Workshop on Status, Barriers and Incentives to Demand Response in EU Member States –
DR in Finland
23rd October 2015
Veli-Pekka Saajo, Director (actg.)
Smart Meters in place 2014
• Activated costs not included
Reasonable R&D Costs
• (per site up to 63 A) • Energy balance settlement done by using the data from
smart meters
Reasonable Smart Meter rollout costs
Innovation incentive 2012-2015
2012
No R&D
R&D under 0,5%
R&D over 0,5% but 1,0%
R&D over 1,0%
4
R&D Incentive in use
2013
Series1
2014
Series1
DR resources
Source: LUT -Energy
DR Markets in Finland
DR for consumers
Consumer engagement by Helen Sähköverkko Oy (DSO)
• With hourly read smart meters Finland is now learning the full DR potential
• First stage started to establish a central data hub in Finland
• Data Hub will be a new possibility to advance with the DR
– Information on potential DR and ways to use it could be located in the Data Hub
• Network based DR, consumers adapting their energy consumption or generation in response to signals given by DSO?
• Distribution network tariffs capacity-based or volumetric-based to promote DR?
• According to research, remote demand response feature (a relay) in smart meters has possibility 1 000 MW load to be used for DR (spot market)
– ICT standards to be harmonized to guarantee seamless data flow between smart meter and retailer/aggregator
– Another 1 000 MW load to be used in the intra-day market (Elbas) after ICT can be upgraded to next generation
Next steps