WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010...

31
WMO OMM 1 E.B Manaenkova TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together in weather, climate and water BRIEF INTRODUCTION TO WMO TROPICAL CYCLONE PROGRAMME (TCP) WMO OMM TLFDP_Shanghai_June2012

Transcript of WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010...

Page 1: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

WMO OMM

For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

World Meteorological OrganizationWorking together in weather, climate and water

BRIEF INTRODUCTION TO

WMO TROPICAL CYCLONE PROGRAMME

(TCP)

WMO OMM

TLFDP_Shanghai_June2012

Page 2: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

2

WMO OMM

For (TBC) 2 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

1. Statutory Status and Coordinating Structure of TCP

2. Challenging Issues for TCP

3. Capacity Development by Training and Technology Transfer

4. Support to Operational Forecasting

Outline of the Presentation

Page 3: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

3

WMO OMM

For (TBC) 3 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

1. Statutory Status and Coordinating Structure of TCP

Page 4: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

4

WMO OMM

For (TBC) 4 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

1. To assist Members in their efforts to implement Tropical Cyclone Programme activities for the safeguard of life and property from tropical cyclones and related hazards to the maximum extent possible within the available budgetary resources;

2. To continue to support the capacity building programmes for developing countries, especially for Least Developed Countries and Small Island Developing States;

3. To maintain and further enhance the collaboration between the Tropical Cyclone Programme and relevant WMO Programmes and Technical Commissions, particularly in relation to the development of tropical cyclone forecasting competencies;

4. To continue close cooperation with other international as well as relevant national organizations at the global and regional levels to promote a multidisciplinary and multi-hazard approach towards the attainment of the humanitarian goals of the Programme.

Outcomes of Cg-16 (guidance for TCP)

Page 5: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

5

WMO OMM

For (TBC) 5 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

TCP Mission, Objectives and Scope

Tropical Cyclone Programme (TCP) is a scientific programme of WMO coordinating regional TC Early Warning Systems and TC Regional Committees. Its origin

dates back to 1972.

Primary objective is to help establish national and regionally coordinated systems to minimize the loss of life

and property caused by tropical cyclones.

Scope of activity embraces;- Meteorology- Hydrology- Disaster Risk Reduction

Page 6: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

6

WMO OMM

For (TBC) 6 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012

TC Regional Warning Centres andTC Regional Committees

Regional Specialized Meteorological Centres (RSMCs; red), Tropical Cyclone Warning Centres (TCWCs; blue) and TC Regional Committees (No. of members in bracket)

Page 7: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

7

WMO OMM

TLFDP_Shanghai_June2012

Tropical Cyclone Warning Service

Cascading Warning Process

- Data from Global Observation System to TC Regional Centres and to Numerical Weather Prediction (NWP) Centres;

- NWP Centres to provide NWP products of TC track and intensity forecasts;

- Regional Centres to make analyses & forecast and prepare regional advisories for NMCs;

- NMCs to issue alerts, advisories and warnings and to liaise with Disaster Management Offices.

Page 8: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

8

WMO OMM

TLFDP_Shanghai_June2012

Regular Session of TC Regional Bodies(Operational Plan)

ESCAP/WMO Typhoon Committee (annual)

(44th Session, 6 - 10 February 2012, Hangzhou, China)

WMO/ESCAP Panel on Tropical Cyclones (annual)

(39th Session, 5 - 9 March 2012, Nay Pyi Taw, Myanmar)

RA V Tropical Cyclone Committee (biennial) (14th Session, 16 - 20 July 2012, Samoa)

RA I Tropical Cyclone Committee (biennial)(20th Session, 3 - 7 Sep. 2012, Maputo, Mozambique)

RA IV Hurricane Committee Session (annual)

(34th Session, 11 - 15 April 2012, Jacksonville, Florida, USA)

Page 9: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

9

WMO OMM

TLFDP_Shanghai_June2012

Storm Surge Watch Scheme

RSMC Tokyo started SS Forecast Chart in June 2011 and will also start SS Time-series Chart in June 2012.

RSMC New Delhi decided at 39th session of the Panel to produce SS graphical advisories similar to RSMC Tokyo in 2013.

RA I and RA V TCCs will formulate concrete SSWS regional projects in their sessions in 2012.

Page 10: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

10

WMO OMM

TLFDP_Shanghai_June2012

Storm Surge Watch Scheme

Actions were taken in all the basins  on the initiative of RSMCs.

Page 11: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

11

WMO OMM

TLFDP_Shanghai_June2012

2. Challenging Issues for TCP

Page 12: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

12

WMO OMM

TLFDP_Shanghai_June2012

Most of the members of TC Regional Committees are developing countries and LDCs/SIDSs.

Gap is widening between developing and developed countries.

Needs to develop human resources and communication capacity → Enhancement of capacity building activities → From GTS to WIS (WMO’s new communication

infrastructure)

Challenges

Page 13: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

13

WMO OMM

TLFDP_Shanghai_June2012

Track forecast has been improved, while intensity forecast still is a serious challenge.

Track Forecast Errors (RSMC Miami) Intensity Forecast Errors

Challenges (cont.)

Page 14: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

14

WMO OMM

TLFDP_Shanghai_June2012

Rapid changes of TC movement (speed and direction), particularly during landfall

Forecast of rainfall/flooding (remotely) associated with TCs (e.g. QPE/QPF)

Challenges (cont.)

Page 15: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

15

WMO OMM

TLFDP_Shanghai_June2012

Storm Surge Watch Scheme

Marine forecasting capabilities are very limited in almost all countries.

Local / regional storms surge, wave and tsunami models and modeling capabilities are in general non-existent.

Challenges (cont.)

Page 16: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

16

WMO OMM

TLFDP_Shanghai_June2012

3. Capacity Development by Training and Technology Transfer

Page 17: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

17

WMO OMM

TLFDP_Shanghai_June2012

Regular Training Course/Workshop

RA I Training Course on Tropical Cyclones - La Reunion, France (biennial)

Southern Hemisphere Training Course on Tropical Cyclones and Workshop on PWS

- Melbourne, Australia (biennial )

RA IV Workshop on Hurricane Forecasting and Warning

- Miami, Florida, (annual)

Training Workshop on Wave and Storm Surge Forecasting - annual, but in rotation by TC basins

Page 18: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

18

WMO OMM

TLFDP_Shanghai_June2012

Regular Attachment Training

• RSMC Tokyo - for Typhoon Committee (20 - 29 Jul. 2011)

• IIT Delhi (storm surge) - for Panel on Tropical Cyclones (12 - 23 Dec. 2011)

• RSMC New Delhi - for Panel on Tropical Cyclones (20 February – 2 March 2012)

• RSMC Honolulu (Pacific Int’l Desk Training Program) - for RA V (S. Pacific)

• NOAA/NCEP (Tropical Training Desk Program)- for RA IV (Cental-America and Caribbean)

Page 19: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

19

WMO OMM

TLFDP_Shanghai_June2012

Implementation of the Typhoon Landfall FDP & the NW Pacific Ensemble Forecast Project

- on going in the Typhoon Committee region

International Workshop on Satellite Analysis of Tropical Cyclones (IWSATC)

- Honolulu, Hawaii, USA, 13 to 16 April 2011

International Workshop on Tropical Cyclone Unusual Behavior

- Xiamen, China, 18 – 20 October 2011

Application of Research and Development

TCP/WWRP joint action

Page 20: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

20

WMO OMM

TLFDP_Shanghai_June2012

General Outcomes

• Much greater interagency understanding. This workshop was an “eye opener” to many of the attendees.

• Significant documentation of some of the causes of interagency differences in intensity estimates.

• Important feedback from forecasters to developers of the emerging objective techniques.

• Dialogue started between researchers and operational centres regarding the sharing of observational datasets.

Application of R&D (cont’d)

International Workshop on Satellite Analysis of Tropical Cyclones (IWSATC)

Page 21: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

21

WMO OMM

TLFDP_Shanghai_June2012

IWSATC - cont’d

Major Recommendations

• Based on findings from the IWSATC, develop guidelines for the improvement of satellite analysis globally

• Strongly encourage the sharing of national TC datasets to allow improved validation of existing satellite intensity estimation methods

• Create and maintain a centralized web site hosted by WMO/TCP, with documentation summarizing regional TC satellite analyses and availability/upgrades to advancing objective methods.

• Expand training material focused on helping forecasters make optimal use of the available satellite-based intensity estimates.

• Hold another WMO-sponsored IWSATC in two or three years, synchronized with the next IBTrACS meeting if possible

Application of R&D (cont’d)

Page 22: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

22

WMO OMM

TLFDP_Shanghai_June2012

Landfall Typhoon Forecast Demonstration Project - Objective ・  To demonstrate the performance of the most advanced

forecasting     techniques for landfalling typhoons.

NW-Pacific TC Ensemble Forecast Project* - Objective ・  To examine the utility of ensemble forecasts to the operational typhoon forecasting.

Transfer of R&D into Operation (cont’d)

Page 23: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

23

WMO OMM

TLFDP_Shanghai_June2012

Transfer of R&D into Operation (cont’d)

Page 24: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

24

WMO OMM

TLFDP_Shanghai_June2012

Transfer of R&D into Operation (cont’d)

Page 25: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

25

WMO OMM

TLFDP_Shanghai_June2012

• Support to Operational Forecasting

Page 26: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

26

WMO OMM

TLFDP_Shanghai_June2012

Support to Operational Forecasting

•Hong Kong, China agreed to host the TC ForecasterWebsite•Management of the website is being transferred fromWMO/TCP to Hong Kong Observatory.•The new website will be established before the 2012 TC season in the S- Hemisphere.

TC Forecaster Website

Page 27: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

27

WMO OMM

TLFDP_Shanghai_June2012

Schematic representation of Tropical Cyclone Forecasters’ Website

TCF Webpage

Workshop Docs

TC Website (Research)

Global Guide to TC Forecasting

Training Material

Final Reps of TC Regional Bodies

As designated

Operational Plans

Support to Operational Forecasting

Page 28: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

28

WMO OMM

TLFDP_Shanghai_June2012

Support to Operational Forecasting

Global Guide to TC Forecasting

• Upgrade of Global Guide to TC Forecasting has been carried out under the initiative of Chip Guard toward its publication by the end of 2012.

• Tailored for developing countries and “smaller” RSMCs/TCWCs

• It will be web-based and closely linked with TCP website and TCF website.

Page 29: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

29

WMO OMM

TLFDP_Shanghai_June2012

Defined averaging periods in the regions

Committee Region Average Wind Speed

RA I Tropical Cyclone Committee

SW Indian Ocean 10-min

Panel on Tropical Cyclones N Indian Ocean10-min (recording)

3-min (non-recording)

RA IV Hurricane Committee

Atlantic and NE Pacific1-min(recording and non-recording)

RA V Tropical Cyclone Committee

S Pacific and SE Indian Ocean10-min

(1-min for USA territories)

Typhoon Committee NW Pacific10-min, 2-min (recording)

3-min (non-recording)

Guidelines for Converting between Various Wind Averaging Periods (cont’d)

Page 30: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

30

WMO OMM

TLFDP_Shanghai_June2012

Recommended Conversion Factors

Vmax600=K Vmax60 At-Sea Off-Sea Off-land In-Land

K 0.93 0.90 0.87 0.84

Traditional 0.88* - - -

*Bureau of Meteorology (1978)

Guidelines for Converting between Various Wind Averaging Periods (cont’d)

Page 31: WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.

WMO OMM

TLFDP_Shanghai_June2012

Thank you

for your

attention

World Meteorological OrganizationWorking together in weather, climate and water

WMO OMM

TLFDP_Shanghai_June2012