![Page 1: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/1.jpg)
Wind and Li-ion energy storage
on the Faroe Islands
ACEF, Manila 8 June 2018 Romain Gouttefangeas
![Page 2: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/2.jpg)
1. Introduction: Saft and ESS
2. Specifying the need
3. Designing a solution
4. The Hushagi BESS
5. Operational experience and results
6. Lessons learnt
ACEF 2018 Manila2
![Page 3: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/3.jpg)
Saft proprietary information
Who is Saft today?
GROUP PROFILE
3,000+ customers
GLOBAL PRESENCE - SALES
100 years of history
Leadership position
on 75-80% of revenue base
9.7% invested in R&D with 3 main
technologies; primary lithium, lithium-ion
& nickel-cadmium,
€744m revenue FY 2017 4,100+ people
35%North
America
32%Europe
33%Asia, MEA,
LatAm
3 ACEF 2018 Manila
![Page 4: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/4.jpg)
Saft proprietary information
Global presence
Head office
Manufacturing
sites
Sales offices
4
19countries
14manufacturing
sites
31sales offices
New office in
Tokyo, Japan
Facility in
Zhuhai, China
New battery
assembly line for rail
in Bangalore, India
ACEF 2018 Manila
![Page 5: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/5.jpg)
Saft proprietary information
Where we fit in Total
55 ACEF 2018 Manila
![Page 6: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/6.jpg)
Saft proprietary information
We serve multiple customer segments for specific applications
6
Aviation Defense Grid IoT Marine
Medical Metering Mobility Oil & Gas
Rail Space Telecom Utilities
ACEF 2018 Manila
![Page 7: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/7.jpg)
Saft proprietary information
Grid compatibility
Demand-supplyflexibility
Self-consumption
Transmission Grids
Distribution / Smart GridsMicrogrids
Private Grids (e.g. railways)
Photovoltaic Power Plants
Wind Power Plants
Smart Buildings
Industrial / Commercial
Energy Storage Solutions (ESS)
7
Large power plants Grids Behind the Meter
Residential, Commercial, Industrial
Applications
Energy Shifting
Smoothing / ramp control
Frequency regulation
Peak Shaving
Hybrid Power Generation
ACEF 2018 Manila
![Page 8: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/8.jpg)
Saft proprietary information
Intensium® Max+ 20 Power & Medium Power
8
VL45E/41M/30P cell
NMC/NCA blend
technology
Module Synerion®
24 E/M/P
Gemini module (2 x Synerion modules in series)
Rated voltage 48V
Energy Storage System Unit (ESSU)
15 Gemini modules in series
1 BMM/ESSU for
charge/discharge control
Container
•18 ESSU in //
•Voltage 630-867V
•1 MBMM for all BMMs control
ACEF 2018 Manila
![Page 9: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/9.jpg)
Saft proprietary information
Battery manufacturer
• Performance
• Lifetime
• Sizing
• Operation modeling
• Configuration
System integrator
• Power Conversion
• Controls
• Monitoring
Project manager
• System engineering
• Contracting
• Execution
local project offices
Long term service provider
• Warranties
• Maintenance
• Training
• Field support
• Asset services
Mastering the Value Chain
9
We offer a strong long-term committment to reliable, efficient and long life system operation
Battery and System technology mastership Application understanding Integration & project competence Bankability
Optimium system sizing and configuration Energy efficiency , low Opex Reliability and long life System and performance warranties
ACEF 2018 Manila
![Page 10: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/10.jpg)
SAFT in
Energy Storage
10
![Page 11: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/11.jpg)
Saft proprietary information
Faroe Islands Wind-Battery project
SEV: vertically integrated utility
– Target 2020: 75% renewables with hydro & wind
• 60% reached in 2015
New 12MW wind farm with ESS in 2015
– Total wind capacity 18MW
– 30% of total generation capacity
– 18% of yearly energy consumption
• 42% hydroenergy, 40% thermal generation
Long term vision
– Two-fold increase of energy consumption by 2030
– Target: 100% renewables
11
18 islands - 50 000 inhabitants, 300 GWh/year
ACEF 2018 Manila
![Page 12: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/12.jpg)
Saft proprietary information
Requirements
– Volatility of wind generation
• Impact on voltage and frequency
• Stress on diesel generation to compensateshort term fluctuation
– Lack of inertia
– Substitution of synchronous generation by inverter based generation
12
Priority for ramp control
maximum
1MW / minute
upramp
downramp
ACEF 2018 Manila
![Page 13: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/13.jpg)
Saft proprietary information
Schematic overview of battery system
13
Grid
Wind generation
Inverter output Composit
output
L-EMSLocal Energy
Management
System
Wind farm
Batteries Inverter
Battery System
ACEF 2018 Manila
![Page 14: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/14.jpg)
Saft proprietary information
SEV project – BESS description
14
BESS = 2 containers IM20P 2.4 MW + 1 PCS ENERCON 2.1MVA + LEMS
2 Intensium Max 20P
Energy 707 kWh
Continuous
discharge power2 400 kW
Continuous
charge power1 500 kW
Nominal voltage 623 V
Voltage range 525V – 700V
Enercon Smart Container
Apparent power 2300 kVA
AC Voltage LV: 400V
MV: 20 kV
DC Power 2 400 kW
DC Voltage
Range345 – 705 V
DC Current 1000 A
ACEF 2018 Manila
![Page 15: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/15.jpg)
Saft proprietary information
Simulation results
– Compliance of 1MW /min ramp rate > 99%
– DC roundtrip efficiency 97.6%
– AC roundtrip efficiency including PCS & auxiliaries 86.2%
– Total efficiency losses 0,22% of wind energy generated
– Avge daily energy throughput of BESS 261%
– Capacity loss after 20 years operation 20,9%
– Impedance increase after 20 years 83%
15 ACEF 2018 Manila
![Page 16: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/16.jpg)
Saft proprietary information16 Energy Storage Europe
2018 Düsseldorf
![Page 17: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/17.jpg)
Saft proprietary information
Results (1/4) - Battery operation
– About 80MWh charged during 40 days
– represents 300% daily throughput
(2 MWh per day / 700kWh battery)
– Maximum battery power frequently required
17ACEF 2018 Manila
![Page 18: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/18.jpg)
Saft proprietary information
Results (2/4) – Impact on the electricity System
18
-2000
0
2000
4000
6000
8000
10000
12000
Pow
er
[kW
]
Húsahagi Wind farm Power and Battery SoC
POC
Wind farm
Smart Container
08:36 09:08 09:40 10:12 10:440
0.2
0.4
0.6
0.8
1
Measurement time [hour:minute]
Batt
ery
SoC
[pu]
SoC
SoC SP
-2000
0
2000
4000
6000
8000
10000
12000
Pow
er
[kW
]
Húsahagi Wind farm Power and Battery SoC
POC
Wind farm
Smart Container
08:36 09:08 09:40 10:12 10:440
0.2
0.4
0.6
0.8
1
Measurement time [hour:minute]
Batt
ery
SoC
[pu]
SoC
SoC SP
ACEF 2018 Manila
![Page 19: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/19.jpg)
Saft proprietary information
Results (3/4) – Benefit for the electricity system
19
-2000
0
2000
4000
6000
8000
10000
12000
Pow
er
[kW
]
Power and frequency at Húsahagi Wind farm
Wind farm
Smart Container
POC
08:28 09:16 10:05 10:54 11:4249.5
49.75
50
50.25
50.5
Measurement time [hour:minute]
frequency [
Hz]
f with SD
without BESS with BESS
-2000
0
2000
4000
6000
8000
10000
12000
Pow
er
[kW
]
Power and frequency at Húsahagi Wind farm
Wind farm
Smart Container
POC
08:28 09:16 10:05 10:54 11:4249.5
49.75
50
50.25
50.5
Measurement time [hour:minute]
frequency [
Hz]
f with SD
ACEF 2018 Manila
![Page 20: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/20.jpg)
Saft proprietary information
Results (4/4) - Curtailment
Significant reduction since 2014
Winter 2014/15 28%
Winter 2015/16 19%
Winter 2016/17 9%
Winter 2017/18 5%
20
Husahagi wind power generationOct 2014 – Jan 2018
0
1 000
2 000
3 000
4 000
5 000
6 000
Production (MWh) Potential Production (MWh) Difference (MWh)
ACEF 2018 Manila
![Page 21: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/21.jpg)
Saft proprietary information
Lessons learnt
Operation of the SEV system with 85% of load covered by wind is possible and stable
3 main business case levers:
1. A small ESS to reduce CAPEX Managing short term variability needs power, but
only little energy
2. Very high wind harvesting Avoidance of > 6000 MWh of diesel generation
3. Avoidance of other grid investments
21ACEF 2018 Manila
![Page 22: Wind and Li-ion energy storage on the Faroe Islands · Energy Storage Solutions (ESS) 7 Large power plants Grids Behind the Meter ... Battery and System technology mastership Application](https://reader036.fdocuments.in/reader036/viewer/2022062507/5fdbd1a09aedb51650770705/html5/thumbnails/22.jpg)
THANK [email protected]