11-05-2016 06-06-2016 POSITION SAT DIVERLOCATION VASIM FILEDCLIENT L &T, ONGCVESSEL SEAMEC PRINCESSJOB Installation 6” spool with 10”pipeline on letral “T” use the
hydro lick jecks for titaning the flange nut bolt use the hydro camos for lick tasting on flange use mud lift for trunch .
COMPANY International grout operation pvt.ltd
15-02-2016 17-03-2016 POSITION SAT DIVERLOCATION SPD 13A (IRAN FILED)CLIENT PGFKVESSEL SEAMEC PRINCESSJOB Installation lubricetar on well head no 5 & open the back
presser valve for fill the grout in well no 5, open the all valve on well head no 5 & monitar the all gage .
COMPANY Synergy sub sea engineering LLC (UAE)
04-03-2015 05-04-2015 POSITION SAT DIVERLOCATION PANNA FILEDCLIENT LT SAPURA,BG INDAIVESSEL LTS 3000JOB Installation 14” 6” spool use the hydro lick jeck for titaning
the flange nut bolt use the camos for lick tasting on flange remove the old riser install the 14”10” 6”new riser on the prosesh platform ,jackets
COMPANY International grout operation pvt.ltd
03-01-2015 04-02-2015 POSITION SAT DIVERLOCATION Bombai highCLIENT Leighton india (ONGC)VESSEL Seamec 3 (DSV)JOB Remove the oil, gas, well flued 12”16”18” riser and riser
clamp,using the broco & cold cutterCOMPANY International grout operation pvt.ltd
30-10-2014 02-12-2014 POSITION SAT DIVERLOCATION PANNA FILED(india)CLIENT BG INDIA(LT SAPUR)VESSEL Seamec 3 (DSV)JOB Installation riser clamp, retrifited anode, grommet wire
bow shilling on leg, cut the 14” pipe line from J tube to till 150 mtr. towords the pipe line using the broco
COMPANY International grout operation pvt.ltd
12-03-2014 15-04-2014 POSITION SAT DIVERLOCATION Bombay HighCLIENT Leighton(ONGC)VESSEL Seamec 3 (DSV)
Page | 1
WORK EXPERIENCE KUSHAL JAIN
JOB Installation riser clamp, I tube clamp, clamp rise clamp, anode, close the riser, I tube clamp, grommet wire ,bow shilling, on leg install the lift bag for lifting the pipe line on cross creation for grouting
COMPANY International grout operation pvt.ltd
27-12-2013 20-01-2013 POSITION SAT DIVERLOCATION Bombay HighCLIENT Leighton(ONGC)VESSEL Seamec 3(DSV)JOB Installation riser clamp, anode, grommet wire ,bow shilling,
On leg.COMPANY International grout operation pvt.ltd
04-10-2013 27-11-2013 POSITION SAT DIVERLOCATION Bombay High CLIENT Leighton(ONGC)VESSEL Seamec 1(DSV)JOB Installation riser clamp, anode, grommet wire ,bow shilling,
On leg and grout bag on 12’pipe line on cruse creation COMPAN International grout operation pvt.ltd
13-04-2013 19-05-2013 POSITION SAT DIVERLOCATION Bombay High CLIENT Leighton(ONGC)VESSEL Seamec 3(DSV)JOB Pre Engineering survey for riser clamp ,close the riser
clamp, install the grout bag on cross correction , as belt survey on pipe line & cross correction, bottom survey for new riser installation
COMPANY International grout operation pvt.ltd
16-02-2013 21-03-2013 POSITION SAT DIVERLOCATION Bombay High CLIENT Leighton(ONGC)VESSEL Seamec 3(DSV)JOB cut the riser, riser clamp & remove on surface use the
hydraulic cutter for riser cut install the grout bag under the 6”,8”gas pipe line & fill the grout in bag
COMPANY International grout operation pvt.ltd
15-12-2012 23-01-2013 POSITION SAT DIVERLOCATION Bombay High CLIENT Leighton(ONGC)VESSEL Seamec 3(DSV)JOB Installation riser clamp, anode cut the anode and ABS
survey. Taken CP reading on the member and clamp.
Page | 2
WORK EXPERIENCE KUSHAL JAIN
COMPANY International grout operation pvt.ltd
19-06-2012 10-07-2012 POSITION AIR DIVERLOCATION Bantara filed in Malaysia CLIENT BC PETROLEUM / TLOVESSEL DLB norce EndeavourJOB Installation monopod,condactar clamp, riser clamp, anode
clamp tensing wire on monopod drive pile & cashing using the vibro & manck hammer in bantra filed in Malaysia
COMPANY International grout operation pvt.ltd
02-02-2012 22-02-2012 POSITION SAT DIVERLOCATION PANNA FILEDCLIENT B.G.I.VESSEL Gal inatallar JOB Inspection of anode and member ,riser,taken
U.T.&C.P.ridding on member ,anode ,riser,mgr on platform member ,and anode
COMPANY Suprim hydro
18-03-2011 22-04-2011 POSITION SAT DIVERLOCATION Mumbai high CLIENT NPCCVESSEL Seamec princess (DSV)JOB Installation the anode and survey the 6”and 16”pipe line
crose cration the 6”&16” pipe line installation the grout beg under 6”& 16” pipe line.
COMPANY International grout operations pvt ltd
22-12-2010 25-02-2011 POSITION SAT DIVERLOCATION Mumbai highCLIENT L/T SAPURA CRESTVESSEL LTS-3000JOB Installation the new MHN processing platform and cut the
bounce tank from MHN platformCOMPANY International grout operations pvt. Ltd.
12-02-2010 30-04-2010 POSITION AIR DIVERLOCATION Mumbai high CLIENT LEIGHTONVESSEL ECLIPESJOB Remove the old riser and riser clamp ,pipe line installed the
new riser ,riser clamp. COMPANY Dolphin offshore india ltd
01-12-2009 30-01-2010 POSITION AIR DIVER
Page | 3
WORK EXPERIENCE KUSHAL JAIN
LOCATION Mumbai highCLIENT LEIGHTON VESSEL Seamec-1JOB Installation the riser clamp on jacket and processing
platform.COMPANY Dolphin offshore india ltd.
08-07-2009 21-09-2009 POSITION AIR DIVERLOCATION Salman filedCLIENT IRAN PETROLIUMVESSEL Bravo sapphireJOB Inspection of anode ,riser ,riser clamp, cleaning of riser
clamp anode and member for M.P.I.COMPANY Dulam int. ltd
05-12-2008 30-01-2009 POSITION AIR DIVERLOCATION RPL sikkaCLIENT RPLVESSEL MYNXJOB Istallation the cashing ,pile and plam cut the pile for pin
and guide the pile in cashing and inspection the plam valve flange
COMPANY Bekk solution( hong kong)
05-12-2008 30-01-2009 POSITION AIR DIVERLOCATION RPL sikkaCLIENT RPLVESSEL MYNXJOB Istallation the cashing ,pile and plam cut the pile for pin and
guide the pile in cashing and inspection the plam valve flange
COMPANY Bekk solution( hong kong)
19-07-2007 20-09-2007 POSITION AIR DIVERLOCATION Masko filed (Qatar)CLIENT Masko petroliamVESSEL PLB-648JOB Laying of pipe line & constration job.COMPANY CCC under water eng. (UAE)
28-02-2007 29-03-2007 POSITION AIR DIVERLOCATION Bombay highCLIENT NPCCVESSEL HLS-2000JOB Installation the riser clamp on jacket & platform.COMPANY Dolphin offshore india ltd
Page | 4
WORK EXPERIENCE KUSHAL JAIN
01-12-2006 31-01-2007 POSITION AIR DIVERLOCATION RPL sikkaCLIENT leghtionVESSEL Mynx bargeJOB Installation sleeper near the 24”pipe line for crossing the
another six pipe line .COMPANY Bekk solution Ltd. (HONG KONG)
19-12-2005 16-01-2006 POSITION AIR DIVERLOCATION Bombay highCLIENT NPCCVESSEL HLS-2000JOB Installation S.B.M. Bombay high D filed do constration job.COMPANY CCC under water eng. (UAE)
25-10-2005 12-11-2005 POSITION AIR DIVERLOCATION oman filedCLIENT OMAN PETROLIAMVESSEL Ocean-6JOB Remove the old SBM installed the new SBMCOMPANY Fraser diving international (UAE)
23-08-2005 20-09-2005 POSITION AIR DIVERLOCATION AldabeiaCLIENT NPCCVESSEL ILANDJOB Laying of pipe line &constraction job.COMPANY CCCunder water eng. (UAE)
22-01-2005 14-05-2005 POSITION AIR DIVERLOCATION Bombay high CLIENT NPCCVESSEL DLB 1000JOB Laying of pipe line & constration job.COMPANY CCCunder water eng.(UAE)
05-11-2004 29-11-2004 POSITION AIR DIVERLOCATION Bombay high CLIENT ONGCVESSEL Seamec 2JOB Installed the riser clamp on jacket &platform for new riser
installation inspection & installed the riser clamp take the C.P. Ridding on clamp ,member cut the anode ,clamp on mamber
COMPANY Dolphin offshore india ltd.
Page | 5
WORK EXPERIENCE KUSHAL JAIN
12-09-2004 20-04-2004 POSITION AIR DIVERLOCATION Rava filedCLIENT ONGCVESSEL Malaviya -12JOB M G R on platform,leg,sbm chain clear the fishing net on
leg,sbm chain inspection on sbm chain &tack the measurement on chain .
COMPANY Dolphin offshore india ltd.
07-05-2004 17-05-2004 POSITION AIR DIVERLOCATION Bombay high north ,south,hira filedCLIENT ONGCVESSEL Ganga dolphinJOB Installed the clamp on riser for holding the G.R.E.pipe.
tideup assess band strips &tie wrapCOMPANY Dolphin offshore india ltd.
24-03-2004 30-04-2004 POSITION AIR DIVERLOCATION Bombay high south filedCLIENT ONGCVESSEL Ganga dolphinJOB Cleaning & riser inspection taken U.T.&C.P. reding on
member ,anode , COMPANY Dolphin offshore india ltd.
05-10-2003 09-10-2003 POSITION AIR DIVERLOCATION Panna filedCLIENT B.G.I.VESSEL SPMJOB Inspection of the sub sea house and joint flange.COMPANY Ocean diving center pvt. Ltd.
11-08-2003 29-09-2003 POSITION AIR DIVERLOCATION Panna filedCLIENT B.G.I.VESSEL SPMJOB Maintenance of SPM morring and de morring of the tanker
change boggiwheel ,morring houser ,on spm COMPANY Ocean diving center pvt.ltd.
01-08-2003 03-08-2003 POSITION AIR DIVERLOCATION Panna filedCLIENT B.G.I.VESSEL SPMJOB Changed of morring hourse ,flooting hose & tankerCOMPANY Ocean diving center pvt.ltd
Page | 6
WORK EXPERIENCE KUSHAL JAIN
04-04-2003 24-04-2003 POSITION AIR DIVERLOCATION Panna filedCLIENT B.G.I.VESSEL p.g. jacketJOB m.g.r.on jackets ,barge bumper pigglines .riser
clamps,anodes bot landing & conductorCOMPANY Ocean diving center pvt.ltd.
11-01-2003 09-03-2003 POSITION AIR DIVERLOCATION RPL sikkaCLIENT RPLVESSEL m.t. kalika
JOB Inspection of permanent boom wire ,sinker ,sinker ped eye , shackle ,inspection of north &shouth jacket ,anodes, marring growth, water suction pump,taken U.T. & C.P. reading on anodes ,pile , H.M.V.D.M. Connecting extra piece of chain between boom &ped eye to sinker ped eye inspection of finder chain & finder on birth A,B,C,D,
COMPANY Ocean diving center pvt.ltd.
23-12-2002 28-12-2002 POSITION AIR DIVERLOCATION Bombay highCLIENT ONGCVESSEL Pride pennsylvaniaJOB Cleaning carry out for NDT inspection as per ABS requrimentCOMPANY Ocean diving center pvt.ltd
26-07-2002 23-08-2002 POSITION AIR DIVERLOCATION Panna filedCLIENT B.G.I.VESSEL SPMJOB Mooring & de mooring of tanker changed mooring houser &
accessories.COMPANY Ocean diving center pvt.ltd.
16-04-2002 18-04-2002 POSITION AIR DIVERLOCATION Bombay highCLIENT ONGCVESSEL Ed holt rigJOB Cleaning carry out for NDT inspection as per ABS requriment
check the speat can hull demage and marked for videography leg also
COMPANY Ocean diving center pvt. Ltd..
20-03-2002 24-03-2002 POSITION AIR DIVERLOCATION RPL sikka
Page | 7
WORK EXPERIENCE KUSHAL JAIN
CLIENT RPLVESSEL m.t.KALIKAJOB Cleaning and inspection of the anodes ,leg taken
U.T.&C.P.reading on h.m. v.d.m. leg video graphy on leg COMPANY Ocean diving center pvt.ltd.
28-12-2001 19-03-2002 POSITION AIR DIVERLOCATION RPL SIKKACLIENT RPLVESSEL M. t. kalikaJOB Removed the object near the barth and piles inspection of
refareation anodes clamp, c.p.pipe indication bio,bridle chain sinker ped eye <D> shackle on the sinker
COMPANY Oceandiving center pvt.ltd.
06-08-2001 13-09-2001 POSITION AIR DIVERLOCATION Panna filedCLIENT ENRONVESSEL SPMJOB Mooring & demooring of the tanker changed the mooring
hawser ,accessories maintenance of SPMCOMPANY Ocean diving center pvt.ltd.
04-05-2001 07-05-2001 POSITION AIR DIVERLOCATION Rava filedCLIENT Can anrgyVESSEL SPMJOB Inspection of sub sea hose and chainCOMPANY Ocean diving center pvt.ltd
14-04-2001 25-04-2001 POSITION AIR DIVERLOCATION Panna filedCLIENT ENRONVESSEL SPMJOB Maintenance of the spm COMPANY Ocean diving center pvt. Ltd.
16-02-2001 10-03-2001 POSITION AIR DIVERLOCATION RPLjettyCLIENT SAIPEM U.K.VESSEL m.t. kalikaJOB Cleaning carry out on pile and anodes placing of grout begs
under II S.P.M. pipe line inspection of clamp ,anodes and pile
COMPANY Ocean diving center
21-10-2000 15-12-2000 POSITION AIR DIVER
Page | 8
WORK EXPERIENCE KUSHAL JAIN
LOCATION chanaiCLIENT NAFTAVESSEL Barge Cormandal keirJOB Laying of pipe line and installation manifold PLEM on nafta
pipe line installation of single point mooring system (calm type SPM) install the sub sea hose cut of bulkhead ,piles for pin to plam SPMchain measured by i0nclinometer.
COMPANY Ocean diving center pvt.ltd.
29-09-2000 20-10-2000 POSITION AIR DIVERLOCATION chanaiCLIENT NAFTAVESSEL Barge asl 39JOB Clear the mud in pipe line by air lifting & hydraulic lift on
shore side and off shore side on various pipe by taking the measurements diver tight nut &boult of chloring pipe in take head no.71 and seal the port side s of the pipe line joint by cement at 1 clock to 3 clock diver guide the extension piece of mail hole mud lifting carry out for putting the spool piece of nafta line nut bolts tighten by hydraulicgive preaser up to 10000PSIto 12000 PSIof spool piece on on shore side
COMPANY Ocean diving center pvt. Ltd.
16-09-2000 23-09-2000 POSITION AIR DIVERLOCATION Bombay highCLIENT ABHANVESSEL Abhan2 rigJOB Cleaning carry out for NDT inspection as per ABS requrimentCOMPANY Ocean diving center pvt.ltd.
05-03-2000 30-06-2000 POSITION AIR DIVERLOCATION Panna filedCLIENT ENRONVESSEL SBMJOB Maintenance of sbm replacing the boggiwheel,mooring
houser,flooting hose,shackleCOMPANY Ocean diving center pvt.ltd.
23-o1-2000 24-01-2000 POSITION AIR DIVERLOCATION Bombay portCLIENTVESSEL Prime 5JOB Patching the self propeller barge hole by using the 5mm
plat with nut & bolt COMPANY Ocean diving center pvt.ltd.
Page | 9
WORK EXPERIENCE KUSHAL JAIN
22-01-2000 POSITION AIR DIVERLOCATION Bombay portCLIENTVESSEL Amer yamanaJOB c.c.t.v.survey of amer yamana ship on C chest propeller,
bottom hull rudder. COMPANY Ocean diving center pvt.ltd.
19-01-2000 POSITION AIR DIVERLOCATION Bombay portCLIENTVESSEL seajainJOB Videography of ship bottom hull, rudder,propeller as per
ABS requrimentCOMPANY Ocean diving center pvt.ltd.
05-01-2000 15-01-2000 POSITION AIR DIVERLOCATION Panna fieldCLIENT ENRONVESSEL PC jacketJOB inspection of riser & riser clamp taken C.P.meter riding on
member ,riser clamp, anode COMPANY Ocean diving center pvt.ltd.
14-12-1999 25-12-1999 POSITION AIR DIVERLOCATION Bombay highCLIENT ONGCVESSEL TPST jacketJOB Inspection of riser & riser clampCOMPANY Ocean diving center pvt.ltd.
12-10-1999 04-11-1999 POSITION AIR DIVERLOCATION Panna fieldCLIENT ENRONVESSEL S B MJOB Maintenance of SBMand replacing the boogi wheel,mooring
houser,flotting hose ,monkey plate & shackle.COMPANY Ocean diving center pvt.ltd.
19-07-1997 30-09-1999 POSITION AIR DIVERLOCATION Rpl jamnagarCLIENT RPLVESSEL Barge ragina 250JOB Leak tasting on pipe line, spool peace ,flange &video graphy
on flange & sbm, installation the cathodic protecation anod on pile remove the clamp on 24” pipe line.
COMPANY Ocean diving center pvt.ltd.
Page | 10
WORK EXPERIENCE KUSHAL JAIN
27-06-1999 05-07-1999 POSITION AIR DIVERLOCATION Panna fieldCLIENT ENRONVESSEL S b mJOB Maintenance of the SBM in panna fildCOMPANY Ocean diving center pvt.ltd.
22-06-1999 25-06-1999 POSITION AIR DIVERLOCATION Bhira damCLIENT TATA POWER PLANTVESSEL On damJOB Inspection of the tunnel and getsCOMPANY Ocean diving center pvt.ltd.
27-03-1999 04-04-1999 POSITION AIR DIVERLOCATION Rpl jettyCLIENT SAIPEM U.K.VESSEL Bumika bargeJOB Inspection of pipe line spool peace &flange did video
graphyCOMPANY Ocean diving center pvt.ltd.
21-11-1998 03-01-1999 POSITION AIR DIVERLOCATION Rpl jettyCLIENT SAIPEM U.K.VESSEL Paral marineJOB Cut the cashing&pile fit the wages between pile & cashing
bring te sample of grouting in side the frameinspection of cashing and grouting .
COMPANY Ocean diving center pvt.ltd.
10-11-1998 18-11-1998 POSITION AIR DIVERLOCATION Bombay highCLIENT TRIDANTVESSEL Tdant 2 rigJOB Cleaning carry out for NDT inspection as per ABS requrimentCOMPANY Ocean diving center pvt. Ltd.
23-10-1998 07-11-1998 POSITION AIR DIVERLOCATION Rpl jAMNAGARCLIENT SAIPEM U.K.VESSEL Casthro-7JOB Laying of pipe line did construction job.COMPANY Ocean diving center pvt.ltd.
09-05-1998 20--05-1998 POSITION AIR DIVERLOCATION dahesCLIENT IPCL
Page | 11
WORK EXPERIENCE KUSHAL JAIN
VESSEL On shore to offshoreJOB Laying of pipe line & did constration job & ship bottom
inspection ,video graphyCOMPANY Ocean diving center pvt.ltd.
16-02-1998 09-03-1998 POSITION AIR DIVERLOCATION Mumbay highCLIENT HITECHVESSEL Hitdrill rigJOB Cleaning carry out for NDT inspection as per ABS requrimentCOMPANY Ocean diving center pvt.ltd.
06-02-1998 14-02-1998 POSITION AIR DIVERLOCATION Naval docyardCLIENT NAVYVESSEL jettyJOB Frame setting using air lift ,jack hammer for grouting &block
placing.COMPANY Ocean diving center pvt.ltd.
15-09-1997
25-09-1997 POSITION AIR DIVER
LOCATION Naval docyardCLIENT NAVYVESSEL jettyJOB Cut of the water stop lock gatsCOMPANY Ocean diving center pvt.ltd.
30-04-1997
04-05-1997 POSITION AIR DIVER
LOCATION Okha portCLIENT ELCOMVESSEL portJOB Cleaning carry out for NDT inspection as per ABS requrimentCOMPANY Ocean diving center pvt.ltd.
18-04-1997
25-04-1997 POSITION AIR DIVER
LOCATION Bombai highCLIENT ONGCVESSEL Parro negaro -3 rigJOB Cleaning carry out for NDT inspecation as per ABS
requrimentCOMPANY Ocean diving center pvt.ltd.
06-04-1997 15-04-1997 POSITION AIR DIVERLOCATION Bombai high
Page | 12
WORK EXPERIENCE KUSHAL JAIN
CLIENT ONGCVESSEL Sagar ratna rigJOB Cleaning carry out for NDT inspecation as per ABS
requriment COMPANY Ocean diving center pvt.ltd.
17-01-1997 24-01-1997 POSITION AIR DIVERLOCATION Bombai highCLIENT ONGCVESSEL Sagar sakti rigJOB Cleaning carry out for NDT inspecation as per ABS
requrimentCOMPANY Ocean diving center pvt.ltd.
05-12-1996 15-02-1996 POSITION AIR DIVERLOCATION Bombay HighCLIENT ONGCVESSEL Deep sea matdrillJOB Cleaning carry out for NDT inspecation as per ABS
requrimentCOMPANY Ocean diving center pv. Ltd.
19-10-1996 01-11-1996 POSITION AIR DIVER LOCATION Bombay high CLIENT ONGC VESSEL Ed- hold rig JOB Cleaning carry out for NDT inspecation as per ABS
requriment COMPANY Ocean diving center pvt ltd