WMEA Presentation May 29, 2014
Managing Power Demand on Excavators
Craig V Fredrich– Engineering Technical Steward
Caterpillar Global Mining
ERS / DGL Product Group
2 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Contents
� Safety
� Introduction
� Caterpillar AC History
� Robust Power Requirements
� Power Demand Management
� Summary
� Questions
3 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Safety
4 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Safety First, Safety Always
Emergency Phone Numbers
• Fire Emergency:
• Call 911
• Medical Emergency:
• Call 911
• CPR/AED Certified?
• Who will call emergency numbers?
• Room Hazards - Chairs
• Location of Exits
• Nearest Fire Extinguisher
• Nearest AED
• Evacuation Point
5 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Introduction
6 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Craig Fredrich
• Electrical engineer
• 28+ Years Mining experience
• Started in field service working on SCR based analog
machines
• Have been with the progression of the drive systems to the
present IGBT digital controls
7 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Caterpillar AC History
8 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Bucyrus forms alliance
with Siemens.
Bucyrus introduces
“Analog SCR” AC Drives
� Electric Rope Shovels
� Small Draglines
Bucyrus introduces “GTO”
AC Drives
� Electric Rope Shovels
� Small Draglines
� Large Draglines (Swing)
Bucyrus introduces
“IGBT/AFE” AC Drives
� 495BII
� Large Draglines (Swing)
Bucyrus develops first AC
IGBT/AFE Gearless
� 8750 Zhungeer (CHINA)
Bucyrus AC IGBT/AFE
Conventional Geared
� 8750 Lake Lindsay (AUS)
� 8750 TAU (CAN)
Bucyrus AC IGBT/AFE
Conventional Geared
� 8200 Reliance (INDIA)
� 8200 Reliance (INDIA)
1976 1980 1989 1999 2003-04 2006-07 2010-14
37 YEARS CATERPILLAR AC EXPERTISE
9 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
IGBT AC Drive Systems
180 plus machines approaching 8,000,000 operational hoursIGBT powered Electric Rope Shovels operating since 1999
5 machines approaching 200,000 operational hoursIGBT powered Draglines operating since 1999
2 new machinesIGBT powered 8200 Draglines go to work 2014
10 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Robust Power Requirements
11 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
• Electric Rope Shovels have a very high rate of change in
power demand
• To reduce energy costs, rope shovels also regenerate
electricity back onto the line
Robust Power Requirements
• A robust power system is
required to manage both
the regeneration and the
high ramp rates
• These requirements
provide challenges for
Diesel power systems
12 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Robust Power Requirements
• Rope shovel rate
of change are 2 to
3 times faster than
a typical Diesel
generator can
provide
• To protect the
generator from
regeneration,
resistive load
banks burn off
excess energy
13 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Power Demand Management
How it Works
Power Demand Management – How it works
Peak Shaver
Shaves peak demand by using
energy stored in ultra capacitors
Ramp Rate Limiter
Redistribution of power for ideal
genset loading
Power supplied by ultra caps
Power stored in ultra caps
Dig Swing & dump Lower
15 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Electric Rope Shovel Typical Power Demand
16 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Power Requirements with Power Management System
Ramp Rate Limiter
Redistribution of power for
ideal genset loading
Peak Shaver
Shaves peak demand by using
energy stored in ultra capacitors
Regeneration
Recharge ultra-capacitors with
energy from stopping motions
17 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Power Demand Management - On-Grid
Intellectual Property – Power Demand Management
• U.S. Patent No. 4,358,719
• U.S. Patent No. 8,174,225
• U.S. Patent No. 8,536,814
• Future Patents Pending
19 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
8750-81 Dragline 8-8-10 Typical KW vs Time curve
20 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
8750-81 Dragline 8-8-10 Typical KW vs Time curve
Peak Shaver
Shaves peak demand by using
energy stored in ultra capacitors
21 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Power Demand Management Overview
22 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Caterpillar Exclusive Technology
Off-Grid Benefits
• Most efficient off-grid power solution available
– Shovel operational on 4MW of genset power for reduced fuel consumption compared to traditional method of operating with 8MW of power or more
• Patented technology manages energy
– Rope shovel regeneration power utilized not wasted
• Sustainable solution
– Reduced greenhouse gas emissions
– Less wasted energy
Additional Benefits after Power Grid is in place
• Trail cable flexibility – longer trail cable runs
• Substation sizing – reduced power infrastructure costs
Cat® Power Demand Management Technology
23 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Power Demand Management – Trail Cable Sizing
Longer trail cable* allows for more flexibility when placing substations
• Keep substation out of the pit
• Less hassle relocating during laybacks
• Remove the need to run high tension cable in the pit
*Trail cable length is dependent
upon many factors, including
voltage drop of the transformer and
overhead line.
24 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Demonstrations at Tucson Proving Grounds
25 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Power Demand ManagementBuilding Blocks
26 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
System Components
Incoming
Power
Transformers AFEs Inverters
Hoist
Propel
Crowd
Swing
Chopper Energy Storage
27 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Equipment Pictures
28 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
MRC Features
� Durable / Resilient Cabinets
� Durable welded steel construction� Designed for ERS shock and vibration
environment
� All components in cabinet are accessible for maintenance
� Degree of protection
� Ventilated section IP21 in acc IEC 529
� Non-ventilated section IP54 in acc IEC529
� Ambient temperature
� Normal Operation -40 °C to + 50 °C
� Storage & Transportation -40 °C to +70 °C
� Integrated and independent liquid cooling system
� Integral propel Transfer Switch
29 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
AC Power Module Building Blocks
� Dragline Skid Configuration� Space for up to four AFE rectifiers
� Common DC bus
� Connects AFE with inverters
� Space for up to five motor inverters
to power
� Maximum one 824AC hoist motor
� Maximum one 824AC drag motor
� Maximum one 822AC swing motor
� Conventional 1370W (4-4-4)
� Powered with 4 MRCs
� Conventional 1370W (4-4-4)
� Powered with 4 MRCs
M
Swing Motor 1
M
Hoist Motor1
M
Drag Motor 1
M
Propel Motor 1
Swing
Inv 1
Hoist
Inv 1A
Drag
Inv 1A
Hoist
Inv 1B
Ground
Fault
ProtectionCrowbar
DC Link Capacitor
Precharge
Transformer
Delta / Wye
Aux Power
AFE 1 AFE 2 AFE 3 AFE 4
T T T T
Drag
Inv 1B
30 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Power Demand ManagementPower Problems / Application
31 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Genset Challenges
• Regen Absorption
– Avoid engine overspeed
• Peak Power Limiting
– Limit engine sizing
• Rate of Change
– Match engine dynamic response
• Application without Peakshaving can require double the
number of gensets needed with peakshaver
32 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Mine Power Considerations
• Unstable Power
– Mines experience machine downtime or component failure due
to insufficient or unreliable power infrastructure
• Delayed Power Plan
– Delays in the mine power plan cause delay in machine
production
• Pit Expansion
– Expanding to an area of the mine that does not have electrical
infrastructure
33 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Mines have limited options for loading tools when opening
a new pit until electrical infrastructure is in place at the pit
Greenfield Mine Application
• Diesel-powered machines are typically employed for initial
overburden removal
• Operating electric rope shovels on
Diesel-generators is generally not
economical due to the machine’s
excessive rate of change in power
demand, unless peak shaving
technology is employed
• Electric rope shovels also regenerate
electricity, which can not be absorbed
by generators and must be absorbed
by PDMS or burned off via load banks
34 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Pros
+ Flexibility / Utility
+ Lower Initial Capital Cost per machine
Mine Development with Diesel-Powered Machines
Power Grid
Complete
Pre-Stripping Production
Cons
- Higher Cost / ton
- Lower NPV
- Higher Total Cost
35 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Pros
+ Lower Cost / ton
+ Longer machine life
+ Backup Generators
+ Best TCO
Mine Development with Power Demand Management
Power Grid
Complete
Pre-Stripping Production
Cons
- Higher Initial Capital Cost
- Generator Cost
36 / Caterpillar Confidential: Green / WHEREVER THERE’S MINING
Holistic Machine Approach
37 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Holistic Machine Approach
CAT Total Machine Commitment
38 / Caterpillar Confidential: GREEN / WHEREVER THERE’S MINING
Holistic Approach Examples
• House Ventilation Study
• Propel Study
• Roller Load Study
• Stability Study
Questions?