Working with Liquid-applied Waterproofing membrane

description

This presentation demonstrates how to apply the product Anydron 2K. The product is a liquid-applied waterproofing system, based on PU technology. The presentation demonstrates all the necessary steps such surface preparation, priming, application of the product, and additional protection. Visit http://www.ktisis.eu

Transcript of Working with liquid applied waterproofing membrane

Page 1: Working with liquid applied waterproofing membrane

Working with Liquid-applied

Waterproofing membrane

Page 3: Working with liquid applied waterproofing membrane

It is used as a waterproofing membrane on a number of constructions such as

• Flat rooftops

• Balconies

• polyurethane foam insulation

• bridges

• Foundations

• Flowerbeds

• water tanks

• Synthetic membranes

Uses

Page 4: Working with liquid applied waterproofing membrane

• Extraordinary resilience to high and low temperatures

• 10+ years lifetime

• High elasticity enabling bridging of cracks

Key Benefits

Page 5: Working with liquid applied waterproofing membrane

• Cool roof properties

• Resistant to stagnant (ponding) water

• Flexibility in adding extra coatings, patching, working on existing roofs with obstacles

Key Benefits

Page 6: Working with liquid applied waterproofing membrane

Application Procedure

Page 7: Working with liquid applied waterproofing membrane

The surface must be completely dry, free of loose material, dust, mould, oils, greases etc.

Surface Preparation

Page 8: Working with liquid applied waterproofing membrane

When coating over previously applied coatings make sure that any loose parts have been removed and that the area has been properly cleaned.

It you are unsure when working over a previous coating, it is advisable to perform a test application over a small area first.

Surface Preparation

Page 9: Working with liquid applied waterproofing membrane

It is recommended to prepare the surface by grinding or sanding.

Always make sure that the surface in question is suitable for the surface preparation method that you plan to use.

Surface Preparation

Page 10: Working with liquid applied waterproofing membrane

If the application area is washed with water, ensure that it has completely dried before starting work

Surface Preparation

Page 11: Working with liquid applied waterproofing membrane

So what about priming the surface?

Page 12: Working with liquid applied waterproofing membrane

It is always recommended to prime the surface to enable maximum adhesion and performance of the coating.

Page 13: Working with liquid applied waterproofing membrane

We recommend two different primers depending on the need:

Priming

Page 17: Working with liquid applied waterproofing membrane

Let’s get to Work!

Page 18: Working with liquid applied waterproofing membrane

Pour the contents of can B into bucket A. The mixing of the two materials needs to be consistent (with a mixer) and should last for at least 3-4 minutes at 300rpm.

Preparing Anydron 2K

Page 19: Working with liquid applied waterproofing membrane

The product can be applied with one of the following methods:

• Roller

• brush

• airless spray gun

Applying Anydron 2K

Page 20: Working with liquid applied waterproofing membrane

Apply at least two layers of the material. The second layer should be applied within 18-36 hours.

Applying Anydron 2K

Page 21: Working with liquid applied waterproofing membrane

It is also possible to add an additional protective layer of KTISOPUR UV (coloured PU coating) or Anydron TR (transparent coating) on top.

The top layer makes the coating more durable to frequent traffic loads as well as providing longer-term resistance.

Adding a protective topcoat

Page 22: Working with liquid applied waterproofing membrane

Anydron 2K can also be applied together with a fibre mesh sheet to create a stronger layer

Strengthening the Membrane

Page 23: Working with liquid applied waterproofing membrane

IMPORTANT

POINTS

Page 24: Working with liquid applied waterproofing membrane

Humidity

Products like Anydron 2K are extremely sensitive to humid surfaces. Therefore all application should be carried out with dry surfaces. When applying on fresh concrete wait at least 28 days before applying.

Page 25: Working with liquid applied waterproofing membrane

Humidity

Furthermore when working during winter and humid months avoid applying the product early in the morning when surfaces may be damp because of night-time humidity

Page 26: Working with liquid applied waterproofing membrane

Under no circumstances should water be added as a

diluting agent!

Humidity

Page 27: Working with liquid applied waterproofing membrane

Visit this link for a video demonstration on how to apply the product on an old rooftop

http://www.youtube.com/watch?v=9SBpTwCx9Z8

Page 28: Working with liquid applied waterproofing membrane

Any Questions?

Page 29: Working with liquid applied waterproofing membrane

Do you require any further information?

Any advice on how to approach your waterproofing project?

Do you want to share your experiences with us?

Page 30: Working with liquid applied waterproofing membrane

Davari and Christodoulou Street

19002 Peania GREECE

email: [email protected]

http://www.ktisis.eu

Contact Us!

Page 31: Working with liquid applied waterproofing membrane

Twitter: https://twitter.com/KtisisEU

Facebook: www.facebook.com/Ktisiscoatings

LinkedIn: http://www.linkedin.com/company/2544597