Procurement Plan, RRP-II: Bihar Page 1 of 36 Procurement Plan for the project Rural Roads Project -II (PMGSY) For Bihar This is an indicative plan prepared by the Project for the entire project period. The Project shall update the Procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during negotiations I. General 1. Bank’s approval Date of the procurement Plan xxxxx, 2014 2. Date of General Procurement Notice issued for Consultancies only:xxxx. 3. Period covered by this procurement plan: For the entire project period II. Goods and Works 1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold US$ Comments GOODS, EQUIPMENT & MACHINERY 1. Goods and Equipment estimated to cost equivalent of US$ 300,000 or more per contract ICB All contracts World Bank SBD will be used and the procurement will be as per procedures described in World Bank Guidelines 2. Goods and Equipment estimated to cost less than US$ 300,000 and greater than US$ 100,000 equivalent per contract NCB First contract for goods for each state , irrespective of value and all contracts estimated to cost more than US$ 200,000 equivalent per contract The NCB bidding document agreed with GOI will be used and the procurement will be as per procedures described in the Procurement and Contract Management Manual. 3. Goods and Equipment estimated to cost less than US$ 100,000 equivalent per contract Shopping procedure with at least three quotations from qualified bidders in accordance with the All post review 95048 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized

Transcript of World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2....

Page 1: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 1 of 36

Procurement Plan for the project

Rural Roads Project -II (PMGSY)

For Bihar This is an indicative plan prepared by the Project for the entire project period. The Project shall update the Procurement Plan annually or as needed

throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional

capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during

negotiations

I. General

1. Bank’s approval Date of the procurement Plan xxxxx, 2014 2. Date of General Procurement Notice issued for Consultancies only:xxxx.

3. Period covered by this procurement plan: For the entire project period

II. Goods and Works

1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in

Appendix 1 to the Guidelines for Procurement.

Expenditure Category Procurement Method Prior Review Threshold

US$

Comments

GOODS, EQUIPMENT & MACHINERY

1. Goods and Equipment

estimated to cost equivalent of

US$ 300,000 or more per

contract

ICB

All contracts World Bank SBD will be used and the

procurement will be as per procedures

described in World Bank Guidelines

2. Goods and Equipment

estimated to cost less than

US$ 300,000 and greater than

US$ 100,000 equivalent per

contract

NCB

First contract for goods for

each state , irrespective of

value and all contracts

estimated to cost more than

US$ 200,000 equivalent per

contract

The NCB bidding document agreed with

GOI will be used and the procurement will

be as per procedures described in the

Procurement and Contract Management

Manual.

3. Goods and Equipment

estimated to cost less than

US$ 100,000 equivalent per

contract

Shopping procedure with at

least three quotations from

qualified bidders in

accordance with the

All post review

95048 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 2 of 36

provisions of paragraph 3.5

of procurement Guidelines.

Procurement through

DGS&D rate contracts will

be considered equivalent to

shopping procedure.

4. Goods and Equipment that

meet the requirements of

paragraph 3.6 and 3.7 of

Procurement Guidelines.

Direct Contracting Upto US$ 10000 post review

and balance prior review

CIVIL WORKS

5.

.

Civil works contracts

estimated to cost more than

US$ 10,000,000 equivalent

per contract

ICB *

All contracts World Bank SBD will be used and the

procurement will be as per procedures

described in World Bank Guidelines.

6.

Civil works contracts

estimated to cost up to US$

10,000,000 equivalent per

contract

NCB

First contract for works for

each state, irrespective of

value and all contracts

estimated to cost more than

US$ 5,000,000 equivalent

per contract will be subject

to prior review by the Bank.

All other works contracts

will be subject to post

review.

The procurement will be done as per

procedures described in the Procurement

cum Contract Management Manual and

using the « Model Bidding Document »

cleared by the Bank

* As per current planning, no ICB contracts are envisaged for civil works.

2. Pre-qualification. Not Applicable

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable

4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum contract Management Manual is already circulated

by NRRDA after taking WB into confidence. All procurement in the project will be done as per procedures described in it. .

Page 3: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 3 of 36

5. Any Other Special Procurement Arrangements:

The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be

conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

Only the model bidding documents for procurement of works through NCB agreed with the Bank (and as amended for time to time),

shall be used for bidding;

No special preference will be accorded to any bidder either for price or for other terms and conditions when

competing with foreign bidders, state-owned enterprises, small scale enterprises or enterprises from any given State;

Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated

bidder;

The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project;

However, as an exception in this project, two part bidding for NCB

works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards(e-

procurement system and complaint handling mechanism acceptable to the Bank)

All procurement of works through NCB in the eight participating states will be done through a standardized e-procurement system

acceptable to the Bank.

As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of

bidders, suppliers and contractors will be included in the bidding documents.

Page 4: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 4 of 36

III. Selection of Consultants

1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix 1 to

the Guidelines Selection and Employment of Consultants:

Expenditure

Category

x

Value threshold per contract

Selection Method Prior Review Threshold

Consultancy

contracts to be

awarded to

Consultant firms

including

selection of

training institutes

by

NRRDA/SRRDAs

Each contract estimated to cost

US$ 200,000 equivalent or

more per contract

-Quality and Cost Based (QCBS) method

-REOI to be published in UNDB on line

All prior review.

Each contract estimated to cost

less than US$ 200,000

equivalent per contract

-Quality and Cost Based (QCBS) method

-Quality Based (QBS) method of selection

in accordance with the provisions of

paragraph 3.1 to 3.4 of Consultant’s

Guidelines.

-Consultant’s Qualifications (CQS) method.

-Least Cost Method (LCS).

-Fixed BudgetMethod.

-Single Source Selection

All single source selection of

consultants with estimated cost

of more than US$ 30,000

equivalent per contract will be

subject to prior review. All

other contracts will be subject to

post review but with TORs

subject to prior review by the

Bank

Individual Consultant

estimated to cost less than US$

30,000 or equivalent per

contract

-Through comparison of qualifications of at

least three candidates.

-Sole Source Selection

All cases subject to post review

but with TORs subject to prior

review by the Bank.

All contracts for single source

d\selection of individual

consultant will be subject to

prior review.

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent

per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Any Other Special Selection Arrangements: NIL

Page 5: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 5 of 36

Rural Roads Project II Procurement Packages with Methods and Time Schedule

Procurement Plan with Methods & Time Schedule for 12 Months period starting December 13 - for CIVIL WORKS

Sl. no

Reference Package No.

Contract (Description) Length (Km)

Estimated Cost (Rs. in Lakhs) of

Estimated Package Cost

(Rs. in Lakhs) of Procurement

Method

Review by Bank (Prior / Post) *

Expected bid

opening date

Comments

Const. Maint. Const. Maint.

* First contract of each State will be Subjected to prior review by the Bank

1

01RRP-02

PWD Road T02 To Kharhar 1.519 89.56 7.50

218.88 17.88 NCB Post 13-01-2014

2 T02 To Bathurbari East 2.118 129.32 10.38

3

01RRP-03

T02 To Sharanpur North 1.800 99.80 7.93

456.49 33.73 NCB Post 13-01-2014

4 Jamua To Khemgarh 5.274 356.69 25.80

5

01RRP-05

T02 To Kasraila 1.101 62.61 5.13

276.77 16.50 NCB Post 13-01-2014

6 Farbisganj Road To Chikni 1.124 132.47 5.44

7 T01 To Bhagparasi 1.188 81.69 5.93

8

01RRP-06

T02 To Katpahar 1.288 74.86 6.04

368.78 22.97 NCB Post 13-01-2014

9 T01 To Chaita 1.587 160.90 8.00

10 T02 To Maratipur Mandaltola 1.899 133.02 8.93

11

01RRP-07

Rajoula To Muslim Tola 2.063 122.66 9.83

468.67 33.76 NCB Post 13-01-2014

12 T01 To Sikatia Bangali Tola 2.198 171.60 9.93

Page 6: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 6 of 36

13 Gaus Nagar To Gangai Tola 2.985 174.41 14.00

14 01RRP-14 L021 To Bhagparasi 14.520 1225.08 73.63 1225.08 73.63 NCB Post 13-01-2014

15

01RRP-15

Tarbit T03 To Marichgaon 1.257 98.46 5.77

441.38 30.67 NCB Post 13-01-2014

16 T01 To Kurhaili 5.334 342.92 24.90

17

01RRP-16

L027 To Dakatia 1.610 93.76 7.53

400.81 26.81 NCB Post 13-01-2014

18 T02 To Barkumba 3.933 307.05 19.28

19

01RRP-17

L025 To Chamra Dhar 1.688 105.96 8.17

426.25 36.55 NCB Post 13-01-2014

20 Deepnagar T03 To Belbari 1.848 98.55 8.76

21 Kankhudia To Dogachhi 3.922 221.74 19.62

22

01RRP-22

T01 Dehipaura To Dainia 1.694 129.13 8.22

352.74 23.59 NCB Post 13-01-2014

23 Sikti To Pararia 3.203 223.61 15.37

24

01RRP-24

T04 To Aulabari 2.560 199.26 11.93

467.76 32.51 NCB Post 13-01-2014

25 T04 To Ranikatta 4.105 268.50 20.58

26

01RRP-26

REO Road Chandighasi Wooden Bridge To Chandighasi

1.632 101.93 7.62

362.98 25.73 NCB Post 13-01-2014

27 PWD To Simarbani North 1.795 141.98 8.38

28 PWD Road To Yadav Tola Kusmaul 1.917 119.07 9.73

29

01RRP-27

Akela Mor To Harua Tola 2.295 167.82 10.60

353.93 23.34 NCB Post 13-01-2014

30 PWD Road To Kujra Tola 2.574 186.11 12.74

31 01RRP-28 Khajuri To Yadav Tola 2.829 162.69 13.69 461.47 28.85 NCB Post 13-01-2014

Page 7: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 7 of 36

32 PWD Road To Dhariagara 3.122 298.78 15.16

33 01RRP-29 PWD Road To Sonapur 3.161 205.54 15.71 205.54 15.71 NCB Post 13-01-2014

34 01RRP-30 PWD Road To Chauhan Tola Paikpar 4.144 297.83 20.41 297.83 20.41 NCB Post 13-01-2014

35 01RRP-31 Jilebiamore REO Road To Gamharia 4.170 259.60 20.11 259.60 20.11 NCB Post 13-01-2014

36 01RRP-33 PWD Road To Harijan Tola to Kusmaul

5.446 411.27 27.01 411.27 27.01 NCB Post 13-01-2014

37

01RRP-35

Matiario To Chauhan Tola 1.276 76.14 5.86

479.29 34.19 NCB Post 13-01-2014

38 L024 To Tiraskund 1.740 114.55 8.55

39 Samaraha To Pothia Dhumgarh 4.227 288.60 19.78

40

01RRP-36

T01 To Ghiwaha via Bhagparwaha 1.325 85.87 6.07

451.03 31.43 NCB Post 13-01-2014

41 Kusmaha To Halla 1.421 103.16 6.06

42 T01 To Binodpur 4.056 262.00 19.30

43

01RRP-37

T01 To Eidgah Paswan Tola 1.658 91.15 7.50

462.00 30.76 NCB Post 13-01-2014

44 Parwaha To Harijantola 1.727 107.94 7.66

45 Shaffganj To Doria Sonapur 3.282 262.91 15.60

46

01RRP-39

Rmai More To Lahasunganj 2.735 190.62 12.37

479.36 25.71 NCB Post 13-01-2014

47 T02- Gopalpur To Majua 2.831 288.74 13.34

48

01RRP-40

Lakshmipur to Dumaria 1.468 90.33 7.21

479.45 32.78 NCB Post 13-01-2014

49 Rajganj to Sahebganj 5.609 389.12 25.57

50 01RRP-41 Kanhali to Tamganj 6.267 415.26 29.24 415.26 29.24 NCB Post 13-01-2014

Page 8: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 8 of 36

51 01RRP-42 NH-57 Rajganj to Nathpurnarpatganj Border

6.682 417.09 32.33 417.09 32.33 NCB Post 13-01-2014

52

01RRP-44

Kajra To Pachira 1.995 183.00 9.40

501.18 30.22 NCB Post 13-01-2014

53 T02 To Ekara 4.388 318.18 20.82

54

01RRP-45

Hingana To Musalman Tola 4.295 277.85 21.34

433.74 33.34 NCB Post 13-01-2014

55 Parsa Hat To Bengwahi East 2.259 155.89 12.00

56

01RRP-46

Math Basaithi To Gunwanti 2.391 154.19 10.74

415.73 26.43 NCB Post 13-01-2014

57 PWD Road To Naraenpur 3.379 261.54 15.69

58

03RRP-01

Amarpur Sahkund to Biswaspur 0.720 37.20 2.52

358.24 31.92 NCB Post 13-01-2014

59 Khaira to Bhimsen 0.983 55.45 4.65

60 Samukhia More to Rajpur 1.316 64.01 6.14

61 Belsira Pansalla to Pathaki 1.431 76.58 6.73

62 Amarpur Chokar Road to Tetaria 2.532 125.00 11.88

63

03RRP-02

Amarpur Chokar to Majhagain 1.470 70.22 6.85

462.02 43.39 NCB Post 13-01-2014

64 Nandlalpatti to Laxmipur via Ramchandarpur

7.852 391.80 36.54

65

03RRP-03

Banka-Dev T02 To Sadpur 0.769 38.84 3.65

214.92 15.35 NCB Post 13-01-2014

66 Banka-Pokharia T04 To Jamhara 1.045 51.18 4.88

67 Singarpur L032 To Gopalpur 1.108 66.22 1.58

68 Banka-Samukhiya More-Pokhiriya T05 To Lalmatiya

1.125 58.68 5.24

69 03RRP-04 Banka-via-Jamdaha To Deoghar T02 Desaria

1.476 68.00 6.82 221.62 21.23 NCB Post 13-01-2014

Page 9: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 9 of 36

70 L078-Katali L053 To Bhukhiya 1.501 72.54 6.98

71 Balimara L066 To Katahara 1.585 81.08 7.42

72

03RRP-07

Banka-Pokharia T04-L054 To Jagai 2.822 135.91 13.05

446.30 43.25 NCB Post 13-01-2014

73 Banka-Pokhariya T04 Dudhari Chhatarpal L051 To Gangati-Bhounra

6.512 310.39 30.20

74

03RRP-08

Belhar Jhunhka T04 To Giddha 0.808 38.02 3.83

257.79 22.07 NCB Post 13-01-2014

75 Belhar Sandipi T05 To Diwandih 1.203 60.47 5.74

76 Belhar Sandipi to Duhba 1.206 58.04 5.73

77 Belhar Sandipi Sautadih to Boka 1.803 101.26 6.77

78

03RRP-10

Samukhiya More to Kdbara 1.927 95.71 9.11

403.11 28.60 NCB Post 13-01-2014

79 Parachak to Rajwara Khoji 2.080 126.58 6.64

80 Samukhia-Ramsaraiya To Kushaha 3.102 180.82 12.85

81

03RRP-12

Lakha to Paidapur 2.121 116.90 10.28

365.91 29.16 NCB Post 13-01-2014

82 Jalani Basbitta Road to Mohanpur Garhi

4.853 249.01 18.88

83

03RRP-16

Bhera More Panjwara to Dharhara 3.860 231.61 9.42

469.17 25.44 NCB Post 13-01-2014

84 BGP Dumka Road to Mohanpur 4.612 237.56 16.02

85

03RRP-17

Punsia Ajitnagar Road To Hizarpur 3.625 171.27 17.15

454.01 44.06 NCB Post 13-01-2014

86 Banka Dhaka More To Kharihara Road to Gorwa

5.871 282.74 26.91

87

03RRP-19

Belhar Katoria PWD Road to Barganiya

1.570 76.22 7.48

376.11 34.08 NCB Post 13-01-2014

88 Gauripur to Gobindpur 1.739 94.09 8.30

Page 10: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 10 of 36

89 Ghogha-Dabar Road to Lathani 1.885 98.08 8.88

90 Chandan Deo PWD Road to Baghmari

1.954 107.72 9.42

91

03RRP-20

Nawadih Road to Nari Jamdaha 2.279 116.35 10.84

373.79 35.14 NCB Post 13-01-2014

92 PWD Katoriya Road to Lohari 2.365 125.98 11.26

93 Garkar Road to Biharo 2.723 131.46 13.04

94

03RRP-22

Tingarwa to Baradih 1.260 65.11 5.97

221.31 20.37 NCB Post 13-01-2014

95 Tingarwa to Jaktaha 3.059 156.20 14.40

96 03RRP-26 Belhar Katoria PWD Road via To Manjhladih

8.718 462.04 30.21 462.04 30.21 NCB Post 13-01-2014

97

03RRP-28

T03 to Kathoni 1.328 61.09 6.06

233.56 20.36 NCB Post 13-01-2014

98 T02 Kusmi To Kotra 1.717 83.57 8.02

99 Punsiya Dhoraiya Manikpur Road to Makesar

1.759 88.90 6.28

100

03RRP-29

Kathra to Phulwariya 1.366 63.29 6.42

240.55 23.65 NCB Post 13-01-2014

101 T02 Kadma More To Maheshpur 1.826 89.90 8.57

102 T01 Rifaetpur To Rampur 1.867 87.36 8.67

103

03RRP-30

Bazar Via Balanchak to Logain 2.120 109.82 9.95

251.16 23.32 NCB Post 13-01-2014

104 T03 To RahmanKitta Via Raghunikiatta

2.868 141.34 13.36

105

03RRP-31

Kathbangaon to Alamnagar Bhagaonda

2.020 104.68 7.21

248.67 21.81 NCB Post 13-01-2014

106 T02 Pipra More To Khajurigariya , Lakshmakitta

3.131 143.99 14.59

107 03RRP-32 T01 to Goura to Pair 3.144 167.89 13.80 418.73 39.49 NCB Post 13-01-2014

Page 11: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 11 of 36

108 T04 Dabaiya To Bazardih Via Sibanchak

5.538 250.84 25.68

109

03RRP-33

T02 To Kharwa 1.390 82.17 5.86

242.41 20.79 NCB Post 13-01-2014

110 T02 To Mahutchak 1.451 75.78 6.91

111 BGP-Dumka Road To Morama 1.687 84.46 8.02

112

03RRP-34

Kolhara To Rajpur 0.865 47.83 3.99

234.86 23.13 NCB Post 13-01-2014

113 BGP-Dumka Road To Ghutia 4.209 187.03 19.14

114

03RRP-35

L024 To Malahi 1.779 95.52 8.53

408.61 33.05 NCB Post 13-01-2014

115 BGP-Dumka Road Majhgain To Subkha

2.013 118.95 6.18

116 Darpa To Mohanpur 4.030 194.14 18.34

117

15RRP-01

Gondalbari To Banadih 2.296 117.01 9.51

237.32 20.06 NCB Post 13-01-2014

118 Bara To Budhwadih 2.400 120.31 10.56

119

15RRP-02

Sirsa to Lodhma 2.371 111.20 9.90

232.36 20.61 NCB Post 13-01-2014

120 Raghosar To Mahasapathal 2.495 121.16 10.71

121

15RRP-03

Chakai Sarawn PMGSY Road To Tola Chhachhudih

2.601 118.61 10.99

256.70 22.20 NCB Post 13-01-2014

122 Leruwa To Jabardaha 2.650 138.09 11.21

123

15RRP-04

Asanghatia To Babudih 2.202 108.14 8.96

239.75 20.30 NCB Post 13-01-2014

124 T05 To Behra 2.665 131.61 11.34

125

15RRP-06

Budhuraidih To Madhuri 1.797 94.19 7.60

219.18 18.95 NCB Post 13-01-2014

126 Basatpur To Salaia 2.700 124.99 11.35

Page 12: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 12 of 36

127

15RRP-07

Near Budhurdih To Jagadih 2.107 104.98 8.83

213.04 17.65 NCB Post 13-01-2014

128 Balkar T01 To Paharpur 2.128 108.06 8.82

129

15RRP-08

Gopidih To Chhata 2.093 105.06 8.78

248.47 20.14 NCB Post 13-01-2014

130 Bela To Raichor 2.756 143.41 11.36

131

15RRP-09

Hariaindhi To Karmatanr 1.618 74.65 6.83

234.98 20.67 NCB Post 13-01-2014

132 T01 To Algori 1.623 79.35 6.87

133 Jamui Road to Pipra 1.660 80.98 6.97

134

15RRP-10

L080 To Korhia 1.768 82.51 7.33

214.52 19.08 NCB Post 13-01-2014

135 Berbari To Dhorsakola 2.780 132.01 11.75

136

15RRP-11

Chhotaki Kerwatanr To Kerwatanr 1.414 69.13 6.22

208.33 18.92 NCB Post 13-01-2014

137 Muratanr To Baski Taur 1.415 70.58 6.20

138 Gadhara To Garbhudih 1.534 68.62 6.50

139

15RRP-12

Basbutti To Dhawatanr 1.574 84.82 6.85

216.96 18.74 NCB Post 13-01-2014

140 Matedih To Pararia 2.814 132.14 11.89

141

15RRP-14

Ghutiari To Dalridih 1.390 65.52 5.87

219.72 18.55 NCB Post 13-01-2014

142 Karna To Chunwariadih 3.032 154.20 12.68

143

15RRP-15

Karna To Baghmara 1.063 52.36 4.65

256.34 22.09 NCB Post 13-01-2014

144 Near Batpar To Gomdadih 1.076 51.72 4.68

145 Basbutia To Gajahi 3.135 152.26 12.76

Page 13: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 13 of 36

146

15RRP-16

PWD Road T01 To Bhundra 1.187 58.67 4.93

219.40 18.16 NCB Post 13-01-2014

147 Basbutia To Pipra 3.254 160.73 13.23

148

15RRP-17

Rangania To Binjhi 2.606 127.83 11.12

469.58 40.43 NCB Post 13-01-2014

149 T03 To Badgaunda 3.430 167.87 14.34

150 Harni to Kachuwa 3.564 173.88 14.96

151

15RRP-21

Simultala To Pandua 1.226 72.18 3.76

377.46 19.19 NCB Post 13-01-2014

152 Jhajha Sono PWD Road To Amba 2.765 154.84 8.44

153 Godaia To Damgitari 3.014 150.44 6.99

154

15RRP-22

Jurpania To Dhanukatari 3.602 211.04 11.02

401.12 17.93 NCB Post 13-01-2014

155 Tabhawa To Baliadih 3.614 190.08 6.91

156 15RRP-25 Narganjo To Jurpania 8.969 533.73 27.46 533.73 27.46 NCB Post 13-01-2014

157

15RRP-28

Barmania To Dudhania 2.218 146.24 6.92

378.02 18.57 NCB Post 13-01-2014

158 L045 To Lewa 2.283 143.84 7.02

159 Kusaia To Gandar Mandal Tola 1.488 87.94 4.63

160

15RRP-29

L057 To Jaeijori 1.543 94.80 4.87

411.45 20.15 NCB Post 13-01-2014

161 Itwa To Barabak 2.426 152.30 7.46

162 Salaia Raghunatha PMGSY Road to Lahathara

2.540 164.35 7.82

163

15RRP-30

Rakatrohania To Kuan Babk 1.958 108.47 5.97

384.38 20.26 NCB Post 13-01-2014

164 Bisunpur To Bhelsumbhia 2.142 125.63 6.38

Page 14: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 14 of 36

165 Ghotari To Binjhi 2.576 150.28 7.91

166

15RRP-31

Rakat Rohania To Muslim Tola 1.398 78.11 4.29

408.50 21.06 NCB Post 13-01-2014

167 Naiyadih To Binjhi 2.646 169.29 8.34

168 Vithara To Bagmadmgi 2.728 161.10 8.43

169

15RRP-32

Panbajan To Teliachhauart 1.916 113.11 5.95

470.28 23.78 NCB Post 13-01-2014

170 Near Ghutwe To Balsom 2.788 160.53 8.54

171 Tilbaria To Kodwatanr 2.989 196.64 9.29

172

15RRP-33

Keshofarka Near Bhaluahi More To Amethiadih

1.138 65.02 3.49

155.85 7.78 NCB Post 13-01-2014

173 Askro To Askro Yadav Tola 1.392 90.83 4.29

174

15RRP-36

Khotwa To Panari 3.192 197.81 9.82

469.67 24.22 NCB Post 13-01-2014

175 Piuprabank To Asstua 4.684 271.86 14.40

176 15RRP-43 Jamui Lakhisarai PWD Road to Itwa Pratappur

6.000 402.43 22.15 402.43 22.15 NCB Post 13-01-2014

177

15RRP-46

Khaira Sono Road to Mange Chapri 3.800 213.99 5.38

430.38 12.53 NCB Post 13-01-2014

178 Amatari to Garbhubar 3.900 216.39 7.15

179

15RRP-47

Nim Nawada to Teliadih 3.900 248.88 7.51

481.16 15.10 NCB Post 13-01-2014

180 Amin Khaira Road to Dhab 4.000 232.28 7.59

181

15RRP-48

Nim Nawada REO Road to Fatehpur 4.000 230.92 6.48

454.56 14.50 NCB Post 13-01-2014

182 Jamui Kauwakol Road to Sokho Mission

4.400 223.64 8.02

183 15RRP-49 Jamui Kauwakol Road to Bichkorba 2.950 172.80 5.16 435.45 14.01 NCB Post 13-01-2014

Page 15: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 15 of 36

184 Kendua to Jhundo 4.700 262.65 8.85

185

15RRP-50

Bujhayat to Masarhandi 3.500 196.38 6.37

447.00 15.10 NCB Post 13-01-2014

186 Nim Nawada Road to Suwerkar Tola 4.900 250.62 8.73

187 15RRP-51 Jamui Kauwakol Road to Goli 8.800 462.52 19.73 462.52 19.73 NCB Post 13-01-2014

188

15RRP-53

Kohbarba More Katahra River REO Road to Donha

1.870 99.39 3.14

465.74 18.07 NCB Post 13-01-2014

189 Kenuhat Ratanpur PWD Road to Bela 2.200 120.93 4.67

190 Jamui Kharagpur PWD Road to Shivdih via Ravidas Tola, Musahari Tola

4.800 245.42 10.26

191

15RRP-55

Kenuhat Ratanpur Road to Maraiya 2.250 126.77 3.94

365.06 12.88 NCB Post 13-01-2014

192 Kenuhat Ratanpur PWD Road to Hiramba

4.500 238.29 8.94

193

15RRP-57

Jinhara Road to Barmania 2.150 119.01 3.91

438.05 14.25 NCB Post 13-01-2014

194 Kohbarba More Katahara River REO Road to Harchak

5.650 319.04 10.34

195

15RRP-58

Thana Road to Yogiya 2.250 127.64 3.87

460.29 16.74 NCB Post 13-01-2014

196 Kohbarba More Katahara River Road L025 to Banjhikusum

6.500 332.65 12.87

197 15RRP-59 Kohbarba More Katahara River to Purnadih

9.680 502.22 17.06 502.22 17.06 NCB Post 13-01-2014

198 15RRP-60 Sondipi Karamtanr Road to Thari 12.000 616.69 22.85 616.69 22.85 NCB Post 13-01-2014

199

15RRP-62

Hussainganj to Sarsa 1.750 122.92 3.33

227.06 7.18 NCB Post 13-01-2014

200 Manjosh to Baruna 1.980 104.14 3.85

201 15RRP-63 Kumar to Tuladih 1.020 51.93 2.16 242.44 8.61 NCB Post 13-01-2014

Page 16: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 16 of 36

202 Amin to Bakshanpur 3.000 190.51 6.45

203 15RRP-65 Near Kairi To Belakura 8.611 538.09 26.51 538.09 26.51 NCB Post 13-01-2014

204 15RRP-67 Cheriya To Nainipathal 9.340 557.15 28.68 557.15 28.68 NCB Post 13-01-2014

205 16RRP-02 T01 To Rahar 2.400 142.24 8.29 142.24 8.29 NCB Post 13-01-2014

206

16RRP-03

T03 To Siyalpara 2.025 105.66 8.23

281.78 16.82 NCB Post 13-01-2014

207 T05 Kayanganj To Gora Salampur 2.497 176.12 8.59

208 16RRP-04 Ibrahimpur To Dhumtola 3.108 237.58 8.57 237.58 8.57 NCB Post 13-01-2014

209 16RRP-06 Khampur To Uphareal 3.804 237.50 15.48 237.50 15.48 NCB Post 13-01-2014

210 16RRP-07 Mirjadpur T02 To Taiyapur 6.470 429.55 27.89 429.55 27.89 NCB Post 13-01-2014

211 16RRP-11 L035 Mahamadia To Dherua 3.932 232.08 7.96 232.08 7.96 NCB Post 13-01-2014

212

16RRP-12

Kolasi To Madhura 1.401 97.69 0.22

447.71 12.80 NCB Post 13-01-2014

213 Dighri To Amirpur Hardas 2.250 140.04 7.80

214 PMGSY Road Vinodpur To Bengali Tola

2.390 209.98 4.78

215

25RRP-01

Narhat Road To Patrang 0.579 31.09 1.69

193.37 11.84 NCB Post 13-01-2014

216 Fatehpur Govindpur Road To Sirpat 0.688 34.92 2.48

217 Shyama Pachrukhi T04 To Pironta 0.750 40.58 2.41

218 Lakhmohana Road To Khaira 0.772 47.76 2.57

219 NH-31 To Patangi 0.794 39.02 2.69

220 25RRP-02 Khanpur Road L023 To Baksanda 0.565 28.97 1.89 217.55 15.43 NCB Post 13-01-2014

Page 17: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 17 of 36

221 Bhanail To Jahana 0.835 41.06 2.57

222 NH-31 To Kumhar Bigha 0.890 44.13 2.68

223 Chaprahat Road T010 To Malikpur East Jafara

0.956 44.80 3.70

224 NH-31 To Manpur 1.305 58.59 4.59

225

25RRP-04

Koiri Bigha To Ingoona 1.848 89.97 7.24

186.41 14.32 NCB Post 13-01-2014

226 NH-31 Fatehpur To Asharafpur 1.899 96.44 7.08

227

25RRP-05

Maheshdih To Ashma 1.124 52.84 4.04

226.18 17.56 NCB Post 13-01-2014

228 Darma Road To Gopalpur 1.129 56.47 4.20

229 Telbhadro Road To Ratanpur 2.247 116.87 9.32

230

25RRP-06

NH-31 To Dewara 2.136 97.06 7.39

212.39 15.91 NCB Post 13-01-2014

231 Gosai Bihga Road To Balia 2.379 115.33 8.52

232

25RRP-07

Telbhadaro Road To Mohanpur Khurd

1.796 98.62 6.98

432.88 30.62 NCB Post 13-01-2014

233 NH-31 Kendua To Oraiya 2.987 159.81 11.10

234 Supaul To Manka 3.959 174.45 12.54

235 25RRP-11 Kariouna To Pharaitha 9.723 455.27 36.59 455.27 36.59 NCB Post 13-01-2014

236

25RRP-17

NH-31 To Pranchak 1.242 56.87 3.86

195.18 13.11 NCB Post 13-01-2014

237 Dhamni Road L067 To Khijua 1.253 73.63 5.17

238 Amawa L026 To Laxmi Bigha 1.287 64.68 4.08

239 25RRP-18 NH-31 To Manjhila 1.207 53.19 4.09 204.98 15.73 NCB Post 13-01-2014

Page 18: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 18 of 36

240 Dhamani Road L067 To Karanpur 3.547 151.79 11.64

241

25RRP-20

Bahadarpur Road L069 To Adil Bigha 1.104 60.20 3.62

234.68 17.01 NCB Post 13-01-2014

242 NH-31 To Bhaunr 3.795 174.48 13.39

243

25RRP-21

L064 To Dulan Bigha 1.303 51.92 4.36

216.71 15.43 NCB Post 13-01-2014

244 Kendua To Madhorampur 1.564 76.72 4.51

245 Sirdala Road T05 To Khushiyali Bihta 1.678 88.07 6.56

246

25RRP-22

NH-31 To Manhar 1.568 89.61 4.42

207.63 14.09 NCB Post 13-01-2014

247 Dhamaul T06 To Laxmipur 2.498 118.02 9.67

248

25RRP-23

Jogya Maran To Bhaijibhita 0.725 45.98 1.69

221.02 14.17 NCB Post 13-01-2014

249 Dhamni Road To Maliyatanr 0.753 40.18 2.66

250 Murhena Road L066 To Pahwa Chak 2.606 134.86 9.82

251 25RRP-26 Jaila Road To Anidih 3.227 171.07 10.72 171.07 10.72 NCB Post 13-01-2014

252

25RRP-27

Dhab L082 To Babhani 0.924 56.92 3.92

203.44 13.94 NCB Post 13-01-2014

253 Jaynagar Road To Sonari 0.971 51.82 3.51

254 Sirdala To Barhi Bigha & Yadav Tola 2.103 94.70 6.51

255

25RRP-28

Upardih L028 To Pirauta 1.576 88.09 4.67

206.71 11.28 NCB Post 13-01-2014

256 Pratap Pur L034 To Mahbatpur 2.026 118.62 6.61

257

25RRP-29

Dhab Road To Parsa 1.346 89.73 5.32

439.31 32.29 NCB Post 13-01-2014

258 Sirdala Road L038 To Chaili 2.396 107.56 8.51

Page 19: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 19 of 36

259 Dhab L038A To Khanpura 4.777 242.02 18.46

260

25RRP-30

Sirdala Road T04 To Beri 0.863 60.83 3.45

422.11 31.60 NCB Post 13-01-2014

261 Kushahan To Chhapri 2.598 126.61 9.43

262 Bardiha Road To Laxmi Bigha 4.895 234.67 18.72

263

25RRP-31

Laund T03 To Rabio 1.389 70.32 3.80

446.26 29.36 NCB Post 13-01-2014

264 Meskaur Sirdala Part To Bholakurha Sarhmajhgawn

2.748 139.95 10.68

265 Meskaur Rirdal Part To Sarh 4.600 235.99 14.88

266

25RRP-32

Bardaha To Angara 2.259 96.35 8.40

402.18 30.91 NCB Post 13-01-2014

267 Rajauli Gaya Road T06 To Barsot 3.115 152.13 10.29

268 Kendua To Akauna 3.195 153.70 12.22

269 25RRP-34 Sirdala Gaya Road To Khatangi 10.700 510.25 35.48 510.25 35.48 NCB Post 13-01-2014

270

25RRP-36

Hisua Rajgir Road To Bagodar 0.554 26.33 2.11

361.03 26.73 NCB Post 13-01-2014

271 T03 To Arian 0.843 48.90 2.37

272 T01 To Muhammandpur 0.949 48.29 3.59

273 T06 NH Singhouli To Sarkatiya 1.944 87.55 7.37

274 T04 Khanpur To Chitabigha 2.939 149.96 11.29

275 25RRP-37 Baurhi To Dhanpur 3.692 186.86 14.19 186.86 14.19 NCB Post 13-01-2014

276

25RRP-44

Purani Mahulidih To Samatand Beldari

1.397 72.71 4.57

225.22 16.85 NCB Post 13-01-2014

277 NH-31 To Gopalpur via Trilokbigha 1.518 75.87 6.13

Page 20: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 20 of 36

278 Nawada Hisua T07 To Laxmi Bigha 1.636 76.64 6.15

279

25RRP-45

T017 To Dilo English 0.708 39.74 2.61

198.59 15.55 NCB Post 13-01-2014

280 Sakulachak Road To Harihar Bigha 1.676 77.32 6.57

281 Nawada Nardiganj Road To Chutkiya Bisar

1.764 81.53 6.37

282

25RRP-47

NH-31 To Piparpati 1.712 95.62 5.91

202.55 11.91 NCB Post 13-01-2014

283 PWD Road To Ghostawan 1.526 106.93 6.00

284

25RRP-48

Nawada Gaya Road To Mahuli 1.916 92.74 6.63

220.77 15.57 NCB Post 13-01-2014

285 PWD Road To Atowa 2.287 128.03 8.94

286

25RRP-49

Pathra English Steel Nagar Road To Singhouli

0.538 29.20 1.88

205.68 11.90 NCB Post 13-01-2014

287 PWD Road To Gonawan 0.628 40.90 1.78

288 Kadirganj To Biharibag 2.650 135.58 8.24

289

25RRP-50

Pakaribarawan Road To Lodipur 1.020 45.66 3.33

228.73 15.20 NCB Post 13-01-2014

290 PWD Road To Mathgulni 1.145 61.69 3.92

291 PWD Road To Gulwariya 1.168 61.99 4.15

292 PWD Road To Gopalpur 1.206 59.39 3.80

293

25RRP-66

Rewar Road To Budhan Bigha 1.417 69.47 5.08

220.16 16.78 NCB Post 13-01-2014

294 Iruri Road To Bhaluri 1.541 78.28 5.25

295 Dharhara Road To Durgapur 1.571 72.41 6.45

296 25RRP-51 Rupo Road To Budhauli 0.738 37.49 2.42 220.82 14.82 NCB Post 13-01-2014

Page 21: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 21 of 36

297 Thalpos Road To Ushari Barhi Road 1.581 75.40 6.14

298 Pakribarawan Road To Rajobigha 1.751 107.93 6.26

299

25RRP-52

Pakribarawan Road To Madhurapur 1.627 90.75 5.63

199.33 11.25 NCB Post 13-01-2014

300 Dhanrha Road To Laxmipur 1.814 108.58 5.62

301

25RRP-54

Borma Road To Abid Bigha 0.705 39.08 2.56

196.79 14.26 NCB Post 13-01-2014

302 Dumri Road To Lilo 2.973 157.71 11.70

303

25RRP-55

PWD Road To Gulni 2.083 89.21 7.90

455.31 33.21 NCB Post 13-01-2014

304 Kapsandi To Kurhaitha 3.241 162.80 12.41

305 PWD Road To Dumrawan 3.979 203.30 12.90

306

25RRP-58

Sundarpur To Thalpos 3.264 173.32 12.35

446.92 34.27 NCB Post 13-01-2014

307 Meghipur To Baliyari 5.798 273.60 21.92

308

25RRP-59

Kunanpur To Sumka 2.074 115.19 8.28

459.58 31.88 NCB Post 13-01-2014

309 Pakribarawan Road To Madra 7.195 344.39 23.60

310

25RRP-60

Kochgaon Sorhipur Road To Bheriya Phatha

1.219 69.92 3.88

206.22 11.76 NCB Post 13-01-2014

311 PWD Road T04 To Korma 1.252 63.62 2.72

312 Rasanpur To Thera 1.500 72.68 5.16

313

25RRP-61

Milki Road To Hajipur 1.600 102.59 3.25

210.81 9.64 NCB Post 13-01-2014

314 PWD Road T07 To Masankhawan 2.097 108.22 6.39

315 25RRP-62 Warsaliganj Kharant Road T07 To Kumbhi

2.141 95.62 7.43 218.54 15.94 NCB Post 13-01-2014

Page 22: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 22 of 36

316 Barnama To Tika Bigha 2.506 122.92 8.51

317

25RRP-65

PWD Road T03 To Balwapar 0.792 44.53 2.16

420.84 13.01 NCB Post 13-01-2014

318 PWD Road To Baghi 3.171 376.31 10.85

319 27RRP-04 Jainagara to Balu Tola 2.650 193.85 15.87 193.85 15.87 NCB Post 13-01-2014

320 27RRP-05 Makhand Milik L026 to Deori 9.100 575.41 54.83 575.41 54.83 NCB Post 13-01-2014

321

27RRP-06

L032 to Lila 0.990 67.21 3.63

397.44 17.55 NCB Post 13-01-2014

322 T02 to Brahman Tola 1.059 75.25 2.04

323 T05 to Mushari Tola Kukroun 1.100 75.87 4.54

324 T01 to Choudhary Tola 3.020 179.11 7.34

325

27RRP-07

Sapha to Nandgola 1.388 78.04 8.37

274.77 26.43 NCB Post 13-01-2014

326 Kankala Chok to Madhepura Border Via Phulkia Lachhmaniya

3.005 196.73 18.06

327 27RRP-10 Begampur to Jhuhari 3.910 254.70 6.40 254.70 6.40 NCB Post 13-01-2014

328

27RRP-11

T01 to Gangeli 1.605 105.94 2.92

266.48 9.14 NCB Post 13-01-2014

329 T05 NH-107 to Gokhulpur 2.762 160.54 6.22

330 27RRP-12 L039-Mahendrapur Fasiya to Buari 2.139 132.28 3.47 132.28 3.47 NCB Post 13-01-2014

331

27RRP-13

T01 to Balua 1.469 78.32 3.48

420.59 17.94 NCB Post 13-01-2014

332 Sri Nagar to Raharhia 2.850 157.69 6.53

333 L030 to Sonapur 3.439 184.58 7.93

334 28RRP-01 Suryapura Bhalunidham Road to Tekanpura

0.600 34.98 2.62 190.71 14.78 NCB Post 13-01-2014

Page 23: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 23 of 36

335 Bikramganj Dinara PWD Road to Khirodharpur

1.050 55.87 4.30

336 Turti to Baruna 1.990 99.86 7.86

337

28RRP-02

Ara Sasaram PWD Road to Dumariya 0.770 43.06 3.22

217.81 16.53 NCB Post 13-01-2014

338 Bikramganj Dinara PWD Road to Reriya

1.228 84.40 7.47

339 Ghosiyakhurd to Kandadih 1.470 90.35 5.84

340

28RRP-03

Bikramganj Dinara Road to Bhaluahi 1.940 101.69 7.61

372.54 26.42 NCB Post 13-01-2014

341 Dhangain Suryapura Road to Amapokhar

2.030 123.67 6.24

342 Bhaluahi to Parsa Madhopur 2.062 147.18 12.56

343

28RRP-04

NH-30 to Paramdih 1.735 95.18 10.56

210.19 22.14 NCB Post 13-01-2014

344 Dawath Panchmandir to Sahadat Dehra

1.912 115.01 11.58

345

28RRP-05

Fatehganj to Khairahi 1.252 71.50 7.60

194.46 20.13 NCB Post 13-01-2014

346 NH-30 to Bunda Dih 2.065 122.96 12.53

347

28RRP-06

L024 to Hathadihan 0.754 60.90 4.52

174.15 11.82 NCB Post 13-01-2014

348 Bikramganj Dumraon PWD Road to Babhanul

1.195 113.25 7.30

349

28RRP-09

T09 To Dehri via Basuhari 1.415 102.69 8.92

473.08 48.73 NCB Post 13-01-2014

350 T02 To Rampur Khurd 6.495 370.39 39.81

351

28RRP-10

T02 To Madhopur via Bardiha 1.569 97.01 9.84

401.56 38.62 NCB Post 13-01-2014

352 T09 To Pachauli 1.660 100.79 10.28

353 L024 To Korariya 2.982 203.76 18.50

Page 24: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 24 of 36

354

28RRP-14

L090 To Dharmagatpur 0.620 61.33 3.89

455.73 41.06 NCB Post 13-01-2014

355 Gunsej NH-30 To Lohara 0.640 48.36 3.96

356 NH-30 To Girdhariya 0.662 60.20 4.11

357 Garigawan To Bhuawal 4.694 285.84 29.10

358 28RRP-15 NH-30 Gunsej To Pongarhi via Ganjbharasara

8.969 612.37 55.06 612.37 55.06 NCB Post 13-01-2014

359

28RRP-18

Sanjhauli Tendua Road to Jamodhi 1.221 79.83 7.52

425.53 33.38 NCB Post 13-01-2014

360 Khetalpur More to Khetalpur 1.790 120.99 11.08

361 Ara Sasaram Road Sanjhauli to Chaira Bharaoi

4.000 224.71 14.78

362

28RRP-21

Kosand Kala to Dhango 0.670 58.20 4.03

407.61 35.78 NCB Post 13-01-2014

363 Suryapura Dhangain PWD Road to Agrer Khurd

5.170 349.41 31.75

364

28RRP-22

T03 To Dehriya 1.200 88.01 7.29

145.07 12.17 NCB Post 13-01-2014

365 T08 To Chorhi 0.800 57.06 4.88

366

28RRP-24

T08 To Chilhauira 1.500 97.50 9.16

368.76 34.75 NCB Post 13-01-2014

367 T01 To Chitrataar 1.650 114.14 10.14

368 T05 To Auraiya 2.500 157.12 15.45

369

28RRP-25

T06 To Pethawan 0.650 53.39 4.12

417.27 37.66 NCB Post 13-01-2014

370 T06 To Bhurkura 5.500 363.88 33.54

371

28RRP-27

Konar Jagadatpura Road To Bahera 1.500 102.49 9.34

218.37 19.82 NCB Post 13-01-2014

372 Barawan Jahanabad Road To Kharahana

1.700 115.88 10.48

Page 25: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 25 of 36

373

28RRP-29

T06 To Panhauti 1.052 72.61 6.53

212.70 18.85 NCB Post 13-01-2014

374 L042 Road To Soni 2.000 140.09 12.32

375

28RRP-31

Sasaram Chousa Road Baispura Road To Chhitani

0.900 60.71 5.53

217.06 18.98 NCB Post 13-01-2014

376 Karagahar Fuli Road To Mathiya Rasulpur

2.159 156.35 13.45

377

28RRP-34

Konar Jagatpur Road Larui 0.850 60.61 3.00

229.94 17.24 NCB Post 13-01-2014

378 L098 To Bhagwanpur 2.300 169.33 14.24

379

28RRP-37

Sasaram Chousa Road To Pipara Road To Tilokpur

0.550 36.12 3.42

230.91 19.85 NCB Post 13-01-2014

380 T13 To Bahuwara 2.614 194.79 16.43

381

28RRP-40

NH-30 To Semariya 1.000 82.13 6.22

205.46 16.20 NCB Post 13-01-2014

382 T011 To Khorari 1.600 123.33 9.98

383

28RRP-41

NH-30 Kochas Nauwa Road To Khaira 0.800 69.14 4.82

213.48 19.11 NCB Post 13-01-2014

384 Kochas Nauwan To Padamasi Dehra 2.300 144.34 14.29

385

28RRP-42

T09 To Bedwaliya 0.700 51.01 4.39

460.76 36.92 NCB Post 13-01-2014

386 NH-30 Mau Dehra To Bathori 2.000 176.03 12.51

387 T09 To Chhitandehra 3.193 233.72 20.02

388

28RRP-43

Usaraw Barahari To Latara 2.900 206.69 18.28

427.48 37.06 NCB Post 13-01-2014

389 Sasaram Chousa Road To Korigawan 3.000 220.79 18.78

390

28RRP-45

Katharai Road To Sakarauli 1.500 123.89 9.46

481.27 37.23 NCB Post 13-01-2014

391 T04 Narwar To Bijan Dihara Hardaspur

4.500 357.38 27.77

Page 26: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 26 of 36

392 28RRP-46 Sasaram Chousa Road To Sawandehri

6.300 461.23 38.88 461.23 38.88 NCB Post 13-01-2014

393 28RRP-48 Katharai Road To Atharwaliya 7.200 520.00 45.25 520.00 45.25 NCB Post 13-01-2014

394

28RRP-50

Mokar Bhaisahi Road to Lok Dehri 0.745 47.07 4.50

222.79 21.22 NCB Post 13-01-2014

395 Kopdih Road to Nirmalpur 0.800 52.44 4.98

396 Gotpa Road to Karma 0.900 58.12 5.61

397 Amara babhanpurwa Jaipur Road to Baradih

1.000 65.16 6.13

398

28RRP-51

Sasaram Darigaon Road T07 to Sikariya

0.900 68.62 5.47

209.75 19.27 NCB Post 13-01-2014

399 Amara Babhanpurwa Road to Belwa 2.260 141.13 13.80

400

28RRP-52

Sasaram Chausa Road to Chaukhanda Chitauli

1.000 62.82 6.10

218.93 19.62 NCB Post 13-01-2014

401 Amara Babhanpurwa Road to Rudna 1.010 74.77 6.24

402 Gotpa Road to Tenua 1.200 81.34 7.28

403

28RRP-53

Akodhigola Road to Bishrampur 1.500 117.67 9.23

207.97 18.36 NCB Post 13-01-2014

404 Samardiha Dumara Agrer Road to Dhanrahi

1.500 90.30 9.13

405

28RRP-55

Amara Babhanpurwa Road to Durgapur

0.630 50.77 3.75

190.58 15.91 NCB Post 13-01-2014

406 Mokar Bhaisahi Road to Bisunpur 2.030 139.81 12.16

407

28RRP-57

Amra Babhanpurwa Road to Sahpur 1.273 90.50 7.68

434.39 39.98 NCB Post 13-01-2014

408 Amara Bhabanpurwa Road to Khudhanu

2.087 138.98 12.85

409 Amara Bhabhanpurwa Road to Jaipur

3.200 204.91 19.45

410 28RRP-58 NH-2 To PAKHNARI 0.900 78.32 6.09 401.43 37.12 NCB Post 13-01-2014

Page 27: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 27 of 36

411 Konar To Barela Road To Kaithee 1.300 77.15 7.92

412 G. T Road To Marichwar 3.800 245.96 23.11

413

28RRP-59

Seosagar Chenari PWD Road To Kekai

1.800 159.70 10.91

409.65 32.87 NCB Post 13-01-2014

414 Dearigaon Malhipur Road To Ulho via Kanchanath Barakadih

3.600 249.95 21.96

415

28RRP-60

Konar Barela Road To Pariagpur 0.900 66.92 5.44

440.47 39.43 NCB Post 13-01-2014

416 Mojari Road To Telara 1.950 153.25 14.76

417 Darigaon Malhipur Road to konki 3.200 220.30 19.23

418

28RRP-61

T05 To Bedwalia 0.959 57.34 5.89

203.48 18.04 NCB Post 13-01-2014

419 Itimha Nonahar PWD Road To Malpura

0.961 66.96 5.82

420 Itimha Nonahar PWD Road To Kesuari

1.048 79.18 6.33

421

28RRP-63

Belarhi Pull To Sanagyta 0.769 56.03 4.58

422.13 42.87 NCB Post 13-01-2014

422 Nasriganj PWD Road To Tenua 1.750 111.67 10.64

423 Bihata Nasriganj PWD Road To Sohada via Amauna

4.553 254.43 27.65

424

28RRP-64

Karakat Thumia Road To Kishundasdih

1.522 95.79 9.32

435.66 41.04 NCB Post 13-01-2014

425 Sohda Road To Koni 2.019 137.94 12.38

426 Sohda Road Rampur Barheta To Leva 3.161 201.93 19.34

427

28RRP-65

Gorari Sakla Road To Badaldih 1.388 80.29 8.47

228.54 22.34 NCB Post 13-01-2014

428 T07 To Banye Dehri 2.251 148.25 13.87

429 28RRP-66 Karup Belwahi Road To Nanhu 1.065 69.25 6.58 208.32 20.55 NCB Post 13-01-2014

Page 28: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 28 of 36

430 Dhawani To Karma via Titho 2.278 139.07 13.97

431

28RRP-68

T05 To Hathini 1.250 69.63 5.02

223.19 15.40 NCB Post 13-01-2014

432 T01 To Tarar 1.300 78.60 5.20

433 T04 To Kusahi 1.300 74.96 5.18

434

28RRP-72

Nokha Nasriganj PWD Road to Rajandih

1.030 59.96 4.16

358.21 23.88 NCB Post 13-01-2014

435 Chaudhari Charan Singh Collage to Mallow

1.040 61.61 3.69

436 Nokha Nasriganj PWD Road to Mishrawaliya

1.050 51.80 4.21

437 Nokha Nasriganj PWD Road to Dhobdiha

3.080 184.84 11.82

438

28RRP-75

Dehri Yadunathpur Road to Katdhar 0.968 66.02 6.09

369.79 32.91 NCB Post 13-01-2014

439 Dehri Yadunathpur Road to Hankarpur

1.158 79.66 7.29

440 Karamdiha to Bhurwa 3.093 224.11 19.53

441 28RRP-76 Dhanauti to Dumariya 7.266 570.74 46.11 570.74 46.11 NCB Post 13-01-2014

442 28RRP-77 Dehri Yadunathpur Road to Baknaura

0.806 63.52 4.89 63.52 4.89 NCB Post 13-01-2014

443 28RRP-79 Dehri Yadunathpur Road to Budhua 14.114 1058.13 87.95 1058.13 87.95 NCB Post 13-01-2014

444

28RRP-80

Tilauthu Sasaram to Alinagar 0.567 40.64 3.63

147.76 12.86 NCB Post 13-01-2014

445 Tilauthu Sasrama Road to Maheshdih

0.644 44.67 4.01

446 Chandanpura to Sonepura 0.837 62.45 5.22

447

37RRP-02

Godiyani to Gaurahia 1.477 85.31 6.53

426.65 30.73 NCB Post 13-01-2014

448 L032 to Kanu Tola 2.586 172.56 11.90

Page 29: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 29 of 36

449 Sahi Tola to Matia Bandobasti 2.804 168.78 12.30

450 37RRP-04 T01 Gonauli to Dharampur 1.275 84.89 4.43 84.89 4.43 NCB Post 13-01-2014

451

37RRP-05

T02 to Bariagi Tola 0.570 38.06 0.01

426.62 23.31 NCB Post 13-01-2014

452 L021 to Mushhari Tola 1.565 105.08 2.52

453 T02 to Thawaia 5.114 283.48 20.78

454

37RRP-06

T03 at Madhopur to Sekh Toli 1.290 88.95 5.25

431.01 24.11 NCB Post 13-01-2014

455 T02 to Gudra 4.550 342.06 18.86

456

37RRP-07

T07 at Ratanmala Tatwali to Ahir Toli Ratanmala

0.656 35.91 3.11

432.76 31.48 NCB Post 13-01-2014

457 L043A Bahuarwa to Tatwa Toli 1.643 116.22 7.34

458 L041 to Ahir Tola 4.750 280.63 21.03

459

37RRP-08

Gharwa to Bathna 1.875 128.74 7.19

436.37 26.09 NCB Post 13-01-2014

460 T06 at Champaran to Khutia Indu 4.314 307.63 18.90

461

37RRP-09

T04 to Bhanachak 2.208 144.00 10.02

406.61 25.38 NCB Post 13-01-2014

462 T01 to Pandey Tola 4.300 262.61 15.36

463

37RRP-10

L028 to Nawka Tola 1.290 88.95 5.25

428.57 25.85 NCB Post 13-01-2014

464 L022 to Harizan Tola 2.245 148.64 7.59

465 Manjhaulia Dhokraha Road to Dusadh Tola

2.880 190.98 13.00

466

37RRP-11

Rulahi to Chamar Toli 2.170 151.65 2.46

410.54 19.32 NCB Post 13-01-2014

467 T04 at Bairia Tola to Harizan Tola 4.000 258.89 16.86

Page 30: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 30 of 36

468

37RRP-13

L056 Sekh Toli to Malah Toli 2.100 132.23 9.23

429.09 28.34 NCB Post 13-01-2014

469 T02 to Dhobi Tola 2.100 119.50 9.19

470 L027 to Chamar Toli 2.700 177.36 9.92

471

37RRP-14

T03 To Harijan Tola 1.455 86.90 5.30

416.55 29.31 NCB Post 13-01-2014

472 T03 To Bakharia 2.775 162.71 12.43

473 T05 to Dudha 2.816 166.94 11.58

474

37RRP-15

Ramnagar to Bairiya 1.655 100.94 7.05

455.67 26.49 NCB Post 13-01-2014

475 Machhargwn to Shiorajpur 1.698 119.78 5.60

476 K.R.Pitch Road to Sofwa Tola 3.863 234.95 13.84

477

37RRP-16

Gosaitola to Paterwa 1.770 116.44 5.72

426.13 28.54 NCB Post 13-01-2014

478 Sansaria to Baroria Tola 2.244 127.77 10.02

479 Hardipatti BT to Lilapatti 2.838 181.92 12.80

480

37RRP-18

Dabaria Bazar to Makri Tola 1.406 91.71 5.33

182.48 12.08 NCB Post 13-01-2014

481 Bettiah Nautan Road to Chamar Toli 1.508 90.77 6.75

482

37RRP-19

Jhakhra Bazar to Purbi Tola 1.064 65.69 4.33

257.03 18.14 NCB Post 13-01-2014

483 Jhakahara Pitch to Baswariya 2.981 191.34 13.81

484

37RRP-21

T01 at Bhawanipur To Dularpati 1.180 83.66 4.67

412.26 24.97 NCB Post 13-01-2014

485 T01 To Balua Deorajpur 1.300 84.38 4.33

486 Bhawanipur To Ramna 3.800 244.22 15.96

Page 31: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 31 of 36

487

37RRP-22

T05 to Puraina Gosai 2.024 144.60 9.40

434.11 29.69 NCB Post 13-01-2014

488 Bettiah Mainatar PWD Road to Banawatola

2.160 141.85 10.07

489 T06 to Barahka Gaun 2.224 147.66 10.22

490

37RRP-25

T03 to Chargahan 1.232 76.19 5.47

427.25 29.00 NCB Post 13-01-2014

491 Tikuliya to Gidha 2.270 154.05 9.84

492 T02 to Barharwa 2.986 197.01 13.69

493

37RRP-26

Kaithwalia Chaube Tola to Sembhapur

3.300 198.33 14.81

468.38 36.45 NCB Post 13-01-2014

494 Rampurawa to Raidhurawa 4.662 270.05 21.64

495

37RRP-29

Bhitharwa REO Road to Semra Sirampur

1.462 120.91 0.18

233.49 4.21 NCB Post 13-01-2014

496 PWD Road Cants to Chitwani 1.592 112.58 4.03

497

37RRP-31

Dumri to Jamhauli 1.675 102.08 3.49

225.95 5.31 NCB Post 13-01-2014

498 Done Canal to Mitni 1.690 123.87 1.82

499

37RRP-32

L050 to Tahkaul 1.309 91.59 2.37

260.38 8.05 NCB Post 13-01-2014

500 Mehnaul Kala to Hardi 2.402 168.79 5.69

501

37RRP-38

T03 to Dhokrahan 1.202 92.91 1.83

379.27 9.61 NCB Post 13-01-2014

502 T02 To Parsauni 1.290 85.61 2.36

503 T01 to Sabeya 2.716 200.75 5.42

504

37RRP-39

L043 to Sirhwa 1.509 103.87 3.29

212.75 6.81 NCB Post 13-01-2014

505 T03 to Tilojpur 1.597 108.88 3.52

Page 32: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 32 of 36

506

37RRP-41

T03 to Bhatuhwa 1.647 125.00 2.53

366.57 10.41 NCB Post 13-01-2014

507 L040 to Sahpur Parsauni 1.654 108.46 4.45

508 T04 Podmole to Basantpur 1.774 133.11 3.43

509

37RRP-43

Nankar to Durgwalia Tola 1.100 76.13 4.75

410.80 12.05 NCB Post 13-01-2014

510 T01 Sikarpur to Dakchin Tola 1.100 91.89 0.24

511 T01 to Khairawa 3.450 242.78 7.06

512

37RRP-45

Chitamanpur to Malda 1.980 150.66 2.63

454.44 15.53 NCB Post 13-01-2014

513 Mahuawa to Pipra 2.180 153.51 4.37

514 T02 to Katahari 2.220 150.27 8.53

515

37RRP-47

T01 Mathura to Belwania 1.560 110.44 3.90

473.98 25.19 NCB Post 13-01-2014

516 T03 to Kehuniya 2.041 156.84 8.69

517 T03 to Mathia 2.693 206.70 12.60

518

37RRP-48

L021 to Nautanwa 1.200 97.77 0.67

468.48 16.44 NCB Post 13-01-2014

519 T07 to Roari 1.334 100.61 6.60

520 L022 to Rakhahi 3.850 270.10 9.17

521

37RRP-50

T03 To Basantpur 0.564 45.98 0.10

379.87 8.22 NCB Post 13-01-2014

522 T03 To Purbi 0.939 71.12 1.68

523 T04 To Purainia 1.023 75.55 1.58

524 T02 To Ausanpur 2.687 187.22 4.87

Page 33: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 33 of 36

525

37RRP-51

L036 To Nonia Tola 1.324 100.75 2.67

358.67 8.61 NCB Post 13-01-2014

526 T03 To Senuria via Sindhwalia 1.704 122.45 3.95

527 L036 To Mahamadwa 1.882 135.47 1.99

Total 1286.497 77761.490 5251.697 77761.490 5251.697 0.000 0.000

BRIDGE SECTION

528 BR-01R-174 BARGACHI - MADANPUR SIKTI 47.120 291.18 7.88 291.18 7.88 NCB Post 13-01-2014

529 BR-01R-175 PALSI - MADANPUR KHURSLIGHAT 212.360 1243.82 33.44 1243.82 33.44 NCB Post 13-01-2014

530 BR-01R-176 PALSI - MADANPUR KHURSALIGHAT 159.280 991.96 25.36 991.96 25.36 NCB Post 13-01-2014

531 BR-01R-177 KURSAKATTA HATTA CHOWK - DONGRABANDH VIA FORBESGANJ PART B

106.200 537.94 14.35 537.94 14.35 NCB Post 13-01-2014

532 BR-01R-178 BARGACHI - MADANPUR SIKTI 79.660 405.94 11.06 405.94 11.06 NCB Post 13-01-2014

533 BR-03R-345 BGP DUMKA ROAD - BASMATTA GOKULA

58.620 159.83 4.57 159.83 4.57 NCB Post 13-01-2014

534 BR-03R-346 SHYAM BAZAR - BHALJOR DAM ROAD

79.620 183.28 5.27 183.28 5.27 NCB Post 13-01-2014

535 BR-03R-347 PARIAHI BGP DUMKA ROAD - SUKHIYABARAIT

164.780 380.68 10.88 380.68 10.88 NCB Post 13-01-2014

536 BR-03R-348 PARIHARI BGP DUMKA ROAD - GOLHATTI

164.780 482.19 13.72 482.19 13.72 NCB Post 13-01-2014

537 BR-03R-349 PARIAHI BGP DUMKA ROAD - RAMPURPABRA

282.480 757.22 21.46 757.22 21.46 NCB Post 13-01-2014

538 BR-03R-350 BGP DUMKA ROAD - KAIRI 159.240 381.53 10.79 381.53 10.79 NCB Post 13-01-2014

539 BR-03R-351 LAUKARIA KATORIYA SIMULTALLA PWD ROAD - AAHRA

132.700 322.83 9.25 322.83 9.25 NCB Post 13-01-2014

540 BR-03R-352 SUIYA BHELWA ROAD - BALIAMARA 318.480 837.21 23.73 837.21 23.73 NCB Post 13-01-2014

Page 34: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 34 of 36

541 BR-16R-153 JHAUA - GARARUA 86.160 316.26 8.97 316.26 8.97 NCB Post 13-01-2014

542 BR-16R-154 NH 31 AT BAJARGAON - SALEMPUR 43.600 137.45 3.97 137.45 3.97 NCB Post 13-01-2014

543 BR-16R-155 BALRAMPUR - TELTA 20.000 59.16 1.70 59.16 1.70 NCB Post 13-01-2014

544 BR-16R-156 PIPRA - BAIDANDA 70.160 317.92 9.01 317.92 9.01 NCB Post 13-01-2014

545 BR-16R-157 RANIKOL - NARGADA 20.000 72.10 2.23 72.10 2.23 NCB Post 13-01-2014

546 BR-16R-158 RANIKOL - NARGADA 64.620 275.49 8.05 275.49 8.05 NCB Post 13-01-2014

547 BR-16R-159 RANIKOL - NARGADA 43.600 138.58 4.10 138.58 4.10 NCB Post 13-01-2014

548 BR-16R-160 CHAUNKI - KACHORA 58.620 247.66 8.03 247.66 8.03 NCB Post 13-01-2014

549 BR-16R-161 CHAUNKI - KACHORA 43.600 142.90 4.12 142.90 4.12 NCB Post 13-01-2014

550 BR-16R-162 CHAUNKI - KACHORA 52.620 240.01 6.93 240.01 6.93 NCB Post 13-01-2014

551 BR-16R-163 RANIKOL - NARGADA 60.000 156.28 4.61 156.28 4.61 NCB Post 13-01-2014

552 BR-16R-164 CHAUNKI - KACHORA 52.620 229.45 6.64 229.45 6.64 NCB Post 13-01-2014

553 BR-16R-165 RATANI - DURIA 40.200 127.53 3.75 127.53 3.75 NCB Post 13-01-2014

554 BR-16R-166 BASTOUL-SONAILI PWD ROAD - MAHESHPUR VIA MAKHNA JHUNKI

50.000 122.88 3.56 122.88 3.56 NCB Post 13-01-2014

555 BR-16R-167 BASTOUL-SONAILI PWD ROAD - MAHESHPUR VIA MAKHNA JHUNKI

141.240 464.26 13.28 464.26 13.28 NCB Post 13-01-2014

556 BR-16R-168 KATIHAR-SONAILI PWD ROAD - BASTAUL-SONAILI PWD ROAD NAWADA

20.000 79.06 2.35 79.06 2.35 NCB Post 13-01-2014

557 BR-16R-169 KUMARIPUR ON RCD ROAD - BAHADURPUR

58.620 256.56 6.90 256.56 6.90 NCB Post 13-01-2014

558 BR-16R-170 KUMARIPUR ON RCD ROAD - BAHADURPUR

58.620 243.46 7.48 243.46 7.48 NCB Post 13-01-2014

Page 35: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 35 of 36

559 BR-16R-171 KEWATIA MACHOLA - MAJHELI 107.700 376.88 10.76 376.88 10.76 NCB Post 13-01-2014

560 BR-16R-172 PWD ROAD BAKHRIPUR - KATIHAR MANIHARI RCD ROAD AT KAJRA

44.000 112.97 3.36 112.97 3.36 NCB Post 13-01-2014

561 BR-27R-246 NH 57 KAASBA GERWA PATH - NALOPARA BAMMADHAR

117.740 590.09 16.08 590.09 16.08 NCB Post 13-01-2014

562 BR-27R-247 NH 57 KASBA GERWA PATH - NALOPARA DAKATA

159.280 676.95 18.71 676.95 18.71 NCB Post 13-01-2014

563 BR-27R-248 TEDRAHI - RAILI 43.600 166.58 4.38 166.58 4.38 NCB Post 13-01-2014

564 BR-27R-249 JALALGARH - BAKANIA 43.600 164.91 4.35 164.91 4.35 NCB Post 13-01-2014

565 BR-27R-250 NH 57 KASBA GARWA PATH - NALOPARA RASELIGHAT

185.820 1089.07 29.34 1089.07 29.34 NCB Post 13-01-2014

566 BR-27R-251 NH 57 KASBA GERWA PATH - NALOPARA KALIBASA

79.660 389.45 10.64 389.45 10.64 NCB Post 13-01-2014

567 BR-27R-252 NH 57 KASBA GERWA PATH - NALOPARA KHARDUHA

52.660 324.44 8.91 324.44 8.91 NCB Post 13-01-2014

568 BR-27R-253 NH 57 KASBA GERWA PATH - NALOPARA PULKATTA

132.740 759.24 21.17 759.24 21.17 NCB Post 13-01-2014

569 BR-27R-254 ANWAR CHOWK - BHAURA POOL BISHARIGHAT

70.660 340.12 9.46 340.12 9.46 NCB Post 13-01-2014

570 BR-27R-255 NH 31 BELGACHI VIA SAGUNIA - TOLIPATH GHUSKIPATH

79.660 381.48 10.56 381.48 10.56 NCB Post 13-01-2014

571 BR-27R-256 NH 31 BELGACHI VIA SAGUNIA - TOLIPATH BAKANIA

117.740 563.62 15.63 563.62 15.63 NCB Post 13-01-2014

572 BR-27R-257 KHARBHARI - JHAJHIYAN ROAD 60.000 143.57 4.24 143.57 4.24 NCB Post 13-01-2014

573 BR-27R-258 GANGHBABAILI REO ROAD JIYANGANJ - SAUTHA

78.160 301.21 8.61 301.21 8.61 NCB Post 13-01-2014

Total 4322.620 16983.200 473.660 16983.200 473.660

Page 36: World Bank Documentdocuments.worldbank.org/curated/en/537921468035387582/... · 2016-07-13 · 2. Short list comprising entirely of national consultants : Short list of consultants

Procurement Plan, RRP-II: Bihar

Page 36 of 36

Procurement Plan with Methods & Time Schedule for 12 Months period starting December 13 - for CIVIL WORKS

Sl. no

Reference

Package

No.

Contract (Description) No.s/qua

ntity

Estimated

Cost (Rs.

In Lakh)

Procurement

Method

Review by

Bank

(Prior /

Post) *

Expected bid

opening date Comments

* First contract of each State will be subject to prior review by the Bank

3. BIHAR - CONSULTANCY

1

Appointment of Project

Management Consultant

(Selection ) under PMGSY

Rural Roads Project-II

QCBS

(Time Based) Prior 11 Jan 2014 In Process

Engineer-in-Chief-cum-

Additional Commissoner-cum-Special Secretary,

Rural Works Department