Electric Generation Interconnection Standard NEM System ... · Standard NEM System (
Wind integration in the NEM and ISP - Clean Energy Council · 2019-05-09 · Transmission will be...
Transcript of Wind integration in the NEM and ISP - Clean Energy Council · 2019-05-09 · Transmission will be...
Wind integration in the NEM and ISPRichard Lowe, Executive Manager Business Growth
TransGrid
CEC Wind Industry Forum 2019
CEC Wind Industry Forum – Richard Lowe2
TransGrid’s network sits at the centre of the NEM
NSW is the largest region in the National Electricity Market, connecting QLD and VIC
32% of Australia’s population
32% of energy in the NEM
Sydney Basin Region
• Peak demand of 8,151 MW
• Approx. 55% energy in the
state
• Annual consumption of
38,018 GWh
• Steady demand growth
since 2014
Once in a generation change
CEC Wind Industry Forum – Richard Lowe3
CEC Wind Industry Forum – Richard Lowe
The NEM is witnessing a withdrawal of traditional thermal generation
4
Supply within the NEM is changing
NEM coal generator operating lives to 2050
Source: Australian Energy Council, 2016. Based upon announced retirement date
or 50th year from full operation
Demand rising since 2014
Source: TransGrid
CEC Wind Industry Forum – Richard Lowe5
50
55
60
65
70
0
1
2
3
4
5
6
7
8
9
10
Fe
b-1
7
Jul-13
Aug-1
3
Dec-1
3
Feb-1
6
Oct-
13
Sep-1
3
Sep-1
8
Sep-1
6
Nov-1
3
Jun-1
5
Sep-1
7
Oct-
18
Jan-1
6
Sep-1
4
Jan-1
4F
eb-1
4M
ar-
14
Jan-1
8
Dec-1
4
Apr-
14
May-1
4
Mar-
18
May-1
6
Jun-1
4
May-1
7
Jul-14
Aug-1
4
Aug-1
8
Oct-
14
Nov-1
4
Jan-1
5F
eb-1
5M
ar-
15
Apr-
15
Dec-1
6
May-1
5
Aug-1
6
Jul-15
Jun-1
8
Aug-1
5S
ep-1
5O
ct-
15
Jun-1
6
Mar-
16
Nov-1
5D
ec-1
5
May-1
8
Oct-
17
Apr-
16
Jul-16
Long term monthly energy usage (TWh - LHS); Rolling 12 months (RHS)
Nov-1
6
Jan-1
7
Mar-
17
Jul-17
Apr-
17
Apr-
18
Jun-1
7
Oct-
16
Nov-1
7D
ec-1
7
Feb-1
8
Jul-18
Nov-1
8D
ec-1
8Jan-1
9
Aug-1
7
12m rolling energy usage (TWh - cumulative)
Monthly energy usage (TWh)
CEC Wind Industry Forum – Richard Lowe6
Increasingly diverse generation mix is forecast
Source: AEMO Integrated System Plan 2018, Neutral Scenario with storage
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
NS
W e
nerg
y genera
ted (
GW
h)
NSW Rooftop PV
NSW Distributed storage generation
NSW Utility storage generation
NSW Utility Solar
NSW Wind
NSW Peaking gas + liquids
NSW CCGT
NSW Hydro
NSW Black coal
NSW energy generation forecast
Implications for transmission
CEC Wind Industry Forum –
Richard Lowe7
8
Transmission will be the platform for renewables
There is an
unprecedented level of
generation connection
enquiries across NSW –
over 40,000MW
Source: TransGrid Transmission Annual Planning Report, 2018
Connection Enquiries and network capacity
CEC Wind Industry Forum – Richard Lowe
CEC Wind Industry Forum – Richard Lowe
• New generation requires increased network capacity
• Increasingly intermittent generation coupled with an increase in
demand side participation
• A systematic approach is needed to manage the current transition
• Transmission can unlock geographic diversity for generation and
lower prices for consumers
9
Transmission solutions
CEC Wind Industry Forum – Richard Lowe
• Released November 2018
• Builds on AEMO’s
Integrated System Plan
• Calls out development of
renewable energy zones
within NSW
• Complementary zones with
significant wind potential in
New England
NSW Transmission Infrastructure Strategy
Source: NSW Transmission Infrastructure Strategy
10
CEC Wind Industry Forum – Richard Lowe11
The Integrated System Plan
Project Energy
Connect
Bannaby Link
QNI upgrade
The Integrated System Plan sets out a long-term strategy for the efficient
development of the NEM transmission network.
Minor VNI upgrade
Source: TransGrid Transmission Annual Planning Report, 2017
ISP projects within NSW Timing (indicative)
QNI upgrade 2022
Minor VNI upgrade 2022
Project EnergyConnect 2023
Bannaby Link End 2024
Thank you.Richard Lowe, Executive Manager Business Growth
TransGrid