WMEA Presentation May 29, 2014

Managing Power Demand on Excavators

Craig V Fredrich– Engineering Technical Steward

Caterpillar Global Mining

ERS / DGL Product Group

Page 2: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

2 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Contents

� Safety

� Introduction

� Caterpillar AC History

� Robust Power Requirements

� Power Demand Management

� Summary

� Questions

Page 3: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

3 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Safety

Page 4: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

4 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Safety First, Safety Always

Emergency Phone Numbers

• Fire Emergency:

• Call 911

• Medical Emergency:

• Call 911

• CPR/AED Certified?

• Who will call emergency numbers?

• Room Hazards - Chairs

• Location of Exits

• Nearest Fire Extinguisher

• Nearest AED

• Evacuation Point

Page 5: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

5 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Introduction

Page 6: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

6 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Craig Fredrich

• Electrical engineer

• 28+ Years Mining experience

• Started in field service working on SCR based analog

machines

• Have been with the progression of the drive systems to the

present IGBT digital controls

Page 7: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

7 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Caterpillar AC History

Page 8: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

8 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Bucyrus forms alliance

with Siemens.

Bucyrus introduces

“Analog SCR” AC Drives

� Electric Rope Shovels

� Small Draglines

Bucyrus introduces “GTO”

AC Drives

� Electric Rope Shovels

� Small Draglines

� Large Draglines (Swing)

Bucyrus introduces

“IGBT/AFE” AC Drives

� 495BII

� Large Draglines (Swing)

Bucyrus develops first AC

IGBT/AFE Gearless

� 8750 Zhungeer (CHINA)

Bucyrus AC IGBT/AFE

Conventional Geared

� 8750 Lake Lindsay (AUS)

� 8750 TAU (CAN)

Bucyrus AC IGBT/AFE

Conventional Geared

� 8200 Reliance (INDIA)

� 8200 Reliance (INDIA)

1976 1980 1989 1999 2003-04 2006-07 2010-14

37 YEARS CATERPILLAR AC EXPERTISE

Page 9: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

9 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

IGBT AC Drive Systems

180 plus machines approaching 8,000,000 operational hoursIGBT powered Electric Rope Shovels operating since 1999

5 machines approaching 200,000 operational hoursIGBT powered Draglines operating since 1999

2 new machinesIGBT powered 8200 Draglines go to work 2014

Page 10: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

10 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Robust Power Requirements

Page 11: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

11 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

• Electric Rope Shovels have a very high rate of change in

power demand

• To reduce energy costs, rope shovels also regenerate

electricity back onto the line

Robust Power Requirements

• A robust power system is

required to manage both

the regeneration and the

high ramp rates

• These requirements

provide challenges for

Diesel power systems

Page 12: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

12 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Robust Power Requirements

• Rope shovel rate

of change are 2 to

3 times faster than

a typical Diesel

generator can

provide

• To protect the

generator from

regeneration,

resistive load

banks burn off

excess energy

Page 13: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

13 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Power Demand Management

How it Works

Page 14: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

Power Demand Management – How it works

Peak Shaver

Shaves peak demand by using

energy stored in ultra capacitors

Ramp Rate Limiter

Redistribution of power for ideal

genset loading

Power supplied by ultra caps

Power stored in ultra caps

Dig Swing & dump Lower

Page 15: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

15 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Electric Rope Shovel Typical Power Demand

Page 16: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

16 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Power Requirements with Power Management System

Ramp Rate Limiter

Redistribution of power for

ideal genset loading

Peak Shaver

Shaves peak demand by using

energy stored in ultra capacitors

Regeneration

Recharge ultra-capacitors with

energy from stopping motions

Page 17: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

17 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Power Demand Management - On-Grid

Page 18: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

Intellectual Property – Power Demand Management

• U.S. Patent No. 4,358,719

• U.S. Patent No. 8,174,225

• U.S. Patent No. 8,536,814

• Future Patents Pending

Page 19: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

19 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

8750-81 Dragline 8-8-10 Typical KW vs Time curve

Page 20: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

20 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

8750-81 Dragline 8-8-10 Typical KW vs Time curve

Peak Shaver

Shaves peak demand by using

energy stored in ultra capacitors

Page 21: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

21 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Power Demand Management Overview

Page 22: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

22 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Caterpillar Exclusive Technology

Off-Grid Benefits

• Most efficient off-grid power solution available

– Shovel operational on 4MW of genset power for reduced fuel consumption compared to traditional method of operating with 8MW of power or more

• Patented technology manages energy

– Rope shovel regeneration power utilized not wasted

• Sustainable solution

– Reduced greenhouse gas emissions

– Less wasted energy

Additional Benefits after Power Grid is in place

• Trail cable flexibility – longer trail cable runs

• Substation sizing – reduced power infrastructure costs

Cat® Power Demand Management Technology

Page 23: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

23 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Power Demand Management – Trail Cable Sizing

Longer trail cable* allows for more flexibility when placing substations

• Keep substation out of the pit

• Less hassle relocating during laybacks

• Remove the need to run high tension cable in the pit

*Trail cable length is dependent

upon many factors, including

voltage drop of the transformer and

overhead line.

Page 24: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

24 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Demonstrations at Tucson Proving Grounds

Page 25: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

25 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Power Demand ManagementBuilding Blocks

Page 26: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

26 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

System Components

Incoming

Power

Transformers AFEs Inverters

Hoist

Propel

Crowd

Swing

Chopper Energy Storage

Page 27: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

27 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Equipment Pictures

Page 28: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

28 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

MRC Features

� Durable / Resilient Cabinets

� Durable welded steel construction� Designed for ERS shock and vibration

environment

� All components in cabinet are accessible for maintenance

� Degree of protection

� Ventilated section IP21 in acc IEC 529

� Non-ventilated section IP54 in acc IEC529

� Ambient temperature

� Normal Operation -40 °C to + 50 °C

� Storage & Transportation -40 °C to +70 °C

� Integrated and independent liquid cooling system

� Integral propel Transfer Switch

Page 29: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

29 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

AC Power Module Building Blocks

� Dragline Skid Configuration� Space for up to four AFE rectifiers

� Common DC bus

� Connects AFE with inverters

� Space for up to five motor inverters

to power

� Maximum one 824AC hoist motor

� Maximum one 824AC drag motor

� Maximum one 822AC swing motor

� Conventional 1370W (4-4-4)

� Powered with 4 MRCs

� Conventional 1370W (4-4-4)

� Powered with 4 MRCs

M

Swing Motor 1

M

Hoist Motor1

M

Drag Motor 1

M

Propel Motor 1

Swing

Inv 1

Hoist

Inv 1A

Drag

Inv 1A

Hoist

Inv 1B

Ground

Fault

ProtectionCrowbar

DC Link Capacitor

Precharge

Transformer

Delta / Wye

Aux Power

AFE 1 AFE 2 AFE 3 AFE 4

T T T T

Drag

Inv 1B

Page 30: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

30 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Power Demand ManagementPower Problems / Application

Page 31: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

31 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Genset Challenges

• Regen Absorption

– Avoid engine overspeed

• Peak Power Limiting

– Limit engine sizing

• Rate of Change

– Match engine dynamic response

• Application without Peakshaving can require double the

number of gensets needed with peakshaver

Page 32: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

32 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Mine Power Considerations

• Unstable Power

– Mines experience machine downtime or component failure due

to insufficient or unreliable power infrastructure

• Delayed Power Plan

– Delays in the mine power plan cause delay in machine

production

• Pit Expansion

– Expanding to an area of the mine that does not have electrical

infrastructure

Page 33: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

33 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Mines have limited options for loading tools when opening

a new pit until electrical infrastructure is in place at the pit

Greenfield Mine Application

• Diesel-powered machines are typically employed for initial

overburden removal

• Operating electric rope shovels on

Diesel-generators is generally not

economical due to the machine’s

excessive rate of change in power

demand, unless peak shaving

technology is employed

• Electric rope shovels also regenerate

electricity, which can not be absorbed

by generators and must be absorbed

by PDMS or burned off via load banks

Page 34: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

34 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Pros

+ Flexibility / Utility

+ Lower Initial Capital Cost per machine

Mine Development with Diesel-Powered Machines

Power Grid

Complete

Pre-Stripping Production

Cons

- Higher Cost / ton

- Lower NPV

- Higher Total Cost

Page 35: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

35 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Pros

+ Lower Cost / ton

+ Longer machine life

+ Backup Generators

+ Best TCO

Mine Development with Power Demand Management

Power Grid

Complete

Pre-Stripping Production

Cons

- Higher Initial Capital Cost

- Generator Cost

Page 36: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

36 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING

Holistic Machine Approach

Page 37: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

37 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Holistic Machine Approach

CAT Total Machine Commitment

Page 38: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

38 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING

Holistic Approach Examples

• House Ventilation Study

• Propel Study

• Roller Load Study

• Stability Study

Page 39: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

Questions?

THANK YOU

Page 40: WMEA Managing Power Demand.ppt · 2020. 4. 12. · WMEA Presentation May 29, 2014 Managing Power Demand on Excavators Craig V Fredrich–Engineering Technical Steward Caterpillar

40 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING