 0.062006 4609 17.17 16.31 -0.87 1.17 0.97 0.072007 8639 19.25 19.21 -0.05 0.75 0.98 0.042008 4928 18.61 17.85 -0.76 1.12 0.97 0.062009 8566 21.35 21.21 -0.14 0.45 0.98 0.022010 6090 20.82 20.02 -0.79 1.19 0.96 0.062011 5636 19.51 19.14 -0.37 0.94 0.96 0.05
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
IBI_REANALYSIS_PHYS_005_002 Water masses (density)
T/S Diagrams
Silleiro, 2011
Tenerife, 2011
vvCadiz, 2011
Valencia, 2011
Bilbao, 2011
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
UV-CLASS2-HF-MOORINGS Gran Canaria, 2011
IBI-REA OBS
v
Gran Canaria, DJF-2011
IBI-REA OBS
IBI-REA
IBI-REA
OBS
OBS
AUG-2011
SEP-2011Progressive Vectors
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
IBI_REANALYSIS_PHYS_005_002 High frequency IBI REA Val with data from moorings
Taylor Diagrams
Silleiro, 2011
Tenerife, 2011Cadiz, 2011
Valencia, 2011
Bilbao, 2011
Scientific reporting for V4.1
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Transition Planning for V4.1
Provide planning information regarding parallel availability from V4.1 launch : Are you able to provide a double dissemination If yes, which will be the period of double dissemination… If not, which are the difficulties (to anticipate user
communication)
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Not Applied: new V4.1 IBI-REA
Products Static
Documentation delivered
Document Title (+ version) Version
V4.1_EPST_External_Product_Spec_Table-1.114_IBI V1.114
V4.0_PDD_Product-Dependencies_1.21_IBIv4.1 V4.1
MYO2-WP9-DUs-TD_IBI-PUERTOS-MADRID-ES_V4.1 V4.1
IBI-PUERTOS-MADRID-ES-Tests results-Summary_V4.1 V4.1
File1_V4.1_IBI-REANALISYS-PHYS V4.1
File1_V4.1_IBI-REANALISYS-BIO V4.1
MYO2-ScVR-REA-IBI-v1.0 V1.0
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Product Specification Customer Name Associated PUM VersionDate Associated QUID Version
Date
IBI_REANALYSIS_PHYS_005_002 MYO2-IBI-PUM-005-002 V0.1 04/14 MYO2-IBI-QUID-REA-005-002 V1.0 04/14
IBI_REANALYSIS_BIO_005_003 MYO2-IBI-PUM-005-003 V0.1 04/14 MYO2-IBI-QUID-REA-005-003 V1.0 04/14
Main Architecture Elements reminder
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Glo MFC:Provision of Initial and bdy data
ECMWFAtm forcing
NEMO
Preprocess.
Ou
tpu
ts
Validation
Products
OBS
SST TACSL TACINSITU TAC
NEMO
Preprocess.
Ou
tpu
ts
Validation
Products
OBS
IBI-CLS-TOULOUSE-FR DU
IBI P
dE P
U: C
ES
GA
, Fin
iste
rrae
IBI M
O P
U:M
eteo
Fra
nce
IBI-PUERTOS-MADRID-SP DU
BACK-UPCapability: exchangeOf files in case of incident
External inputs
Internal inputs
ftp ftp, Motuftp
MIS-GW(Subsetting, WMS, DGF)
ftplo
g f
iles
MIS-GW(Subsetting, WMS, DGF)
log
file
s
List of implemented interfaces<PU> = SST-IFREMER-BREST-FR
Ports Interface types Interface unique name Will be provided? When ?Delivery / Download FTP EI_D_FTP_ EI_D_FTP_<PU>
FTPS EI_D_FTPS_ EI_D_FTPS_<PU> OPENDAP EI_D_OPENDAP_ EI_D_OPENDAP_<PU>
SUBSETTER EI_D_SUBSETTER_ EI_D_SUBSETTER_<PU>
DirectGetFIle EI_D_DGF_ EI_D_DGF_<PU>
Viewing Interactive maps (Gridded
products)EI_Vi_MAP_GRIDDED_ EI_Vi_MAP_GRIDDED_<PU>
Interactive maps (InSitu and
along-the-track products) EI_Vi_MAP_ALL_ EI_Vi_MAP_ALL_<PU>
Monitoring & Control (Basic) Push Monitoring II_C_BASIC_PUSH_MONITORING_ II_C_BASIC_PUSH_MONITORING_<PU>
(Advanced) Push Monitoring II_C_ADV_PUSH_MONITORING_ II_C_ADV_PUSH_MONITORING_<PU>
Support Services ITIL support processes
(hooks)II_S_ITIL_SUPPORT_ II_S_ITIL_SUPPORT_<PU>
Products Management support processes (hooks)
II_S_ PRODUCTS_MNGT_ II_S_ PRODUCTS_MNGT_<PU>
Components deployment Will be deployed ? When ?THREDDS V4.1
OPENDAP (as THREDDS service) WMS 1.0 (as THREDDS service)
MIS Gateway
highlight scheduled changes
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
List of implemented Interfaces :<PU> = IBI-PUERTOS-MADRID-SP
Ports Interface types Interface unique nameWill be provided? When ?
Delivery / Download
FTP EI_D_FTP_IBI-PUERTOS-MADRID-SP NO Cancelled, linked to V0
FTPS EI_D_FTPS_IBI-PUERTOS-MADRID-SP Yes Active from V2
OPENDAP EI_D_OPENDAP_IBI-PUERTOS-MADRID-SP yes Active from V1
SUBSETTER EI_D_SUBSETTER_IBI-PUERTOS-MADRID-SP yes Active from V2
Viewing Interactive maps (Gridded prd.) EI_Vi_MAP_GRIDDED_IBI-PUERTOS-MADRID-SP yes Active from V2
Interactive maps EI_Vi_MAP_ALL_IBI-PUERTOS-MADRID-SP yes Active from V2
Monitoring & Control
(Basic) Push Monitoring II_C_BASIC_PUSH_MONITORING_IBI-PUERTOS-MADRID-SP -
(Advanced) Push Monitoring II_C_ADV_PUSH_MONITORING_IBI-PUERTOS-MADRID-SP yes Active from V2
Support Services
ITIL support processes (hooks) II_S_ITIL_SUPPORT_IBI-PUERTOS-MADRID-SP Yes Active from V1
Products Management support processes (hooks)
II_S_ PRODUCTS_MNGT_IBI-PUERTOS-MADRID-SPYes Active from V1
Components deploymentWill be deployed ? When ?
THREDDS V4.1 yes Active from V1
OPENDAP (as THREDDS service) yes Active from V1
WMS 1.0 (as THREDDS service) yes Active from V2
MIS Gateway yes Active from V2
MyOcean2 Design Workshop – Barcelona 6,7,8th June 2012
List of implemented Interfaces :<DU> =IBI-CLS-TOULOUSE-FR
Ports Interface types Interface unique nameWill be provided? When ?
Delivery / Download
FTP EI_D_FTP_IBI-CLS-TOULOUSE-FR YES 2011
FTPS EI_D_FTPS_IBI-CLS-TOULOUSE-FR NO
OPENDAP EI_D_OPENDAP_IBI-CLS-TOULOUSE-FR YES 2011
SUBSETTER EI_D_SUBSETTER_IBI-CLS-TOULOUSE-FR YES 2011
Viewing Interactive maps (Gridded pr.) EI_Vi_MAP_GRIDDED_IBI-CLS-TOULOUSE-FR YES 2011
Interactive maps EI_Vi_MAP_ALL_IBI-CLS-TOULOUSE-FR NO
Monitoring & Control
(Basic) Push Monitoring II_C_BASIC_PUSH_MONITORING_IBI-CLS-TOULOUSE-FR -
(Advanced) Push Monitoring II_C_ADV_PUSH_MONITORING_IBI-CLS-TOULOUSE-FR YES 2011
Support Services
ITIL support processes (hooks) II_S_ITIL_SUPPORT_IBI-CLS-TOULOUSE-FR YES 2011
Products Management support processes (hooks)
II_S_ PRODUCTS_MNGT_IBI-CLS-TOULOUSE-FRYES 2011
Components deploymentWill be deployed ? When ?
THREDDS V4.1 YES 2011
OPENDAP (as THREDDS service) YES 2011
WMS 1.0 (as THREDDS service) YES 2011
MIS Gateway YES 2011
MyOcean2 Design Workshop – Barcelona 6,7,8th June 2012
Products evolution foreseen for V5
Product Customer Name Status
IBI-ANALYSIS-FORECAST-PHYS-005-001-b Updated
IBI_REANALYSIS_PHYS_005_002 Keep Static
IBI_REANALYSIS_BIO_005_003 Keep Static
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Interfaces and system evolution foreseen in V5
Provide information on interfaces evolution foreseen in V5
No changes expected on interfaces
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
2 types of system changes foreseen for V5
Changes associated to potential upgrades in the IBI NEMO model application or updates of any required external inputs.
Changes required in the IBI operational suite to adapt it to any novelty (upgrade) of the computing environment existing at that time.
V5 Master schedule plan
Present here the main steps and planned dates of the developments for your WP in V5
List issues, risks … (if any)
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
MyOcean2 Design Workshop – Barcelona 6,7,8th June 2012
Master Schedule (review of the 1st MyO-2 Master Plan)
Model improvement DeliveryImprovement of operational suite: decrease CPU time, increase robustness
V3 and V4
River input improvement V3
Solving the BU issue V3 New stress parameterization taking waves into account
V4
Possible new Heat flux formulation V4
Nudging for spin-up V4
Change of model version from 2.3 to 3.4 V4
Vertical turbulence with input form waves
V4
Data assimilation ECOMF…
Still on the plan …
Tested, but decided not to be applied at MyO2 stage
Tested, but decided not to be applied at MyO2 stage
Testing delayed to MyO2 end (Op impl. at V5; if demonstrated)
Testing delayed to MyO2 end (Op impl. at V5; if demonstrated)
MyOcean2 Design Workshop – Barcelona 6,7,8th June 2012
Master Schedule Plan for MyO-FO and beyond (Copernicus….)
Model improvement DeliveryPossible new Heat flux formulation V5 (if demonstrated at the end MyO2)
Nudging for spin-up V5 (if demonstrated at the end MyO2)
Production and/or Dissemination of waves products
Copernicus (if decided at Top Level)
New stress parameterization taking waves into account
Copernicus
Vertical turbulence with input form waves
Copernicus
Data assimilation Copernicus
V5 Master schedule plan
List issues, risks … (if any) V5 fixed at the end of MyO-FO. (Acceptance in Dec-2014) Jump from MyO-2 to MyO-FO and the short time extension of
MyO-FO (6 months) introduce some risk of discontinuity in the Team (risk high at PdE PC).
Very likely we will have to face a temporary limitation in terms of human resources for the MyO-FO period.
Activities related to provide the committed Operational Service will be the priority (and will not be affected).
However, R&D activities, Tier-1 and system updates capabilities may be affected by the human resources gap.
This is main reason because some continuity between V4 and V5 is planned.
Leaving significant changes ahead for further Copernicus upgrades.
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
V5 Change impact
Provide information on products updates likely impact (on external or internal users (TAC MFC))
MyOcean2 V4.1 Acceptance & V5 Product Design Workshops – June 2014
Provide information on impact mitigation (double dissemination timeframe, availability of samples, …)