Woodbridge High School

Woodbridge SchoolDistrict

Design Development forWoodbridge High School

22 May 2012

Page 2: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Site PlanConcept A

Page 3: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

DD Plan• Ground Floor

Design Development

Page 4: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

DD Plan• Second Floor

Design Development

Page 5: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

The following series of images are intended to indicate the level of detail

associated with current Design Development plans.

We have only presented a small portion of the design sheets.

Design Development

Page 6: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 7: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 8: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 9: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 10: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 11: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 12: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 13: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 14: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

The project is being designed using Building Information Modeling – BIM

• Considered “next generation” of Auto-Cad• 3D virtual building – allows “clash detection”

of trades on paper prior to construction• Clash detection resolution prior to

construction reduces potential for change-orders

Design Development

Page 15: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

becomes

The following series of images show some of the detail associated with BIM – virtual 3D

designs

Design Development

Page 16: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 17: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 18: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Design Development

Page 19: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Woodbridge School DistrictProject Cost Summary – up-dated

Building Construction Costs $ 46,597,632

Design & Consulting Fees $ 2,659,269

State, County, Local & Agency Fees $ 1,155,895

FF&E & Technology Equipment $ 1,970,000

Subtotal $ 52,382,795

Total Project Costs $ 52,382,795

Woodbridge School District Budget $ 52,539,700

Total Amount Under / (Over) Budget $ 156,905

Proposed Add Alternates $ 3,000,000

May 22, 2012

Page 20: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Woodbridge School DistrictProject Schedule

Space programming 09/22/11 – 11/16/11

Schematic Designs (30%) 11/11/11 – 01/17/12

Design Development (60%) 12/19/11 – 04/23/12

Construction Documents 03/22/12 – 08/23/12

Bid Pack A (Site Concrete & Steel) 8/20/12

Bid Pack B (Building & Systems) 10/03/12

Funding available $10.5 m 10/2011 (FY-12)

Funding available $21.0 m 10/2012 (FY-13)

Funding available $21.0 m 10/2013 (FY-14)

3/29/12

On sched.

On Schedule

On Schedule

12/11

Page 21: Woodbridge High School Woodbridge School District Design Development for Woodbridge High School 22 May 2012.

Woodbridge High School

Recommend the Woodbridge Board of Education approve for continued

design progression, the design development documents, budget

and schedule

Thank you!