Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

download Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

of 17

Transcript of Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    1/17

    1 RNC Commissioning

    Main Step

    Step 1 Checking Hardware

    Step 2. Monitoring Unit Start Up

    Step 3. Logging in to MMI system for f i rs t t im e

    Step 4. Create telnet or HTTP to print alarms

    Step 5. Sett ing c alendar date and time fo r RNC

    Step 6. Enabl ing CPLD up grade

    Step 7. Changing s ystem n ame of the network element

    Step 8. Inspecting SW Bui ld and Safe Copyin g

    Step 9. Inspecting the hardware management system

    Step 10. Interrogating th e equipm ent database

    Step 11. Interrogating Hardware data

    Step 12. Interrogating Softw are bui ld info rmation

    Step 13. Inspecting m ass memory devices

    Step14. Inspecting un it diagnostics and wo rking states

    Step 15. Inspecting th e messaging sy stem

    Step 16. Inspecting sy nchr onisation sy stem

    Step 17. Configu ring th e VDS device

    Step 18. Veri fying sy stem s tart-up

    Step 19. Configu red IP backbone

    Step 20. Configu ring OMS

    Step 21. Testing IP conn ections for OMS

    Step 22. SW Upg rade

    2 RNC Integration

    Main Step

    Step 1. Configuration of ESA24/ESA30

    Step 2. Creating IuCS (ATM, IP)

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    2/17

    3 Pre-Service handover Checks

    Main Step

    Pre-Checks (NSN)

    4 FAC

    Main Step

    CSV file - Part and S/N verification

    Step7. Creating OAM (FlexiWBTS, ATM or IP)

    Step 3. Creating IuPS (ATM, IP)

    Step 4. Creating IuR (ATM, IP)

    Step5. Creating IuB (ATM, IP)

    Step6. Creating OAM (Netact, IP)

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    3/17

    Sign-off of FAC document

    Note: The Day count has been based on a Best Case sce

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    4/17

    RNC 2600 (RU20)

    Responsibility

    NSN - RNC Engineer, Field Manager, NSN

    Installation ContractorVodacom - Vodacom Representative

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - BSC Engineer, RIC Team, NetAct resource

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer, IP Planner if required for

    discrepanciesNSN - RNC Engineer

    NSN - RNC Engineer

    NSN - RNC Engineer

    Detail Activity

    Physical Cabl ing

    Configu re Interface of ESA

    Route Configu ration

    Physical Cabl ing

    Log ical Signal l ing Config uration

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    5/17

    SCCP Parameter Mod if ication

    IUCS Object Creation

    Physical Cabl ing

    Log ical Signal l ing Config uration

    SCCP Parameter Mod if ication

    IUPS Objec t Creation

    Physical Cabl ing

    Log ical Signal l ing Config uration

    SCCP Parameter Mod if ication

    IUR Object Creation

    Physical Cabl ing

    Tunnel Creation on the TX

    IPNB / COCO Creation (depend o n th e final

    TX)

    Configu ration on the OMS & OMU

    Conf igurat ion o n the NetAct Side

    Route Configu ration / ATM Link

    IP Add ress / ATM Info (depend o n the final

    TX)

    Responsibility

    NSN - RNC Engineer

    Vodacom Representative for Acceptance Sign-

    off

    Responsibility

    NSN - Project Manager

    Vodacom - Logistics Manager

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    6/17

    NSN - Project Manager

    Vodacom - Project Manager

    nario, were there are no HW, SW or a

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    7/17

    Expected schedule

    Day1

    Day1

    Day2

    Day2

    Day2

    Day2

    Day3

    Day2

    Day2

    Day3

    Day3

    Day3

    Day3

    Day3

    Day3

    Day4

    Day4

    Day4

    Day4

    Day4

    Day4

    Day5

    Requirements / Responsible Person

    Physical Port (VDC supp ly the avai lable port to NSN - NPO)

    IP Address Space (VDC Supp ly the avai lable subnet to NSN - NPO for the OAM Lin k)

    Subnet Informat ion & GW (VDC supply the in format ion about the router /hop to reach NetAct server from

    RNC to NSN - NPO. NSN - NPO prepare the datafi l l and Sch ematic diagram for th e route)

    Physical Port (VDC supp ly the avai lable port to NSN - NPO)

    SPC Inform ation of th e MSC/MGW (VDC sup ply the info rmation about th e MSC and/or MGW where RNC

    wil l be conn ected to to NSN - NPO)

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    8/17

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC and Wil l pro vide

    the feature l ist need to activate based on th e agreement w ith the cus tom er)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Physical Port (VDC supp ly the avai lable port to NSN - NPO)

    SPC Inform ation of th e SGSN/GGSN (VDC supp ly the inform ation about t he MSC and/or MGW where RNC

    wil l be conn ected to to NSN - NPO)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC and Wil l pro vide

    the feature l ist need to activate based on th e agreement w ith the cus tom er)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Physical Port (VDC supp ly the avai lable port to NSN - NPO)

    SPC Inform ation of the neighbo ring RNCs(VDC sup ply the inform ation about the MSC and/or MGW where

    RNC wil l be conn ected to to NSN - NPO)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC and Wil l pro vide

    the feature l ist need to activate based on th e agreement w ith the cus tom er)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Physical Port (VDC supp ly the avai lable port to NSN - NPO)

    TX Information (VDC Supply the avai lable TX to NSN - NPO)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Datafi ll (NSN - NPO wil l compi le the datafi l l based on th e suppl ied info rmation from VDC)

    Expected schedule

    Day 8

    Expected schedule

    Day 9

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    9/17

    Day 10

    y other issues found, and all transmission and other connections is in place and on time a

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    10/17

    Comments

    Confirm all CNIB and PCM cabling, and labelling, before NSN Installation Contractor leave site. CR to be

    requested at least 48hrs before power-up activity needs to be performed,Vodacom representative is requiredon site for the power-up activity, the activity is performed at night (22h00 till 04h00).

    Confirm that all units start up in normal WO state. Any faulty units need to be identified and send for repairs.

    Confirm any IP discrepancies with NPO and VC Planning.

    Confirm NTP Server IP address and set on OMS & OMU, and confirm time zone settings. Check with RIC if OK.

    checked for both TBU-0 and TBU-1

    Test on SFU-0 and SFU-1

    All cables should be connected

    Requires an RNC Restart, confirm all units return to Working State - notice 0691 WORKING STATE CHANGE

    ACTIVATED....

    All LAN cables must be installed for this (VC), Ips to be defined for OMU as per IP plan

    RNC Restart required

    Subtopics

    See NED for RU10 or RU20. Access and IP plan provided by NPO planning.

    All the Intergation will be done by NSN - RNC Eng. If Something missed during the Integration the Engineer

    will coordinate with NSN - NPO & Customer.

    NSN - RNC Engineer, NPO resource if required

    Vodacom - VC Representative, Tx RAN CORE if required

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    11/17

    NSN - RNC Engineer, NPO resource if required

    Vodacom - VC Representative, Cisco Engineer if required

    NSN - RNC Engineer, NPO resource if required, RIC

    Vodacom - VC Representative

    NSN - RNC Engineer, NPO resource if required

    Vodacom - VC Representative, Tellabs Engineer, ATM & IP Resource

    NSN - RNC Engineer, NetAct Resource, NPO resource if required

    Vodacom - VC Representative

    NSN - RNC Engineer, NPO resource if required

    Vodacom - VC Representative

    Comments

    Final checks and on site BSC acceptance.

    Comments

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    12/17

    nd in working order.

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    13/17

    Expected

    schedule

    Day 5

    Day 5

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    14/17

    Day 6

    Day 7

    Day 7

    Day 7

    Day 7

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    15/17

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    16/17

    Comments

    In case of issues, an VC CORE resource might be required for the connection to the MSS via the MGW.

  • 7/30/2019 Worksheet in VDC SRAN WR Pilot Info 31.5.12.xls

    17/17

    In case of issues, an VC Cisco resource might be required for the connection to the 7609's

    Confirm between which RNC Iur connections was created, also confirm that adjacencies for the Node-B and

    Flexi has been created for the correct RNC's for testing of handovers. NPO can provide XML for adjacencies,

    Creation of links from the Node-B & Flexi, to the RNC, via Tellabs. This is done by 2 different sections from

    Vodacom.

    Integration to NetAct