1
WORK STUDY REPORT
ON
REVIEW OF STAFF
WORKING UNDER
SSE/COACHING (TL/AC) OF
ELECTRICAL DEPARTMENT
OVER
AMBALA DIVISION
2017-2018
WORK STUDY TEAM
SH. LALIT KUMAR AWSO LEADER SH. RAM PARSHAD CWSI MEMBER
SH. YOGESH BADHWAR CWSI MEMBER
GUIDANCE
BY
SH. ASHOK KUMAR AGARWAL SWSO
DATE OF COMMENCEMENT: 17.04.2017
DATE OF COMPLETION : 28.04.2017
No. 16-CP/15/WS/2017-18 Central Planning Cell
Northern Railway
Headquarters Office,
Baroda House,
New Delhi
2
EXECUTIVE SUMMARY
This study was allotted to Central Planning Cell, HQ Office, to identify redundant/unproductive/ wasteful activities in train lighting staff working over Firozpur Division with a view to improve the manpower productivity and economy. STAFF POSITION
The total sanctioned and on roll strength of train lighting staff of over Ambala Division is as under:-
Deptt Category S/S O/R VA
AC
Tech 136 93 43
Gr ‘D’ 122 71 51
Total 258 164 94
T/L
Tech 170 106 64
Gr ‘D’ 87 80 07
Total 257 186 71
Grand Total
Tech 306 199 107
Gr ‘D’ 209 151 58
Total 515 350 165 No. of posts identified as surplus and recommended for surrender: - Gr. ‘C’ = 02 posts
Gr. ‘D’ = 16 posts Total = 18 posts FINANCIAL IMPLICATIONS
Anticipated recurring savings = 85.15 lakh per annum. Capital saving = Nil Total = 85.15 lakhs per annum
515
350
165
497
18
0
100
200
300
400
500
600
SS OR VAC Proposed Staff Surplus
No. of. Staff
3
I N D E X
S.N. Contents Pages
From To
1 Synopsis
4 4
2 Summary of recommendations
5 5
3 Acknowledgement
6 6
4 Introduction
7 7
5
Brief description, staff position, Workload
Critical analysis, proposed requirement of
staff, Recommendations and general
observation.
8 22
6 Financial implications
- 23
7 Productivity
-- 24
8 Work Study Detail Chart
-- 25
9 List of annexure
-- 26
4
SYNOPSIS
Indian Railway is one of the largest government organization which
transports passenger and freight traffic from one place to another at an
optimum level of safety, security, reliability and punctuality. Railways constant
endeavor has been to transform the benefits of improved performances to
reach the people and national economy. Railways have been making all
possible efforts to make journey more affordable and comfortable through
adoption of modernization and system improvements
IR has introduced high speed sophisticated AC coaches to provide
comfortable journey to rail users in Rajdhani and Shatabdi trains. The coaches
are attended during preventive maintenance in shops/depots for fitness of AC
equipments, fans and lights to avoid inconvenience to rail users. Considerable
improvements have been achieved with the introduction of 110V electric
supply in place of 24V which was not only the cause of poor service but
demanded excessive maintenance with poor output. The least maintenance/
maintenance-free batteries have been provided by replacing old frequently
attended/maintenance batteries. The End-on-Generation (EOG) is being used
requiring least maintenance and ensures un-interrupted electric supply IN
Shatabdi/Rajdhani/Duronto trains.
Keeping in view above, SDGM/NR assigned the work study on “Review of
staff working under SSE/Coaching (TL/AC) of electrical Department over
Ambala Division” to the Central Planning Cell, HQ Office, with a view to
reduce wastage/redundant activities to effect economy and manpower
productivity. The team reviewed the AC & train lighting staff vis-à-vis existing
workload to assess the requirement of staff economically by reducing
wastages in the system of maintaining the conventional coaches. The team
held discussions at various levels to arrive at actual status of requirement of
staff keeping practical ability in consideration. The requirement of AC & train
lighting staff over Ambala Division comes to 497 posts against the sanctioned
strength of 515 posts and have identified 18 posts as surplus. The
acceptance/implementation of the recommendations contained in the report
yield a net recurring saving of about 178.48 lakh per annum will be
achieved by the administration.
*****
5
SUMMARY OF RECOMMENDATIONS
S
N
Recommendations Refer Para No
Implementing/Accepting Authority
1
It is proposed that 18 posts of AC & TL staff
of Electrical in different categories and
grades over Ambala Division identified as
surplus and recommended for surrendered
as under:-
S.
N
Category Pay scale & grade
pay
No. of
surplus
posts
1 Group ‘C’ 5200-20200-1900 02
2 Group ‘D’ 5200-20200-1800 16
Total 18
2.7.0 ADRM/UMB
Sr DEE/G/UMB
Sr DPO/UMB
******
6
ACKNOWLEDGEMENT
The Work Study team is highly grateful to Sh. Kuldeep Singh, ADRM/UMB,
Sh. Sunil Kumar Sharma, Sr.DEE/G/UMB, Sh Ish Kumar DEE/UMB & Sh Vinit
Jain, Sr. DPO/UMB for giving their valuable guidance for conducting the study.
The team is also thankful to all other functionaries for extending their
cooperation for providing necessary data/information during the course of
study.
******
7
1.0.0 INTRODUCTION
1.1.0 In its endeavor to provide comfortable and affordable journey to rail
users, Railways have adopted modern technologies due to modernization
and upgraded systems. Modernization and improved services have
resulted in increase the revenue expenditure. Consequently reduction in
avoidable expenditure against wasteful/redundant activities should be
explored.
1.1.1 The electrical maintenance of coaches is a vital activity as it is comfort
oriented. A coach through fit to run but may not be electrically fit
becomes a cause of complaint and a major factor for leakage of railway
revenue as well as cause of detention.
1.1.2 A considerable number of staff is engaged for carrying out the electrical
maintenance of coaches. Due to modernization, certain activities have
either been closed on modified. After adoption of 110 V supply in place of
24 V supply, a lot of activities have been closed but the staff is still
engaged on old pattern.
1.1.3 Keeping in view above, SDGM/NR desired to conduct a work study on
“Review of staff working under SSE/Coaching (TL/AC) of electrical
Department over Ambala Division” with a view to effect economy in
expenditure by reducing wasteful/redundant activities in view of
technological upgradations made in AC & train lighting maintenance
system.
1.2.0 TERMS OF REFERENCE:
The following terms of references were adopted for conduct of the study:-
1. To review staff strength vis-à-vis existing workload. 2. To identify redundant/unproductive activities with a view to eliminate
wasteful expenditure 3. To suggest ways and means to improve the efficiency and productivity of
the system 1.3.0 METHODOLOGY ADOPTED
Method and work measurement techniques of work study were adopted to arrive at fruitful results as follows:-
1. Data Collection and its critical analysis. 2. Work sampling/activity sampling to compare actual performance 3. Held discussions at various levels.
8
2.0.0 BRIEF DESCRIPTION, STAFF POSITION, WRKLOAD, CRITICAL
ANALYSIS, PROPOSED STAFF, GENERAL OBSERVATIONS AND
RECOMMENDATIONS.
2.1.0 Ambala division is an important Division of Northern Railway. It has
popular tourism places. It is strategic due to defence needs and train
operation, it is a major food grains loading division. It is spread over the
states of Punjab, Haryana, Himachal Pradesh and Uttar Pradesh.
2.1.1 By virtue of modernization and technological up-gradations, lots of
changes have been introduced to effect comfort, convenience to rail
users and improved train operations. A large number of mail, express,
passenger and good trains are maintained by Ambala Division at an
optimum level of safety, security, reliability and punctuality.
2.1.2 This work study is limited to the review of AC & train lighting staff of
electrical deptt over Ambala Division.
2.1.3 The present day train lighting system has evolved from the erstwhile
conventional double battery, conventional heavy copper switch gear
system. The basic problem is that system was heavy theft of copper
parts of various electrical appliances/equipments. The Electrical train
lighting system has improved owing to the gradual improvement in the
standards of amenities viz light, fans and developments of indigenous
dynamos, brushless alternators and associated switchgears. The system
of End on Generation (EOG) got evolved to overcome the problem of
non generation on slow speeds on branch line train as well as
interference with generating equipments, batteries and other under gear
equipments by antisocial elements. Due to technological developments
and modernization, the under-slung AC equipments are being converted
into RMPU AC equipments.
2.1.4 The major achievements made by the Railway have been converting the
electric supply in conventional coaches from 24V to 110V by changing
the generation system. Certain other changes have also been made by
the Railways to minimize avoidable activities for reducing excess staff
being engaged against unproductive activities.
2.1.5 Ambala Division has deployed the AC & electric train lighting staff at
different locations viz SRE, UMB, KLK (BG), KLK (NG), SML, CDG, BTI,
NLDM & DUI depots. The existing pattern of workload is to be
9
rationalized for effective and economical maintenance due to
modernization of conventional coaches.
2.2.0 EXISTING SET UP
2.2.1 To cater the needs of Train Lighting activities over Ambala Division the
train lighting depots are working under the overall control of Sr. DEE/G/UMB
are as under:-
1. SAHARANPUR (SRE) 2. AMBALA (UMB) 3. KALKA (BG) (KLK) 4. KALKA (NG) (KLK) 5. SHIMLA (SML) 6. CHANDIGARH (CDG) 7. BATHINDA (BTI) 8. NANGALDAM (NLDM) 9. DHURI (DUI)
2.2.2 The activities broadly required to be carried out by AC & train lighting
branch are as under:-
1. Primary maintenance at base depots 2. Secondary maintenance at destination/terminals. 3. Sick line attention of coaches. 4. Passing through train attention (STR) 5. Escorting important/nominated trains.
2.2.3 PRIMARY MAINTENANCE
The nominated trains on completion of their trip are given primary
maintenance by electrical train lighting staff in base depots in which
dynamos/alternators are given extensive maintenance. In the present
scenario 24 V dynamos have been replaced by 110 V alternators which
require less time for maintenance as compared to conventional
dynamos. To ensure un-interrupted electric supply distribution, the
regulators, main fuses and junction boxes are checked and changed if
required. The axle pulley is checked and optimum belt tension is
maintained. Battery is checked by measuring voltage and specific
gravity. The battery is changed and distilled water is added whenever
required. Lighting system is checked to ensure that all Tube lights,
10
lamps & fans are in working order. Defective switches and lamps are
repaired/replaced. Every lamp reflector is opened and cleaned. The
complete examination of fan blades/carbon brushes is carried out if
required. It is ensured that all fans are in working order. Simultaneously,
the extensive wiring examination is also carried out and repaired as
required.
2.2.4 SECONDARY MAINTENANCE
All the activities carried out during primary maintenance carried out
during secondary maintenance. The difference is that during primary
maintenance the requirement is repaired as well as replaced wherever
required but during secondary maintenance only repair is carried out.
The other difference is that the schedules are adhered to during
primary maintenance.
2.2.5 SCHEDULE MAINTENANCE
The primary based coaches are given thorough examination and repair
carried out periodically i.e., fortnightly/monthly schedules as per extent
instructions by the concerned department in addition to the regular
primary maintenance. Keeping in view the safety and public amenity,
special attention is given to all equipments.
2.2.6 Heavy repairs are undertaken at important depots for under gear
equipments, alternators, carriage fans, train lighting, batteries, switch
gears, wiring etc. Such works arise at major primary based depots.
There have been changed with development of brushless alternators
and electronic regulators. Over the years, there have also been
improvements in the types of tools available for undertaking repair
works.
2.2.7 PLATFORMS
On arrival of trains at the terminating stations, the lamps and fans are
switched off after examining electric equipments. In case of any
deficiency, a joint note is prepared along-with security staff and
submitted to the AC & TL incharges. On placement of trains at
originating station on the platform, the staff attends Air-conditioning
system of AC coaches, lamps, lighting points and fans by switching
them on load according to the weather and is kept in working order.
2.2.8 ESCORTING STAFF
11
The staff is required to be sent to escort nominated trains in AC
coaches so as to attend air conditioning system & electric train lighting
defects if any, enroute/during the run of train.
2.2.9 Topping of distilled water is necessary in the battery of coaches to meet
the requirement of deficient distilled water in battery cells. For this
purpose, the distilled water generating plants are installed at major
electric train lighting depots.
2.3.0 STAFF POSITION: Category wise, grade wise staff position of AC & TL
staff over UMB division.
A. TL COACHING Staff
S N Depot
MCM TLF TLF-I TLF-II TLF-III TL Kh Total
S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R Vacc
1 SRE 4 5 12 05 12 08 08 06 13 07 49 31 18
2 UMB 2 8 12 04 11 07 18 10 16 12 59 41 18
3 KLK(BG 1 1 12 02 02 02 12 06 15 07 42 18 24
4 KLK(NG 0 0 0 0 0 0 0 0 0 0 0 0 0
5 SML 0 0 0 0 0 0 0 0 0 03 0 03 +3
6 CDG 0 1 5 5 3 4 23 04 16 34 47 48 +1
7 BTI 2 6 9 7 4 7 9 2 19 9 43 31 12
8 NLDM 1 0 2 0 2 0 3 4 7 7 15 11 4
9 DUI 0 0 1 1 0 0 0 1 1 1 1 2 +1
Total A 10 21 53 24 34 28 73 33 87 80 257 186 71
B. AC COACHING Staff
S N Depot
MCM AC ACF-I ACF-II ACF-III AC Kh Total
S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R S/S O/R Vacc
1 SRE 0 1 3 2 3 4 4 3 8 3 18 13 5
2 UMB 2 6 15 7 5 9 13 10 13 7 48 39 9
3 KLK (BG 2 0 1 1 0 0 13 4 21 15 37 20 17
4 KLK (NG 0 0 0 0 0 0 0 0 0 0 0 0 0
5 SML 0 0 0 0 0 0 0 0 0 0 0 0 0
6 CDG 0 1 0 2 0 4 56 21 65 34 121 62 59
7 BTI 0 1 1 1 1 0 3 3 4 4 9 9 0
8 NLDM 0 0 0 5 4 4 10 4 11 8 25 21 4
9 DUI 0 0 0 0 0 0 0 0 0 0 0 0 0
Total B 4 9 20 18 13 21 99 45 122 71 258 164 94
G Total(A+B) 14 30 73 42 47 49 172 78 209 151 515 350 165
12
2.4.0 WORKLOAD
Coach Holding: Depot wise coach holding of AC & TL of primary:
Sr No Depot AC TL
1 SRE 03 25 (Including ART)
2 UMB 03+04(RA) 43 (Including ART)
3 KLK (BG) 10 73
4 KLK (NG) -- 68
5 SML -- 68
6 CDG 39 110
7 BTI 03 90 (Including ART)
8 NLDM 08 47
9 DUI -- --
Total 70 524 (456)
2.4.1 Work load of Train Lighting COACHING
The activity wise workload of different electric train lighting depots over
Ambala Division is tabulated below:-
S. No
Depot Number of coaches
Terminal train coaches per day
Passing Through
Primary holding
Secondary Coach/day
Mail/Exp Pass Mail/ Exp
Pass
1 SRE -- 14 -- 34 405 160
2 UMB 43 -- 23 59 815 11
3 KLK (BG) 73 39 29 11 -- --
4 KLK (NG) 68 -- -- -- -- --
5 SML -- 68 -- -- -- --
6 CDG 110 18 17 70 22 15
7 BTI 90 13 -- 15 200 157
8 NLDM 47 12 -- -- -- --
9 DUI --- -- -- -- -- --
13
2.4.2 Work load of AC Coaching:
Activity SRE UMB KLK
(BG)
KLK
(NG)
SML CDG BTI NLDM DUI
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung
-- -- -- -- -- 13 -- 4 --
SGAC
RMPU 03 03 10 -- -- -- 03 4 --
EOG
U/Slung -- -- -- -- -- -- -- -- --
EOG RMPU
-- 04 -- -- -- 26 -- -- --
Total 03 07 10 -- -- 39 03 8 --
Seco
ndary
M
ain
t
Ac
Coach
/day
SGAC U/Slung
-- -- -- -- -- -- -- -- --
SGAC
RMPU -- -- 08 -- -- 09 03 4.7 --
EOG
U/Slung -- -- -- -- -- -- -- -- --
EOG RMPU
-- -- -- -- -- -- -- -- --
Train Passing
46 319 29 -- -- 47 39 2 --
Coach
Hold
ing Sick line
Attention 03 07 10 -- 39 03 8 --
Power
Cars -- -- 4 -- 6 -- -- --
14
2.5.0 CRITICAL EXAMINATION
2.5.1 Due to improve technological up-gradations in almost every sphere over
Indian Railway, the services have improved considerably and image
among rail users as also improved. To bring improvements in Railway
working system a lot of expenditure has to be incurred. In the process
of technological up-gradations, certain activities become redundant/
unproductive/wasteful. Adoption of 110V batteries in place of 24V
batteries, 110V alternators in place of 24V dynamos, V-belts instead of
flat belts, introduction of RMPU LHB coaches in place of under slung
coaches and EOG power cars etc; has reduced the efforts routine
maintenance activities considerably and the system has become more
reliable. Consequently, the manpower requirements have also reduced.
So as to enhance economy, the redundant activities must be eliminated
and the wastages over excess staff/stores must be checked.
2.5.2 This study is limited to the review of AC & TL staff over Ambala Division.
The team collected staff position, workload from divisional headquarter
and critically analysed the data/informations regarding maintenance
practices.
2.5.3 The proposed requirement of AC & TL staff has been calculated as per
yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued
by Railway Board addressed to General Managers, All Zonal Railways.
The work study team has taken in to consideration the yard stick in
vogue, held discussion at various levels, geographic conditions while
proposing the requirement of staff. The depot wise requirement of staff
as under:-
2.6.0 REQUIREMENT OF STAFF
The team critically analysed the existing workload of all AC & TL depots over Ambala Division so as to assess requirement of staff required for primary, secondary, train passing and sick lines etc activities.
15
2.6.1 SAHARANPUR (SRE) TL coaching:
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 25 coach
holding 0.3 men per
coach holding 7.5
2 Secondary maintenance. 14 coaches per
day 0.15 men per
coach 2.1
3
Train passing mail/express 439 coaches
per day
0.07 men per
coach
* No train passing staff to be sanctioned for enroute attention at intermediate stations less than 200 km
Train passing Passenger 160 coaches per day
0.06 men per coach
4 Sick line 25 coach
holding
0.05 men per
coach holding 1.25
Total 10.85
Leave reserve @ 12.5% 01.35
Total 12.2 say 12 men
SAHARANPUR (SRE) AC Coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung -- 1.75/coach holding --
SGAC RMPU 03 1.40/coach holding 4.2
EOG U/Slung -- 1.40/coach holding --
EOG RMPU -- 1.00/coach holding --
Seco
ndary
Main
t Ac
Coach
/day SGAC U/Slung --- 0.90/Coach/day --
SGAC RMPU -- 0.7/coach handled
/day
--
EOG U/Slung -- 0.70/Coach/day --
EOG RMPU -- -- --
Train Passing 46 coach 0.13/coach *
Coach
Hold
ing Sick line Attention 03 coach 0.25/coach 0.75
Power Cars -- 12/ 10 power car --
Material storage/Accountal Statistical work
03 coach 15 man for 500 coach holding
1.00
Total 05.95
LR @ 12.5% 0.74
Total 6.69 say 7
* Yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued by
Railway Board
16
2.6.2 AMBALA (UMB) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 43 coach
holding
0.3 men per
coach holding 12.9
2 Secondary maintenance. -- 0.15 men per coach
--
3 Term/train passing mail/express
838 coach per day
0.07 men per coach
58.66
Term/ train passing
Passenger
70 coaches per
day
0.06 men per
coach 4.2
4 Sick line 43 coach holding
0.05 men per coach holding
2.15
Total 77.91
Leave reserve @ 12.5% 9.73
Total 87.64 say 88 men
AMBALA (UMB) AC coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung -- 1.75/coach holding --
SGAC RMPU 3coach 1.40/coach holding
4.2
EOG U/Slung -- --
EOG RMPU 4 coach 1.00/coach holding 4.0
Seco
ndary
Main
t Ac
Coach
/day
SGAC U/Slung --- 0.90/Coach/day --
SGAC RMPU -- 0.7/coach /day --
EOG U/Slung -- 0.7/Coach/day --
EOG RMPU -- 0.5/coach/day --
Train Passing 319 0.13/coach 41.47
Coach
Hold
ing Sick line Attention 7 coach 0.25/coach 1.75
Power Cars -- 12/ 10 power car --
Material storage/Accountal 7 coach Holding 15 man for 500
coach holding
1.0
Statistical work 7 coach Holding 8 man for 150 or more holding
1.0
Total 53.42
LR @ 12.5% 6.67
Total 60.09 say 60
17
2.6.3 KALKA (BG) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement
of staff
1 Primary maintenance 73 coach holding 0.3 men per
coach holding 21.9
2 Secondary maintenance. 39 coaches per day
0.15 men per coach
5.85
3
Train passing/ mail/express 29 coaches per
day
0.07 men per
coach
*No train passing staff to be sanctioned for
enroute attention at intermediate stations less than
200 km Train passing/ passenger
11 coaches per day
0.06 men per
coach
4 Sick line 73 coach holding 0.05 men per
coach holding 3.65
Total 34.09
Leave reserve @ 12.5% 4.26
Total 38.35 say 38 men
KALKA (BG) AC coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung -- 1.75/coach holding --
SGAC RMPU 10 coach 1.40/coach holding 14
EOG U/Slung -- 1.40/coach holding --
EOG RMPU -- 1.00/coach holding --
Seco
ndary
Main
t Ac
Coach
/day SGAC U/Slung --- 0.90/Coach/day --
SGAC RMPU 08 coach 0.7/coach handled
/day
5.6
EOG U/Slung -- -- --
EOG RMPU -- 1.0/coach handled --
Coach
Hold
ing Sick line Attention 10 coach 0.25/coach 2.5
Power Cars 4 coach 12/ 10 power car 4.8
Material storage/Accountal 10 coach 15 man for 500
coach holding
1.0
Statistical work 10 coach 8 man for 150 or
more holding
1.0
Total 28.90
LR @ 12.5% 3.61
Total 32.51 say 33
* Yardstick/policy No.2000/Elect (G)/181/21-Pt. dt. 22/30.11.2004 issued by
Railway Board
18
2.6.4 KALKA (NG) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 68 coach
holding
0.15 men per
coach holding 10.2
2 Secondary maintenance. -- 0.15 men per coach
--
3 Sick line 68 coach holding
0.025 men per coach holding
1.7
Total 11.9
Leave reserve @ 12.5% 1.48
Total 13.38 say 13 men
2.6.5 SHIMLA (SML) TL coaching.
At present 03 men are working against the sanctioned strength of Nil at
Shimla to cope up the existing work load of terminal trains. The work study
team is of the opinion that the existing system hold good and may continue,
therefore the proposed comes to 03 men including LR.
19
2.6.5 CHANDIGARH (CDG) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 110 coach
holding
0.3 men per
coach holding 33.00
2 Secondary maintenance. 18 coaches per day
0.15 men per coach
2.70
3
Term/ mail/express 39 coaches per day
0.07 men per coach 2.73
4 Sick line 110 coach holding
0.05 men per coach holding
5.5
Total 43.93
Leave reserve @ 12.5% 5.49
Total 49.42 say 49 men
CHANDIGARH (CDG) AC coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung 13 coach 1.75/coach holding 22.75
SGAC RMPU -- 1.40/coach holding 00.0
EOG U/Slung -- 1.40/coach holding 00.0
EOG RMPU 26 coach 1.00/coach holding 26.0
Seco
ndary
Main
t Ac
Coach
/day SGAC U/Slung -- 0.90/Coach/day 00.0
SGAC RMPU 9 coach 0.7/coach handled
/day
6.3
EOG U/Slung -- -- 00.0
EOG RMPU -- 1.00/coach handled 00.0
Train Passing 47 coach 0.13/coach *
Coach
Hold
ing Sick line Attention 39 coach 0.25/coach 9.75
Power Cars 6.0 coach 12/ 10 power car 7.2
Material storage/Accountal 39 coach 15 man for 500
coach holding
1.0
Total 73.0
LR @ 12.5% 9.12
Total 82.12 say 82 men
* No train passing staff to be sanctioned for enroute attention at intermediate
stations less than 200 km
20
2.6.7 BATHINDA (BTI) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 90 coach holding 0.3 men per
coach holding 27.0
2 Secondary maintenance. 13 coaches per day
0.15 men per coach
1.95
3 Term/Train passing mail/express
200 coaches per day
0.07 men per coach
14.0
4 Sick line 90 coach
holding
0.05 men per
coach holding 4.5
Total 47.45
Leave reserve @ 12.5% 5.93
Total 53.38 say 53 men
BATHINDA (BTI) AC coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung -- 1.75/coach holding --
SGAC RMPU 3 coach 1.40/coach holding 4.2
EOG U/Slung -- 1.40/coach holding --
EOG RMPU -- 1.00/coach holding --
Seco
ndary
Main
t Ac
Coach
/day SGAC U/Slung --- 0.90/Coach/day --
SGAC RMPU 3 coach 0.7/coach handled /day
2.1
EOG U/Slung -- -- --
EOG RMPU -- 1.00/coach handled --
Train Passing 39 coach 0.13/coach 5.07
Coach
Hold
ing Sick line Attention 3 coach 0.25/coach 0.75
Power Cars -- 12/ 10 power car --
Material storage/Accountal 3 coach holding 15 man for 500
coach holding
1
Statistical work 3 coach holding 8 man for 150 or
more holding
1
Total 14.12
LR @ 12.5% 1.76
Total 15.88 say 16
21
2.6.8 NANGALDAM (NLDM) TL coaching.
SN Activity Workload Yard Stick
Proposed
requirement of staff
1 Primary maintenance 47 coach holding 0.3 men per
coach holding 14.1
2 Secondary maintenance. 12 coaches per day
0.15 men per coach
1.8
3
Term/Train passing mail/express
-- 0.07 men per coach
--
Term/Train passing
passenger
-- 0.06 men per
coach --
4 Sick line 47 coach holding
0.05 men per coach holding
2.35
Total 18.25
Leave reserve @ 12.5% 2.28
Total 20.53 say 21 men
NANGALDAM (NLDM) AC coaching:
Activity Work load Yard Stick Proposed Staff
Prim
ary
Main
t A
C
Coach
Hold
ing
SGAC U/Slung 4 coach 1.75/coach holding 7.0
SGAC RMPU 4 coach 1.40/coach holding 5.6
EOG U/Slung -- 1.40/coach holding 00.0
EOG RMPU -- 1.00/coach holding 00.0
Seco
ndary
Main
t Ac
Coach
/day SGAC U/Slung --- 0.90/Coach/day 00.0
SGAC RMPU 4.7 coach 0.7/coach handled /day
3.29
EOG U/Slung -- -- 00.0
EOG RMPU -- 1.00/coach handled 00.0
Train Passing 2 coach 0.13/coach 0.26
Coach
Hold
ing Sick line Attention 8 coach 0.25/coach 2.00
Power Cars NIL coach 12/ 10 power car 00.0
Total 18.15
LR @ 12.5% 2.26
Total 20.41 say 20
22
2.6.9 DHURI (DUI) TL coaching.
At present 3 men are working against the sanctioned strength of 2 men at
DUI. This is a small station 2 men are sufficient to cope up the existing work
load. The proposed requirement comes to 02 men including LR.
2.7.0 The summarized position of existing Sanctioned, proposed and surplus staff
of Train lighting and AC staff working over UMB division is as under:
S N Station
T/L (A) AC (B)
S/S Proposed Surplus (+) Shortage (-)
S/S Proposed Surplus (+) Shortage (-)
1 SRE 49 12 37 18 07 11
2 UMB 59 88 -29 48 60 -12
3 KLK (BG) 42 38 04 37 33 04
4 KLK (NG) 0 13 -13 0 0 0
5 SML 0 03 -03 0 0 0
6 CDG 47 49 -02 121 82 39
7 BTI 43 53 -10 09 16 -07
8 NLDM 15 21 -06 25 20 05
9 DUI 02 02 00 0 0 0
TOTAL 257 279 -22 258 219 +40
Grand Total sanction TL & AC Staff (A+B) = 515 Total Proposed TL & AC Staff (A+B) = 497 Total Surplus posts of TL & AC = 18
The above table reveals that the proposed requirement of TL & AC staff comes
to 498 against the sanctioned strength of 515 and 18 posts identified as surplus
in different categories and grades under SSE/TL and SSE/AC of electrical deptt
over UMB division.
RECOMMENDATION NO.1
It is proposed that 18 posts of train lighting staff and AC staff of electrical deptt in different categories and grades over Ambala Division identified as surplus and recommended for surrendered as under:-
S.N Category Pay scale & grade
pay
No. of surplus posts
1 Group ‘C’ Staff 5200-20200-1900 02
2 Group ‘D’ Staff 5200-20200-1800 16
Total 18
******
23
3.0.0 FINANCIAL IMPLICATIONS
S N Category Pay scale +
Grade pay
No.
of
post
s
Rec.
No
Monthly
value per
posts .
Total annual
recurring
saving .
1 Group ‘C’ Staff 5200-20200-1900 02 1 43212/- 1037088/-
2 Group ‘D’ Staff 5200-20200+1800 16 1 38948/- 7478016/-
Total 18 8515104/-
No. of posts identified as surplus: -
Group ‘C’ = 02 posts Group ‘D ’= 16 posts Total = 18 posts
Anticipated recurring saving = 85.15 lakh per annum Capital saving = Nil Total saving = 85.15 lakh per annum
****
24
4.0.0 PRODUCTIVITY
4.1.0 The total annual expenditure incurred on the sanctioned strength of 515
posts of Train lighting & AC staff of UMB Division is tabulated below:-
SN
Category
Pay Scale + Grade Pay
Monthly value per posts
S/S Total annual expenditure in
1 MCM 9300-34800+4200 76856/- 14 12911808/-
2 Tech-I 5200-20200+2800 63180/- 73 55345680/-
3 Tech-II 5200-20200+2400 55432/- 47 31263648/-
4 Tech-III 5200-20200+1900 43212/- 172 89189568/-
5 Khallasi 5200-20200+1800 38948/- 209 97681584/-
Total 515 286392288/-
The above table reveals that 286392288/- has to be incurred on the
existing sanctioned strength of Train lighting & AC staff over UMB Divn.
4.2.0 Expenditure to be incurred on the proposed requirement of Train
lighting & AC staff over UMB Divn.
S
N
Categ
ory
Pay Scale +
Grade Pay
Monthly
value
per
posts
Propos
ed
strengt
h
Total annual
expenditure
1 MCM 9300-34800+4200 76856/- 14 12911808/-
2 Tech-I 5200-20200+2800 63180/- 73 55345680/-
3 Tech-II 5200-20200+2400 55432/- 47 31263648/-
4 Tech-III 5200-20200+1900 43212/- 170 88152480/-
5 Khallasi 5200-20200+1800 38948/- 193 90203568/-
Total 497 277877184/-
The above table reveals that the expenditure on proposed staff of Train
lighting & AC staff will come to 277877184/-over UMB Division.
25
WORK STUDY REPORT DETAILED CHART
Department : - Electrical Deptt
Name of study : - Review of Train lighting & AC staff over UMB Divn.
Activity centre :- Train lighting & AC Depot over UMB Divn.
SN
Sub activity Center
Brief description of Staff
Work Study Recommendation
Representative workload
1 SRE, UMB, KLK (BG), KLK (NG), SML, CDG, BTI, NLDM & DUI
S/S -515 O/R –350 Vacc -165
S/S -515 Proposed –497 Surplus -18 (Gr ‘C’)-02 (Gr ‘D)-16
Primary/secondary maintenance, train passing and sick line activities for maintenance of fans, bulbs/ tube lights, dynamos/ alternators, batteries and switch gear etc. of AC & non AC coaches by train lighting staff.
26
LIST OF ANNEXURES
S.N. Description Annexure
No.
1 Authority letter No. 16-CP/15/WS/17-18
dt.17.04.2017 to conduct the study I
2
Statement showing category and grade
wise sanctioned and on roll position of
train lighting & AC staff of Electrical
Deptt over UMB Divn.
II
*****