SESAR Overview
WAKENET3 Europe WorkshopPaul Adamson
SJU Programme Manager (WP6/12)
EUROPEAN CONTEXT
Page 2
TODAY’S SITUATION IN EUROPE
Traffic growth cannot be sustained through the current fragmented air navigation services
organisation and ageing ATM technologiesPage 3
EUROPEAN CHALLENGE
For the benefit of all air space users: airlines, business & general aviation, airports, air navigation service providers, military, passengers & citizens
A new Air Traffic Management System is required:
Page 4
WHAT IS SESAR ?
Page 5
SESAR in short
� The European ATM modernisation programme
� The technical component of the Single European Sky
� SESAR is managed by a single entity, created by the EU Council, co-founded by the EU and Eurocontrol
� SESAR is a partnership between 15 industry partners and 2 public institutions
Other comparable initiatives are launched worldwide:
•NEXTGEN (US)•CARAT (Japan)•FIANS (India)•NCAS (China)…
Page 6
The 4 Goals of SESAR
Enabling EU skiesto handle 3 times
more traffic
Improving safety by a factor of 10
Reducingthe environmental
impactper flight by 10%
Cutting ATM costs by 50%
Page 7
SESAR is Organised in 3 Phases :
Definition phase Resulted in the European ATM Master Plan
2006-20082008-2014
Implements the results of the development phase, delivers the performance increase foreseen in the ATM Master Plan
Deploymentphase
2015-2025
Development phase
Based on the Master Plan, results in Standards , new operational procedures, new technologies and pre-industrial components ,
Managed by theSESAR Joint Undertaking
Page 8
We are Here!
We are Here!
SESARA public private partnership:
European Commission
Eurocontrol
ANSPsANSPs
Staff associations
Airspace Users
The supply industry
The supply industry AirportsAirports
Maintain buy-in from EU member states, link to SES framework, contributing 700 MEURMaintain buy-in from EU member states, link to SES framework, contributing 700 MEUR
Maintain buy-in from member states. Major contributor across the work programme, contributing 700 MEUR
Maintain buy-in from member states. Major contributor across the work programme, contributing 700 MEUR
Innovations from the private sector, contributions from service providers and facility owners, contributing 700 MEUR
Innovations from the private sector, contributions from service providers and facility owners, contributing 700 MEUR
Secure buy-in given the changes in the role of the Human in the System (Pilots/Controllers/Engineers)Secure buy-in given the changes in the role of the Human in the System (Pilots/Controllers/Engineers)
Page 9
Ensure technology and operations developed deliver tangible benefit to users. Validate close to the market.Ensure technology and operations developed deliver tangible benefit to users. Validate close to the market.
10
NATS_newLo...
LOGO INDRA 300
EUROPEAN COMMISSION
Airports
GroundIndustry
AirborneIndustry
NationalAuthorities
R&D community
StaffAssociations
Air Navigation
Service Providers
Airspaceusers
Page 10
International Cooperation
�ATM modernisation is a global endeavour
�Need to be pragmatic
� Interoperability is key
�EC/FAA MoC�SESAR/NextGen Cooperation�Global interoerabilty�Targetted�Tangible
�Discussions with others countries
Page 11
SESAR Work Programme
Page 12
KEY FACTS on the SESAR work programme
� 16 work packages
� 294 projects
� 4 to 6 Members on average per project
� Project cost ranging from 300K€ to 30M€+, average 7M€
� Work Package and Projects are led by SESAR Members
� Consistent engineering methodology
� Validation ‘close to market’
�� TODAY: 1400 persons working TODAY: 1400 persons working on the programmeon the programme
�� 2000 persons foreseen in 20112000 persons foreseen in 2011
Page 13
SESAR Work Programme
Page 14
Directly involved
Directly impacted
Indirectly impacted
WP9 Aircraft SystemsWP11 Flight Operations Centre
WP B Target Concept and Architecture MaintenanceWP C Master plan Maintenance
WP16 R&D Transversal AreasWP15 Non-Avionics CNS Systems
WP3 Validation Infrastructure Adaptation and Integration
WP7 Network operationsWP13 Network Management Systems
WP8 ,Information ManagementWP 14 SWIM
WP6 Airport OperationsWP11 Flight Operations CentreWP12 Airport Operational Systems
WP5 TMA Operations WP10 Ground ATM Systems
WP4 En-route OperationsWP10 Ground ATM Systems
WP5 TMA OperationsWP10 Ground ATM Systems
Page 15
Each Phase of Flight
WP6 Airport OperationsWP11 Flight Operations CentreWP12 Airport Operational Systems
• Consistent engineering methodology• Validation ‘close to market’• Performance partnership
Deployment Oriented – Maturity Goal
V0V0 V1V1 V2V2 V3V3 V4V4 V5V5
IdeaIdea Implemented Concept
Implemented Concept
ATM NeedsScope Feasibility Integration
Pre-Ops Operational
Gather and assess ATM performance
Needs
Scope Operational Concept and develop
Validation plans
Iteratively develop and evaluate concept
Build, consolidate and test
Industrialisation and approval
ImplementationImplementation
Focus of SESAR JU V&V
Gate Gate Gate
StandardsRegulations
Concept Maturity Lifecycle ModelConcept Maturity Lifecycle Model
Certification
Page 16
How it works: Delivery Flow
DevelopmentService FocusConcept Components
Validation & VerificationProject FocusIntegrated Focus
Project
Integrated
Master PlanDeploymentSchedule IOC
ImplementationPan EuropeanLocal
ConceptRequirementsV&V StrategyV&V PlansKPI / MetricsPrototypesPlatforms
Business CaseCase BasedOperabilityFeasibilityStandardsRulesPrototypes
WP16 WP3
V1
WP16 WP3
V2 / V3
WPC
V4 / V5 IOC
Deployment Decision
Page 17
V3
V2
V3
V2V1
3 Maturity Targets
STEP 1ATM ServiceLevel 2
STEP 3ATM ServiceLevel 4
STEP 2ATM ServiceLevel 3
2009 2012 2016 2019
V3
V2V1
IOCIOC
IOC= Initial Operational Capability
2010 2011 2013 2014 2015 2017 2018
IOCIOC
IOCIOC Initial Operational CapabilityInitial Operational Capability
Page 18
ATM Services
Page 19
Relationship WP to Services
Page 20
Work PackagesWork Packages
(Decisions)
ATM Services(Guidance)
21
Project Initiation Report
• What a project is intending to do
• Prepare the start of the project
• Address’ areas that define and describe project.
• Provide SJU a limited amount of well defined information.
• Focus rather than quantity
What is the plan?
22
Overview of Project Status
•Wake Vortex projects ‘Green’ ☺☺☺☺
• 6.8.1 (Flexible and Dynamic Use of Wake Vortex Separations)
• 12.2.2 (Runway Wake Vortex Detection, Prediction, and Decision Support Tools)
• 9.11 (Aircraft Systems for Wake Encounter Alleviation)
• 9.30 (Weather Hazard/Wake Vortex Sensor)
•First Engineering review completed
•First project reports received
Page 23
CONCLUSION
1. Public Private Partnership
2. Addresses all flight phases
3. Key components:
- Performance based
- Automated support to human
- Collaborative environment using SWIM
- Interoperability
4. Wake Vortex a key element
5. Coordination with FAA/NextGen
6. Moving rapidly into ‘Execution’
Page 24
EUROPEAN COMMISSION
www.sesarju.eu
Thank you …
Page 25
Main Concept Elements
SWIMSWIM
Sharing of information Sharing of information system wide system wide
‘‘The Aviation IntranetThe Aviation Intranet ’’
InteroperableInteroperable
Air and Ground Air and Ground systemssystems
Airport operationsAirport operations
Network Operations Network Operations PlanPlan
Collaborative Collaborative decisionsdecisions
Automation Automation SupportSupport
HumanHuman --centred centred systemsystem
Performance based 4-D trajectory
management
Efficient a/c separation
modes
Page 26
ATM Operational Roadmap
20132013 20172017 20202020 20252025 Initial OperatingInitial OperatingCapabilityCapability
SE
SA
R D
efin
ition
Pha
se A
TM
Ser
vice
Lev
elS
ES
AR
Def
initi
on P
hase
AT
M S
ervi
ce L
evel
0 / 10 / 1
22
33
44
55
Implementation
Implementation
Implementation
Implementation
Available
Available
Available
AvailableAvailable
R&D
R&D
R&D
R&D
R&DR&D
Available
Implementation
Page 27
Deploying SESAR
Validation and Verification
Page 28
Keys to Validation and Verification
• ATM Community Participation (Users, Providers, Staff .. )
• Focus:
- Time to Market
- Close-to-Market --Target Operational Deployment Environment (Live Trials)
- Early Benefit (mature concepts, procedures and products)
• Coherent Validation and Verification
- Top Down, Incremental & Structured Approach;
- Supported by the Transversal work packages (WPB, WP3 & WP16)
- Bottom-Designed and Executed by Projects
• Continuous Maturity Assessment
Page 29