VIETNAM ELECTRICITYDONG NAI POWER COMPANY LIMITED
El 712VOL. 7
RURAL DISTRIBUTION PROJECT
COMPONENT PROJECT
DAU GIAY 1 10KVSUBSTATION + TRANSMISSION LINE
VOLUME 3
ENVIRONMENTAL MANAGEMENT PLAN
HO CHI MINH CITY - NOVEMBER 2007
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
VIETNAM ELECTRICITYDONG NAI POWER COMPANY LIMITED
RURAL DISTRIBUTION PROJECT
COMPONENT PROJECT
DAU GIAY I 1 OKVSUBSTATION + TRANSMISSION LINE
VOLUME 3
ENVIRONMENTAL MANAGEMENT PLAN
Project Manager : Bui Phuc Truong
Carried out by : Nguyen Huu Ngan
Ho Ch Minh Gty, CL. November 2007
ELECT g T STOCK COMPANYBZWCWOP*IOF H MINH CITY
'/Mc - DUUCTOR
NGUYEN VAN TRINH
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
INDEX
I. PROJECT OUTLINE AND SCOPE OF WORK ......................... 4
II. ENVIRONMENT IMPACT FILTER QUESTIONS ...................................... 8
III. MITIGATION MEASURES ...................................... 13
IV. URGENT SITUATIONS AND SOLUTIONS .......................... 18
V. CONSULTATION AND PtJPLIC INFORMATION .................................... 20
VI. ENVIRONMENT MONITORING PLAN ....................................... 21
VII. IMPLEMENTATION RESPONSIBILITY FOR ENVIRONMENTALMANAGEMENT PLAN ............................................. 26
VIII. PPROCESS OF REPORT ........................................ 28
IX. ENHANCED PLAN FOR ABILITY OF ENVIRONMENT MANAGEMENT .31
X. ESTIMETED COST FOR ENVIRONMENTAL MANAGEMENT PLAN ...... 32
DAU GIAY II OKV SUBSTATION + TRANSMISSION LINE PAGE 3
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
ENVIRONMENTAL MANAGEMENT PLAN
I. PROJECT OUTLINE AND SCOPE OF WORK
1.1 PROJECT OUTLINE
- Title: Dau Giay 1 10kV Substation and Transmission Line
- Location: Dong Nai
- Scope of work and location of the project:
Table 1:
Scope of work and location of Dau Giay 110kV Substation and TransmissionLine
Location Size of safety Geographical scopecorridor
1. Quantity - The substation is - 3525m long, - Xuan Thanhlocated within An 40m wide communeOne (01) Loc rubber11 OkV- plantation, 1600msubstation and away fromtransmission lines Highway IA
(Xuan Thanhcommune, ThongNhat district).
- Construction area of the substation:8.500m2 .
- Construction area of the foundation. Construction areas and land condition f t l 2for transmission lines: 800m.
- Land condition: currently industrialfarming land (rubber plant).
3. Is there any part of the substation or - Nonethe safety corridor within 3km radius ofany nature preservation or naturalforest?
4. Is there any part of the substation or - Nonethe safety corridor within 300m to anyhistorical or cultural site?
5. Is there any part of the substation or - None.the safety corridor within 300m to thecentral of the commune (People's Industrial ZoneCommittee, schools, markets, healthy
DAU GIAY I 10KV SUBSTATION + TRANSMISSION LINE PAGE 4
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
centre), or within 2 km to residentialareas?
6. List of environment-sensitive items reported in (3)-(5).
Name of substation! location of Name ofNo. commune and district and corridor environment Distance
near environment sensitive items sensitive items
The substation is located within An The substation isLoc rubber plantation, 1600m away Dau Giay located within Daufrom Highway 1A (Xuan Thanh Industrial Zone Giay Industrialcommune, Thong Nhat district). Zone
(Table 1.1: Details on natural conditions of the project area and data from fieldinspection are explained in the project Investment Plan.)
1.2 PREPARATION OF CONSTRUCTION AREA:
- Clearance of construction area and safety corridor of transmission line- Preparation of construction area and locations of columns on connection lines
- Plane clearance is carried out manually, in compliance with Decree 106/2005/ND-CP, dated on 17/08 /2005 by the Government on reference to several termsin Electricity Law on safety protection of high voltage electricity grid projects.
- Before executing the project, Parts A and B must negotiate with governmentaloffices to assure fair compensation and to pay attention to environmental impacts inaccordance to current environment protection regulations.
1.3 COMPENSATION AND PLANE CLEANCE
- Clearance of construction plane and safety corridor is compensated inaccordance with Document 86 EVN/QLXD dated 06/01/2000 by Electricity Vietnam(EVN) on land acquisition and compensation in electricity construction projects.
- According to technical survey, there are no houses in the station andtransmission line construction area, and thus no relocation is required. Compensationwill be carried out after the People's Committee of Dong Nai Province issues formaldocuments. The construction are is industrial farming land and compensation pricewill be determined by the Project Management Committee, based on price issued bythe local People's Committee.
1.4 TEMPORARY CONSTRUCTION CAMP DURING CONSTRUCTION
- Temporary construction camp during the execution of the project will be builton farming land in the substation area. The camp will be built with flexible structurefor easy disassemble: brick foundation, wooden (or steel) columns, wooden beam, tinroofs, timber walls, cement floor, assuring hygiene conditions. The camp area will becalculated based on the number of workers on site. The camp comprises of: housing,utility buildings and offices. Number of workers are estimated as follows:
DAU GIAY I 10KV SUBSTATION + TRANSMISSION LINE PAGE 5
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
No. FACTOR UNIT QUANTITY
I Main group of construction workers person 50
2 Technical and management staff person 4
3 Service staff person 2
Total person 56
Criteria and areas
No. TYPE NORM UNIT CALCULATION AREA
Collective 4m2/person m2 52 x4 208housing
2 Staff housing *6 m2/person m2 6 x 4 24
3 Office 4m 2/person m2 4 x 4 16
4 Bathroom, toilets 1m2/6 person m2 56 6 9.5
5 Dining hall 1m2/3 person m2 56 3 18.5
Total m2 276
1.5 STORAGE:
- Materials (except sand, rock and pebbles) are stored in storage units anddistributed to construction sites by cars.
- Construction time is estimated to be 6 months; therefore, storage will be builtusing straws and bamboos. Sites will be covered by bamboos, surrounded by drainage.
- Closed storage units are used to store cement and electrical materials andaccessories. Open storage units are used to store iron and steel foundation materials,beam, and grounding wire. Outdoor area contains steel column, timber, sand, rock, etc.
Major construction materials and equipments
No. NAME TECHNICALQUNIYOTPROPERTY QUANTITY NOTE
I Bulldozer 1,89m3 1 filling
2 Truck 1OT 3 transporting materials
3 Excavator 0,25m3 digging
4 Crane 5-1 OT 2 equipment installation
5 Pond rammer 1,5 3 concrete mixing
DAU GIAY I 10KV SUBSTATION + TRANSMISSION LINE PAGE 6
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
6 Road roller 12T 1 Ram foundation
7 Water pump 2HP 1 Pumping water
8 Welling machine 100A
1.6 LEGAL FREAMWORK
1.6.1 Existing vietnamese legislations
- Environment Protection Law 52/2005/QH1 1 passed by the National Assemblydated on 29/11/2005.
- Decree No. 80/2006/ND-CP by the Government dated 09/08/2006 aboutdetailed regulations and instructions on implementing several clauses in EnvironmentProtection Law.
- Circular 08/2006/TT- BTNMT by the Ministry of Natural Resources andEnvironment on 08/09/2006, guiding on methods to assess environment strategies andeffects, and promises to protect the environment.
- Government Decree No.106/2005/ND-CP dated August 17th, 2005 onimplementation guidelines for some items stipulated in the Electricity Law onprotection of high voltage electrical networks.
- Government Decree No.24/2000/ND-CP on implementation guidelines of theForeign Investment Law in Vietnam (article 82), mentions environmental protection.
- Current Vietnamese standards.
1.6.2 WB policies
- OP 4.01 Environment Assessment.
- OP 4.11 Cultural Properties.
- BP 17.50 Information disclosure.
- Detailed guidance on assessment method and general impact of D/L projectscan be from:
- World bank, 1991. Book on Environmental assessment, third reprint.- Framework for applying environment safeguards to Rural Distribution Project.
DAU GIAY 1 OKV SUBSTATION + TRANSMISSION LINE PAGE 7
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
II. ENVIRONMENT IMPACT FILTER QUESTIONS
Table 2: Filter impacts on the environment caused by the Dau Giay 110kV-substation and transmission lines project
Filtering questions Yes No Description
Will the project cause
1. Clearance of green plane to obtain land - Plane area: 8.500M2.
for the substation and removal of big X - Width and length of safety corridor to be cleared: (40m x 3525m).
trees to create space for the safety - Type of trees to be clear: rubber trees.
corridor? Small impact.
2. Impacts on birds and botanical species? x - There are no protected birds and botanical species in the projectarea. Therefore, the project has no negative impact on natural life.
. I t - The project area does not have any living animals. Therefore, theproject has no negative impact on the ecosystems.
- The substation is situated within the industrial park. Whenconstruction is complete, there will be many high- and middle-power transmission lines into and from the station that may cause
4. Disfiguration of landscape? X small impact on the landscape of the industrial park.
- The 110kV transmission lines into the substation will go through therubber plant and therefore, cause no impact on the landscape.
- Water may be contaminated by waste from workers' activities.
discharged byqstafi and workers? X - During construction, there will be a certain level of waste fromworkers, but this is negligible and temporary. Assessed as small
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 8
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
Filtering questions Yes No Description
impact.
6 E o r - Relief feature in construction site is rather flat so erosion does not
6. Erosion risk? Ximpact.
- Dust is mainly generated in the plane clearance stage, as well as
transportation of materials, which will cause atmosphere
7 Increase of dust in the construction X contamination to the neighboring areas.
area? - However, these activities are temporary and discontinuous. The
impacts will cease when construction is completed. Assessed as
small impact.
- Construction equipments will cause an increase of noise; however,
8. Increase noise and/or vibration? X these activities are short-termed, and therefore, assessed as smallimpact.
- Transportation condition in the area is void asphalt concrete
pavement road system.
9. Damage to or degradation of - Regular vehicles used on the road during construction are tip-cars.aso o aand trucks ... (used for transportation of soil, materials and
transportation and infrastructure X eupet... ~equipments. ... )
systems?,- Scope of the project is not big, thus, intensity of vehicle usage is not
high. Therefore, assessed as no impact on the degradation of
transportation and infrastructure systems.
. W- During the execution of the project, construction waste is suitably10. Waste Issue? X discharged.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 9
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINHI CITY
Filtering questions Yes No Description
- Waste from camping sites will he collected and discharged atdesignated areas or anaerobically digested. Assessed as averageimpact.
- Permanently acquired area for the project is 8.500nM2 for the
substation and 800m2 for the foundation.11. Permanent land acquisition? X - Permanently acquired land is farm land.
Small impact.
- During construction, land is temporarily acquired.
- Temporarily acquired area is 1000m 2.
- Temporarily acquired land is farm land.
Small impact.
13. Is there any household need to be - There are no households affected by the construction of the
relocated? If yes, how many X substation and its transmission lines. Therefore, there is no
households? relocation. No impact.
14. Would the resettlement site isenvironmentally and/or culturally X - No relocation and resettlement. No impact.
sensitive?
- Construction site impacts to transport vehicles:+ Construction of substation: means of transporting equipment and
15. Obstructions to the transportation in the X materials or backfilling are not cause much impact to transport
Project 's site? vehicles.
+ Construction of 1 OkV transmission line and connection line:
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 10
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
Filtering questions Yes No Description
cause impact significantly to road and rail transport andsometimes cause traffic jam when stretching the line across the
road. Impact at medium level.* Traffics would be affected by construction of line: High way
Long Thanh - Dau Giay (in case this highway isconstructed before 110kV Substation Dau Giay), North-South Railway, Nation Road 1; transport vehicles: lorry,passenger car, motor... and train.
* High way Long Thanh - Dau Giay: 100-1 lOm wide,transport density is very high.
* Nation Road 1: 25-30m wide, transport density is very high.
* Railway: safety range is 5-1Om, transport density is notcontinuity, however railway is high priority.
16 Local flooding around executing area - The substation is based on a high area and shares the drainage
due to digging andfilling? X system with the industrial park, therefore there is no risk inflooding.
- Because the substation is located within the industrial park, there are
few locals and mostly workers in the park.17 Isthereanyriskofdisease - The 1lOkV transmission lines go through the rubber plant, where
dissemination from construction workers X there are no private households.to the local peoples (and vice versa) ?
- Therefore, there is no risk of disease dissemination from theconstruction workers to the local peoples and vice versa.
18. Safety risk and health effects on the x - During project's planning, safety measurements have been noted
community during operation of the and complied with legal regulations. However, risk of short-circuit
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE II
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
Filtering questions Yes No Description
station? exists, when workers do not follow the instructions laid out.Assessed as small impact.
19. Magnetic field causes interference with X - Because the station is located far from wireless information station,
radio waves. there is no interference.
20. Fire and explosion risk during X - Fire and explosion risk during operation of transformers caused by
operation? oil leak. Rated as small effect.
21. Land, air and water pollution from oil X - Oil leaks can cause bad affects to water and air environments. Rated
leaks from transformer? as small effect.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 12
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
III. MITIGATION MEASURES
Table 3 - Mitigation measures
No. Probable impact Applied mitigation measures Cost Responsibility
Construction phase.
- Use manual method to clear if applicable. Do not clear1. Clear the vagetable absolutely, try to remain vegetable blanket if it is still safe for
blanket to construct the transmisson line's and substation's corridor. Remain thethe substation or cut trees which their height is less than 4m. (belong secure range) Included in Contractors
down the big trees to construction costclear the corridor of Do not bum the branches at the place they are cut down.
the transmission line Lumping them in specified place or local resident will takeadvantage for agriculture purpose.
2. Undercut the natural i
landscape where the - Design the transmission line and substation as long as it is Included in Consultant
substation constructed aesthetic for industrial zone. designing cost
or the line goes.
3. Decrease the waterquality of water - Dig small holes in substation area to converge mud and dirtysource in construction land before it flows into road gully or out the substation area .
site due to dirty - If the construction is carried out in the rainy season or near Included in Contractors
water comes from water source, it is necessary to cover the soil, sand and bond construction cost
workers' camp or choke dike around them to prevent from pollution of water
where having dig or resource.level land
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 13
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCIH OF HOCHIMINH CITY
No. Probahle impact Applied mitigation measures Cost Responsibility
- Insure all trucks transporting dusty materials to/from the siteare covered in order to avoid dust and materials not dropping Included in
4. Increase dust in during the trip.InlddnCotaornearby area . . . construction cost
- Water spray dusty areas (construction site, roads etc.) duringhot, dry, windy conditions.
- All construction activity to be conducted during daytimehours. If evening construction is required, It is necessary tohave the agreement of local affected person and noise level
5. Increase noise and/or must be minimized. Included in Contractorsvibration, construction cost
- Use methods or equipments that generate low noise orvibrations.
- Truckers honk if necessary.
- Insure garbage, and waste water of workers'camp not causesanitary. Ex: we have to bond road gully reasonably inconstruction site, not leave litter freely. If there is no service
6 Iof collecting garbage, we have to bond digestion and bury6. Impact on air, water,
soil quality by garbage. Waste water must be treated in on-site treatmentsystem before discharge to the environment.
discharging Of Included inconstruction waste - All of solid waste must be collected and treated in appropriate construction cost Contractors
and waste of place.workers'camp - Contractor have to frequently clear away in site and around
camp.
- Set up a efficient supervision plan in order to ensure waste arecollected and treated obey the regulation.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 14
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
N Probable impact Applied mitigation measures Cost Responsibility
- Designing and calculating project logically to minimize n Electricity Joint-
permanent acquisition lands aims at not affect to cultivated desin ing Brach CofpH Clands, egmgcs BrnhoHoC
area or land owners' business. Minh City
S.Tmoayaqie - During construction, contractors need to have appropriate Included in8. Temporary acquired construction measure to minimize temporary acquired land. construction cost Contractors
- Restore temporary acquired lands as soon as possible.
- Having concrete construction plan and safety measures for Included inworkers during the construction. construction cost
- Submit construction plan to appropriate authorities.
- Minimize time of interrupting transportation activities.
- Execute the works in daytime.
- Putting up suitable traffic signboards in reasonable place(signboard of speed; signboard for driver and for guidance of
9. Affect to rural traffic transport when going by construction site). Contractors
- Assigning workers co-ordinate with local traffic police toregulate transport during the construction when stretching theline across the Nation Road 1 and high way.
- It is priority to railway; co-coordinating with localadministrator of railway (notice in advance about time andplace to execute, guidance of transport when going byconstruction site.)
Operation
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 15
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
Probable inpact Applied mitigation measures Cost Responsibility
1. Obstructions to the At crossing position in road and rail transport, design has to ElectricitykJoint-transportation in the obey regulation seriously and safety in operation and notice Included In stock Company -
Project's site? about the height of span and pole position. Minh City
2. Public health and - Approving officers have to be trained and executivesafety effects during absolutely electrical safety precautions. Included inthe operation of... ogaPwe
substation and - Frequently check, set up a maintenance program in order to yearly operation Dong Nai Power
transmission line, detect leaky and fix it in time during the operation. cost Company Limited
- Install notice-board at places where voltage is probability.
- Comply with fire regulations.
3. Explosion and fire - Frequently check and maintain fire equipment. Included in Dong Nai Power
hazard - Training and maneuver with support of appropriate authorities cost Company Limited
to reply fire and explosion hazard.
- Frequently check vehicles, machines to detect oil leaking ifany. Included in
- In case of oil leaking, area where oil leaking occurred must be designing cost Electricity Joint-
4. Contamination of soil, segregated and treated promptly and prevented from oil stock Company -
air and water quality spreading that can take negative effect to the surrounding Branch of Ho Chi
from oil leaking area. Included in Minh City
- Set up a maintenance program in order to detect timely the yearly operation Dong Nai Powerrisk of substation problem and oil leaking. Check the covering cost Company Limitedlevel of the pits.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 16
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
No. Probable impact Applied mitigation measures Cost Responsibility
- In the design stage, the altitude of the substation must beconsidered and bond choke dike around them to prevent oilleaking from spreading over.
- Check and set up a maintenance program in order to detecttimely the risk of substation problem and oil leaking.
- When oil leaking, immediately isolate the leaker and treat it,not to leave it overflow causing pollution.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 17
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
IV. URGENT SITUATIONS AND SOLUTIONS
Table 4 - Urgent Situations And Solutions
Risks Solutions Responsibility
- Contractor shall protect the site and report to the Construction
Supervisor/ Dong Nai Power Company Limited and localmuseum/ cultural management authority
- Delive the object found to local museum/ cultural managementauthority. - Contractor, construction
1. Find out objects which is supervisortocoordinatesupposed as old-age - Determine whether construction can be continued or halted for superaisor
objects. further investigation - Contractor
-~ The Directors of the provincial Department of Cultural and - All relevant authorities
Information and local Museum shall be responsible for thesubsequent handling of the objects found in accordance with
Article 21 of the Decree no. 92/2002 guiding the Implementationof the Law on Cultural Heritage
- Protect the site and report to local authority - Contractor
2. Find out tombs or skeleton - Determine who/where/how to address and propose next actions - All relevant authorities
- Implement the proposed actions - Those who are assigned to
3. There are complaints from - Fix the problem immediately if possible - Contractor
community about - Take note in log book - Contractor, Dong Nai
environmental problems . Power Company Limited
related to construction - Discuss-with the Employer/local authority where conflicts occur and local authority
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 18
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
Risks Solutions Responsibility
activities
- Carry out first aid where possible and transfer the victim the - Worker/people at the site
4 Accidents due to explosive nearest hospital as soon as possible and if necessary - Contractor, One member
materials leftfrom war - Protect the site and place warning site electricity Dong Nai ltd
- Prepare incident notes and local authority
- Carry out first aid where possible and transfer the victim the
5. Accident at bomb or mine nearest hospital as soon as possible and if necessary - Contractor, Dong Nai. . .Power Company Limited
left after the war - Protect the site and place warning siteand local authority
- Prepare incident notes
- Block off the scene .and inform to authority in charge. - Contractor and local6. Explosion materials
- Contact with the nearest army unit to get help. authority
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 19
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
V. CONSULTATION AND PUPLIC INFORMATION
Table 5 - Information Synthesis of public consultation
No. Component Consultation Date Attended Representative (Local authority and Summary of content andProject place people households) community's idea
Dong Nai Rubber Company
Mrs. Nguyen Thi Gai -Vice Director Discuss information about the
Mr. Chau Van Hiep General Director - project:Dau Giay Industrial Zone Joint Stock - Present the scope of the project
Company and the necessary of the project.
Mr. Nguyen Van Minh-Planing - The location of construction for
Manager the substation and connection
Dong Nai Mr Nguyen Van Thanh-Account line.
I Rubber 31/07/2007 08 Department - The problem of compensation
Company Mr. Ngo Tuan Khoi - Technical and resettlement
Deparment - The ability of invironment
Mr. Hoang Trong Viet Son - Capital impacts (impact to economic-
construction socio activity, air quality, noise,
Thong Nhat People's committee water) from construction stage to
Mr. Mai Van Hien - Office Manager of operation stage.
People's committee - Mitigation method
0: Tran Quang Tuan - Specialist
DAU GIAY 110KV SUBSTATION AND TRANSMISSION LINE PAGE 20
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
VI. ENVIRONMENT MONITORING PLAN
Table 6 - Mornitoring table
Wlhen
How is thePhase! Where is the parameter to parameter to
Environmental What parameter is to is the parameter to be monitored/type be monitored- Cost Responsibility
Issue be monitored? of monitoring mrementeqimet measurement
equipment? or
continuous?
Construction phase
-Included inconstruction - Contractors.
cost. - Construction
1. Clear - Engineering and corridor of the ltime/aweek -Included in Monitoring
away range transmission line Ob .t in the first construction Consultant
vegateble/ - How to treat to - Where to gather month; then supeo ising - Safeguard
cut trees branches and cut branches and cut monthly cost. Independenttrees. trees - Included in elnvironmen
environment t Monitoringsupervising Consultantcost
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 21
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
- Included inconstruction - Contractors.
- Current state of the Weekly(when cost. - ConstructionWekl (we - Included in Monitoringroad, the traffic transporting cuctin Constant
2. Rural density. equipment, construction Consultant
Traffic - Quantity of means,- Along the street Observation material to Supervisor - Safeguard
load, density in construction cost. Independenttraveling in the road. site) -Included in Environmen
environment t MonitoringSupervisor Consultantcost.
- Included inconstruction - Contractors.
- Drainage in - fn the -substation, cost.construction site, alongh corridor, - Construction
3. Quality of mud collecting water resource - Included in Monitoring
water, - The weather when near the When and after construction Consultant
hydraulic- digging. construction site; Observation heavy rain. Supervisor - Safeguard
fill and - Degree of clearance. substation, poles cost. Independent
scour in acclivous -Included in Environmen- Grade in relief. environment t Monitoring
construction site Supervisor Consultant
cost..
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 22
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
- Included inconstruction - Contractors.
- Check the covering - When cost. - Construction
level of the pits and transporting Before/when - Included in Monitoring
4 Dust, air leak tightness - Civil buildings construction Consultantand other Observation transporting in suevin
pollution - Check ability to a n s ner hot, dry, windy supervising - Safeguard
dispersionconstructions near days. cost. Independent
mound and bank the construction -Included in Environment
site. environment Monitoring
supervising Consultantcost..
- Noise from means,constructionmachines and from - Concered
the preparation of Cause noise department
construction. - Civil buildings, Interview local during Project hired by
5. Noise , , ,. . construction management Dong Nai
- Time to carry out along the lne, resident when having board 's cost Power
construction, complaints Company
discharge Limited
equipments,materials.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 23
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCHI OF HOCHIMINH CITY
-Included inconstruction - Contractors.cost. - Construction
ad - Included in Monitoring
6 Sanitation - Waste of living, - Drainage, camp Weekly and construction Consultant
in construction waste, and where the O before the . .
constructi waste water in garbage and waste Observation acceptance of supervising - Safeguard
on site construction site. treated. work cost. Independent- Included in Environmentenvironment Monitoringsupervising Consultantcost..
- Meeting for
populating labour Temporary camp. -Included in
7 tE enf - Where building construction - Contractors.
w orkeruamb nc erv foundation or Observation, Weekly and cost. - Construction
worker ambulance service, stretching interviewing, seeing before -Included in Monitoring
and where storing, transmission line. records. construction construction Consultant
people remaining dangerousmaterial, fuel. - At crosses with Supervisor
- Notice board in roads and railway cost.
dangerous place.
Operation phase
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 24
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
1. Electric -Included in Dong Nai
field and - Power of electric - Civil buildings to havincludedin PowerElectrometer/torque- When having yearlyPoe
electroma field and power of be nearest the .gn ti elcrmgei.fed crio coil magnetometer complaint operation Company
gnetic electromagneticfield corridor cs iie
field cost Limited
- Degree of noise. The -Included in Dong Nai
distance from . Inlue in Power. - The nearest civil When having yearly Compn
2. Noise substation to the buildings. Use counter CompanyUs counterdgs complaints operation Lite
nearest civil cost.Lmted
buildings.
- Management team _ Management Dong Nai
of substation's check Office of -Included in Power
3 Safety and maintenance Substation Seeing record/plan 6 yearly Company
S - Equipment for fire _ Operation Observation months/yearly operation Limitedprvnin and -Oeaoncost
prevention departmentunburned equipment.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 25
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
VII. IMPLEMENTATION RESPONSIBILITY FOR ENVIRONMENTAL MANAGEMENT PLAN
Table 7 - Implement Responsibility for Environmental Managing Plan
No Parties Main responsibility
1 Contractor - Carry out the mitigation methods proposed, report to Project Managing Unitimplementation of mitigation methods.
- Inspect and evaluate the mitigation methods according to contractors' propose and
2 Construction Monitoring Consultant inspect the implementation of project causing affect to environment; verify the effect
of reporting procedure and have the necessary proposes aim at raising the
effectiveness in implementation of environment engagement.
3 Local authority and community in - Supervise and solve the environment problem.(waste, dust, noise, traffic, clearance
project sector. for the project)
- Frequently inspect the implementation of the mitigation methods during the
construction and operation.
- Inspect and evaluate environment quality based on figure and requirement proposed
in the report.
Safeguard Independent Monitoring - Specify ensuing environment problems.
Consultant (SIMC) - Organize the meetings of public consultation to record local people's feedback and
evaluate about Environmental Management Plan of the project.
- Evaluate participation rate of local authority in supervising and solving environment
problems.
- Write report for each stage and judge of changes and differences in carrying out
Environmental Management Plan or of supervising work. In parallel, write internal
A GY 1V
DAU GIAY I I10KV SUBSTATION AND TRANSMISSION LINE PAGE 26
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
No Parties Main responsibility
report and raise warning or measures in mitigation environment's affect.
- Take general responsibility in synergy and managing the execution of the project,
5 Dong Nai Power Company Limited guide and direct to execute Environmental Management Plan and ensure to supply
the execution cost.
6 Resource and Environment agency - Supervise and solve the environment problem.
- Take the highest responsibility towards management project as well as environment.
7 E VN - Organize and attend training class, seminar to improve the experience in the
implementation of Environmental Management Plan and to share experience.
- Inspect and evaluate the effectiveness of supervising system in the implementation
8 WB of Environmental Management Plan of: Project Management Unit, Dong Nai Power
Company Limited, Vietnam Electricity and others.
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 27
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
VIII. PPROCESS OF REPORT
Table 8 - Process of report and representative example of supervising report
VIII.lPROCESS OF REPORT
Type Writer Receiver Schedule
Contractor Dong Nai Power Monthly
Contractor 's report for investor CompanyLimited
Construction Monitoring Dong Nai Power Monthly
Construction Monitoring Consultant Consultant CompanyLimited
Safeguard Independent Dong Nai Power Monthly
Report of Safeguard Independent Monitoring Consultant Monitoring Consultant CompanyLimited
Representative in local resident Dong Nai Power Monthly
Report of community monitoring (if any) CompanyLimited
Report of Dong Nai Power Company Limitedfor the Dong Nai Power Company Vietnam Quarterly
implementation of Environmental Management Plan Limited Electricity
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 28
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
VIII.2 SAMPLE OF MONITORING REPORT
Monthly Environment Monitoring Report
(Contractor's report for Dong Nai Power Company Limited)
Project's name: Location of the project:
Executive Unit:
Data of commencement Date of writing:
No. Impact Implemented mitigation methods Remarks
Clearance of vegetable to obtain landfor the
1 substation and removal of big trees to create
space for the safety corridor?
2 Undercut the natural landscape where the
substation constructed or the line goes.
Decrease the water quality of water source in
3 construction site due to dirty water comes
from workers' camp or where having dig or
level land ?
4 Increase dust in nearby are ?
5 Increase noise and/or vibration?
Sanitation in construction site due to
6 construction waste and waste of workers'
camp?
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 29
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
No. Impact Implemented mitigation methods Remarks
7 Permanent land acquisition?
8 Temporary land acquisition?
9 Affect to rural traffic?
10 Cause accidentfor workers and local resident
in construction phase?
Reporter
Job title:
Tel: Email:
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 30
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
IX. ENHANCED PLAN FOR ABILITY OF ENVIRONMENT MANAGEMENT
Table 9 - Enhanced Plan for Ability of Environment Management
Content Learners Quantity Time Organizer Cost
Training class of Viet - Staff of Dong Nai - Before carrying out Viet Nam Electricity
Nam Electricity Power Company t proje Tyme ofn i k L the project. Time of coordinates with 1000
(i inmkno training course is Environment Consulting USD/personof environment about 3 days. Unit .
management)
Training class of Dong - Staff of local power - Before carrying out
Nai Power Company company in charge the project and after
Limited of operation; the training course Dong Nai Power Company
(training in safety and authority 3 s in knowledge of Limited coordinates with 1000
supervising method representatives person environment Environment Consulting USD/person
and report of concerned. management Time Unit
environment plan) of training course is
about 1 day.
Total 2000 USD
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 31
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLAN
BRANCH OF HOCHIMINH CITY
X. ESTIMETED COST FOR ENVIRONMENTAL MANAGEMENT PLAN
Table 10 - Total Cost for Environmental Management Plan
No Content Construction phase Operation phase
1 Carry out mitigation measures. Calculated in construction contract Included in yearly operation cost
2 Frequently supervise environment during Calculated in Construction
the construction. Monitoring Consulting contract
Supervise in construction phase by
3 Independent Environment Monitoring 2000 USD
Consultant
4 Training to enhance ability 2000 USD
Total 4000 USD
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 32
ELECTRICITY JOINT STOCK COMPANY ENVIRONMENT MANAGEMENT PLANBRANCH OF HOCHIMINH CITY
APPENDIX
DAU GIAY I 10KV SUBSTATION AND TRANSMISSION LINE PAGE 33
Existing and proposed protected areas in Dqng Nai provinceCatc khu bao ve hien c6 v'a de xu%t 6 tinh Dong Nai
- L
wAf~ £swAj$ ^taWua
AHItIr. 4h IQuui
.0 : W Linh
| TiAn UylSn A T SJnhl linh:
r -, ** --- o kF ieal7l3
6Th6ng.Nhit|
o ' i* ~TP. EnH
a J T- niPhd4A ~qrJJA
huAQun OttUn
A Long Sntf
utr1XuUJn Loc -J O
L nhLong Thi- - 4
I LI -0 m T. nn . : e
Gh bUDOCCt 4d
inX D1u&O JSISa!Gi -. * .. Binh Ch, 0 sufu|Vegeatation type I Kieu rfing Legend I Chi6 gia'i
nEw Trhreen foresi n Ring ihL ng Kanh Proiecied area I KHhu bao vCo 1iferou fous I~S fRZng lb kim Provi ncial bord-r f Ra n h gi-bi i-in hDeSdduous foresi I Ri ng rung Ica (kh6p) U ~Dsifici border I Ra n h gi6i h uy6n
*Ser ni-deciduous foresi f FRSng riDa rung la*Lim esione foresl t RUng nui dA
Bar nboo I RSjng ire ritfaN Pla naliohn foresh f Rng lr rng N
GrasIsla nd a1nd scrub I E16 ir'ong f
Agr ic ull ural1 la nd f OM n6 ng ng hiep W E*Waier bodies I ci nufubc;* E ngreve fI Re ng ngap mlhan a| Planleali fI U Ring lrnm
BOVLO.TTr" LNCj INCi * LtL l-KWrung,~~.-RCL4 I %b N9 Xng w- ,t , '- fs \S
II-
LNC ItNC
iI
LBK LQ NO NOL
1 0 Kt' t-;>t>L¢/r §LNC2 NtiLN;(hO3 1 X62
-$LU ¢*,# ̂lCJ -BRANO -} L\I 8 CITY DAU GIAY 11OkV SUBSTATION +rJINTSGK9 TRANSMISSION LINENOE r /7
- - - - - EXISTING 110W IiRANSMISSION LINE BAUEU LOll KIAN I 1L1 4 I I- l TOR I5 ;iPl VN h
110kV TRANSMISSION LINE WDHMECTIMG WTH DAU hAY SUBSTATION ,@tfIl- .liAGER BUI P IT' POINT OF PROJECT AREA- DAU GIAY 110/21kV) SUBSTATION m -. 1 r - r 1- 4E .U P.U . . N|C.BHKf : 'N1 Y HU C N AN E M LD.06 0 .01
iti - II 150000 O1
1 2 1 3 1 4 AL 5 6 1 7 8
01. 20 DiDI A LAT
At DAU GIAY TOWN /
AA|THONG NHAT DISTRIC -DONG NAI PROVINCE A1 |4 II- la, 110kV OVERHEAD LINE (EXISTING)
B .T1 t 1t U~7E Mi-
\_- Tr 18 0
CIPHER 7!B() MUNICIPAL CENTER
Oj PALACE O CLLTURE |E SPORT
/I / STARU YB
(/) PARKSTAJnT TCKCMPN |TANMSSO LN
C D TRA NSMEISION LINE LOCI
| ICSIRETR |NUYEN VUOAN G N
1CHECE TRAN VAN | SCALE 01
1 N2'1 I4 (M) 56
UY BAN NHAN DAN CQNG HOA XA HQI CHUJ NGHIA VI$T NAM
TINH D6NG NAI DUc lip - Tir do - Hanh phuc
So&A, '/TJBND-CNN Bien Hda, ngay 04 thdng 01 ndm 2007
V/v th6a thuan vi tri tram llOKV
Diau Giay vi hu6ng tuyen du*rg diyahAnh re I IlOKV du noi viao tram.
Kinh gCri:- Giam doc S& Cong nghiep;
- Giam doc GBng ty Dien luc D6ng Nai;
- Giam doc Gong ty co phan Dien Hi NMi.
Sau khi xem xet Van ban 10721SCN-ON ngay 13l/212006 cu.a Sa
Cong nghiep ve viec th6a thuan vi ti tram I I OKV Diu Giy va htrng tuyen
duarng diy nhanh re 11 iKV dau n6i vio tram (c6 y kien th6ng nhat cua cac
nganh, dia phu(mg vi don vi lien quan tai Van ban s6 997/SCN-DN ngaiy
27/11/2006 cuia S& cang nghiep); Chui tich IJBND tinh c6 y kien nhur sau:
1/. Thong nhat vi tri tram 110KV Dau Giay va hua6ng tuyen du6ng
day nh&nh re 110KV diu n6i vao tram the hien tren bin ve mat bang tuyen s6
LD.06.05.DT.01 thang 12/2006 do Cong ty c6 phan Dien Hi NMi Ip (dinh
kem).
- Th6a thuan vi tri tram va hrmng tuyen du&ng day neu tren la cc s&
phap 1y cho Cong ty c6 phan E)ien Ha N6i trien khai Idp ho sa thiet ke hoin
chinh trinh duyet theo quy dinh.
21. ChCi dau tu, dan vi tur van thiet ke, don vi thi c6ng c6 trich nhiem
phoi hap chat cha v&i cac nganh, dia phuang lien quan trong qua trinh trien
khai th,uc hien cac butrc tiep theo, dam bao dong tien df quy dinh vi phu hrp
quy hoach dtrac duyet.
KT. CHIJ TICHNao nhdn: PHG1 CHU TICH
-Ch itch vi cx Phc Chu tich UBT;-Sa XD. GTVT;.- UBND huy4n Thdng NhAt;-C&ng ry Cao su Edng Nai;-ChinL, PM6 Vn ph6ngCN.-N;- Luu: VT, CNN.
- D QuAc Thii
SS 02, Nguyi Vsn Tl. P. Thanh Binh, TP. Bien H&ITEL: (061) 3=501 - FAX: (061) 3823854 - 3824934
UY BAN NHAN DAN CONG HOA XA HOI CHU NGHIA VIET NAM
HIUYEN THONG NHAT DUc lip - Tiy do - Hanh phuc
So:,j41q /GXN.UBND Th6ng Nhat, ngyI/ th6ng g nam 2007
GIAY XAC NHAN DANG KY
BAN CAM KET BAO VE MOT TRIYONG
cuia Dur an: Lu6i di6n phan phAi nOng th6n
Dir an thanh phan: Tram 1 1 OKV + Nhanh re Dau Giay
CHU TICH UBND HUYEN THONG NHAT
XAC NHAN:
Dieu 1 . Xac nhan noi dung ban dang ky cam ket bao ve moi trtrang cuiaCong ty TNHHMTV Dien luc DOng Nai; Dd.ng ky ban cam ket bao ve m6i
trtr&ng cuia dir an Luai dien ph.n ph6i nong thon. Du an thanh phan tram 1 OKV
+ nhanh re Dau Giay, tai xa Xuan Thanh, Huyen Thong Nhat. Ban dang ky' kem
theo cong vatn so 1935/CV-DLDN8 ngay 06/8/2007 do ong D6 Huu Hoang -
Ph6 Giam DOc cong ty da cam ket.
Dieu 2. Chui Du an co trach nhiem th,uc hien dung va day dui nhung noi
dung ve bao ve moi tnrwang neu trong ban cam ket bao ve moi truarng.
Dieu 3. Ban cam ket bao ve moi truarng c'ua Du an la co s& de cac co quan
quan 1 nha nuac ve bao ve m6i trua&ng giam sat, kiem tra, thanh tra viec th,uc
hien bao ve moi tnr6ng cuia Dir an.
Dieu 4. Giay xac nhan nAy c6 gia tri ke tur ngAy ky./.
Nai Nhatn: TICH- S& TN-MT; /@ g%.,:- Ph6ng TC-KH; // /^ 'k- Ph6ng TN&MT;- DIC LiEn PCT UBND huy8n;- Chanh, Ph6 VP;- Chu doanh nghiep;- Luw VT+TH (KT). anP g Dung
CHI NHANH CONG TY CQNG HOA XA HQI CHUI NGHIA VIET NAMCO PHAN DIEN HA N(QI DOc la.p - Tit do - Hanh phuc
BIEN BAN LAM VIEC
Ve viec: Thoa thua.n khoi liking cay cao su phat quang trong hanh langtuyen dtdIng day 110kV v'a vi tri TBA 110kV Dau Gidy.
Cong trinh: Tram bien Ap 110kV Dau Giay va nhanh re
Horn nay, ngay _,4 thang 07 nam 2007, tai Cong ty Cao Su DOng Nai, daidie.n cua hai dd$n vi CN - CUng ty Co Phan Dien Ha Noi va Cong ty Cao Su Do6ngNai gap ga trao doi khoi luidng cay cao su can phat hoang cu'a vi tri TBA 110kVDau Giay va cac hang lang tuye'n dtr'ng day l10kV theo Bien ban cuoc hop so997/SCN-DN ngay 27/11/2006 tai Sa Cong Nghiep ve viec xem xet vi tri TBA110kV Dau Giay va nhanh re va Can cu cong van so' 96/UBND-CNN ngay04/01/2007 cua UBND tinh D6ng Nai ve vie.c thoa thuan vi tri TBA 110kV DauGiay va hu¶dng tuyen dudng day nhanh re 110kV.
Thanh phan go-m co:
1. Dai dien Cong ty Cao Su Dong Nai:Ba: Nguyen Thi Gai Chutc vu: P. Giam DocCacng dia dien cac ph6ng: P. Ky thuat Cao su, P. Xay dung cd bain, P. Ke
hoach vat tu', P. Tai chinh Ke toan va COng ty CP KCN Dau Giay.
2. Dai dien Chi Nhanh Cong Ty Co Phan Diien Ha N6i:Ong: Tran Van Hieu ChCfc vu.: Giam Do6cOng: Bii Phuic Trfnng Chu'c vu,: T. Ph6ng TK Dien
Sau khi trao doi vac di thu'c dia cong trinh, hai ben tho"ng nhat noi dung sau1. Ve vi tri TBA 110kV Dau Giay:
Vi tri tram n'am trong dien tich Nong trutng cao su dau Giay cach Quo"c 1l IA1.600m thuoc xa Xuan Thanh, huyen Thong Nhat, tinh Dong Nai. Die.n tich phatquang IA : 11.550m2. So cay cao su phat quang khoang: 645 cay cao su (555/lha).Kho'i lira c,u the' se dujc chinh xac lai trong qua trinh tie'n hanh cone tac den bugiai t6a.
2. Ve Hanh lang nhanh re 110kV:Chieu dai tuye'n 3.521 m. diem dau noi (DN) nam trong khoang tru T79 - T80
cua du'6ng day dtftng day 110kV Long Binh - Loteco - Tho'ng Nhat - Long Khanh- Xuan Trnfdng, tai vi tri nay tuyen Iai phai g6c 90" di song song vdi dufdng cao toC
1/'
Tp.HCM - Da Lat (cach 500m) vA Quoc L6 20, tuyen vuidt Quoc 1l 1A, viuct diu'ngsat Bac Nam vA den diem GI g6c 900, doan ti die7m dau noi den GI dai khoang2.901m. Tr day tuyen di thang vao TBA, v1ldt qua diudng cao toc Dau Giay - Dalat, doan tl' diem GI den diem cuoi (DC) dai khoang 620m.
- Toan tuyen duding day di trong phan dat cao su cua C6ng ty Cao su DongNai. Phan doan tuye'n a nh httdng cao su dai 3.506m vdi hanh lang tuyendufdng day Ia 40m, moi ben lA 20m nhiu sau:
+ Tu' tim tuyen ra moi ben 5m (canh tay xa tru neo 5m moi ben).
+ Chieu cao cay nga vao dtng day la 15m (da bao gom 4m hanh langan toan dien).
- Dien tich phat quang lA: 140.240m2 . So cay cao su phat quang khoang:7.783 cay cao su (555/lha). Kho'i ludng cu the' se duf'c chinh xac lai trongqua trinh tien hAnh cBng tac den bui giai toa.
Cong ty Cao Su Dong Nai c6 van ban bao cao vdi Tap doAn C6ng nghiep CaoSu Viet Nam ve hAnh lang tuyen duidng day vA TBA 1 10kV Dau Giay. Khi c6 daydu H6 sd Phap 1l.
3. VSn de den bu hanh lang tuyen:
Viec den bu: Odn gia den bu cay cao su, dat chie'm dung vinh vien vA hanhlang tuyen dudng day 1 10kV du'dc ap dung theo qui dinh vA ddn gid cuia UBNDtinh Dong Nai vA Tap doAn Cao su Viet Nam.
D/D. CONG.-TY CAO SU DON DID. CHI NHANH CONG TY/ ~. '4 lN HA NQI
( .) ')/ t S. ~4Lr;rfu
:.A 4t- .
NGUYEN THI GAI TRAN VAN HIEU
2/2
CQNG HOA XA HQI CHU NGHIA VIIET NAMDoc lap - Tuf do - Hanh phu'c
BIEN BAN CUOC HQP THAM VANVe viic:
- Pho bien th8ng tin va cac Ke hoach Den bii ti dinh cu cu'a D.t an;- Cac van de liEn quan den Ke'hoach quan If moi truding.
Cong trinh: Tram bien Ap ll OkV Du Gidy vai nhdnh re.
Hom nay, ngay thdng nam 2007,
Dia diem: tai Cong ty Cao Su DE)ng Nai.
Thanh phdn go'm co:
1. Daididn C8ngty CaoSuD6ngNai:Ba: Nguyen Thi Ga i Cht'c vu : P. Giam DocCung dia dien cac ph6ng : P. Kg thuat Cao su, P. Xay dtrng co ban, P. Ke hoach vat
tu', P. TAi chinh Ke toan vA Cong ty CP KCN Dau Giay.2. Dai dien UBND huye.n Tho'ng Nha't:
Ong: ..... Chu'c vu:Ong: <-* Fvn Chuc vu: .'.,,l .4?.2..
3. Dai di&n Chi Nhanh Cong Ty Co Phan Din Ha Noi:Ong: Tran Van Hieu Chuc vu: Giaim D6cOng: Bui Phuic Trtfdng ChuYc vu: T. Ph6ng TK Dien
Cdn c[?:
- Bien ban cu6c hop so 997/SCN-DN ngay 27/11/2006 tai SO Cong Nghiep ve viecxem xet vi tri TBA 1 10kV Dau Giay va nhanh re.
- Cong van so' 96/UBND-CNN ngay 04/01/2007 cua UBND tinh D6ng Nai ve viecth6a thuan vi tri TBA 110kV Dau Giay va htfdng tuye"n dLrdng day nhanh re110kV.
Do vi tri xay du.ng tram bie'n ap 1 10kV Dau Giay va nhanh re n-am tren phan da"t doCUng ty cao su Dong Nai qudn 1I nen cac ben tien hanh trao doi vdi cac no,i dung sau:
+ Trinh bay so hlut ve qui mo va su c-an thie't cua Diu an;+ Vi tri xay durng tram bien dp, tuye"n duifng day da'u noi vao tram,+ Cac va'n de lien quan d-en den bu tAi dinh cu de thufc hien duf an;+ Cac tac dong moi trudng dtfcic dut doan la c6 the xay ra (tac dong d-e'n hoat
dong kinh te xa hoi, chalt uLdflg khong khi, tie'ng on, moi trudng nu'dc...) tifkhi Du an trien khai thi cong xay du.rng de'n giai doan van hAnh.
1/2
+ Bien phdp giam thieu cac anh hirang cuing nhiu cac tdc dong cu'a Dif' n de'nm6i tru'8ng xung quanh.
Sau khi trao doi hai ben tho'ng nhat nhulsau:
- C6ng ty cao su D6ng Nai se tao dieu kien thuan li trong qua trinh thiuc hien den buicho di an.
- Trong qua trinh thanh 1y cay, Cong ty cao su Dong Nai dam bao sao cho kh6ng lamanh htf6ng den m6i truLdng xung quanh, thLrc hien cac bien phap giam thieu cac anhhutfng cing nhir cac tdc dong neu c6 (nhur sau khi don ha phai sdm tien hanh dichuyen kh6i khu vitc dtu dn; khong d6t lI cay canh cay tai cho, ma phai tien hanhthu gom tap trung va xuf 1y chon la'p dung quy dinh; kh6ng su' du. ng cdc dung cu d-onha cay gay tieng on qud mu'c do cho phep theo qui dinh ...)
- Cong ty Cao Su D6ng Nai c6 van ban bao cdo vdi Tap doan Cong nghiep Cao SuViet Nam ve hanh lang tuyen duWrng day va TBA 1 lOkV Dau Giay, khi c6 day duHo so Phdp 1.
- Trong qud trinh thi cong va van hanh dir dn c6 cdc tdc d6 ng, ainh hutng bdi dif dn,thi ddn vi Chu' dau tui, don vi van hanh se thuLc hien bien phdp giam thieu cdc tdcdong sau cho kh6ng lam anh hiring den moi trti$ng xung quanh Du' dn.
Cdc kien nghi
- Cdc birdc thilc hien phai theo dung qui dinh hien hanh.
- Trong qud trinh thtfc hien neu c6 gap tr6 ngai, cdc ben se cung phoi hop giai quyet.
Bien ban ket thuic luc ...... gi.d. cng ngay, Bien ban daoc lap thanh 03 bo giongnhau co doc lai cho nhuYng thanh vien tham gia dui hop cuing nghe va thong nhat ky ten.
D AI DIEN DAI DIEN DAI DIEN/ NGjTiAO SU DON0I UBND HUYEN TH6NG NHAT CHI NHANH CONG TY
-- rx<t 4 w \tz,\ - m,-CO A,N E)IEN HA NQI)
-WA e-!(.' t' 'r% 4ji n fi6n
TRAN VAN HIEU
2/2
DANH SACH CAC THANH VIENTHAM GIA CUQC HOP
Ve viec:
- Pho bien thong tin va cac Ke hoach Den biu tai dinh cu' cua Dtu an;
- Cac van de lien quan dMn Ke' hoach quan 1y moi trt'dng.
Cong trinh :Tram bien ap 110kV Dau Giay va nnh re, tinh Dong Nai.
Thii gian Ngayo-/.thang..O).i..nam2007.
Dia die-m :Cng ty Cao su Dong Nai.
STT HQ VA TEN CHLC VIlJ KY TEN
Cong ty Cao Su Dong NaiI / -I,,
- /I1t)v/,ed 1jOd (Al', /'t' Ca' __W,1
6- J_______-t---=2 < -t -f t -
9
UBND hitybi Tholing Nliti
1 I \d/ rti (-6"ct'e /,67 vLYb)l2
3
Chii Nlhdnlh Cong Ty Co P/ha'i Din Hti Noi
I Nguyen Van Trinh P. Giam DE)c
2 BMi Ph6c Trdtng Tp. Thiet ke"
CUQC HOP THAM VAN CQNG DONGDIA DIEM: VAN PHONG CONG TY CAO SU DONG NAI
THIT GIAN: NGAY 31 THANG 7 NAM 2007
-. L I 1-
4 ''
- -0
v*