PART I 505E TURBINE CONTROL & TURBINE INTERLOCK SYSTEM KEBB 2X150 TPH + 1X32MW COAL BASED POWER PLANT PT. PETROKIMIA GRESIK, EAST JAVA PREPARED BY : NAME : ARIPIN HP: 081320009898 EMAIL : [email protected] KEBB PT. PETROKIMIA GRESIK FOR KEBB PT. PETROKIMIA GRESIK PAGE : 1 of 14

description

training ww 505e

Transcript of Woodward 505e

  • PART I

    505E TURBINE CONTROL

    &

    TURBINE INTERLOCK SYSTEM

    KEBB 2X150 TPH + 1X32MW COAL BASED POWER PLANT

    PT. PETROKIMIA GRESIK, EAST JAVA

    PREPARED BY :

    NAME : ARIPIN

    HP: 081320009898

    EMAIL : [email protected]

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    PAGE : 1 of 14

  • 505E TURBINE CONTROL

    The 505E is 32 bit microprocessor based control to control speed ( or load) turbine and steam extraction turbine.

    Turbine Control Device : Type : 505E

    Version : 2.06-6A

    Manufacturer : WOOWARD, FORT COLLINS CO, USA.

    Electrical Configuration :

    1. Power Supply input : 24 VDC (18 32VDC, 77VA max, 6.25A internal fuse) 2. Signal for HP Servo valve : 1 point, 4-20mA 3. Signal for LP Servo valve : 1 point, 4-20mA 4. Analog Input point : 6 points, 4-20mA 5. Analog Output point : 6 points, 4-20mA 6. Digital Input point : 16 points, 18 26VDC 2.5mA. 7. Digital output point : 8 points (NO/NC). 8. Aux. Power : 7 points, 24VDC 200mA max. 9. Speed Sensor input : 2 points (MPU = passive, Proximity Probe = active) 10. Serial Communication Ports : 2 ports (Modbus communication : RS-232, RS-422, RS485)

    FUNCTION OF BUTTON

    1. PRGM (Program) : to change all parameter (shutdown mode)

    2. RUN : to Activate the 505E

    3. STOP : to deactivate the 505E (once verification is given)

    PAGE : 2 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    acerText Box3

    acerText Box505E Version 2.06-6A

  • 4. RESET : to clear all alarm

    5. F1 (Alarm) : to display any alarm

    6. F2 (over speed test enable) : command for over speed test.

    7. F3 : (Not Programmed)

    8. F4 : to enable or disable extraction, Light ON Extraction Active.

    9. SCROLL : Push the button left rigt, up down to display the parameter what do you want.

    10. SELECT : push the button up or down to select current display (@)

    11. ADJ : to up or down the parameter (Run Mode)

    12. NO (0) : enter 0 or NO button to disable our command

    13. YES (1) : enter 1 or YES button to enable our command

    14. ACTR (2) : to display current actuator position (Run Mode)

    15. CONT (3) : to display the parameter which is in control (Run Mode)

    16. CAS (4) : (Not Programmed)

    17. RMT (5) : Remote speed set point control information (Run Mode)

    18. LMTR (6) : to display the valve limiter information (Run Mode)

    19. Speed (7) : to display current speed & setting (Run Mode)

    20. AUX (8) : (Auxiliary,Not Programmed)

    21. KW (9) : to display current KW & Speed (Run Mode)

    22. CLEAR : Clear Program / Run Mode entries, and takes to main display

    23. EXT/ADM : Enter a decimal point or displays the extraction information (Run Mode)

    24. DYN : Accesses the dynamic setting of the parameter controlling the actuator position (Run Mode)

    25. ENTER : Enter new values in the program mode. And allows the direct entry of the setpoint values in the run mode.

    26. EMERGENCY STOP : Emergency Shutdown command for the control.

    PAGE : 3 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • PAGE : 4 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • SPEED PID OPERATIONAL MODE

    The Speed PID operates in one of the following modes, depending on configuration and system conditions :

    1. Speed Control ------- > Gen. And Utility Breaker are open 2. Frequency Control ---- > Gen. Breaker is Closed, and Utility Breaker is open (Single Running) 3. Unit load Control ----- > Gen. Breaker and Utility Breaker are Closed (Synchrone Running)

    - Turbine HP and LP valve position control - Generator Load Control

    NOTE : in KEBB Petrokimia, signal indication for Utility Breaker is looped (jump) with Generator Breaker.

    When not programmed for Generator application, the 505E speed PID operates in a speed control mode at all times. When programmed for Generator application, the state of the Generator and utility breaked determine the operational mode of the speed PID.

    If the Generator breaker is OPEN, the speed PID operates in a SPEED CONTROL MODE.

    If the Generator breaker is CLOSED, and the utility breaker is open, the FREQUENCY CONTROL MODE is selected.

    When Generator breaker and utility breaker are close, a UNIT LOAD CONTROL MODE is selected.

    While in the Speed Control Mode, the Speed PID will control a turbine at the same speed or frequency regardless of the load its supplying ( up to the units load capability). With this configuration, no form of droop or second controlling parameter (KW signal) is used by the PID for stability or control.

    The Unit Load PID have 2 (two) parameters to control unit load and act as a stabilizing effect for any change in bus / utility frequency. With this configuration, when bus frequency decrease or increase, unit load increase or decrease respectively.

    F (frequency) ------- > kW (Load)

    F (frequency) ------- > kW (Load)

    PAGE : 5 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • 3000rpm

    0

    3210rpm

    SP

    EE

    D S

    ETTING

    Actual Frequency set by the utility (+/- 50H

    z)

    50% Load

    100% Load

    kW LO

    AD

    FRE

    QU

    ENC

    Y IS SE

    T BY TH

    E U

    TILITY G

    RID

    / PLN

    LOA

    D V

    AR

    IES

    WITH

    SPEED SET PO

    INT

    (FRE

    QU

    EN

    CY

    AN

    D LO

    AD R

    ELATION

    SHIP)

    PAGE : 6 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    acerText Box3180rpm

    acerText Box+/- 50Hz

  • +-

    PID

    TOO

    UTP

    UT

    0%E

    RR

    OR

    1. SP

    EE

    D C

    ON

    TRO

    L

    SPE

    ED S

    ET PO

    INT (U

    P TO

    3000RPM

    )

    TUR

    BINE

    SPE

    ED (3000R

    PM)

    +-

    PID

    5% of

    Rated speed

    AND

    0%E

    RR

    OR

    DR

    OP

    CA

    LC

    SPE

    ED S

    ET PO

    INT (U

    P TO

    3210RPM

    )

    TUR

    BINE

    SPE

    ED (3000R

    PM)

    UTILITY

    BR

    EAKER

    GEN

    . BREA

    KER

    2. TUR

    BIN

    E IN

    LET V

    ALV

    E P

    OS

    ITION

    CO

    NTR

    OL W

    ITH FR

    EQ

    UE

    NC

    Y S

    WITC

    H ----> S

    ING

    LE R

    UN

    NIN

    G

    TOO

    UTP

    UT

    -

    PAGE : 7 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    acerText Box

  • +-

    PID

    5% of

    Rated speed

    +-

    PID

    5% of

    Rated speed

    AN

    D

    0%ER

    RO

    R

    AN

    D

    0%ER

    RO

    R

    DR

    OP C

    ALC

    DR

    OP C

    ALC

    SP

    EE

    D S

    ET P

    OIN

    T (UP

    TO 3210R

    PM

    )

    TUR

    BIN

    E S

    PE

    ED

    (3000RP

    M)

    UTILITY

    BR

    EA

    KE

    RG

    EN

    . BR

    EA

    KE

    R

    TOO

    UTPU

    T

    UTILITY

    BR

    EA

    KE

    RG

    EN

    . BR

    EA

    KE

    R

    GE

    N. K

    W

    SP

    EE

    D S

    ET P

    OIN

    T (UP

    TO 3210R

    PM

    )

    TUR

    BIN

    E S

    PE

    ED

    (3000RP

    M)

    TOO

    UTPU

    T

    3. GE

    NE

    RA

    TOR

    LOA

    D C

    ON

    TRO

    L WITH

    FRE

    QU

    EN

    CY

    SW

    ITCH

    AN

    D K

    W FE

    ED

    BA

    CK

    -----> SY

    INC

    HR

    ON

    E R

    UN

    NIN

    G

    --

    3. GE

    NE

    RA

    TOR

    LOA

    D C

    ON

    TRO

    L WITH

    FRE

    QU

    EN

    CY

    SW

    ITCH

    -----> SY

    NC

    HR

    ON

    E R

    UN

    NIN

    G

    PAGE : 8 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    acerText Box4.

  • AC

    TUA

    TOR

    -SERVO

    3000RPM

    TUR

    BINE

    SPEED

    VALVE

    LIMITER

    INLET M

    OTO

    RIZED

    VALVE

    MAN

    UA

    L START M

    OD

    E

    100%

    0%

    TIME

    (EXAM

    PLE : PAN

    ASIA PO

    WER

    PLANT) Q

    UIC

    K C

    LOSE

    /HY

    DR

    AULIC

    VALV

    E FULLY O

    PEN

    AN

    D BYP

    ASS VA

    LVE

    PAGE : 9 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • AC

    TUA

    TOR

    -SERVO

    3000RPM

    TUR

    BINE

    SPEED

    VALVE

    LIMITER

    SEM

    I AUTO

    MA

    TIC STAR

    T MO

    DE

    100%

    0%

    TIME

    (EXAM

    PLE : KEBB

    PETR

    OKIM

    IA POW

    ER PLAN

    T)

    QU

    ICK

    CLO

    SE /H

    YD

    RAU

    LIC VA

    LVE FU

    LLY OPEN

    INLET M

    OTO

    RIZED

    VALVE

    PAGE : 10 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • TURBINE START

    The 505E has 3 (three) turbine start mode : 1. Manual Mode

    2. Semi Automatic Mode

    3. Automatic Mode

    1. Check Turbine accessories ( example : EH Control Oil Pressure, Inlet Motorized Valve, Drain Valve, etc) or All important parameter to allow turbine start up. if OK --- > go to 505E.

    2. Start Permissive - Open the Quick Closed Valve/ Hydraulic Valve ( Right and Left) untill fully Open, and the

    limit switch will contact and send signal to 505E and DCS ----- > Fully Open - Click the 505 Run Permission Button on the Turbine & Gen Display DCS Computer,

    and click YES.

    3. Push RESET button - All alarms must be cleared, push the ALARM (F1) button to check alarm list if the button

    is LIGHT ON (RED). - If alarm still appear, check the parameter and interlock switch. The interlocked

    parameter must in safe range, and the not important parameter switch while the turbine start must be open (example : Generator Protection Switch, Vacuum protection, extraction protection).

    - 505E will ramp open the LP valve ( Extraction Valve) to fully open 100%. And the HP valve ( Inlet Turbine Valve) still in the position fully close 0 %.

    4. Push RUN button - The 505E in RUN mode will control the Turbine speed. - The HP Valve (Governor) will ramp open to minimum speed setting --- > 600 rpm. - And, Set the speed according to the Turbine Star up Chart.

    5. Setting The Speed - Push the SPEED Button (7)

    PAGE : 11 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • - Push ENTER button Insert New Value Setting ( example : 12 00), and the push ENTER button.

    ACTIVATE EXTRACTION NO. 2 IN 505E

    1. Check Extraction No. 2 line ( Motorized Valve, drain Valve, etc.) to allow extraction no. 2 active / enable. If ready, go to 505E to enable the extraction no. 2.

    2. Push F4, and then 3. Push YES /1 button to enable the Extraction. The display will change from disabled to

    enabled, and F4 button will light on (red colour).

    PAGE : 12 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • SPEED VS EXTRACTION PRIORITY

    Because an 505E has 2 (two) valve must be controlled ( Governor Inlet valve and Steam Extraction ). 505E can control 2 (two) parameter at a time. If the turbine reaches an operating limit, the result is only free moving valve to control with, thus the 505E can only control 1 (one) parameter.

    In KEBB Petrokimia, Speed Priority is programmed. The 505E will only control turbine speed/load When the turbine reaches an operating limit. When programmed for speed priority, the 505E will maintain speed/load and sacrifice extraction control. With this configuration the Extraction PID is forced to lose control of its process.

    PAGE : 13 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • A. ENCLOSED DRAWING :

    1. Control Oil HE Flow Chart 2. 505E wiring Diagram for DI/DO Points 3. 505E wiring Diagram for AI/AO Points 4. Turbine Hot Well Control Diagram 5. Turbine Alarm & Trip Setting 6. Turbine Shutdown Logic Diagram

    B. ENCLOSED VIDEO : 1. 505E Button Fuction 2. 505E RUN and Speed Setting 3. 505E Extraction Activation / Deactivation 4. 505E Service Mode

    PAGE : 14 of 14

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IKFO

    R K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

  • LAMPIRAN : 1 of 6K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    FOR

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IK

  • LAMPIRAN : 2 of 6K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    FOR

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IK

  • LAMPIRAN : 3 of 6K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    FOR

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IK

  • LAMPIRAN : 4 of 6K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    FOR

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IK

  • 550 mm

    or 850 mm

    150 mm

    or 450 mm

    35%

    8.3MP

    a or 9.0 MP

    a

    0.89MP

    a or 1.49 MP

    a

    -0.65 MP

    a

    0.13MP

    a, DC

    oil start

    0.65MP

    a, HP

    pump S

    tart

    10.5MP

    a

    510C or 540C

    3210rpm

    95C

    95C

    95C

    95C

    95C

    80C

    70C

    70C

    70C

    60C

    80m

    -0.6mm

    or 0.6mm

    20%

    0.79MP

    a

    -0.45MP

    a

    0.08MP

    a

    0.3MP

    a

    9.6MP

    a

    110C

    110C

    110C

    110C

    110C

    100C

    100C

    100C

    120m

    -0.8mm

    or 0.08mm

    Spdt

    LAMPIRAN : 5 of 6K

    EB

    B P

    T. PE

    TRO

    KIM

    IA G

    RE

    SIK

    FOR

    KE

    BB

    PT. P

    ETR

    OK

    IMIA

    GR

    ES

    IK

    acerText Box> 14.0Mpa -----> pump A STOP

    < 10.5Mpa -----> pump A START

    jika pressure masih rendah dari :

    < 10.0MPa -----> pump B START ( 2 motor A & B START)

    acerText Box

  • 120m

    120m

    01505E TURBINE CONTROL 1.pdfCONFIGURATION OF CONTROL.pdf505E TURBINE CONTROL 2.pdfFREQ AND LOAD RELATIONSHIP.pdfPID1.pdfPID2.pdfMANUAL START.pdfSEMI AUTO START.pdf505E TURBINE CONTROL3.pdf

    23dwg1.pdfdwg2.pdfdwg3.pdfdwg4.pdfdwg5.pdfdwg6.pdf