Version 02-2017 Solving tomorrow’s transportation challenges
Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459
January 7, 2020
NOTICE TO ALL CONTRACTORS: Proposal #33: 1021-00-78, WISC 2021 100
Baldwin - Menomonie CTH NN Bridge EB B-55-0271 IH 94 St. Croix County
1021-00-79, WISC 2021 101 Baldwin - Menomonie CTH NN Bridge WB B-55-0270 IH 94 St. Croix County
1021-04-77, WISC 2021 102 Baldwin - Menomonie Carr Creek EB Br B-55-0281 & 0285 IH 94 St. Croix County
1021-04-78, WISC 2021 103 Baldwin - Menomonie Carr Creek WB Br B-55-0282 & 0286 IH 94 St. Croix County
Letting of January 12, 2021 This is Addendum No. 04, which provides for the following: Special Provisions:
Revised Special Provisions Article
No. Description
26 Cable Barrier Type 1, Item 613.1100.S; Cable Barrier End Terminal Type 1, Item 613.1200.S Schedule of Items:
Revised Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
460.6224 HMA Pavement 4 MT 58-28 S TON 4745 -880 3865 613.1100.S Cable Barrier Type 1 LF 7250 -2875 4375 613.1200.S Cable Barrier End Terminal Type 1 EACH 14 -8 6 614.0220 Steel Thrie Beam Bullnose Terminal EACH 1 2 3
Added Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
203.0200.05 Removing Old Structure 158+25.29 EB LS 0 1 1 312.0110 Select Crushed Material TON 0 12848 12848
460.6244 HMA Pavement 4 MT 58-34 S TON 0 880 880 614.0230 Steel Thrie Beam LF 0 253 253
Deleted Bid Item Quantities
Bid Item Item Description Unit Old
Quantity Revised Quantity
Proposal Total
203.0200.01 Removing Old Structure 158+25.29 WB LS 1 -1 0 312.0115 Select Crushed Material CY 6118 -6118 0
Plan Sheets:
Revised Plan Sheets Plan
Sheet Plan Sheet Title (brief description of changes to sheet)
11 Finished Typical Sections (Revised agg shld note) 12 Finished Typical Sections (Revised pavement layer note)
114 Miscellaneous Quantities (Revised select crush material bid item) 129 Miscellaneous Quantities (Revised HMA quantities, add HMA bid item) 135 Miscellaneous Quantities (Revised select crush material bid item) 137 Miscellaneous Quantities (Revised HMA quantities, add HMA bid item)
Added Plan Sheets
Plan Sheet
Plan Sheet Title (brief description of why sheet was added)
106A-C Cable Barrier Borings 213A-H Steel Thrie Beam Bullnose Terminal (SDD 14B26)
The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.
Sincerely,
Mike Coleman Proposal Development Specialist Proposal Management Section
ADDENDUM NO. 04
1021-00-78, 1021-00-79, 1021-04-77 and 1021-04-78
January 7, 2021
Special Provisions
26. Cable Barrier Type 1, Item 613.1100.S; Cable Barrier End Terminal Type 1 Item 613.1200.S.
Replace paragraph one under section titled A Description with the following: This special provision describes providing socketed high-tension TL-4 cable guard meeting the National Cooperative Highway Research Program (NCHRP) Report 350, Test Level 4. Schedule of Items Attached, dated January 7, 2021, are the revised Schedule of Items Pages 1 – 16. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 11, 12, 114, 129, 135, and 137 Added: 106A – 106C and 213A – 213H
END OF ADDENDUM
WIS
DOT/
CADD
S SH
EET
42EH
WY:
COU
NTY
:C:
\C3D
\102
1040
7\SH
EETS
PLAN
\020
302-
TS-I9
4-CT
HB.
DWG
FILE
NAM
E :
1/7/
2021
11:
08 A
MPL
OT
DATE
:PL
OT
BY :
THAO
, KO
U
2
PRO
JECT
NO
:PL
OT
NAM
E :
2
SHEE
T PL
OT
SCAL
E :
1IN
:15
FT
1021
-04-
77,7
8IH
94
ST. C
ROIX
FIN
ISH
ED T
YPIC
AL S
ECTI
ON
S
LAYO
UT
NAM
E - 0
1
WIS
DOT/
CADD
S SH
EET
42EH
WY:
COU
NTY
:C:
\C3D
\102
1040
7\SH
EETS
PLAN
\020
302-
TS-I9
4-CT
HB.
DWG
FILE
NAM
E :
1/4/
2021
3:0
7 PM
PLO
T DA
TE :
PLO
T BY
:TH
AO, K
OU
2
PRO
JECT
NO
:PL
OT
NAM
E :
2
SHEE
T PL
OT
SCAL
E :
1IN
:15
FT
1021
-04-
77,7
8IH
94
ST. C
ROIX
FIN
ISH
ED T
YPIC
AL S
ECTI
ON
S
LAYO
UT
NAM
E - 0
2
WIS
DOT/
CADD
S SH
EET
42EH
WY:
IH
94
COU
NTY
: ST
. CRO
IXC:
\C3D
\102
1000
8\SH
EETS
PLAN
\030
200-
MQ
-CTH
NN
.DW
GFI
LE N
AME
:1/
5/20
21 3
:22
PMPL
OT
DATE
:PL
OT
BY :
THAO
, KO
U
3
PRO
JECT
NO
:PL
OT
NAM
E :
3
SHEE
T PL
OT
SCAL
E :
1" =
1'
1021
-00-
78
LAYO
UT
NAM
E - 0
1
MIS
CELL
ANEO
US
QU
ANTI
TIES
WIS
DOT/
CADD
S SH
EET
42EH
WY:
IH
94
COU
NTY
: ST
. CRO
IXC:
\C3D
\102
1040
7\SH
EETS
PLAN
\030
200-
MQ
-I94-
CTH
B.DW
GFI
LE N
AME
:1/
5/20
21 1
1:11
AM
PLO
T DA
TE :
PLO
T BY
:TH
AO, K
OU
3
PRO
JECT
NO
:PL
OT
NAM
E :
3
SHEE
T PL
OT
SCAL
E :
1" =
1'
1021
-04-
77
LAYO
UT
NAM
E - 0
3
MIS
CELL
ANEO
US
QU
ANTI
TIES
WIS
DOT/
CADD
S SH
EET
42EH
WY:
IH
94
COU
NTY
: ST
. CRO
IXC:
\C3D
\102
1040
7\SH
EETS
PLAN
\030
200-
MQ
-I94-
CTH
B.DW
GFI
LE N
AME
:1/
5/20
21 3
:12
PMPL
OT
DATE
:PL
OT
BY :
THAO
, KO
U
3
PRO
JECT
NO
:PL
OT
NAM
E :
3
SHEE
T PL
OT
SCAL
E :
1" =
1'
1021
-04-
78
LAYO
UT
NAM
E - 0
9
MIS
CELL
ANEO
US
QU
ANTI
TIES
WIS
DOT/
CADD
S SH
EET
42EH
WY:
IH
94
COU
NTY
: ST
. CRO
IXC:
\C3D
\102
1040
7\SH
EETS
PLAN
\030
200-
MQ
-I94-
CTH
B.DW
GFI
LE N
AME
:1/
5/20
21 1
1:12
AM
PLO
T DA
TE :
PLO
T BY
:TH
AO, K
OU
3
PRO
JECT
NO
:PL
OT
NAM
E :
3
SHEE
T PL
OT
SCAL
E :
1" =
1'
1021
-04-
78
LAYO
UT
NAM
E - 1
1
MIS
CELL
ANEO
US
QU
ANTI
TIES
EXIS
TIN
GEX
ISTI
NG
< M
EDIA
N10
:1 O
R F
LATT
ER10
:1 O
R F
LATT
ER
C M
EDIA
N
TRAF
FIC
TRAF
FIC
BI-D
IREC
TIO
NAL
TR
AFFI
CU
NI-D
IREC
TIO
NAL
TR
AFFI
C
THR
IE B
EAM
RAI
LS M
AY N
EED
TO
BE
FIEL
D B
ENT
TO F
IT T
HE
LOC
ATIO
N.
SEE
STAN
DAR
D D
ETAI
L D
RAW
ING
S 14
B26
SHEE
TS a
-h.
IF R
OC
K IS
EN
CO
UN
TER
ED, R
EMO
VE R
OC
K TO
FU
LL D
EPTH
OF
POST
PLU
S 2
1 2". M
INIM
UM
DIA
MET
ERO
F TH
E R
OC
K R
EMO
VAL
IS 1
2" D
IAM
ETER
UN
BEN
T ST
AND
ARD
TH
RIE
BEA
M R
AIL
B1 (P
OST
8 T
O P
OST
10
AND
PO
ST 1
0 TO
PO
ST 1
2)
SLO
TTED
TH
RIE
BEA
M R
AIL
E1 (P
OST
1 T
O P
OST
1)
SLO
TTED
TH
RIE
BEA
M R
AIL
B3 (P
OST
5 T
O P
OST
8)
SLO
TTED
TH
RIE
BEA
M R
AIL
E4 (P
OST
1 T
O P
OST
5)
BEYO
ND
PO
ST 1
2: C
ON
STR
UC
T ST
EEL
THR
IE B
EAM
- U
SE U
NBE
NT
STAN
DAR
D T
HR
IE B
EAM
RAI
L N
O. 5
.
DIM
ENSI
ON
S AR
E FR
OM
BAC
K O
F R
AIL
TO B
ACK
OF
RAI
L W
HER
E R
AIL
IS B
OLT
ED T
O P
OST
OR
BLO
CK.
U-B
OLT
CAB
LE C
LIPS
(3 P
ER C
ABLE
) SPA
CED
OU
T O
N N
OSE
, TO
HO
LD C
ABLE
TO
BAC
KSID
E O
F TH
E R
AIL.
NO
SE C
ABLE
WIT
H S
WAG
GED
EN
D B
UTT
ON
S.
NO
SE C
ABLE
AN
CH
OR
PLA
TE (B
ACKS
IDE
OF
SPLI
CE)
.
THE
SLAC
K IN
TH
E N
OSE
CAB
LES
SHAL
L BE
EVE
NLY
DIS
TRIB
UTE
D B
ETW
EEN
TH
E C
ABLE
CLI
P FA
STEN
ERS
AND
PO
ST N
O. 1
ON
EIT
HER
SID
E O
F TH
E N
OSE
.
MIN
IMU
M W
OR
KIN
G W
IDTH
4' -
2".
MAX
. WID
TH O
F SY
STEM
IS 1
4' -
2 1 2"
MEA
SUR
ED F
RO
M T
HE
BAC
K O
F R
AIL
TO B
ACK
OF
RAI
L W
HER
E R
AIL
IS B
OLT
ED T
O A
PO
ST O
R B
LOC
K.
FIXE
D O
BJEC
T O
R O
THER
HAZ
ARD
.
PLAN
IS T
O P
RO
VID
E ST
ATIO
N O
FFSE
T TO
CEN
TER
OF
POST
5 IN
PLA
NS. TR
AFFI
C
TRAF
FIC
TRAF
FIC
NO
OTH
ER F
IXED
OBJ
ECTS
WIT
HIN
TH
IS A
REA
PLA
N V
IEW
GR
AD
ING
AT
BU
LLN
OS
E(A
LL IN
STAL
LATI
ON
S)
HA
ZA
RD
FR
EE
AR
EA
INS
IDE
BU
LLN
OS
EM
ED
IAN
HA
ZA
RD
PR
OT
EC
TIO
N P
AY
LIM
ITS
SE
CT
ION
A -A
ME
DIA
N G
RA
DIN
G
GE
NE
RA
L N
OT
ES
VAR
IES
(ALL
INST
ALLA
TIO
NS)
EDG
E O
F TR
AVEL
ED W
AY
EDG
E O
F TR
AVEL
ED W
AY
10:1
OR
FLA
TTER
(LO
NG
ITU
DIN
AL A
ND
TRAN
SVER
SE)
VAR
IABL
E SL
OPE
NO
RM
AL O
REX
ISTI
NG
SLO
PE
150'
126'
MIN
.
60' M
IN.
EDG
E O
F SH
OU
LDER
LAP
PIN
G D
ET
AIL
EDG
E O
FTR
AVEL
ED W
AYPA
Y LI
MIT
FO
R S
TEEL
THR
IE B
EAM
( L.
F.)
PAY
LIM
IT F
OR
STE
ELTH
RIE
BEA
M (
L. F
.)
BULL
NO
SETE
RM
INAL
BULL
NO
SETE
RM
INAL
L
EDG
E O
FTR
AVEL
ED W
AYTR
AFFI
C
14
TY
PIC
AL
BU
LLN
OS
E L
AY
OU
TP
LAN
VIE
W
1312
1110
98
76
54
32
1
6' -
3"6'
- 3"
6' -
3"6'
- 3"
6' -
3"3'
- 1
1 2"3'
- 1
1 2"3'
- 1
1 2"3'
- 1
1 2"3'
- 1
1 2"
3' -
1 1 2"
E1 E2 E3 E4 5
5
E1E3
1413
1211
109
87
65
43
21
E4
E1E3
E4
SYM
MET
RIC
AL A
BOU
T TH
E C
ENTE
RLI
NE
E2
STEE
L TH
RIE
BEA
M B
ULL
NO
SE T
ERM
INAL
(PAY
LIM
IT F
OR
EAC
H T
ERM
INAL
IS P
OST
12
TO P
OST
12)
5
15' -
10"
9' - 8"
11' - 8"
13' - 1"
13' - 11"
14' - 2 12"
SEE
DET
AIL
"A"
DE
TA
IL "
A"
107
108
107
107
107
107
107
AA
E1E1
106
104 10
1 102
10310
2
103
100
100
100
100
100
105
105
107
106
105
104
103
102
101
100
62.1
' FR
OM
CEN
TER
OF
POST
1 T
O F
RO
NT
FAC
E O
F H
AZAR
D
UPP
ER A
ND
LOW
ER P
OST
ASSE
MBL
Y
108
A A
105
SDDSDD
14B26 - 04a14B26 - 04a
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
6' -
3" A
SYM
MET
RIC
AL 1
0-G
AUG
E W
-BEA
M T
O T
HR
IE B
EAM
GU
ARD
TRAN
SITI
ON
. SEE
SD
D 1
4B45
FO
R M
OR
E IN
FOR
MAT
ION
.
W-B
EAM
RAI
L. S
EE S
DD
14B
42 F
OR
MO
RE
INFO
RM
ATIO
N.
SEE
POST
NO
. 9 A
ND
ALL
STE
EL T
HR
IE B
EAM
PO
ST B
EYO
ND
DET
AIL.
SEE
SDD
14B
42 F
OR
INST
ALLA
TIO
N IN
FOR
MAT
ION
.
SEE
SDD
14B
45 F
OR
INST
ALLA
TIO
N D
ETAI
LS. R
EPLA
CE
ASYM
MET
RIC
ALW
-BEA
M T
O T
HR
IE B
EAM
TR
ANSI
TIO
N A
ND
W-B
EAM
RAI
L W
ITH
E1.
PAY
FOR
MO
DIF
IED
TH
RIE
BEA
M T
RAN
SITI
ON
.
CO
NC
RET
E BA
RR
IER
OR
BR
IDG
E R
AIL.
SEE
PLAN
FO
R S
TATI
ON
AN
D O
FFSE
T TO
CEN
TER
OF
POST
.
SEE
PLAN
FO
R S
TATI
ON
AN
D O
FFSE
T TO
CEN
TER
OF
SPLI
CE.
SEE
PLAN
FO
R F
LAR
E R
ATE.
A M
INIM
UM
OF
25 F
T O
F TH
RIE
BEA
M T
ANG
ENT
BEFO
RE
TRAN
SITI
ON
ING
TO
BEA
M G
UAR
D O
R T
HR
IE B
EAM
TR
ANSI
TIO
N.
NO
T AL
L BU
LLN
OSE
HAR
DW
ARE
SHO
WN
. SEE
OTH
ER S
HEE
TS IN
14B
26.
WID
ER H
AZAR
D T
O B
E SH
IELD
ED.
TRAN
SITI
ON
RAI
L H
EIG
HT
TO 3
1" O
VER
TH
E LE
NG
TH O
F A
12' -
6" B
EAM
SEC
TIO
N.
GE
NE
RA
L N
OT
ES
208
207
206
205
204
203
202
201
200
209
210
211
212
206
105
208
206
STEE
L TH
RIE
BEA
M B
ULL
NO
SE T
ERM
INAL
(PAY
LIM
ITS
FOR
EAC
H T
ERM
INAL
IS P
OST
NO
. 12
TO N
O. 1
2)ST
EEL
THR
IE B
EAM
BU
LLN
OSE
TER
MIN
AL(P
AY L
IMIT
S FO
R E
ACH
TER
MIN
AL IS
PO
ST N
O. 1
2 TO
NO
. 12)
STEE
L TH
RIE
BEA
MPA
Y LE
NG
TH (L
F)
VA
RIA
BLE
WID
TH
BU
LLN
OS
E
1 2 P
LAN
VIE
WV
AR
IAB
LE W
IDT
H B
ULL
NO
SE
WIT
H C
ON
NE
CT
ION
TO
MG
S B
EA
M G
UA
RD
12
PLA
N V
IEW
VA
RIA
BLE
WID
TH
BU
LLN
OS
EW
ITH
CO
NN
EC
TIO
N T
O R
IGID
BA
RR
IER
206
208
206
STEE
L TH
RIE
BEA
M B
ULL
NO
SE T
ERM
INAL
(PAY
LIM
ITS
FOR
EAC
H T
ERM
INAL
IS P
OST
NO
. 12
TO N
O. 1
2)ST
EEL
THR
IE B
EAM
PAY
LEN
GTH
(LF)
MO
DIF
IED
MG
S TH
RIE
BEA
M T
RAN
SITI
ON
PAY
AS M
GS
THR
IE B
EAM
TR
ANSI
TIO
N
207
205
E1E1
E1E1
204
3' -
1 1 2"
NO
RM
AL P
OST
SPAC
ING
202
202
207
205
206
208
206
STEE
L TH
RIE
BEA
M B
ULL
NO
SE T
ERM
INAL
(PAY
LIM
ITS
FOR
EAC
H T
ERM
INAL
IS P
OST
NO
. 12
TO N
O. 1
2)ST
EEL
THR
IE B
EAM
PAY
LEN
GTH
(LF)
E1
202
202
203
203
200
201
3' -
1 1 2"
NO
RM
AL P
OST
SPAC
ING
208
208
206
208
206
211
MG
S BE
AM G
UAR
D 3
PAY
LEN
GTH
(LF)
206
212
209
212
206
SDDSDD
14B26 - 04b14B26 - 04b
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
PO
ST
3
PO
ST
2
PO
ST
1
CA
BLE
AN
CH
OR
AS
SE
MB
LY C
ON
NE
CT
ION
PR
OFI
LE V
IEW
302
301
P1
300
CR
OS
S S
EC
TIO
N A
- A
GR
OU
ND
LIN
ESEE
CAB
LE A
NC
HO
RAS
SEM
BLYD
ETAI
LSE
E N
OSE
CAB
LER
ETAI
NIN
G C
LIP
DET
AIL
NO
SE
CA
BLE
RE
TA
ININ
G C
LIP
T2T1
Q1
E2
A3
301
L1
GR
OU
ND
LIN
E
SEE
DET
AIL
"B"
SEE
DET
AIL
"A"
2' - 7 58"TO TOP OF RAIL1"
DE
TA
IL "
A"
DE
TA
IL "
B"
S2S1
R1
L1
E2E4
Q1
PO
ST
8
SEE
DET
AIL
"C"
DE
TA
IL "
C"
TH
RIE
BE
AM
SP
LIC
E
E1
E3
P2P3
302
300
T3
P1P2
P3
Q2
F1 F2 F3
C2
S1S2
E4
SEE
ANC
HO
R B
RAC
KET
ASSE
MBL
Y D
ETAI
L.
SEE
ANC
HO
R C
ABLE
ASS
EMBL
Y D
ETAI
L
ON
E W
ASH
ER B
ETW
EEN
BO
LT H
EAD
AN
D R
AIL
AND
BET
WEE
NN
UT
AND
AN
CH
OR
BR
ACKE
T AS
SEM
BLY.
ON
E W
ASH
ER B
ETW
EEN
BO
LD H
EAD
AN
D F
OU
ND
ATIO
N T
UBE
AND
BET
WEE
N N
UT
AND
FO
UN
DAT
ION
TU
BE.
300
301
302
303G
EN
ER
AL
NO
TE
S
CA
BLE
AN
CH
OR
AS
SE
MB
LY
N1
N2
N1
N2
E4
E3E4
E2E1
L2 A1
J1
W1 D
IREC
TIO
N O
F TR
AFFI
C
SDDSDD
14B26 - 04c14B26 - 04c
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
PO
ST
NO
. 1
PO
ST
NO
. 2
PO
ST
NO
S. 3
-8P
OS
T N
OS
. 9 A
ND
ALL
ST
EE
LT
HR
IE B
EA
M P
OS
TS
BE
YO
ND
GR
OU
ND
LIN
E
7' -
10"
2' -
7 5
8"
1"
5' -
10"
2' -
7 5
8"
1"
3' -
4"
2' -
7 5
8"
1"
3' -
9 3
8"
2' -
7 5
8"
1"
6' -
6"
L1L1
C2
M1
B2
A1
A2
E2
400
E1
D3
D2
D1
D1
E4
J1J1
J1
G1
2 3
4" M
AX.
2 3
4" M
AX.
U2
U1
C2
B2
DE
TA
IL "
A"
SEE
DET
AIL
"A"
U3
C1
B1
C1
C2
B2
B1
U1U
2
U2U
2
U3
DE
TA
IL "
A"
F1F2
F3F1
F2F3
G2
G3
G1
G2
G3
G1
G2
G3
G1
G2
G3
SEE
DET
AIL
"B"
Q1
R1
S2 DE
TA
IL "
B"
G1
G2
G3
E2
S1
H1
H2
H3
EX
PLO
DE
D V
IEW
RAI
L C
AN B
E E3
OR
E4
DEP
END
ING
ON
PO
ST L
OC
ATIO
N.
TOR
QU
E BO
LD B
ETW
EEN
60-
75 F
T-LB
HEI
GH
T W
ILL
VAR
Y W
ITH
IN H
EIG
HT
TRAN
SITI
ON
TO
OTH
ER H
ARD
WAR
E.SE
E N
OTE
213
, SH
EET
"b".
400
401G
EN
ER
AL
NO
TE
S
H1
H2
H3
401
401
402
402
SDDSDD
14B26 - 04d14B26 - 04d
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
8"6"
1' - 2 14"
BLO
CK
OU
T (
D1)
7 18"
ELE
VA
TIO
NP
RO
FILE
1 3
4"
8"6"
1' - 2 14"
7 18" 7 18"
1 3
4"
8"6"
1' - 2 14"
7 18" 7 18"
3"
BLO
CK
OU
T (
D2)
ELE
VA
TIO
NB
LOC
KO
UT
(D
3)E
LEV
AT
ION
34"
DIA
.3
4" D
IA.
34"
DIA
.
PR
OFI
LEP
RO
FILE
FOU
ND
AT
ION
TU
BE
ELE
VA
TIO
N
3"
34"
DIA
.
6"
8"
6"
8"
X1"
17"
PR
OFI
LE
3 16"
UP
PE
R S
HE
AR
PLA
TE
(C
1)
5 1 2"
7 12" 7 18" 7 58"
2 3
4"
5 1 2"
34"
DIA
.
78"
DIA
.
2 1 2"
DIA
.
1' - 2 38"
3' 10"
2' - 5 18"7
1 2"
3 3
4"
BC
T P
OS
T (
L1)
ELE
VA
TIO
NP
RO
FILE
3 16"
3 15
16"
5 1316"
1"
3 15
16"
34"
34"
1"
Y7 18"
34"
DIA
.
PO
ST
ELE
VA
TIO
N
13"
13"
58"
34"
1 1 2"
10"
1 1 2"
1 12"
5 12"
2 12"
1 2" D
IA.
1 1 2"
10"
1 1 2"
1 12"
5 12"
2 12"
2"
1316
" DIA
.1 2"
DIA
.
3"
PLA
N
PR
OFI
LE
LOW
ER
SH
EA
R P
LAT
E (
B1)
PR
OFI
LE
PLA
N
PLA
N
ELE
VA
TIO
NP
RO
FILE
ELE
VA
TIO
NP
RO
FILE
UP
PE
R P
OS
T A
SS
EM
BLY
LOW
ER
PO
ST
AS
SE
MB
LY
3 3
4"
3/16
"1/
4"TY
P.
34"
3/16
"
2 1 2"
1 2"
1" D
IA.
PAR
T
A1 A2 B2
LEN
GTH
"X"
8' -
0"
6' -
0"
3' -
6"
PAR
T
M1
M2
C2
LEN
GTH
"Y"
6' -
6"
5' -
8 5/
8"
2' -
8 5/
8"
C1
C2
C1
C2
B2B2
B1B1
C2
C1
B1B2
SDDSDD
14B26 - 04e14B26 - 04e
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
2" (T
YP.)
8 1 2"
(TYP
.)6
1 4"(T
YP.)
6' -
3" (T
YP.)
SLO
TT
ED
TH
RIE
BE
AM
RA
IL E
1
2932
" DIA
. X 1
1 8" S
LOT
(TYP
.)3
4" D
IA. X
2 1 2"
SLO
T (T
YP.)
SLO
TT
ED
TH
RIE
BE
AM
RA
IL E
3
12' -
6"
12' -
6"
2932
" DIA
. X 1
1 8" S
LOT
(TYP
.)3
4" D
IA. X
2 1 2"
SLO
T (T
YP.)
34"
DIA
X 1
1 3
4" S
LOT
(TYP
.)
2" (T
YP.)
8 1 2"
(TYP
.)
6 1 4"
(TYP
.)15
58"
21 5
8"21
58"
16 1 8"
9"9
78"
6' -
3" (T
YP.)
8 1 2"
BEN
D R
ADIU
S =
5' -
2 3 16
"
9' -
9 15
16"
34"
DIA
. X 2
1 2" S
LOT
(TYP
.)3
4" D
IA. X
2 1 2"
SLO
T (T
YP.)
2932
" DIA
. X 1
1 8" S
LOT
(TYP
.)3
4" D
IA. X
1 1 8"
SLO
T (T
YP.)
34"
DIA
. X 2
' - 3
" SLO
T (T
YP.)
34"
DIA
. X 2
1 2" S
LOT
(TYP
.)
2932
" DIA
. X 1
1 8" S
LOT
(TYP
.)
34"
DIA
. X 9
34"
SLO
T (T
YP.)
12' -
6"
78"
DIA
. (TY
P.)
SLO
TT
ED
TH
RIE
BE
AM
RA
IL E
2P
LAN
VIE
W
SLO
TT
ED
TH
RIE
BE
AM
RA
IL E
4P
LAN
VIE
W
BEN
D R
ADIU
S =
34' -
1 7 16
"
13' -
4 13
16"
2" (T
YP.)
8 1 2"
(TYP
.)2"
(TYP
.)
8 1 2"
(TYP
.)
6 1 4"
(TYP
.)1'
- 2
1 8"
2' -
10 3
8"3'
- 4
58"
6' -
3"
11 3
4"1'
- 8
58"
2' -
4 1 2"
8 "
2"1"
1 3
8"6
1 4"4
1516
"4"
6 1 4"
(TYP
.)10
58"
1' -
78"
(TYP
.)
4' -
1 1 8"
4"3
4" D
IA. X
8 7
8" S
LOT
(TYP
.)
12' -
6"
34"
DIA
. (TY
P.)
7' -
4 3
4"4 3 16
"
ELE
VA
TIO
N V
IEW
NO
N -
RA
DIU
SE
DS
LOT
TE
D T
HR
IE B
EA
M R
AIL
E4
ELE
VA
TIO
N V
IEW
NO
N -
RA
DIU
SE
D
SDDSDD
14B26 - 04f14B26 - 04f
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
NO
SE
CA
BLE
AN
D S
WA
GE
BU
TT
ON
14' -
6"
U -
BO
LTP
LAT
E W
AS
HE
R (
T2)
1 1 4"
1 1 4"
R 1 4"
2 1 4"
1 4"
1 4" -
20 U
NC
38" 2 1 4" 3
4"
38"
1 1 2"
38"5 16
" DIA
.(T
YP.) 2
1 4"
1 8"
ELE
VA
TIO
N V
IEW
PR
OFI
LE V
IEW
NO
SE
CA
BLE
AN
CH
OR
(R
1)
2"8
58"
2"
2932
" DIA
. X 1
1 8" S
LOT
1 3 16
" 2"
3 16"
1 1 4"
4 1 8"
55°
ELE
VA
TIO
N V
IEW
PR
OFI
LE V
IEW
PLA
N V
IEW
AN
CH
OR
CA
BLE
AS
SE
MB
LY
6' -
6"
4' -
0"
1' -
4"
2" (T
YP.)
4" (T
YP.)
34"
DIA
. (TY
P.)
AN
CH
OR
BR
AC
KE
TE
ND
PLA
TE
(N
2)
1/4"
3 SI
DES
ELE
VA
TIO
N V
IEW
1"
55°
5 5
8"1
34" PR
OFI
LE V
IEW
38"
3"
2 3
4"
1 1 2"
1 3
8"
AN
CH
OR
BR
AC
KE
T A
SS
EM
BLY
(N
1)
ELE
VA
TIO
N V
IEW
PR
OFI
LE V
IEW
BC
T B
EA
RIN
G P
LAT
E (
A3)
5"
3'-4
"
4"
8" 1 1 8"
DIA
.
58"
5"7"
1 1 2"
6"
1 8"
2 3
8" D
IA.
ELE
VA
TIO
N V
IEW
PR
OFI
LE V
IEW
BC
T P
OS
T S
LEE
VE
(L2
)
1' -
3"
V4V3
V2V1
V4V3
V1
U -
BO
LTN
UT
(T
3)U
- B
OLT
(T1)
V2
Q1
Q2
N2
N1
N1
N2
N2 N
1
SDDSDD
14B26 - 04g14B26 - 04g
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
PAR
TN
UM
BER
A1 A2
DES
CR
IPTI
ON
MAT
ERIA
L SP
ECIF
ICAT
ION
LONG
FO
UNDA
TIO
N TU
BE
FOUN
DATI
ON
TUBE
AASH
TO M
111/
ASTM
A12
3 AS
TM A
500
GRAD
E B
OR
ASTM
A-5
01
AASH
TO M
111/
ASTM
A12
3 AS
TM A
500
GRAD
E B
OR
ASTM
A-5
01
AASH
TO M
111/
ASTM
A12
3 AS
TM A
36 M
IN S
TREN
GTH
36 K
SI, O
R AS
TM A
529
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A57
2 M
AX.
STRE
NGTH
50
KSI,
OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
A3BE
ARIN
G PL
ATE
AT P
OST
B1LO
WER
SLI
P PO
ST A
SSEM
BLY
- PLA
TEAA
SHTO
M11
1/AS
TM A
123
ASTM
A36
MIN
STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
572
MAX
.ST
RENG
TH 5
0 KS
I, O
R AS
TM A
709
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A99
2 M
AX. S
TREN
GTH
50 K
SI
B2LO
WER
SLI
P PO
ST A
SSEM
BLY
- TUB
EAA
SHTO
M11
1/AS
TM A
123
ASTM
A50
0 GR
ADE
B O
R AS
TM A
-501
AASH
TO M
111/
ASTM
A12
3 AS
TM A
36 M
IN S
TREN
GTH
36 K
SI, O
R AS
TM A
529
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A57
2 M
AX.
STRE
NGTH
50
KSI,
OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
C1
UPPE
R SL
IP P
OST
ASS
EMBL
Y - P
LATE
AASH
TO M
111/
ASTM
A12
3 AS
TM A
6 W
6X9
OR
W6X
8.5
ASTM
A36
MIN
STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI, O
RAS
TM A
572
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
C2
UPPE
R SL
IP P
OST
ASS
EMBL
Y - P
OST
D1
BLO
CK F
OR
STEE
L PO
ST -
WO
OD
WIS
DOT
SPEC
. 614
D2
TAPE
RED
BLO
CK F
OR
STEE
L PO
ST -
WO
OD
WIS
DOT
SPEC
. 614
D3
TAPE
RED
BLO
CK F
OR
BCT
POST
- W
OO
DW
ISDO
T SP
EC. 6
14
E1TH
RIE
BEAM
RAI
LAA
SHTO
M18
0 CL
ASS
A TY
PE 2
APP
ROVE
D PR
ODU
CER
AASH
TO M
180
CLAS
S A
TYPE
2 A
PPRO
VED
PRO
DUCE
R. IN
DICA
TE R
ADIU
S BE
AM G
UARD
IS B
ENT
TO O
N TH
E BA
CKSI
DE O
F RA
IL.
FOLL
OW
AAS
HTO
M18
0. M
ARK
RADI
US.
E2TH
RIE
BEAM
RAI
L -SH
OP
BENT
AND
PUN
CHED
E3TH
RIE
BEAM
RAI
L - P
UNCH
EDAA
SHTO
M18
0 CL
ASS
A TY
PE 2
APP
ROVE
D PR
ODU
CER
AASH
TO M
180
CLAS
S A
TYPE
2 A
PPRO
VED
PRO
DUCE
R. IN
DICA
TE R
ADIU
S BE
AM G
UARD
IS B
ENT
TO O
N TH
E BA
CKSI
DE O
F RA
IL.
FOLL
OW
AAS
HTO
M18
0. M
ARK
RADI
US.
E4TH
RIE
BEAM
RAI
L -SH
OP
BENT
AND
PUN
CHED
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC H
EAVY
HEX
HEA
D A
STM
A30
7 GR
ADE
B O
R SA
E J4
29 G
RADE
2 O
R AS
TM F
1554
GRA
DE 3
6F1
5/8"
DIA
. HEX
HEA
D GR
OUN
D ST
RUT
AND
YOKE
BO
LTHO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1/AS
TM B
695
CLAS
S 50
TYP
E 1
F43
6 TY
PE 1
(HAR
DEN
WAS
HER
ONL
Y)F2
5/8"
DIA
. GRO
UND
STRU
TAN
D YO
KE B
OLT
- W
ASHE
RHO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1/AS
TM B
695
CLAS
S 50
TYP
E 1
UNC
OVE
R TA
P NU
TS A
S SP
ECIF
IED
IN A
ASHT
O 2
91/A
STM
A 5
63 H
EAVY
HEX
HEA
D A
STM
A56
3DH
OR
SAE
J995
GRA
DE 5
F3GR
OUN
D ST
RUT
AND
YOKE
BO
LT -
NUT
G1
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 F
436
TYPE
1 (H
ARDE
N W
ASHE
R TY
PICA
LLY
USED
WIT
H ST
EEL P
OST
S) O
R AS
TM F
844
(UNH
ARDE
NED
WAS
HER
TYPI
CALL
Y US
ED W
ITH
WO
OD)
5/8
" DIA
. PO
ST B
OLT
G2
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
AST
MB6
95 C
LASS
50
TYPE
1 F
436
TYPE
1 (H
ARDE
N W
ASHE
R TY
PICA
LLY
USED
WIT
H ST
EEL P
OST
S) O
R AS
TM F
844
(UNH
ARDE
NED
WAS
HER
TYPI
CALL
Y US
ED W
ITH
WO
OD)
PO
ST B
OLT
- W
ASHE
R
G3
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
AST
MB6
95 C
LASS
50
TYPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/AST
M A
563
AAS
HTO
M18
0 RE
CESS
ED H
EAVY
HEX
HEA
DAS
TM A
563D
H O
R SA
E J9
95 G
RADE
5 P
OST
BO
LT -
NUT
H1
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
AST
MB6
95 C
LASS
50
TYPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/AST
M A
563
HEA
VY H
EX H
EAD
7/8
" AS
TM A
563D
H O
RSA
E J9
95 G
RADE
5 7
/8" D
IA. S
OIL
TUB
E BO
LT
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 7
/8"
ASTM
F84
4 TY
PE 1
(HAR
DEN
WAS
HER
ONL
Y)H
2SO
IL T
UBE
BOLT
- W
ASHE
R
H3
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/AST
M A
563
HEA
VY H
EX H
EAD
7/8
" AS
TM A
563D
HO
R SA
E J9
95 G
RADE
5SO
IL T
UBE
BOLT
- NU
T
J116
D DO
UBLE
HEA
D NA
ILAS
TM A
153
HOT
DIPP
ED C
LASS
D D
OUB
LE H
EAD
AST
M F
1667
TYP
E 1
STYL
E 12
(16
DOUB
LE H
EADE
D)
L1BC
T TI
MBE
R PO
STW
ISDO
T SP
EC. 6
14 S
4S F
INIS
H O
N 4
SIDE
L2AA
SHTO
M11
1/AS
TM A
123
2 3
/8" O
D A
STM
53
GRAD
E B
BCT
POST
SLE
EVE
AASH
TO M
111/
ASTM
A12
3 A
STM
A6
W6X
9 O
R W
6X8.
5 A
STM
A36
MIN
. STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI,
OR
ASTM
A57
2 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
709
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A99
2 M
AX. S
TREN
GTH
50 K
SIM
1W
6X8.
5 O
R W
6X9
STEE
L PO
ST
AASH
TO M
111/
ASTM
A12
3 A
STM
A6
W6X
9 O
R W
6X8.
5 A
STM
A36
MIN
. STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI,
OR
ASTM
A57
2 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
709
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A99
2 M
AX. S
TREN
GTH
50 K
SIM
2W
6X8.
5 O
R W
6X9
STEE
L PO
ST
AASH
TO M
111/
ASTM
A12
3 A
STM
A36
MIN
. STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
572
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
N1
ANCH
OR
BRAC
KET
AASH
TO M
111/
ASTM
A12
3 A
STM
A36
MIN
. STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
572
MAX
. STR
ENGT
H 50
KSI
, OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
N2
ANCH
OR
BRAC
KET
- BEA
RING
PLA
TE
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC H
EAVY
HEX
HEA
D 5
/8"
ASTM
A30
7 GR
ADE
B O
R SA
E J4
29 G
RADE
2 O
R AS
TM F
1554
GRA
DE 3
6P1
5/8"
DIA
. ANC
HOR
BRAC
KET
BOLT
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 F
436
TYPE
1 (H
ARDE
N W
ASHE
R O
NLY)
P2AN
CHO
R BR
ACKE
T BO
LT -
WAS
HER
P3HO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1/AS
TM B
695
CLAS
S 50
TYP
E 1
UNC
OVE
R TA
P NU
TS A
S SP
ECIF
IED
IN A
ASHT
O 2
91/A
STM
A 5
63 H
EAVY
HEX
HEA
D A
STM
A56
3DH
OR
SAE
J995
GRA
DE 5
SOIL
TUB
E BO
LT -
NUT
PAR
TN
UM
BER
DES
CR
IPTI
ON
MAT
ERIA
L SP
ECIF
ICAT
ION
Q1
5/8"
DIA
. NO
SE C
ABLE
6X19
AAS
THO
M30
/ AS
TM A
741
XIPS
INDE
PEND
ENT
WIR
E CO
RE (I
WRC
) PR
6X25
XIP
S, IW
RC N
OM
INAL
BRE
AKIN
G ST
RENG
THO
F 41
.2 K
IPS.
Q2
COLD
TUF
F BU
TTO
N, S
-409
SIZ
E NO
. 12
STO
CK N
UMBE
R 10
4039
5 O
R AN
Y O
THER
SIM
ILAR
SIZ
ED W
AGED
-GRI
P-BU
TTO
N FE
RRUL
ES.
ASTM
A57
6 GR
ADE
1035
SW
AGE
FITT
ING
ARE
TO B
E FI
ELD
SWAG
ED P
ER M
ANUF
ACTU
RERS
REC
OM
MEN
DATI
ON.
NO
MIN
ALBR
EAKI
NG S
TREN
GTH
OF
41.2
KIP
S.NO
SE C
ABLE
-SW
AGE
BUTT
ON
AASH
TO M
111/
ASTM
A12
3 A
STM
A36
MIN
. STR
ENGT
H 36
KSI
, OR
ASTM
A52
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
572
MAX
. STR
ENGT
H50
KSI
, OR
ASTM
A70
9 M
AX. S
TREN
GTH
50 K
SI, O
R AS
TM A
992
MAX
. STR
ENGT
H 50
KSI
R1
NOSE
CAB
LE A
NCHO
R BR
ACKE
T
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1
/AS
TM B
695
CLAS
S 50
TYP
E 1
UNC
AAS
HTO
M18
0 HE
AD A
STM
A30
7 GR
ADE
B O
R SA
E J4
29 G
RADE
2 O
R AS
TM F
1554
GRA
DE 3
6S1
5/8"
DIA
. SPL
ICE
BOLT
- BO
LT
S2HO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1 /
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/AST
M A
563
AAS
HTO
M18
0 RE
CESS
ED H
EAVY
HEX
HEAD
5/8
" AS
TM A
563D
H O
R SA
E J9
95 G
RADE
5SP
LICE
- BO
LT N
UT
T11/
4" D
IA. N
OSE
CAB
LE -
U BO
LTHO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1 /
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC H
EAVY
HEX
HEA
D A
STM
A30
7 GR
ADE
B O
R SA
E J4
29 G
RADE
2 O
R AS
TM F
1554
GRA
DE 3
6
T2U-
BOLT
- PL
ATE
WAS
HER
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1
/AS
TM B
695
CLAS
S 50
TYP
E 1
F43
6 TY
PE 1
(HAR
DEN
WAS
HER
ONL
Y)
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/ AS
TM A
563
HEA
VY H
EX H
EAD
AST
M A
563D
H O
RSA
E J9
95 G
RADE
5T3
U-BO
LT N
UT
ASTM
A15
3 O
R B6
95 C
LASS
55
OR
F232
9 U
NC F
ULLY
THR
EADE
D H
EX H
EAD
TAP
BO
LT A
STM
A44
9 O
R SA
E J4
29 G
RADE
5U
17/
16" D
IA.
SLIP
PO
ST A
SSEM
BLY
-BR
EAKA
WAY
BO
LTAS
TM F
436
TYPE
I (H
ARDE
N TY
PICA
LLY
USED
WIT
H ST
EEL)
GAL
V. A
ASHT
O M
111/
ASTM
A 1
23 O
R GA
LV. H
OT
DIP.
TO
PO
ST B
OLT
CLAS
S C
/ AST
M F
2329
OR
GALV
. MEC
HANI
CALL
Y TO
AAS
HTO
M23
2 CL
ASS
C / A
STM
A15
3 CL
ASS
C /
ASTM
AAS
HTO
M29
8 CL
ASS
50,
TYPE
1 /
ASTM
B69
5 CL
ASS
55, F
2329
U2
7/16
" DIA
. SLI
P PO
ST A
SSEB
LY -
BREA
KAW
AY B
OLT
- W
ASHE
R
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1
/ST
M B
695
CLAS
S 50
TYP
E 1
UNC
OVE
R TA
P NU
TS A
S SP
ECIF
IED
IN A
ASHT
O 2
91/A
STM
A 5
63 H
EAVY
HEX
HEA
D A
STM
A56
3DH
OR
SAE
J995
GRA
DE 5
U3
SLIP
PO
ST A
SSEB
LY -
BREA
KAW
AY B
OLT
- NU
T
V1U-
BOLT
- PL
ATE
WAS
HER
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1
/AS
TM B
695
CLAS
S 50
TYP
E 1
F43
6 TY
PE 1
(HAR
DEN
WAS
HER
ONL
Y)
UNC
ASTM
A57
6 GR
ADE
1035
SW
AGE
FITT
ING
ARE
TO B
E FA
CTO
RY S
WAG
ED.
MIN
. BRE
AKIN
G ST
RENG
TH O
F 42
.7 K
IPS.
ASM
E B3
0.26
"FO
RGED
, CAS
T, O
R DI
E ST
AMPE
D W
ITH
THE
FOLL
OW
ING
IN T
O C
ONN
ECTI
ON:
NAM
E O
F M
ANUF
ACTU
RE O
R TR
ADEM
ARK
OF
CONN
ECTI
ON'
S M
ANUF
ACTU
RER,
SIZ
E O
R RA
TED
LOAD
, GRA
DE F
OR
ALLO
Y EY
EBO
LTS.
"V2
ANCH
OR
CABL
E-SW
AGE
FITT
ING
V31"
DIA
. ANC
HOR
CABL
E-W
ASHE
RHO
T DI
P AA
SHTO
M23
2 CL
ASS
/ AST
M A
153
CLAS
S C
/ AST
M F
2329
C O
R M
ECHA
NICA
L GAL
. TO
AAS
HTO
M29
8 CL
ASS
50 T
YPE
1 /
ASTM
B69
5 CL
ASS
50 T
YPE
1 F
436
TYPE
1 (H
ARDE
N W
ASHE
R O
NLY)
HOT
DIP
AASH
TO M
232
CLAS
S / A
STM
A15
3 CL
ASS
C / A
STM
F23
29 C
OR
MEC
HANI
CAL G
AL. T
O A
ASHT
O M
298
CLAS
S 50
TYP
E 1/
ASTM
B69
5 CL
ASS
50 T
YPE
1 U
NC O
VER
TAP
NUTS
AS
SPEC
IFIE
D IN
AAS
HTO
291
/ AS
TM A
563
HEA
VY H
EX H
EAD
AST
M A
563D
H O
RSA
E J9
95 G
RADE
5V4
1" D
IA. A
NCHO
R CA
BLE-
NUT
W1
REFL
ECTO
RSE
E S
DD 1
5A4
BIL
L O
F M
AT
ER
IALS
LIS
T
SDDSDD
14B26 - 04h14B26 - 04h
STAT
E O
F W
ISC
ON
SIN
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
N
APPR
OVE
D
DAT
ER
OAD
WAY
STA
ND
ARD
S D
EVEL
OPM
ENT
ENG
INEE
R
/S/
FHW
A
ST
EE
L T
HR
IE B
EA
MB
ULL
NO
SE
TE
RM
INA
L
Augu
st 2
020
Rod
ney
Tayl
or
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0002 201.0105Clearing STA
74.000_________._____ _________._____
0004 201.0205Grubbing STA
74.000_________._____ _________._____
0006 203.0100Removing Small Pipe Culverts EACH
14.000_________._____ _________._____
0010 203.0200Removing Old Structure (station) 02.158+31.35 WB
LUMP SUM _________._____LS
0012 203.0200Removing Old Structure (station) 03.160+50.91
LUMP SUM _________._____LS
0014 203.0200Removing Old Structure (station) 04.STA 42+48
LUMP SUM _________._____LS
0016 203.0600.SRemoving Old Structure Over WaterwayWith Minimal Debris (station) 01. 42+50
LUMP SUM _________._____LS
0018 203.0600.SRemoving Old Structure Over WaterwayWith Minimal Debris (station) 02. STA43+00
LUMP SUM _________._____LS
0020 204.0100Removing Concrete Pavement SY
39,922.000_________._____ _________._____
0022 204.0120Removing Asphaltic Surface Milling SY
5,430.000_________._____ _________._____
0024 204.0155Removing Concrete Sidewalk SY
18.000_________._____ _________._____
0026 204.0165Removing Guardrail LF
1,835.000_________._____ _________._____
0028 204.0170Removing Fence LF
11,890.000_________._____ _________._____
0030 204.0180Removing Delineators and Markers EACH
14.000_________._____ _________._____
0032 204.0195Removing Concrete Bases EACH
3.000_________._____ _________._____
Proposal Schedule of Items Page 1 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0034 204.0220Removing Inlets EACH
11.000_________._____ _________._____
0036 204.9090.SRemoving (item description) 01. CableBarrier
LF3,475.000
_________._____ _________._____
0038 205.0100Excavation Common CY
150,234.000_________._____ _________._____
0040 206.1000Excavation for Structures Bridges(structure) 01. B-55-0271
LUMP SUM _________._____LS
0042 206.1000Excavation for Structures Bridges(structure) 02. B-55-0270
LUMP SUM _________._____LS
0044 206.1000Excavation for Structures Bridges(structure) 03. B-55-0281
LUMP SUM _________._____LS
0046 206.1000Excavation for Structures Bridges(structure) 04. B-55-0285
LUMP SUM _________._____LS
0048 206.1000Excavation for Structures Bridges(structure) 05. B-55-0282
LUMP SUM _________._____LS
0050 206.1000Excavation for Structures Bridges(structure) 06. B-55-0286
LUMP SUM _________._____LS
0052 206.2000Excavation for Structures Culverts(structure) 01. C-55-19
LUMP SUM _________._____LS
0054 208.0100Borrow CY
116,051.000_________._____ _________._____
0056 208.1100Select Borrow CY
2,593.000_________._____ _________._____
0058 210.1500Backfill Structure Type A TON
1,832.000_________._____ _________._____
0060 210.2500Backfill Structure Type B TON
685.000_________._____ _________._____
Proposal Schedule of Items Page 2 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0062 213.0100Finishing Roadway (project) 01. 1021-00-78
EACH1.000
_________._____ _________._____
0064 213.0100Finishing Roadway (project) 02. 1021-00-79
EACH1.000
_________._____ _________._____
0066 213.0100Finishing Roadway (project) 03. 1021-04-77
EACH1.000
_________._____ _________._____
0068 213.0100Finishing Roadway (project) 04. 1021-04-78
EACH1.000
_________._____ _________._____
0070 305.0110Base Aggregate Dense 3/4-Inch TON
27,635.000_________._____ _________._____
0072 305.0120Base Aggregate Dense 1 1/4-Inch TON
91,532.000_________._____ _________._____
0074 311.0115Breaker Run CY
57.000_________._____ _________._____
0078 415.0120Concrete Pavement 12-Inch SY
43,635.000_________._____ _________._____
0080 415.0410Concrete Pavement Approach Slab SY
900.000_________._____ _________._____
0082 416.0620Drilled Dowel Bars EACH
128.000_________._____ _________._____
0084 416.1010Concrete Surface Drains CY
24.000_________._____ _________._____
0086 416.1110Concrete Shoulder Rumble Strips LF
13,555.000_________._____ _________._____
0088 450.4000HMA Cold Weather Paving TON
1,860.000_________._____ _________._____
0090 455.0605Tack Coat GAL
5,785.000_________._____ _________._____
1.000000092 460.2000
Incentive Density HMA Pavement DOL7,150.000
7,150.00
Proposal Schedule of Items Page 3 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0094 460.6223HMA Pavement 3 MT 58-28 S TON
6,475.000_________._____ _________._____
0096 460.6224HMA Pavement 4 MT 58-28 S TON
3,865.000_________._____ _________._____
0098 465.0110Asphaltic Surface Patching TON
1,155.000_________._____ _________._____
0100 465.0125Asphaltic Surface Temporary TON
23,810.000_________._____ _________._____
0102 465.0400Asphaltic Shoulder Rumble Strips LF
16,900.000_________._____ _________._____
0104 501.1000.SIce Hot Weather Concreting LB
24,830.000_________._____ _________._____
0106 502.0100Concrete Masonry Bridges CY
4,178.000_________._____ _________._____
0108 502.3200Protective Surface Treatment SY
5,643.000_________._____ _________._____
0110 502.3210Pigmented Surface Sealer SY
979.000_________._____ _________._____
0112 502.4205Adhesive Anchors No. 5 Bar EACH
42.000_________._____ _________._____
0114 503.0128Prestressed Girder Type I 28-Inch LF
2,590.000_________._____ _________._____
0116 503.0137Prestressed Girder Type I 36W-Inch LF
1,855.000_________._____ _________._____
0118 504.0100Concrete Masonry Culverts CY
101.000_________._____ _________._____
0120 505.0400Bar Steel Reinforcement HS Structures LB
89,475.000_________._____ _________._____
0122 505.0600Bar Steel Reinforcement HS CoatedStructures
LB559,320.000
_________._____ _________._____
0124 505.0800.SBar Steel Reinforcement HS StainlessStructures
LB10,655.000
_________._____ _________._____
Proposal Schedule of Items Page 4 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0126 506.2605Bearing Pads Elastomeric Non-Laminated
EACH216.000
_________._____ _________._____
0128 506.4000Steel Diaphragms (structure) 01. B-55-0271
EACH15.000
_________._____ _________._____
0130 506.4000Steel Diaphragms (structure) 02. B-55-0270
EACH21.000
_________._____ _________._____
0132 506.4000Steel Diaphragms (structure) 03. B-55-0281
EACH18.000
_________._____ _________._____
0134 506.4000Steel Diaphragms (structure) 04. B-55-0285
EACH9.000
_________._____ _________._____
0136 506.4000Steel Diaphragms (structure) 05. B-55-0282
EACH18.000
_________._____ _________._____
0138 506.4000Steel Diaphragms (structure) 06. B-55-0286
EACH9.000
_________._____ _________._____
0140 511.1100Temporary Shoring SF
1,700.000_________._____ _________._____
0142 511.1200Temporary Shoring (structure) 01. C-55-19
SF1,660.000
_________._____ _________._____
0144 511.1200Temporary Shoring (structure) 02. B-55-0270
SF650.000
_________._____ _________._____
0146 511.1200Temporary Shoring (structure) 03. B-55-0285
SF1,500.000
_________._____ _________._____
0148 511.1200Temporary Shoring (structure) 04. B-55-0282
SF1,350.000
_________._____ _________._____
0150 511.1200Temporary Shoring (structure) 05. B-55-0286
SF300.000
_________._____ _________._____
Proposal Schedule of Items Page 5 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0152 516.0500Rubberized Membrane Waterproofing SY
181.000_________._____ _________._____
0154 520.1018Apron Endwalls for Culvert Pipe 18-Inch EACH
4.000_________._____ _________._____
0156 520.1024Apron Endwalls for Culvert Pipe 24-Inch EACH
1.000_________._____ _________._____
0158 520.1036Apron Endwalls for Culvert Pipe 36-Inch EACH
4.000_________._____ _________._____
0160 520.2018Culvert Pipe Temporary 18-Inch LF
1,400.000_________._____ _________._____
0162 520.3424Culvert Pipe Class III-A Non-metal 24-Inch
LF238.000
_________._____ _________._____
0164 520.3636Culvert Pipe Class III-B Non-metal 36-Inch
LF266.000
_________._____ _________._____
0166 522.0124Culvert Pipe Reinforced Concrete ClassIII 24-Inch
LF937.000
_________._____ _________._____
0168 522.0130Culvert Pipe Reinforced Concrete ClassIII 30-Inch
LF279.000
_________._____ _________._____
0170 522.1018Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch
EACH5.000
_________._____ _________._____
0172 522.1024Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch
EACH9.000
_________._____ _________._____
0174 522.1030Apron Endwalls for Culvert PipeReinforced Concrete 30-Inch
EACH2.000
_________._____ _________._____
0176 531.1100Concrete Masonry Ancillary StructuresType NS
CY7.000
_________._____ _________._____
0178 531.1140Steel Reinforcement HS AncillaryStructures Type NS
LB870.000
_________._____ _________._____
Proposal Schedule of Items Page 6 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0180 550.0020Pre-Boring Rock or ConsolidatedMaterials
LF1,470.000
_________._____ _________._____
0182 550.0500Pile Points EACH
168.000_________._____ _________._____
0184 550.1120Piling Steel HP 12-Inch X 53 Lb LF
3,315.000_________._____ _________._____
0186 550.2106Piling CIP Concrete 10 3/4 X 0.365-Inch LF
8,140.000_________._____ _________._____
0188 601.0576Concrete Curb & Gutter 4-Inch Sloped30-Inch Type J
LF50.000
_________._____ _________._____
0190 601.0590Concrete Curb & Gutter 4-Inch Sloped36-Inch Type TBTT
LF560.000
_________._____ _________._____
0192 602.0405Concrete Sidewalk 4-Inch SF
160.000_________._____ _________._____
0194 603.8000Concrete Barrier Temporary PrecastDelivered
LF38,810.000
_________._____ _________._____
0196 603.8125Concrete Barrier Temporary PrecastInstalled
LF55,580.000
_________._____ _________._____
0198 603.8500Anchoring Concrete Barrier TemporaryPrecast
LF11,850.000
_________._____ _________._____
0200 603.8505Anchoring Concrete Barrier TemporaryPrecast on Bridge Decks
LF205.000
_________._____ _________._____
0202 604.0500Slope Paving Crushed Aggregate SY
1,380.000_________._____ _________._____
0204 606.0100Riprap Light CY
66.000_________._____ _________._____
0206 606.0300Riprap Heavy CY
2,068.000_________._____ _________._____
Proposal Schedule of Items Page 7 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0208 611.0430Reconstructing Inlets EACH
5.000_________._____ _________._____
0210 611.0642Inlet Covers Type MS EACH
12.000_________._____ _________._____
0212 611.3901Inlets Median 1 Grate EACH
8.000_________._____ _________._____
0214 611.3902Inlets Median 2 Grate EACH
2.000_________._____ _________._____
0216 611.8120.SCover Plates Temporary EACH
7.000_________._____ _________._____
0218 612.0206Pipe Underdrain Unperforated 6-Inch LF
600.000_________._____ _________._____
0220 612.0406Pipe Underdrain Wrapped 6-Inch LF
1,220.000_________._____ _________._____
0222 613.1100.SCable Barrier Type 1 LF
4,375.000_________._____ _________._____
0224 613.1200.SCable Barrier End Terminal Type 1 EACH
6.000_________._____ _________._____
0226 614.0150Anchor Assemblies for Steel Plate BeamGuard
EACH24.000
_________._____ _________._____
0228 614.0220Steel Thrie Beam Bullnose Terminal EACH
3.000_________._____ _________._____
0230 614.0360Steel Plate Beam Guard Temporary LF
240.000_________._____ _________._____
0232 614.0380Steel Plate Beam Guard EnergyAbsorbing Terminal Temporary
EACH1.000
_________._____ _________._____
0234 614.0905Crash Cushions Temporary EACH
10.000_________._____ _________._____
0236 614.0920Salvaged Rail LF
1,226.000_________._____ _________._____
0238 614.2300MGS Guardrail 3 LF
4,613.000_________._____ _________._____
Proposal Schedule of Items Page 8 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0240 614.2500MGS Thrie Beam Transition LF
576.000_________._____ _________._____
0242 614.2610MGS Guardrail Terminal EAT EACH
10.000_________._____ _________._____
0244 614.2620MGS Guardrail Terminal Type 2 EACH
12.000_________._____ _________._____
0246 616.0100Fence Woven Wire (height) 01. 4-FT LF
11,630.000_________._____ _________._____
0248 618.0100Maintenance And Repair of Haul Roads(project) 01. 1021-00-78
EACH1.000
_________._____ _________._____
0250 618.0100Maintenance And Repair of Haul Roads(project) 02. 1021-00-79
EACH1.000
_________._____ _________._____
0252 618.0100Maintenance And Repair of Haul Roads(project) 03. 1021-04-77
EACH1.000
_________._____ _________._____
0254 618.0100Maintenance And Repair of Haul Roads(project) 04. 1021-04-78
EACH1.000
_________._____ _________._____
0256 619.1000Mobilization EACH
1.000_________._____ _________._____
0258 620.0300Concrete Median Sloped Nose SF
14.000_________._____ _________._____
0260 624.0100Water MGAL
918.000_________._____ _________._____
0262 625.0500Salvaged Topsoil SY
191,795.000_________._____ _________._____
0264 627.0200Mulching SY
119,215.000_________._____ _________._____
0266 628.1504Silt Fence LF
15,135.000_________._____ _________._____
0268 628.1520Silt Fence Maintenance LF
15,135.000_________._____ _________._____
Proposal Schedule of Items Page 9 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0270 628.1905Mobilizations Erosion Control EACH
10.000_________._____ _________._____
0272 628.1910Mobilizations Emergency Erosion Control EACH
8.000_________._____ _________._____
0274 628.2002Erosion Mat Class I Type A SY
21,560.000_________._____ _________._____
0276 628.2004Erosion Mat Class I Type B SY
54,730.000_________._____ _________._____
0278 628.7005Inlet Protection Type A EACH
11.000_________._____ _________._____
0280 628.7504Temporary Ditch Checks LF
2,280.000_________._____ _________._____
0282 628.7560Tracking Pads EACH
12.000_________._____ _________._____
0284 628.7570Rock Bags EACH
50.000_________._____ _________._____
0286 629.0210Fertilizer Type B CWT
121.000_________._____ _________._____
0288 630.0130Seeding Mixture No. 30 LB
2,855.000_________._____ _________._____
0290 630.0200Seeding Temporary LB
5,190.000_________._____ _________._____
0292 630.0300Seeding Borrow Pit LB
2,360.000_________._____ _________._____
0294 630.0500Seed Water MGAL
1,082.000_________._____ _________._____
0296 633.0100Delineator Posts Steel EACH
65.000_________._____ _________._____
0298 633.0500Delineator Reflectors EACH
65.000_________._____ _________._____
0300 633.1100Delineators Temporary EACH
332.000_________._____ _________._____
Proposal Schedule of Items Page 10 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0302 633.5200Markers Culvert End EACH
12.000_________._____ _________._____
0304 634.0614Posts Wood 4x6-Inch X 14-FT EACH
28.000_________._____ _________._____
0306 634.0616Posts Wood 4x6-Inch X 16-FT EACH
6.000_________._____ _________._____
0308 635.0200Sign Supports Structural Steel HS LB
3,535.000_________._____ _________._____
0310 637.2230Signs Type II Reflective F SF
12.000_________._____ _________._____
0312 638.2101Moving Signs Type I EACH
1.000_________._____ _________._____
0314 638.2102Moving Signs Type II EACH
27.000_________._____ _________._____
0316 638.3000Removing Small Sign Supports EACH
27.000_________._____ _________._____
0318 638.3100Removing Structural Steel Sign Supports EACH
5.000_________._____ _________._____
0320 642.5201Field Office Type C EACH
1.000_________._____ _________._____
0322 643.0300Traffic Control Drums DAY
58,975.000_________._____ _________._____
0324 643.0420Traffic Control Barricades Type III DAY
5,230.000_________._____ _________._____
0326 643.0705Traffic Control Warning Lights Type A DAY
7,190.000_________._____ _________._____
0328 643.0715Traffic Control Warning Lights Type C DAY
20,280.000_________._____ _________._____
0330 643.0800Traffic Control Arrow Boards DAY
1,830.000_________._____ _________._____
0332 643.0900Traffic Control Signs DAY
27,830.000_________._____ _________._____
Proposal Schedule of Items Page 11 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0334 643.0920Traffic Control Covering Signs Type II EACH
2.000_________._____ _________._____
0336 643.1051Traffic Control Signs PCMS with CellularCommunications
DAY1,820.000
_________._____ _________._____
0338 643.4100.STraffic Control Interim Lane Closure EACH
215.000_________._____ _________._____
0340 643.5000Traffic Control EACH
1.000_________._____ _________._____
0342 645.0105Geotextile Type C SY
186.000_________._____ _________._____
0344 645.0111Geotextile Type DF Schedule A SY
622.000_________._____ _________._____
0346 645.0120Geotextile Type HR SY
3,135.000_________._____ _________._____
0348 645.0130Geotextile Type R SY
140.000_________._____ _________._____
0350 646.1040Marking Line Grooved Wet Ref Epoxy 4-Inch
LF36,395.000
_________._____ _________._____
0352 646.1555Marking Line Grooved ContrastPermanent Tape 4-Inch
LF3,925.000
_________._____ _________._____
0354 646.3555Marking Line Grooved ContrastPermanent Tape 8-Inch
LF2,261.000
_________._____ _________._____
0356 646.6120Marking Stop Line Epoxy 18-Inch LF
40.000_________._____ _________._____
0358 646.6464Cold Weather Marking Epoxy 4-Inch LF
10,720.000_________._____ _________._____
0360 646.7220Marking Chevron Epoxy 24-Inch LF
180.000_________._____ _________._____
0362 646.9010Marking Removal Line Water Blasting 4-Inch
LF41,750.000
_________._____ _________._____
Proposal Schedule of Items Page 12 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0364 649.0105Temporary Marking Line Paint 4-Inch LF
120,970.000_________._____ _________._____
0366 649.0120Temporary Marking Line Epoxy 4-Inch LF
41,750.000_________._____ _________._____
0368 649.0150Temporary Marking Line RemovableTape 4-Inch
LF18,175.000
_________._____ _________._____
0370 649.0760Temporary Marking Raised PavementMarker Type I
EACH350.000
_________._____ _________._____
0372 650.4000Construction Staking Storm Sewer EACH
12.000_________._____ _________._____
0374 650.4500Construction Staking Subgrade LF
30,459.000_________._____ _________._____
0376 650.5000Construction Staking Base LF
38,284.000_________._____ _________._____
0378 650.5500Construction Staking Curb Gutter andCurb & Gutter
LF610.000
_________._____ _________._____
0380 650.6500Construction Staking Structure Layout(structure) 01. B-55-0271
LUMP SUM _________._____LS
0382 650.6500Construction Staking Structure Layout(structure) 02. B-55-0270
LUMP SUM _________._____LS
0384 650.6500Construction Staking Structure Layout(structure) 03. C-55-19
LUMP SUM _________._____LS
0386 650.6500Construction Staking Structure Layout(structure) 04. B-55-0281
LUMP SUM _________._____LS
0388 650.6500Construction Staking Structure Layout(structure) 05. B-55-0285
LUMP SUM _________._____LS
0390 650.6500Construction Staking Structure Layout(structure) 06. B-55-0282
LUMP SUM _________._____LS
Proposal Schedule of Items Page 13 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0392 650.6500Construction Staking Structure Layout(structure) 07. B-55-0286
LUMP SUM _________._____LS
0394 650.7000Construction Staking ConcretePavement
LF14,755.000
_________._____ _________._____
0396 650.9910Construction Staking SupplementalControl (project) 01. 1021-00-78
LUMP SUM _________._____LS
0398 650.9910Construction Staking SupplementalControl (project) 02. 1021-00-79
LUMP SUM _________._____LS
0400 650.9910Construction Staking SupplementalControl (project) 03. 1021-04-77
LUMP SUM _________._____LS
0402 650.9910Construction Staking SupplementalControl (project) 04. 1021-04-78
LUMP SUM _________._____LS
0404 650.9920Construction Staking Slope Stakes LF
37,024.000_________._____ _________._____
0406 652.0125Conduit Rigid Metallic 2-Inch LF
10.000_________._____ _________._____
0408 652.0225Conduit Rigid Nonmetallic Schedule 402-Inch
LF265.000
_________._____ _________._____
0410 653.0140Pull Boxes Steel 24x42-Inch EACH
2.000_________._____ _________._____
0412 653.0905Removing Pull Boxes EACH
1.000_________._____ _________._____
0414 655.0625Electrical Wire Lighting 6 AWG LF
870.000_________._____ _________._____
0416 670.0100Field System Integrator LUMP SUM _________._____LS
0418 670.0200ITS Documentation LUMP SUM _________._____LS
Proposal Schedule of Items Page 14 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0420 674.0300Remove Cable LF
110.000_________._____ _________._____
0422 690.0150Sawing Asphalt LF
12,394.000_________._____ _________._____
0424 690.0250Sawing Concrete LF
369.000_________._____ _________._____
1.000000426 715.0415
Incentive Strength Concrete Pavement DOL13,361.000
13,361.00
1.000000428 715.0502
Incentive Strength Concrete Structures DOL25,710.000
25,710.00
1.000000430 715.0710
Optimized Aggregate Gradation Incentive DOL60,130.000
60,130.00
1.000000432 740.0440
Incentive IRI Ride DOL12,660.000
12,660.00
5.000000434 ASP.1T0A
On-the-Job Training Apprentice at$5.00/HR
HRS2,100.000
10,500.00
5.000000436 ASP.1T0G
On-the-Job Training Graduate at$5.00/HR
HRS2,400.000
12,000.00
0438 SPV.0060Special 01. Relocate Ground MountDMS
EACH1.000
_________._____ _________._____
0440 SPV.0060Special 02. Traffic Control VerticalPanels
EACH169.000
_________._____ _________._____
0442 SPV.0060Special 03. Manholes Special 4-FTDiameter Temporary
EACH4.000
_________._____ _________._____
0444 SPV.0060Special 04. Temporary Inlets Median 1Grate
EACH2.000
_________._____ _________._____
0446 SPV.0105Special 01. Project Concrete CrackMitigation and Repair, 1021-00-78
LUMP SUM _________._____LS
Proposal Schedule of Items Page 15 of 16
Wisconsin Department of Transportation 01/07/2021 15:44:55
Proposal ID: 20210112033 Project(s): 1021-00-78, 1021-00-79, 1021-04-77, 1021-04-78Federal ID(s): WISC 2021100, WISC 2021101, WISC 2021102, WISC
2021103
0001 Contract ItemsSECTION:
Alt Set ID: Alt Mbr ID:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescriptionItem ID
ProposalLine
Number
0448 SPV.0105Special 02. Project Concrete CrackMitigation and Repair, 1021-00-79
LUMP SUM _________._____LS
0450 SPV.0105Special 03. Project Concrete CrackMitigation and Repair, 1021-04-77
LUMP SUM _________._____LS
0452 SPV.0105Special 04. Project Concrete CrackMitigation and Repair, 1021-04-78
LUMP SUM _________._____LS
0454 SPV.0105Special 05. Temporary Bridge WideningB-55-12
LUMP SUM _________._____LS
0456 203.0200Removing Old Structure (station) 05.158+25.29 EB
LUMP SUM _________._____LS
0458 312.0110Select Crushed Material TON
12,848.000_________._____ _________._____
0460 460.6244HMA Pavement 4 MT 58-34 S TON
880.000_________._____ _________._____
0462 614.0230Steel Thrie Beam LF
253.000_________._____ _________._____
Section: 0001 _________._____Total:
Total Bid: _________._____