Work Breakdown Structure
Subtitle
![Page 2: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/2.jpg)
WBS Characteristics:
▪ The Work Breakdown Structure is a hierarchy which specifies the list of tasks involved in a project – down to the finest detail.
▪ The WBS splits the task list up into major ‘packages’
▪ On the following slide, is the WBS for the project to outsource these Learning Materials.
![Page 3: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/3.jpg)
![Page 4: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/4.jpg)
Packages:
▪ The split of the task list into different packages should be logical, and also compatible with regards to cost control and reporting.
▪ For each Package, it should be possible to test whether the entire package is completed or not.
▪ You will see 5 different packages in the previous example.
![Page 5: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/5.jpg)
Lowest Level:
▪ The lowest level of each activity on a WBS should be an individual task
▪ This task should be possible to complete by an individual, or team, within a reasonable defined period of time.
▪ For example, delegating the task of drawing up action lists could be completed by an individual within a defined period of time, such as one afternoon.
![Page 6: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/6.jpg)
Limitations to the WBS:
▪ No consideration for the order in which tasks should be carried out, and whether a task is dependant on another.
▪ No representation of how long each task might take.
▪ Does not show you who, or what resources are involved in each task.
![Page 7: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/7.jpg)
Alternatives to WBS:
1. Product Breakdown Structure
2. Cost Breakdown Structure – Completed AFTER the Work Breakdown Structure and Product Breakdown Structure
![Page 8: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/8.jpg)
Product Breakdown Structure:
• This is a tool for dealing with complex products, such as the motorcycle in the opposite example.
• The PBS provides a means for identifying all the components that make up a particular product.
• It is worth noting the Project Management methodology PRINCE uses the PBS as an alternative to the WBS.
![Page 9: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/9.jpg)
Cost Breakdown Structure:
• The CBS can only be completed after the WBS and PBS (if any). This is because, for example, the costs of labour should be possible to cross reference with the WBS.
• This is a tool for identifying each cost category associated with a project
![Page 10: Work breakdown Structure](https://reader036.fdocuments.in/reader036/viewer/2022081820/54681695af7959b65d8b7109/html5/thumbnails/10.jpg)
Sources and Further Reading:
▪ Field, M. and Keller, M. (1998), Croatia: Thomson Learning– Chapter 2.1
▪ Servello, M. and Evans, M. W. (2002) Work Breakdown Structure. Encyclopedia of Software Engineering.