WiMAX Outdoor Compact BTS E9230 Quick Installation Guide R1[1].0(201010)
Transcript of WiMAX Outdoor Compact BTS E9230 Quick Installation Guide R1[1].0(201010)
WiMAX Outdoor Compact BTS
E9230 Quick Installation Guide R1.0 (2010-10)
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you do not agree to the following terms, please notice that you are not allowed to use this document. Copyright © 2010 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer, distribution, use or disclosure of this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPORATION is prohibited.
and are registered trademarks of ZTE CORPORATION. ZTE’s company name, logo and product names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION. Other product and company names mentioned herein may be trademarks or trade names of their respective owners. Without the prior written consent of ZTE CORPORATION or the third party owner thereof, anyone’s access to this document should not be construed as granting, by implication, estopped or otherwise, any license or right to use any marks appearing in the document. The design of this product complies with requirements of environmental protection and personal security. This product shall be stored, used or discarded in accordance with product manual, relevant contract or laws and regulations in relevant country (countries). This document is provided “as is” and “as available”. Information contained in this document is subject to continuous update without further notice due to improvement and update of ZTE CORPORATION’s products and technologies.
ZTE CORPORATION
Address: NO. 55 Hi-tech Road South ShenZhen P.R.China 518057
Website: http://dms.zte.com.cn
Email: [email protected]
E9230 Quick Installation Guide R1.0
II
Revision History
Product Version Document Version Serial NumberReason for Revision
V3.0, V4.0 R1.0 First published
Author
Date Document Version Prepared by Reviewed by Approved by
2010-11-12 1.0 Liu Zhe
Wang huarong Yi huaNiu Ruifeng Zheng Weijun Wang Wenhui
Ma Wenguang
Tools
Auxiliary Materials
GPS Antenna
GPS Feeder Connector
Antenna Components Two-feeder Fixer
Grounding Clip
Grounding Bar
Copper Pig Nail
Sunshade Installation
Components (Optional)
Installation Components
Pole-mounting Installation
Components (for one E9230 in one
pole)
Pole-mounting Installation Components
(for two E9230s in one pole)
Pole-mounting Installation
Components (for three E9230s in one
pole)
Outdoor Ultraviolet
Cable Tie Indoor Cable Tie
Outdoor Waterproof
Label
Indoor Label Paper
Auxiliary Materials
Power Cable
Grounding Cable
RF Feeder Cable
GPS Feeder
Fiber Optic Cable
Ethernet Cable
PVC Insulation Tape
Waterproof Gum
Ultraviolet Tape
E9230 Overview
Engineering Indexes
Item Index
Dimension 370mm×320mm×198mm(height x width x depth)
Weight <18kg Power Supply
-48VDC,(-57VDC~-40VDC)
Overall Power Consumption
<120W
Temperature -40~+55 Relative Humidity
5%RH~95%RH
Grounding ≤10Ω
Appearance
Typical Installation Scenarios
One E9230 and an antenna installed on one Pole
One E9230 installed on one L-bar
E9230 Cabinet Installation
Installation Step: Preparation
Fixing Brackets
For One E9230 on One Pole/L-bar For Two E9230s on One Pole For Three E9230s on One Pole
Notes:
Two kinds of bolts are available for clip component of two E9230s on one pole:
80 mm and 120 mm long, which should be selected according to the diameter of the pole.
It is recommended to use a pole with a diameter ranging from 60 mm to 120 mm.
For the pole whose diameter ranges from 60 mm to 90 mm, the 80 mm long bolt should be used.
For the pole whose diameter ranges from 90 mm to 120 mm, the 120 mm long bolt should be used.
Supporting Panel
Notes: The sunshade components are optional!
E9230 Cabinet Installation
Installation Step (1): Installing one E9230 on one pole
E9230 Cabinet Installation
Installation Step (2): Installing one E9230 on one L-bar
E9230 Cabinet Installation
Installation Step (3): Installing E9230 on a Tower
E9230 Cable Installation
Cable Connection: System Connection Diagram
E9230 Cable Installation
Cable Connection (1): Power Cable
E9230 Cable Installation
Cable Connection (2): ETH Cable
E9230 Cable Installation
Cable Connection (3): Fiber Optic Cable (Optional)
E9230 Cable Installation
Cable Connection (4): Grounding Cable
E9230 Cable Installation
Cable Connection (5): GPS Feeder Cable
E9230 Cable Installation
Cable Connection (6): RF Feeder Cable
E9230 Cable Installation
Water-proof Treasure
E9230 Cable Installation
Water-proof Treasure for Unused Sockets on the bottom of E9230 Cabinet
After cable installation, the unused sockets on the bottom of E9230 cabinet should also be
sealed by the way of “1+3+3”. Please follow the operations as below:
①Tighten the protection cover on the socket firstly;
②Start wrapping from the bottom of the protection cover. The horizontal wrapping direction
should be the same as the screw direction, and the vertical direction should face the socket
direction from the socket below;
③Fix the tapes with the black cable tie at the base of the socket.
Installation Acceptance
Cables
1 Any cable is forbidden to be coiled and should be tied in the wiring channel and be placed casually.
2 All cables should be laid straightly, and they should not intertwine with each other or hang in the air.
3 The radio cables (microwave cables, antenna feeders, main antenna feeders, GPS feeders and so on)
are prohibited to be lied at an angle of 90 degree.
4 The cable ties are bound orderly, with proper tightness. The interval between cable ties is no more than
0.5 m and all ties face the same direction.
5 In the room, after a cable tie is bound, the extra part is cut completely smoothly, without any spur.
6 Outside the room, after a cable tie is bound, 1~2 mm surplus is reserved and the cable is cut smoothly
without any spur.
7 Labels with correct contents are attached at both ends of a cable. The labels face right after
attachment.
8 The VSWR test should be done before the waterproof measures are taken to the feeders. Besides, the
feeders should be marked.
9 The used and unused connectors at the bottom of E9230 cabinet should be sealed in the way of “1
layer of insulation tape + 3 layers of waterproof tape + 3 layers of ultraviolet tape”.
10
As for the outdoor DC shielded power cable or the RF feeder, If it is shorter than 5 m, the shielded layer
of the power cable or the RF feeder should be grounded at one point; if it is between 5 m and 20 m, the
shielded layer should be grounded at two points; if it is longer than 20 m, the shielded layer should be
grounded at three points: the point where it leaves the iron tower platform, the point where it
approaches the outdoor cable tray and the point 1 m from the equipment room. If the cable length on
the iron tower exceeds 60 m, a grounding point should be added every 20 m. The grounding cable
should be laid downward as the feeder (equipment room direction) and its inclination angle with the
feeder should not exceed 15°.
Note: The grounding clip is used when the cable is grounded!
E9230 Cabinet
1 The main pole should be vertical, with an error less than 2°.
2 The interface between the jumper and E9230 cabinet is screwed up with a torque spanner of 1.7 Nm ~2 Nm;
The interface between the GPS feeder and E9230 cabinet is screwed up with a torque spanner of 1Nm.
3 The jumper is correctly connected to the connection terminal at the bottom of the cabinet.
4 The pole for equipment (except antenna) installation should be placed in the roof or within the fence of iron
tower.
5 All installation assembly should be firmly fixed, resisting the hurricane or meeting other specific
requirements. It is recommended to use poles of 4 ~ 6mm depth and with a diameter of 60mm ~ 120mm.
6 The cabinet must be reliably grounded and installed within 45° protection range of a lightning rod.