1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL DEPARTMENT OVER AMBALA DIVISION 2017-2018 WORK STUDY TEAM SH. LALIT KUMAR AWSO LEADER SH. RAM PARSHAD CWSI MEMBER SH. YOGESH BADHWAR CWSI MEMBER GUIDANCE BY SH. ASHOK KUMAR AGARWAL SWSO DATE OF COMMENCEMENT: 17.04.2017 DATE OF COMPLETION : 28.04.2017 No. 16-CP/15/WS/2017-18 Central Planning Cell Northern Railway Headquarters Office, Baroda House, New Delhi

Transcript of WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK...

Page 1: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

1

WORK STUDY REPORT

ON

REVIEW OF STAFF

WORKING UNDER

SSE/COACHING (TL/AC) OF

ELECTRICAL DEPARTMENT

OVER

AMBALA DIVISION

2017-2018

WORK STUDY TEAM

SH. LALIT KUMAR AWSO LEADER SH. RAM PARSHAD CWSI MEMBER

SH. YOGESH BADHWAR CWSI MEMBER

GUIDANCE

BY

SH. ASHOK KUMAR AGARWAL SWSO

DATE OF COMMENCEMENT: 17.04.2017

DATE OF COMPLETION : 28.04.2017

No. 16-CP/15/WS/2017-18 Central Planning Cell

Northern Railway

Headquarters Office,

Baroda House,

New Delhi

Page 2: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

2

EXECUTIVE SUMMARY

This study was allotted to Central Planning Cell, HQ Office, to identify redundant/unproductive/ wasteful activities in train lighting staff working over Firozpur Division with a view to improve the manpower productivity and economy. STAFF POSITION

The total sanctioned and on roll strength of train lighting staff of over Ambala Division is as under:-

Deptt Category S/S O/R VA

AC

Tech 136 93 43

Gr ‘D’ 122 71 51

Total 258 164 94

T/L

Tech 170 106 64

Gr ‘D’ 87 80 07

Total 257 186 71

Grand Total

Tech 306 199 107

Gr ‘D’ 209 151 58

Total 515 350 165 No. of posts identified as surplus and recommended for surrender: - Gr. ‘C’ = 02 posts

Gr. ‘D’ = 16 posts Total = 18 posts FINANCIAL IMPLICATIONS

Anticipated recurring savings = 85.15 lakh per annum. Capital saving = Nil Total = 85.15 lakhs per annum

515

350

165

497

18

0

100

200

300

400

500

600

SS OR VAC Proposed Staff Surplus

No. of. Staff

Page 3: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

3

I N D E X

S.N. Contents Pages

From To

1 Synopsis

4 4

2 Summary of recommendations

5 5

3 Acknowledgement

6 6

4 Introduction

7 7

5

Brief description, staff position, Workload

Critical analysis, proposed requirement of

staff, Recommendations and general

observation.

8 22

6 Financial implications

- 23

7 Productivity

-- 24

8 Work Study Detail Chart

-- 25

9 List of annexure

-- 26

Page 4: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

4

SYNOPSIS

Indian Railway is one of the largest government organization which

transports passenger and freight traffic from one place to another at an

optimum level of safety, security, reliability and punctuality. Railways constant

endeavor has been to transform the benefits of improved performances to

reach the people and national economy. Railways have been making all

possible efforts to make journey more affordable and comfortable through

adoption of modernization and system improvements

IR has introduced high speed sophisticated AC coaches to provide

comfortable journey to rail users in Rajdhani and Shatabdi trains. The coaches

are attended during preventive maintenance in shops/depots for fitness of AC

equipments, fans and lights to avoid inconvenience to rail users. Considerable

improvements have been achieved with the introduction of 110V electric

supply in place of 24V which was not only the cause of poor service but

demanded excessive maintenance with poor output. The least maintenance/

maintenance-free batteries have been provided by replacing old frequently

attended/maintenance batteries. The End-on-Generation (EOG) is being used

requiring least maintenance and ensures un-interrupted electric supply IN

Shatabdi/Rajdhani/Duronto trains.

Keeping in view above, SDGM/NR assigned the work study on “Review of

staff working under SSE/Coaching (TL/AC) of electrical Department over

Ambala Division” to the Central Planning Cell, HQ Office, with a view to

reduce wastage/redundant activities to effect economy and manpower

productivity. The team reviewed the AC & train lighting staff vis-à-vis existing

workload to assess the requirement of staff economically by reducing

wastages in the system of maintaining the conventional coaches. The team

held discussions at various levels to arrive at actual status of requirement of

staff keeping practical ability in consideration. The requirement of AC & train

lighting staff over Ambala Division comes to 497 posts against the sanctioned

strength of 515 posts and have identified 18 posts as surplus. The

acceptance/implementation of the recommendations contained in the report

yield a net recurring saving of about 178.48 lakh per annum will be

achieved by the administration.

*****

Page 5: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

5

SUMMARY OF RECOMMENDATIONS

S

N

Recommendations Refer Para No

Implementing/Accepting Authority

1

It is proposed that 18 posts of AC & TL staff

of Electrical in different categories and

grades over Ambala Division identified as

surplus and recommended for surrendered

as under:-

S.

N

Category Pay scale & grade

pay

No. of

surplus

posts

1 Group ‘C’ 5200-20200-1900 02

2 Group ‘D’ 5200-20200-1800 16

Total 18

2.7.0 ADRM/UMB

Sr DEE/G/UMB

Sr DPO/UMB

******

Page 6: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

6

ACKNOWLEDGEMENT

The Work Study team is highly grateful to Sh. Kuldeep Singh, ADRM/UMB,

Sh. Sunil Kumar Sharma, Sr.DEE/G/UMB, Sh Ish Kumar DEE/UMB & Sh Vinit

Jain, Sr. DPO/UMB for giving their valuable guidance for conducting the study.

The team is also thankful to all other functionaries for extending their

cooperation for providing necessary data/information during the course of

study.

******

Page 7: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

7

1.0.0 INTRODUCTION

1.1.0 In its endeavor to provide comfortable and affordable journey to rail

users, Railways have adopted modern technologies due to modernization

and upgraded systems. Modernization and improved services have

resulted in increase the revenue expenditure. Consequently reduction in

avoidable expenditure against wasteful/redundant activities should be

explored.

1.1.1 The electrical maintenance of coaches is a vital activity as it is comfort

oriented. A coach through fit to run but may not be electrically fit

becomes a cause of complaint and a major factor for leakage of railway

revenue as well as cause of detention.

1.1.2 A considerable number of staff is engaged for carrying out the electrical

maintenance of coaches. Due to modernization, certain activities have

either been closed on modified. After adoption of 110 V supply in place of

24 V supply, a lot of activities have been closed but the staff is still

engaged on old pattern.

1.1.3 Keeping in view above, SDGM/NR desired to conduct a work study on

“Review of staff working under SSE/Coaching (TL/AC) of electrical

Department over Ambala Division” with a view to effect economy in

expenditure by reducing wasteful/redundant activities in view of

technological upgradations made in AC & train lighting maintenance

system.

1.2.0 TERMS OF REFERENCE:

The following terms of references were adopted for conduct of the study:-

1. To review staff strength vis-à-vis existing workload. 2. To identify redundant/unproductive activities with a view to eliminate

wasteful expenditure 3. To suggest ways and means to improve the efficiency and productivity of

the system 1.3.0 METHODOLOGY ADOPTED

Method and work measurement techniques of work study were adopted to arrive at fruitful results as follows:-

1. Data Collection and its critical analysis. 2. Work sampling/activity sampling to compare actual performance 3. Held discussions at various levels.

Page 8: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

8

2.0.0 BRIEF DESCRIPTION, STAFF POSITION, WRKLOAD, CRITICAL

ANALYSIS, PROPOSED STAFF, GENERAL OBSERVATIONS AND

RECOMMENDATIONS.

2.1.0 Ambala division is an important Division of Northern Railway. It has

popular tourism places. It is strategic due to defence needs and train

operation, it is a major food grains loading division. It is spread over the

states of Punjab, Haryana, Himachal Pradesh and Uttar Pradesh.

2.1.1 By virtue of modernization and technological up-gradations, lots of

changes have been introduced to effect comfort, convenience to rail

users and improved train operations. A large number of mail, express,

passenger and good trains are maintained by Ambala Division at an

optimum level of safety, security, reliability and punctuality.

2.1.2 This work study is limited to the review of AC & train lighting staff of

electrical deptt over Ambala Division.

2.1.3 The present day train lighting system has evolved from the erstwhile

conventional double battery, conventional heavy copper switch gear

system. The basic problem is that system was heavy theft of copper

parts of various electrical appliances/equipments. The Electrical train

lighting system has improved owing to the gradual improvement in the

standards of amenities viz light, fans and developments of indigenous

dynamos, brushless alternators and associated switchgears. The system

of End on Generation (EOG) got evolved to overcome the problem of

non generation on slow speeds on branch line train as well as

interference with generating equipments, batteries and other under gear

equipments by antisocial elements. Due to technological developments

and modernization, the under-slung AC equipments are being converted

into RMPU AC equipments.

2.1.4 The major achievements made by the Railway have been converting the

electric supply in conventional coaches from 24V to 110V by changing

the generation system. Certain other changes have also been made by

the Railways to minimize avoidable activities for reducing excess staff

being engaged against unproductive activities.

2.1.5 Ambala Division has deployed the AC & electric train lighting staff at

different locations viz SRE, UMB, KLK (BG), KLK (NG), SML, CDG, BTI,

NLDM & DUI depots. The existing pattern of workload is to be

Page 9: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

9

rationalized for effective and economical maintenance due to

modernization of conventional coaches.

2.2.0 EXISTING SET UP

2.2.1 To cater the needs of Train Lighting activities over Ambala Division the

train lighting depots are working under the overall control of Sr. DEE/G/UMB

are as under:-

1. SAHARANPUR (SRE) 2. AMBALA (UMB) 3. KALKA (BG) (KLK) 4. KALKA (NG) (KLK) 5. SHIMLA (SML) 6. CHANDIGARH (CDG) 7. BATHINDA (BTI) 8. NANGALDAM (NLDM) 9. DHURI (DUI)

2.2.2 The activities broadly required to be carried out by AC & train lighting

branch are as under:-

1. Primary maintenance at base depots 2. Secondary maintenance at destination/terminals. 3. Sick line attention of coaches. 4. Passing through train attention (STR) 5. Escorting important/nominated trains.

2.2.3 PRIMARY MAINTENANCE

The nominated trains on completion of their trip are given primary

maintenance by electrical train lighting staff in base depots in which

dynamos/alternators are given extensive maintenance. In the present

scenario 24 V dynamos have been replaced by 110 V alternators which

require less time for maintenance as compared to conventional

dynamos. To ensure un-interrupted electric supply distribution, the

regulators, main fuses and junction boxes are checked and changed if

required. The axle pulley is checked and optimum belt tension is

maintained. Battery is checked by measuring voltage and specific

gravity. The battery is changed and distilled water is added whenever

required. Lighting system is checked to ensure that all Tube lights,

Page 10: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

10

lamps & fans are in working order. Defective switches and lamps are

repaired/replaced. Every lamp reflector is opened and cleaned. The

complete examination of fan blades/carbon brushes is carried out if

required. It is ensured that all fans are in working order. Simultaneously,

the extensive wiring examination is also carried out and repaired as

required.

2.2.4 SECONDARY MAINTENANCE

All the activities carried out during primary maintenance carried out

during secondary maintenance. The difference is that during primary

maintenance the requirement is repaired as well as replaced wherever

required but during secondary maintenance only repair is carried out.

The other difference is that the schedules are adhered to during

primary maintenance.

2.2.5 SCHEDULE MAINTENANCE

The primary based coaches are given thorough examination and repair

carried out periodically i.e., fortnightly/monthly schedules as per extent

instructions by the concerned department in addition to the regular

primary maintenance. Keeping in view the safety and public amenity,

special attention is given to all equipments.

2.2.6 Heavy repairs are undertaken at important depots for under gear

equipments, alternators, carriage fans, train lighting, batteries, switch

gears, wiring etc. Such works arise at major primary based depots.

There have been changed with development of brushless alternators

and electronic regulators. Over the years, there have also been

improvements in the types of tools available for undertaking repair

works.

2.2.7 PLATFORMS

On arrival of trains at the terminating stations, the lamps and fans are

switched off after examining electric equipments. In case of any

deficiency, a joint note is prepared along-with security staff and

submitted to the AC & TL incharges. On placement of trains at

originating station on the platform, the staff attends Air-conditioning

system of AC coaches, lamps, lighting points and fans by switching

them on load according to the weather and is kept in working order.

2.2.8 ESCORTING STAFF

Page 11: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

11

The staff is required to be sent to escort nominated trains in AC

coaches so as to attend air conditioning system & electric train lighting

defects if any, enroute/during the run of train.

2.2.9 Topping of distilled water is necessary in the battery of coaches to meet

the requirement of deficient distilled water in battery cells. For this

purpose, the distilled water generating plants are installed at major

electric train lighting depots.

2.3.0 STAFF POSITION: Category wise, grade wise staff position of AC & TL

staff over UMB division.

A. TL COACHING Staff

S N Depot

MCM TLF TLF-I TLF-II TLF-III TL Kh Total

S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R Vacc

1 SRE 4 5 12 05 12 08 08 06 13 07 49 31 18

2 UMB 2 8 12 04 11 07 18 10 16 12 59 41 18

3 KLK(BG 1 1 12 02 02 02 12 06 15 07 42 18 24

4 KLK(NG 0 0 0 0 0 0 0 0 0 0 0 0 0

5 SML 0 0 0 0 0 0 0 0 0 03 0 03 +3

6 CDG 0 1 5 5 3 4 23 04 16 34 47 48 +1

7 BTI 2 6 9 7 4 7 9 2 19 9 43 31 12

8 NLDM 1 0 2 0 2 0 3 4 7 7 15 11 4

9 DUI 0 0 1 1 0 0 0 1 1 1 1 2 +1

Total A 10 21 53 24 34 28 73 33 87 80 257 186 71

B. AC COACHING Staff

S N Depot

MCM AC ACF-I ACF-II ACF-III AC Kh Total

S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R Vacc

1 SRE 0 1 3 2 3 4 4 3 8 3 18 13 5

2 UMB 2 6 15 7 5 9 13 10 13 7 48 39 9

3 KLK (BG 2 0 1 1 0 0 13 4 21 15 37 20 17

4 KLK (NG 0 0 0 0 0 0 0 0 0 0 0 0 0

5 SML 0 0 0 0 0 0 0 0 0 0 0 0 0

6 CDG 0 1 0 2 0 4 56 21 65 34 121 62 59

7 BTI 0 1 1 1 1 0 3 3 4 4 9 9 0

8 NLDM 0 0 0 5 4 4 10 4 11 8 25 21 4

9 DUI 0 0 0 0 0 0 0 0 0 0 0 0 0

Total B 4 9 20 18 13 21 99 45 122 71 258 164 94

G Total(A+B) 14 30 73 42 47 49 172 78 209 151 515 350 165

Page 12: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

12

2.4.0 WORKLOAD

Coach Holding: Depot wise coach holding of AC & TL of primary:

Sr No Depot AC TL

1 SRE 03 25 (Including ART)

2 UMB 03+04(RA) 43 (Including ART)

3 KLK (BG) 10 73

4 KLK (NG) -- 68

5 SML -- 68

6 CDG 39 110

7 BTI 03 90 (Including ART)

8 NLDM 08 47

9 DUI -- --

Total 70 524 (456)

2.4.1 Work load of Train Lighting COACHING

The activity wise workload of different electric train lighting depots over

Ambala Division is tabulated below:-

S. No

Depot Number of coaches

Terminal train coaches per day

Passing Through

Primary holding

Secondary Coach/day

Mail/Exp Pass Mail/ Exp

Pass

1 SRE -- 14 -- 34 405 160

2 UMB 43 -- 23 59 815 11

3 KLK (BG) 73 39 29 11 -- --

4 KLK (NG) 68 -- -- -- -- --

5 SML -- 68 -- -- -- --

6 CDG 110 18 17 70 22 15

7 BTI 90 13 -- 15 200 157

8 NLDM 47 12 -- -- -- --

9 DUI --- -- -- -- -- --

Page 13: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

13

2.4.2 Work load of AC Coaching:

Activity SRE UMB KLK

(BG)

KLK

(NG)

SML CDG BTI NLDM DUI

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung

-- -- -- -- -- 13 -- 4 --

SGAC

RMPU 03 03 10 -- -- -- 03 4 --

EOG

U/Slung -- -- -- -- -- -- -- -- --

EOG RMPU

-- 04 -- -- -- 26 -- -- --

Total 03 07 10 -- -- 39 03 8 --

Seco

ndary

M

ain

t

Ac

Coach

/day

SGAC U/Slung

-- -- -- -- -- -- -- -- --

SGAC

RMPU -- -- 08 -- -- 09 03 4.7 --

EOG

U/Slung -- -- -- -- -- -- -- -- --

EOG RMPU

-- -- -- -- -- -- -- -- --

Train Passing

46 319 29 -- -- 47 39 2 --

Coach

Hold

ing Sick line

Attention 03 07 10 -- 39 03 8 --

Power

Cars -- -- 4 -- 6 -- -- --

Page 14: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

14

2.5.0 CRITICAL EXAMINATION

2.5.1 Due to improve technological up-gradations in almost every sphere over

Indian Railway, the services have improved considerably and image

among rail users as also improved. To bring improvements in Railway

working system a lot of expenditure has to be incurred. In the process

of technological up-gradations, certain activities become redundant/

unproductive/wasteful. Adoption of 110V batteries in place of 24V

batteries, 110V alternators in place of 24V dynamos, V-belts instead of

flat belts, introduction of RMPU LHB coaches in place of under slung

coaches and EOG power cars etc; has reduced the efforts routine

maintenance activities considerably and the system has become more

reliable. Consequently, the manpower requirements have also reduced.

So as to enhance economy, the redundant activities must be eliminated

and the wastages over excess staff/stores must be checked.

2.5.2 This study is limited to the review of AC & TL staff over Ambala Division.

The team collected staff position, workload from divisional headquarter

and critically analysed the data/informations regarding maintenance

practices.

2.5.3 The proposed requirement of AC & TL staff has been calculated as per

yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued

by Railway Board addressed to General Managers, All Zonal Railways.

The work study team has taken in to consideration the yard stick in

vogue, held discussion at various levels, geographic conditions while

proposing the requirement of staff. The depot wise requirement of staff

as under:-

2.6.0 REQUIREMENT OF STAFF

The team critically analysed the existing workload of all AC & TL depots over Ambala Division so as to assess requirement of staff required for primary, secondary, train passing and sick lines etc activities.

Page 15: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

15

2.6.1 SAHARANPUR (SRE) TL coaching:

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 25 coach

holding 0.3 men per

coach holding 7.5

2 Secondary maintenance. 14 coaches per

day 0.15 men per

coach 2.1

3

Train passing mail/express 439 coaches

per day

0.07 men per

coach

* No train passing staff to be sanctioned for enroute attention at intermediate stations less than 200 km

Train passing Passenger 160 coaches per day

0.06 men per coach

4 Sick line 25 coach

holding

0.05 men per

coach holding 1.25

Total 10.85

Leave reserve @ 12.5% 01.35

Total 12.2 say 12 men

SAHARANPUR (SRE) AC Coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung -- 1.75/coach holding --

SGAC RMPU 03 1.40/coach holding 4.2

EOG U/Slung -- 1.40/coach holding --

EOG RMPU -- 1.00/coach holding --

Seco

ndary

Main

t Ac

Coach

/day SGAC U/Slung --- 0.90/Coach/day --

SGAC RMPU -- 0.7/coach handled

/day

--

EOG U/Slung -- 0.70/Coach/day --

EOG RMPU -- -- --

Train Passing 46 coach 0.13/coach *

Coach

Hold

ing Sick line Attention 03 coach 0.25/coach 0.75

Power Cars -- 12/ 10 power car --

Material storage/Accountal Statistical work

03 coach 15 man for 500 coach holding

1.00

Total 05.95

LR @ 12.5% 0.74

Total 6.69 say 7

* Yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued by

Railway Board

Page 16: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

16

2.6.2 AMBALA (UMB) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 43 coach

holding

0.3 men per

coach holding 12.9

2 Secondary maintenance. -- 0.15 men per coach

--

3 Term/train passing mail/express

838 coach per day

0.07 men per coach

58.66

Term/ train passing

Passenger

70 coaches per

day

0.06 men per

coach 4.2

4 Sick line 43 coach holding

0.05 men per coach holding

2.15

Total 77.91

Leave reserve @ 12.5% 9.73

Total 87.64 say 88 men

AMBALA (UMB) AC coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung -- 1.75/coach holding --

SGAC RMPU 3coach 1.40/coach holding

4.2

EOG U/Slung -- --

EOG RMPU 4 coach 1.00/coach holding 4.0

Seco

ndary

Main

t Ac

Coach

/day

SGAC U/Slung --- 0.90/Coach/day --

SGAC RMPU -- 0.7/coach /day --

EOG U/Slung -- 0.7/Coach/day --

EOG RMPU -- 0.5/coach/day --

Train Passing 319 0.13/coach 41.47

Coach

Hold

ing Sick line Attention 7 coach 0.25/coach 1.75

Power Cars -- 12/ 10 power car --

Material storage/Accountal 7 coach Holding 15 man for 500

coach holding

1.0

Statistical work 7 coach Holding 8 man for 150 or more holding

1.0

Total 53.42

LR @ 12.5% 6.67

Total 60.09 say 60

Page 17: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

17

2.6.3 KALKA (BG) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement

of staff

1 Primary maintenance 73 coach holding 0.3 men per

coach holding 21.9

2 Secondary maintenance. 39 coaches per day

0.15 men per coach

5.85

3

Train passing/ mail/express 29 coaches per

day

0.07 men per

coach

*No train passing staff to be sanctioned for

enroute attention at intermediate stations less than

200 km Train passing/ passenger

11 coaches per day

0.06 men per

coach

4 Sick line 73 coach holding 0.05 men per

coach holding 3.65

Total 34.09

Leave reserve @ 12.5% 4.26

Total 38.35 say 38 men

KALKA (BG) AC coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung -- 1.75/coach holding --

SGAC RMPU 10 coach 1.40/coach holding 14

EOG U/Slung -- 1.40/coach holding --

EOG RMPU -- 1.00/coach holding --

Seco

ndary

Main

t Ac

Coach

/day SGAC U/Slung --- 0.90/Coach/day --

SGAC RMPU 08 coach 0.7/coach handled

/day

5.6

EOG U/Slung -- -- --

EOG RMPU -- 1.0/coach handled --

Coach

Hold

ing Sick line Attention 10 coach 0.25/coach 2.5

Power Cars 4 coach 12/ 10 power car 4.8

Material storage/Accountal 10 coach 15 man for 500

coach holding

1.0

Statistical work 10 coach 8 man for 150 or

more holding

1.0

Total 28.90

LR @ 12.5% 3.61

Total 32.51 say 33

* Yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued by

Railway Board

Page 18: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

18

2.6.4 KALKA (NG) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 68 coach

holding

0.15 men per

coach holding 10.2

2 Secondary maintenance. -- 0.15 men per coach

--

3 Sick line 68 coach holding

0.025 men per coach holding

1.7

Total 11.9

Leave reserve @ 12.5% 1.48

Total 13.38 say 13 men

2.6.5 SHIMLA (SML) TL coaching.

At present 03 men are working against the sanctioned strength of Nil at

Shimla to cope up the existing work load of terminal trains. The work study

team is of the opinion that the existing system hold good and may continue,

therefore the proposed comes to 03 men including LR.

Page 19: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

19

2.6.5 CHANDIGARH (CDG) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 110 coach

holding

0.3 men per

coach holding 33.00

2 Secondary maintenance. 18 coaches per day

0.15 men per coach

2.70

3

Term/ mail/express 39 coaches per day

0.07 men per coach 2.73

4 Sick line 110 coach holding

0.05 men per coach holding

5.5

Total 43.93

Leave reserve @ 12.5% 5.49

Total 49.42 say 49 men

CHANDIGARH (CDG) AC coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung 13 coach 1.75/coach holding 22.75

SGAC RMPU -- 1.40/coach holding 00.0

EOG U/Slung -- 1.40/coach holding 00.0

EOG RMPU 26 coach 1.00/coach holding 26.0

Seco

ndary

Main

t Ac

Coach

/day SGAC U/Slung -- 0.90/Coach/day 00.0

SGAC RMPU 9 coach 0.7/coach handled

/day

6.3

EOG U/Slung -- -- 00.0

EOG RMPU -- 1.00/coach handled 00.0

Train Passing 47 coach 0.13/coach *

Coach

Hold

ing Sick line Attention 39 coach 0.25/coach 9.75

Power Cars 6.0 coach 12/ 10 power car 7.2

Material storage/Accountal 39 coach 15 man for 500

coach holding

1.0

Total 73.0

LR @ 12.5% 9.12

Total 82.12 say 82 men

* No train passing staff to be sanctioned for enroute attention at intermediate

stations less than 200 km

Page 20: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

20

2.6.7 BATHINDA (BTI) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 90 coach holding 0.3 men per

coach holding 27.0

2 Secondary maintenance. 13 coaches per day

0.15 men per coach

1.95

3 Term/Train passing mail/express

200 coaches per day

0.07 men per coach

14.0

4 Sick line 90 coach

holding

0.05 men per

coach holding 4.5

Total 47.45

Leave reserve @ 12.5% 5.93

Total 53.38 say 53 men

BATHINDA (BTI) AC coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung -- 1.75/coach holding --

SGAC RMPU 3 coach 1.40/coach holding 4.2

EOG U/Slung -- 1.40/coach holding --

EOG RMPU -- 1.00/coach holding --

Seco

ndary

Main

t Ac

Coach

/day SGAC U/Slung --- 0.90/Coach/day --

SGAC RMPU 3 coach 0.7/coach handled /day

2.1

EOG U/Slung -- -- --

EOG RMPU -- 1.00/coach handled --

Train Passing 39 coach 0.13/coach 5.07

Coach

Hold

ing Sick line Attention 3 coach 0.25/coach 0.75

Power Cars -- 12/ 10 power car --

Material storage/Accountal 3 coach holding 15 man for 500

coach holding

1

Statistical work 3 coach holding 8 man for 150 or

more holding

1

Total 14.12

LR @ 12.5% 1.76

Total 15.88 say 16

Page 21: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

21

2.6.8 NANGALDAM (NLDM) TL coaching.

SN Activity Workload Yard Stick

Proposed

requirement of staff

1 Primary maintenance 47 coach holding 0.3 men per

coach holding 14.1

2 Secondary maintenance. 12 coaches per day

0.15 men per coach

1.8

3

Term/Train passing mail/express

-- 0.07 men per coach

--

Term/Train passing

passenger

-- 0.06 men per

coach --

4 Sick line 47 coach holding

0.05 men per coach holding

2.35

Total 18.25

Leave reserve @ 12.5% 2.28

Total 20.53 say 21 men

NANGALDAM (NLDM) AC coaching:

Activity Work load Yard Stick Proposed Staff

Prim

ary

Main

t A

C

Coach

Hold

ing

SGAC U/Slung 4 coach 1.75/coach holding 7.0

SGAC RMPU 4 coach 1.40/coach holding 5.6

EOG U/Slung -- 1.40/coach holding 00.0

EOG RMPU -- 1.00/coach holding 00.0

Seco

ndary

Main

t Ac

Coach

/day SGAC U/Slung --- 0.90/Coach/day 00.0

SGAC RMPU 4.7 coach 0.7/coach handled /day

3.29

EOG U/Slung -- -- 00.0

EOG RMPU -- 1.00/coach handled 00.0

Train Passing 2 coach 0.13/coach 0.26

Coach

Hold

ing Sick line Attention 8 coach 0.25/coach 2.00

Power Cars NIL coach 12/ 10 power car 00.0

Total 18.15

LR @ 12.5% 2.26

Total 20.41 say 20

Page 22: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

22

2.6.9 DHURI (DUI) TL coaching.

At present 3 men are working against the sanctioned strength of 2 men at

DUI. This is a small station 2 men are sufficient to cope up the existing work

load. The proposed requirement comes to 02 men including LR.

2.7.0 The summarized position of existing Sanctioned, proposed and surplus staff

of Train lighting and AC staff working over UMB division is as under:

S N Station

T/L (A) AC (B)

S/S Proposed Surplus (+) Shortage (-)

S/S Proposed Surplus (+) Shortage (-)

1 SRE 49 12 37 18 07 11

2 UMB 59 88 -29 48 60 -12

3 KLK (BG) 42 38 04 37 33 04

4 KLK (NG) 0 13 -13 0 0 0

5 SML 0 03 -03 0 0 0

6 CDG 47 49 -02 121 82 39

7 BTI 43 53 -10 09 16 -07

8 NLDM 15 21 -06 25 20 05

9 DUI 02 02 00 0 0 0

TOTAL 257 279 -22 258 219 +40

Grand Total sanction TL & AC Staff (A+B) = 515 Total Proposed TL & AC Staff (A+B) = 497 Total Surplus posts of TL & AC = 18

The above table reveals that the proposed requirement of TL & AC staff comes

to 498 against the sanctioned strength of 515 and 18 posts identified as surplus

in different categories and grades under SSE/TL and SSE/AC of electrical deptt

over UMB division.

RECOMMENDATION NO.1

It is proposed that 18 posts of train lighting staff and AC staff of electrical deptt in different categories and grades over Ambala Division identified as surplus and recommended for surrendered as under:-

S.N Category Pay scale & grade

pay

No. of surplus posts

1 Group ‘C’ Staff 5200-20200-1900 02

2 Group ‘D’ Staff 5200-20200-1800 16

Total 18

******

Page 23: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

23

3.0.0 FINANCIAL IMPLICATIONS

S N Category Pay scale +

Grade pay

No.

of

post

s

Rec.

No

Monthly

value per

posts .

Total annual

recurring

saving .

1 Group ‘C’ Staff 5200-20200-1900 02 1 43212/- 1037088/-

2 Group ‘D’ Staff 5200-20200+1800 16 1 38948/- 7478016/-

Total 18 8515104/-

No. of posts identified as surplus: -

Group ‘C’ = 02 posts Group ‘D ’= 16 posts Total = 18 posts

Anticipated recurring saving = 85.15 lakh per annum Capital saving = Nil Total saving = 85.15 lakh per annum

****

Page 24: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

24

4.0.0 PRODUCTIVITY

4.1.0 The total annual expenditure incurred on the sanctioned strength of 515

posts of Train lighting & AC staff of UMB Division is tabulated below:-

SN

Category

Pay Scale + Grade Pay

Monthly value per posts

S/S Total annual expenditure in

1 MCM 9300-34800+4200 76856/- 14 12911808/-

2 Tech-I 5200-20200+2800 63180/- 73 55345680/-

3 Tech-II 5200-20200+2400 55432/- 47 31263648/-

4 Tech-III 5200-20200+1900 43212/- 172 89189568/-

5 Khallasi 5200-20200+1800 38948/- 209 97681584/-

Total 515 286392288/-

The above table reveals that 286392288/- has to be incurred on the

existing sanctioned strength of Train lighting & AC staff over UMB Divn.

4.2.0 Expenditure to be incurred on the proposed requirement of Train

lighting & AC staff over UMB Divn.

S

N

Categ

ory

Pay Scale +

Grade Pay

Monthly

value

per

posts

Propos

ed

strengt

h

Total annual

expenditure

1 MCM 9300-34800+4200 76856/- 14 12911808/-

2 Tech-I 5200-20200+2800 63180/- 73 55345680/-

3 Tech-II 5200-20200+2400 55432/- 47 31263648/-

4 Tech-III 5200-20200+1900 43212/- 170 88152480/-

5 Khallasi 5200-20200+1800 38948/- 193 90203568/-

Total 497 277877184/-

The above table reveals that the expenditure on proposed staff of Train

lighting & AC staff will come to 277877184/-over UMB Division.

Page 25: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

25

WORK STUDY REPORT DETAILED CHART

Department : - Electrical Deptt

Name of study : - Review of Train lighting & AC staff over UMB Divn.

Activity centre :- Train lighting & AC Depot over UMB Divn.

SN

Sub activity Center

Brief description of Staff

Work Study Recommendation

Representative workload

1 SRE, UMB, KLK (BG), KLK (NG), SML, CDG, BTI, NLDM & DUI

S/S -515 O/R –350 Vacc -165

S/S -515 Proposed –497 Surplus -18 (Gr ‘C’)-02 (Gr ‘D)-16

Primary/secondary maintenance, train passing and sick line activities for maintenance of fans, bulbs/ tube lights, dynamos/ alternators, batteries and switch gear etc. of AC & non AC coaches by train lighting staff.

Page 26: WORK STUDY REPORT - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/...1 WORK STUDY REPORT ON REVIEW OF STAFF WORKING UNDER SSE/COACHING (TL/AC) OF ELECTRICAL

26

LIST OF ANNEXURES

S.N. Description Annexure

No.

1 Authority letter No. 16-CP/15/WS/17-18

dt.17.04.2017 to conduct the study I

2

Statement showing category and grade

wise sanctioned and on roll position of

train lighting & AC staff of Electrical

Deptt over UMB Divn.

II

*****