Winston-Salem Urban Area METROPOLITAN PLANNING ORGANIZATION FY 2020-2029 MTIP Amendments and Modificaons Public review and comments: February 15 2021 - March 17, 2021

Transcript of Winston-Salem Urban Area

Page 1: Winston-Salem Urban Area

Winston-Salem Urban Area

METROPOLITAN PLANNING ORGANIZATION

FY 2020-2029 MTIP Amendments and Modifications

Public review and comments:

February 15 2021 -

March 17, 2021

Page 2: Winston-Salem Urban Area

WINSTON-SALEM URBAN AREA METROPOLITIAN PLANNING ORGANIZATION (MPO)

JANUARY 2021 DOCUMENTS FOR PUBLIC REVIEW February 15, 2021 – March 17, 2021 (30 day)

The Transportation Advisory Committee (TAC) for the Winston-Salem Urban Area Metropolitan Planning

Organization (WSMPO) serves as a forum for cooperative transportation planning and decision-making

for the MPO region which includes Forsyth County and portions of Davie, Davidson and Stokes

Counties. The next meeting of the TAC will be held Thursday, February 18, 2021 at 4:15 PM. This

meeting is being held via teleconference with applicable video access to protect our community during

the COVID-19 pandemic. Agenda materials for this meeting can also be found at

www.cityofws.org/Departments/Transportation/MPO/TAC. The below items will be presented during

this meeting:

Amendment and Modifications to the Fiscal Years 2020-2029 Winston-Salem Urban Area

Metropolitan Transportation Improvement Plan (MTIP)

The Fiscal Year 2020-2029 MTIP is a comprehensive listing of all transportation projects programmed for

the Winston-Salem Urban Area and must be a subset of the Winston-Salem Urban Area 2040

Metropolitan Transportation Plan Update (MTP) and match the FY2020-2029 State Transportation

Improvement Program (STIP).

The North Carolina Department of Transportation (NCDOT) regularly updates the STIP to include new

projects and modify existing projects. Any STIP amendment for new statewide projects or projects

within the Winston-Salem Urban Area MPO triggers the amendment of the MTIP. STIP amendments for

regionally significant projects that have significant project revisions or cross the Federal Highway

Administration (FHWA) 4-year funding period or modeling horizon years require an Air Quality

Conformity Determination Report (AQCDR).

Public notice of public transportation activities and time established for public review of and comments

on the TIP will satisfy the program of projects (POP) requirements. Persons needing special provisions,

including language assistance to attend this meeting should contact Byron Brown ([email protected],

336-747-6871) at least 48 hours in advance.

FEBRUARY 2021 DOCUMENTS FOR PUBLIC REVIEW AND COMMENT

CONTENTS

FY2020-2029 MTIP Amendments and Modifications, January 2021

You may submit comments for any of these documents in writing to Byron Brown

([email protected]) or mail to:

City of Winston-Salem, DOT

Attn: Byron Brown

P.O. Box 2511

Winston-Salem, NC 27102

Page 3: Winston-Salem Urban Area

INFORMATION ITEM #6

Page 4: Winston-Salem Urban Area

Winston-Salem Urban Area Metropolitan Planning Organization Transportation Advisory Committee

Action Request

Meeting Date: February 18, 2021 Agenda Item Number: __ 6 __

Action Requested: Review of the Fiscal Year 2020-2029 Metropolitan Transportation Improvement Program (MTIP) Amendments and Modifications for the Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO).

SUMMARY OF INFORMATION: Attachments: Yes X No .

The Fiscal Year (FY) 2020-2029 Metropolitan Transportation Improvement Program (MTIP) is a comprehensive list of all transportation projects programmed for the Winston-Salem Urban Area and must be a subset of the Winston-Salem Urban Area 2045 Metropolitan Transportation Plan (MTP) and match Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) projects in the FY 2020-2029 State Transportation Improvement Program (STIP). The 2045 MTP and the Air Quality Conformity Determination Report (AQCDR) were adopted by the TAC on September 17, 2015.

The North Carolina Department of Transportation (NCDOT) regularly updates the STIP to include new projects and modify existing projects. Any STIP amendment for new statewide projects or projects within the Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) triggers the amendment of the MTIP. STIP amendments for regionally significant projects that have significant project revisions or cross the Federal Highway Administration (FHWA) 4-year funding period or modeling horizon years require an AQCDR. Modifications to the STIP do not require adoption but are provided for information.

The attached document describes the additions, deletions, amendments and modifications to the Winston-Salem Urban Area FY 2020 – 2029 MTIP.

As required by the WSUAMPO’s Public Participation Policy, the amendments and modifications to the FY 2020 – 2029 MTIP will be made available for public review and comment for at least thirty (30) days from February 15, 2021 through March 17, 2021.

TAC Vote: Motion by:___________________ Second by:_________________________

Vote: For ________ Against ________

Page 5: Winston-Salem Urban Area

Item #6

RESOLUTION APPROVING THE FISCAL YEAR 2020 – 2029 METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM (MTIP) AMENDMENTS AND

MODIFICATIONS FOR THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZAITON (WSUAMPO).

A motion was made by TAC Member and seconded by TAC Member for the adoption of the following resolution, and upon being put to a vote was duly adopted.

WHEREAS, the Metropolitan Transportation Improvement Plan (MTIP) is a comprehensive listing of all transportation projects programmed for the Winston-Salem Urban Area and must match the State Transportation Improvement Program (STIP); and

WHEREAS, the North Carolina Department of Transportation (NCDOT) regularly updates the STIP to include new projects and modify existing projects; and

WHEREAS, any STIP amendment for new statewide projects or projects within the Winston-Salem Urban Area Metropolitan Planning Organization (WSUAMPO) triggers the amendment of the MTIP; modifications to the STIP do not require adoption but are provided for information; and

WHEREAS, the attached document describes the amendments and modifications to the Winston-Salem Urban Area Fiscal Year 2020-2029 MTIP; and

WHEREAS, as required by the WSUAMPO’s Public Participation Policy, the amendments and modifications to the MTIP were available for public review and comment for at least thirty (30) days from February 21, 2020 through March 23, 2021.

NOW, THEREFORE, BE IT RESOLVED that the Transportation Advisory Committee of the Winston-Salem Urban Area Metropolitan Planning Organization adopts the amendments and modifications to the Fiscal Year 2020 – 2029 Metropolitan Transportation Improvement Program (MTIP) as shown on the attached list.

Adopted on this the 20th day of May, 2021.

______________________________ Mike Horn, Chairman Transportation Advisory Committee

______________________________ Kirk E. Ericson, Secretary Transportation Advisory Committee

Page 6: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP MODIFICATIONS

VARIOUS, PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.

ADD ENGINEERING, RIGHT-OF-WAY, CONSTRUCTION, IMPLEMENTATION, AND OPERATIONS IN FY 21 AND FY 22 NOT PREVIOUSLY PROGRAMMED TO ALLOW FOR POTENTIAL FUTURE AUTHORIZATIONS.

ENGINEERING FY 2020 - (CMAQ)$97,000

FY 2020 - (L)$25,000

FY 2021 - (CMAQ)$97,000

FY 2021 - (L)$25,000

FY 2022 - (CMAQ)$97,000

FY 2022 - (L)$25,000

RIGHT-OF-WAY FY 2020 - (CMAQ)$97,000

FY 2020 - (L)$25,000

FY 2021 - (CMAQ)$97,000

FY 2021 - (L)$25,000

FY 2022 - (CMAQ)$97,000

FY 2022 - (L)$25,000

CONSTRUCTION FY 2020 - (CMAQ)$1,422,000

FY 2020 - (L)$355,000

FY 2021 - (CMAQ)$1,422,000

FY 2021 - (L)$355,000

FY 2022 - (CMAQ)$1,422,000

FY 2022 - (L)$355,000

IMPLEMENTATIO FY 2020 - (CMAQ)$97,000

FY 2020 - (L)$25,000

FY 2021 - (CMAQ)$97,000

FY 2021 - (L)$25,000

FY 2022 - (CMAQ)$97,000

FY 2022 - (L)$25,000

OPERATIONS FY 2020 - (CMAQ)$97,000

FY 2020 - (L)$25,000

FY 2021 - (CMAQ)$97,000

FY 2021 - (L)$25,000

FY 2022 - (CMAQ)$97,000

FY 2022 - (L)$25,000

$6,795,000

C-5620

DAVIDSON

DAVIE

FORSYTH

EXEMPT

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

37Thursday, February 4, 2021

* INDICATES FEDERAL AMENDMENT

Page 7: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP MODIFICATIONS

VARIOUS, WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.

ADD PLANNING IN FY 22 NOT PREVIOUSLY PROGRAMMED AT REQUEST OF MPO.

PLANNING FY 2020 - (BGDA)$600,000

FY 2020 - (L)$150,000

FY 2021 - (BGDA)$600,000

FY 2021 - (L)$150,000

FY 2022 - (BGDA)$1,660,000

FY 2022 - (L)$415,000

$3,575,000

* U-4951

DAVIDSON

DAVIE

FORSYTH

STOKES

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

38Thursday, February 4, 2021

* INDICATES FEDERAL AMENDMENT

Page 8: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

STATEWIDE PROJECT

STIP MODIFICATIONS

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTION

MODIFYING PROJECT TC-0005 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CONSTRUCTION FY 2021 - (L)$417,000

FY 2021 - (5339)$1,668,000

$2,085,000

* TC-0005

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FOR FACILITY CONSTRUCTION

MODIFYING PROJECT TC-0006 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CONSTRUCTION FY 2021 - (L)$84,000

FY 2021 - (5339)$335,000

$419,000

* TC-0006

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR CONSTRUCTION PROJECT

MODIFYING PROJECT TC-0007 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CAPITAL FY 2021 - (L)$297,000

FY 2021 - (5339)$1,189,000

$1,486,000

* TC-0007

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTION

MODIFYING PROJECT TC-0008 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CAPITAL FY 2021 - (L)$1,000,000

FY 2021 - (5339)$4,000,000

$5,000,000

* TC-0008

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FOR FACILITY CONSTRUCTION

MODIFYING PROJECT TC-0010 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CONSTRUCTION FY 2021 - (L)$284,000

FY 2021 - (5339)$1,135,000

$1,419,000

* TC-0010

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

83Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 9: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

STATEWIDE PROJECT

STIP MODIFICATIONS

STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTION

MODIFYING PROJECT TC-0011 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

CAPITAL FY 2021 - (L)$598,000

FY 2021 - (5339)$2,391,000

$2,989,000

* TC-0011

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, 5339(b) DISCRETIONARY GRANT TO PURCHASE ELECTRIC BUSES AND CHARGING STATIONS.

MODIFYING PROJECT TC-0012 TO IDENTIFY SOURCE AND AMOUNT OF LOACAL FUNDS AT THE REQUEST OF INTEGRATED MOBILITY DIVISION NCDOT

ACQUISITION FY 2021 - (L)$223,000

FY 2021 - (5339)$894,000

$1,117,000

* TC-0012

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

STATEWIDE, MOBILITY FROM ALL GRANT OPPORTUNITY FROM THE FTA.5310 DISCRETIONARY GRANT AWARDED BY FTA.

MODIFYING PROJECT TC-0013 TO STIP FY 2021. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. MOVING MATCH FUNDS FROM LOCAL TO STATE AT THE REQUEST OF INTEGRATED MOBILITY DIVISION.

CAPITAL FY 2021 - (S)$70,000

FY 2021 - (L)$70,000

FY 2021 - (5310)$280,000

$420,000

* TC-0013

STATEWIDE

PUBLIC TRANS

PROJ.CATEGORY

STATEWIDE PROJECT-

84Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 10: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP ADDITIONS

SR 4278 (SOUTH CHERRY STREET), OAKHURST STREET TO HOLY CROSS CHURCH IN KERNERSVILLE. CONSTRUCT FIVE-FOOT SIDEWALK.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2022 - (BGDA)$206,000

FY 2022 - (L)$51,000

RIGHT-OF-WAY FY 2023 - (BGDA)$105,000

FY 2023 - (L)$26,000

CONSTRUCTION FY 2024 - (BGDA)$1,501,000

FY 2024 - (L)$375,000

$2,264,000

* BL-0014

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

BROAD STREET, SR 4309 (EAST MOUNTAIN STREET) TO HARMON LANE IN KERNERSVILLE. CONSTRUCT FIVE-FOOT SIDEWALK.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2021 - (BGDA)$86,000

FY 2021 - (L)$22,000

RIGHT-OF-WAY FY 2022 - (BGDA)$72,000

FY 2022 - (L)$18,000

CONSTRUCTION FY 2023 - (BGDA)$633,000

FY 2023 - (L)$158,000

$989,000

* BL-0015

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

HARMON LANE, SR 4315 (SOUTH MAIN STREET) TO BROAD STREET IN KERNERSVILLE. CONSTRUCT FIVE-FOOT SIDEWALK.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2021 - (BGDA)$36,000

FY 2021 - (L)$9,000

RIGHT-OF-WAY FY 2022 - (BGDA)$58,000

FY 2022 - (L)$14,000

CONSTRUCTION FY 2023 - (BGDA)$264,000

FY 2023 - (L)$66,000

$447,000

* BL-0016

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

SOUTHERN STREET GREENWAY, SOUTHERN STREET TO KERNERS MILL CREEK GREENWAY IN KERNERSVILLE. CONSTRUCT MULTI-USE PAVED PATH.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2023 - (BGDA)$69,000

FY 2023 - (L)$17,000

RIGHT-OF-WAY FY 2024 - (BGDA)$36,000

FY 2024 - (L)$9,000

CONSTRUCTION FY 2025 - (BGDA)$504,000

FY 2025 - (L)$126,000

$761,000

* BL-0017

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

91Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 11: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP ADDITIONS

BREWER ROAD, BUCHANAN STREET TO CLEMMONSVILLE ROAD. CONSTRUCT FIVE-FOOT SIDEWALK.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2021 - (BGDA)$164,000

FY 2021 - (L)$41,000

RIGHT-OF-WAY FY 2022 - (BGDA)$410,000

FY 2022 - (L)$103,000

CONSTRUCTION FY 2023 - (BGDA)$1,861,000

FY 2023 - (L)$465,000

$3,044,000

* BL-0018

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

LONG BRANCH TRAIL PHASE II, MARTIN LUTHER KING, JR. DRIVE TO 27TH STREET. CONSTRUCT TEN-FOOT TRAIL.

PROJECT ADDED AT REQUEST OF MPO.

ENGINEERING FY 2021 - (BGDA)$800,000

FY 2021 - (L)$200,000

CONSTRUCTION FY 2024 - (BGDA)$20,000

FY 2024 - (L)$80,000

$1,100,000

* BL-0019

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

DEPOT STREET, US 311 (MAIN STREET) TO SR 1992 (SULLIVANTOWN ROAD) IN WALKERTOWN. CONSTRUCT SIDEWALK.

PROJECT ADDED AT REQUEST OF MPO.

RIGHT-OF-WAY FY 2021 - (BGDA)$72,000

FY 2021 - (L)$18,000

CONSTRUCTION FY 2022 - (BGDA)$311,000

FY 2022 - (L)$78,000

$479,000

* BL-0020

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

NC 66 / SR 4309 (WEST MOUNTAIN STREET), BEAUCREST STREET TO ASBURY DRIVE. CONSTRUCT TURN-LANE BETWEEN KERNERSVILLE YMCA AND DEERE-HITACHI'S EAST ENTRANCE AND EXTEND EXISTING SIDEWALK FROM BEAUCREST STREET TO ASBURY DRIVE.

ADD NEW PROJECT AT REQUEST OF MPO.

ENGINEERING FY 2021 - (BGDA)$301,000

FY 2021 - (L)$75,000

RIGHT-OF-WAY FY 2022 - (BGDA)$162,000

FY 2022 - (L)$41,000

CONSTRUCTION FY 2023 - (BGDA)$2,197,000

FY 2023 - (L)$549,000

$3,325,000

* HL-0015

FORSYTH

EXEMPT

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

92Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 12: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP ADDITIONS

US 311 (MAIN STREET), SR 1977 (PINE HALL ROAD) IN WALKERTOWN. REALIGN INTERSECTION AND ADD AUXILIARY TURN LANES.

ADD NEW PROJECT AT REQUEST OF MPO.

RIGHT-OF-WAY FY 2021 - (BGDA)$72,000

FY 2021 - (L)$18,000

CONSTRUCTION FY 2022 - (BGDA)$412,000

FY 2022 - (L)$103,000

$605,000

* HL-0016

FORSYTH

EXEMPT

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

STIP MODIFICATIONS

SMITH REYNOLDS AIRPORT (INT), ACQUIRE LAND AND CLEAR TERRAIN OBSTRUCTIONS EAST OF RUNWAY 15-33 TO DRAIN AND GRADE MATERIAL IN PLACE.

TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$1,909,000

$1,909,000

AV-5738

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

SMITH REYNOLDS AIRPORT (INT), CONSTRUCT NEW TAXILANE.

TO ALLOW ADDITIONAL TIME FOR PLANNING, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

CONSTRUCTION FY 2022 - (T)$6,200,000

$6,200,000

AV-5832

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

93Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 13: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP MODIFICATIONS

VARIOUS, VARIOUS SECONDARY ROUTES. INSTALL LONG-LIFE PAVEMENT MARKINGS.

ADD NEW PROJECT SEGMENT "A" AT REQUEST OF TRANSPORTATION MOBILITY AND SAFETY DIVISION.

CONSTRUCTION FY 2021 - (HSIP)$1,900,000

$1,900,000

* HS-2009A

DAVIDSON

DAVIE

FORSYTH

ROWAN

STOKES

DIVISION

PROJ.CATEGORY

HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

CABARRUS-ROWAN URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

NORTHWEST PIEDMONT RURAL PLANNING ORGANIZATION

-

VARIOUS, DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

ADD CONSTRUCTION IN FY 21 AND FY 22 NOT PREVIOUSLY PROGRAMMED.

CONSTRUCTION FY 2020 - (S)$100,000

FY 2020 - (TA)$400,000

FY 2021 - (S)$200,000

FY 2021 - (TA)$800,000

FY 2022 - (S)$200,000

FY 2022 - (TA)$800,000

$2,500,000

* R-5789

DAVIDSON

DAVIE

FORSYTH

ROWAN

STOKES

DIVISION

PROJ.CATEGORY

CABARRUS-ROWAN URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

NORTHWEST PIEDMONT RURAL PLANNING ORGANIZATION

-

94Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 14: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP MODIFICATIONS

FUTURE I-74, WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-40 TO US 421 / NC 150 / BUSINESS 40.

TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 21 TO FY 22.

GARVEE CON FY 2022 - (NHP)$12,870,000

FY 2023 - (NHP)$12,870,000

FY 2024 - (NHP)$12,870,000

FY 2025 - (NHP)$12,870,000

FY 2026 - (NHP)$12,870,000

FY 2027 - (NHP)$12,870,000

FY 2028 - (NHP)$12,870,000

FY 2029 - (NHP)$12,870,000

POST YR- (NHP)$90,090,000

CONSTRUCTION FY 2022 - (NHP)$2,975,000

FY 2022 - (S(M))$12,500,000

FY 2023 - (NHP)$2,975,000

FY 2023 - (S(M))$12,500,000

FY 2024 - (NHP)$5,950,000

FY 2024 - (S(M))$25,000,000

$254,950,000

U-2579AB

FORSYTH

REGIONAL

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

VARIOUS, BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.

ADD CONSTRUCTION IN FY 21 NOT PREVIOUSLY PROGRAMMED, AT REQUEST OF MPO.

CONSTRUCTION FY 2020 - (BGDA)$490,000

FY 2020 - (TADA)$276,000

FY 2020 - (L)$192,000

FY 2021 - (BGDA)$560,000

FY 2021 - (L)$140,000

$1,658,000

* U-4741

DAVIDSON

DAVIE

FORSYTH

STOKES

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

95Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 15: Winston-Salem Urban Area

REVISIONS TO THE 2020-2029 STIP

ITEM N

HIGHWAY PROGRAM

(HANDOUT)

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

STIP MODIFICATIONS

US 311; SR 4394 (MARTIN LUTHER KING, JR. BOULEVARD), US 158 / US 421 / NC 150 / BUSINESS 40 TO US 52 / NC 8 IN WINSTON-SALEM. STREETSCAPE IMPROVEMENTS.

TO ALLOW CITY ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 23.

RIGHT-OF-WAY FY 2022 - (BGANY)$500,000

FY 2022 - (L)$100,000

CONSTRUCTION FY 2023 - (BGDA)$1,750,000

FY 2023 - (L)$438,000

$2,788,000

U-5539A

FORSYTH

DIVISION

PROJ.CATEGORY

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION

-

96Thursday, January 7, 2021

* INDICATES FEDERAL AMENDMENT

Page 16: Winston-Salem Urban Area

������������ ����������� �������������������� ��� �

��� ������ !�" #� �� !$�#�����%��%��&%#���%� #���

'�(� �

)���*��

$ ��

)���*�� �$�#��

�%+,�

-���������

#��

# ���.�� �

#��

�%+�

!��� &���!���

��/���0� �0/�0/0123 �0 !�"��� �0

!�"��� �0 �4�������. �������� �� ������� (������

*�"��� ����5� (� 4���� 4���� 63���� 6��0������ �,� )�.7�����

� ��,1�,����

Page 17: Winston-Salem Urban Area

Winston-Salem Urban Area Public Transportation Program FY 2021-F2022 Section 5307- Program of Projects

Federal Transit Administration Projects

Transit systems located in urbanized areas of more than 200,000 in population are eligible to use Federal Transit Administration (FTA) Section 5307 funds for operating and capital

assistance. There are three transit agencies in the urban area that are eligible to receive this funding: Davidson County Transportation, Piedmont Authority for Regional Transportation

(PART) and Winston-Salem Transit Authority (WSTA). As per FTA regulation, the Program for Projects must outline how these funds will be used and be advertised for public review and

comment.

Davidson County Transportation (DCT)

Operation Preventive Maintenance Capital Total

FY2021 $140,218 $46,739 $0 $186,957

Winston-Salem Transit Authority (WSTA)

Operation Preventive Maintenance Capital Total

FY2021 $1,100,000 $2,400,000 $943,605 $4,443,605

Piedmont Authority for Regional Transportation (PART)

Operation Preventive Maintenance Capital Total

FY2021 $440,000 $141,000 $0 $581,000

Public notice of public participation plan activities and time established for public review of and comments of the

TIP will satisfy the Program of Projects (POP) requirements. Any person who believes they have been aggrieved by

an unlawful discriminatory practices regarding the Winston-Salem Urban Area MPO programs has a right to file a

complaint with Marlene Davis, City of Winston-Salem, P.O. Box 2511, Winston-Salem, NC 27102, within 180 days

following the date of the alleged discrimination occurrence.

About

The Urbanized Area Formula Funding program (49 U.S.C. 5307) makes federal resources available to urbanized areas and to governors for transit capital and operating assistance in urbanized areas and for transportation-related planning. An urbanized area is an incorporated area with a population of 50,000 or more that is designated as such by the U.S. Department of Commerce, Bureau of the Census.

Funding is made available to designated recipients that are public bodies with the legal authority to receive and dispense federal funds. Governors, responsible local officials and publicly owned operators of transit services shall designate a recipient to apply for, receive, and dispense funds for urbanized areas pursuant to 49USCA5307(a)(2). The governor or governor's designee acts as the designated recipient for urbanized areas between 50,000 and 200,000.

For urbanized areas with 200,000 in population and over, funds are apportioned and flow directly to a designated recipient selected locally to apply for and receive Federal funds. For urbanized areas under 200,000 in population, the funds are apportioned to the governor of each state for distribution.