Results you can rely on

BRAD WILSON AREAS OF EXPERTISE

Mr. Brad Wilson has GIS survey and technical experience in the following general areas:

Computer aided drafting and design using AutoCAD and MicroStation

Preparation of alignment sheets, property plots, map and pipeline drafting, quad maps and quad excerpts, permit drawings, document control and supervision.

Researching and programming ways to streamline survey data processing from the stage of collection to the stage of drawing completion; through programming feature code libraries, in Trimble Geomatics and Inroads to make the process much more efficient and cost effective

Written numerous procedures to help remove the human error in data collection, data QA/QC and data post processing

Streamlined data to the point of GIS and into Pipeline Integrity Management

Created numerous feature code libraries to make data more compatible with GIS.

Created and managed spreadsheets/databases for material documents, x-ray reader sheets, purchase orders, hydrostatic test documents, field reports, survey notes and photographs for data records integrity management, through organized data deliverables, Hyperlinked data to geographic X,Y,Z locations in spreadsheets and in GIS.

Utilized loader templates mirroring the GIS tables to load GIS data into the client GIS systems.

Constantly evolving/streamlining data management for small data projects to big data operations management.

Performed field and office training to show different ways of utilizing and collecting data to make data 100% usable from a positional and content standpoint, collecting only the data necessary in the field and linking that data to data records to pull in the necessary data variables not collected in the field by collecting match numbers in the field that match to numbers in data records integrity.

REPRESENTATIVE EXPERIENCE Mr. Wilson has spent my time since 1999 researching and programming ways to streamline survey data processing from the stage of collection to the stage of drawing completion; through programming feature code libraries, in Trimble Geomatics and Inroads, he has been able to make the process much more efficient and cost effective. Since the Gulfstream project completion in 1999 he has worked as a Survey/GIS Data Technician Coordinator on countless projects, learning new ways to take the information collected in the field and use the data for GIS tables, station and offset reports, traverse reports, DOT reports, X-ray reports, as-built weld reports, pi calculations, weld calculations, DTM's, profiling, cross sections,

Page 2: Wilson_Brad_Master_01072016

2 of 5

permitting and FERC, construction and as-built drawings, constantly finding innovative ways to meet client demands. He has written numerous procedures to help remove the human error in data collection, data QA/QC and data post processing. I have evolved to look at data differently, to make data accurate throughout the project lifespan and to apply data records to that data to give the data tractability to an X, Y and Z location and eventually an as-built horizontal and vertical station. Specialties: Survey/GIS Data processing Problem solving Communication Expediting Organization Making Data Accurate, Transparent, Traceable, Verifiable and Complete

Mr. Wilson serves as a GIS Survey Data Technician Coordinator with responsibilities of coordinating office and field GIS survey Data Technicians on various project listed below. Process, QA/QC and manage data for delivery into numerous GIS platforms. Write procedures, progress reports, proposals and track man-hours to keep projects running efficiently and effectively. He is responsible for field and office training for project kick-off meetings. He has worked with clients to attain the project expectations and see that those expectations are met. Below are some of the projects coordinated in this position.

ONEOK - Overland Pass Project – 760 Miles

El Paso Natural Gas – Ruby Project – 680 Miles

El Paso Natural Gas - Raton Project - 120 Miles

El Paso Natural Gas - Elba Express – 125 Miles

El Paso Natural Gas – Line 300 Project – 125 Miles

El Paso Natural Gas – MPP Project – 6 Miles

El Paso Natural Gas – NSD Project – 7 Miles

El Paso Natural Gas – South System Expansion – 200 Miles

Kinder Morgan – NSD Project – 8 Miles

Kinder Morgan – NEUP Project – 45 Miles

Enterprise – Texas Express Project – 580 Miles

Carolina Gas – 10 Miles

Occidental - Elk Hills Project – 60 Miles

Colonial Excel – 450 Miles

NiSource Program – Numerous Operations Projects

Marathon Program – Numerous Gathering Projects

BP Program – Numerous line replacement projects

Colonial – Numerous Projects

Panhandle – Numerous projects

Williams Midstream – Multiple Projects

Page 3: Wilson_Brad_Master_01072016

3 of 5

Williams – Gulfstream Natural Gas – 450 Miles

Millennium Pipeline – 200 Miles

Centurion – Elk Hills – 60 Miles

Enterprise – Texas Express – 580 Miles

UGI – Auburn II – 28 Miles

UGI – Uniondale – 7 Miles

UGI – Auburn Loop – 10 Miles

CPG – Mountaineer – 180 Miles

100’s of operation and maintenance projects, numerous clients

100’s of gathering line projects, multiple clients

Mr. Wilson served as a Drafting Coordinator with coordination of the field survey data technicians. Responsibilities included design tasks on Phase I and 2 of the Gulfstream Natural Gas System project. Coordinated drafting tasks and responsible for processing civil and environmental survey data, training of survey data technicians, and worked directly with surveyors to improve the overall quality of data. Coordinated design and survey data processing in Florida field office during construction of Phase I. Created and maintained property base of property plats for approximately 650 plats on Phase I and approximately 350 plats on Phase 2 of the project. Coordinated and processed data on Gulfstream phase 3.

Mr. Wilson served as a Designer or Drafter on several projects, below are a few key projects with his responsibilities:

On the Inland Petroleum Distribution Systems Project

Responsible for drawing 3D fuel parts for rapid deployment fuel systems for the military and performed computer design layout of fuel systems. Prepared fuel parts and systems drawings at 1:1 scale to check compatibility of all parts. Created, printed and assembled drawings for presentations.

TriState Project

Detailed engineering and right-of-way acquisition in support of an application to FERC for a proposed 147-mile, 30-inch natural gas pipeline. Responsible for ISO 9000 compliance, creation of forms and procedures, environmental geobases and level-lists and procedures for accepting environmental data from environmental lists. Performed work on all aspects of the pipeline project, including troubleshooting, river crossing drawings, alignment sheets, training and photo imagery.

KN Energy’s Pony Express Project

Decommissioning of a 916-mile, 8- through 24-inch crude oil pipeline and conversion to natural gas service, and the construction of a new 114-mile, 12-inch crude oil pipeline and a 62-mile, 16-inch natural gas lateral. Responsible for building alignment sheets and quad maps for FERC deadline. Extracted, combined and rotated imagery for the alignment sheets through Iras-b and MBI in MicroStation. Also worked on Geobases for alignment sheets.

Page 4: Wilson_Brad_Master_01072016

4 of 5

Tenneco’s Boston Expansion Project

A 64-mile, 20- through 36-inch gas pipeline through urban areas. Responsible for preparing alignment sheets, quad maps, site-specific drawings for river permits, wetland construction and residential construction. Created the environmental geobase and worked on other geobases. Great Lakes Security Loop Expansion Project

A 24.5-mile, 36-inch natural gas loopline in the Upper Peninsula of Michigan. Worked with binary raster images, cleaned and rebuilt scanned images and made engineer corrections. Also drew 30 stream crossings from field notes. Northern Border Pipeline Extension Project

A 231-mile, 30-inch natural gas pipeline extension. The project included six compressor stations, a gas metering and pressure reduction station and 12 river crossings. Responsible for stream and river crossing permits and construction drawings in accordance with ISO 9000 specifications. Supervised 15 drafters and designers performing construction and as-built drawings in accordance with FERC regulations. Responsible for collation of drawings for the construction bid package. PARCO MFM Pipeline Extension Project

A 176-mile, 18-inch and a 5- mile. 16-inch products pipeline, including two pump stations and three terminal stations. Responsible for preparation of drawing logic diagrams and redline corrections of civil drawings. Also performed plotting of drawings.

Public Service Electric & Gas Meter Regulator Stations Project

The project scope included preliminary and detailed engineering for upgrades to meter stations and associated gas pipeline segments. Performed detailed drawings of anchor blocks with rebar and concrete.

Mr. Wilson served as a Field Data Technician on the Palmetto and South System Expansion Projects. Responsible for processing survey data; creating forms, procedures and drawings; training survey data technicians and working directly with surveyors to improve overall quality of data.

Freebird Project

15 mile Bi-directional pipeline including preliminary design through staking survey, well pad layout and design, project drawings through issued for bid set.

Mr. Wilson created a data management plan to streamline the survey data processing/QA/QC. Using several different software's, created a data management system for this 15 mile project. He worked with the survey crews to streamline the processes to the GIS techs. GIS Survey Data Technician Coordinator and Drafting Coordinator. Responsible for processing survey data; creating forms, procedures and drawings; training survey data technicians and working directly with surveyors to improve overall quality of data. Performed drafting coordination duties, creating and managing quad maps, alignment sheets, quad excerpts NWI maps, residential

Page 5: Wilson_Brad_Master_01072016

5 of 5

construction drawings, Site specific road crossings and directional drill drawings.

EDUCATION

Engineering, Tulsa Junior College

Drafting and Design, Tulsa Technology Center

CAD Drafting, Tulsa Technology Center SPECIALIZED TRAINING

Managing For Success - Behavioral Research

Effective Communication

Personnel Management

Business communication

AutoCAD Light

Fieldworks Class

AutoCAD 2000i

AutoCAD, Tulsa Vo-Tech

MicroStation

2002, Applying Inroads Cogo

2002, Inroads Survey Basics

Introduction to ArcView GIS

Blue Marble Training

Access Training

Communications Training

Pipeline Safety Training

Excel

Word

Workplace Harassment

Foreign Corrupt Practices Act

Workplace Harassment: Recog. and Prev. Harassing Behavior for Employee

Code of Business Conduct and Ethics

FERC Standards of Conduct: Order 717

FERC Standards of Conduct

AutoCAD 2000i Level 1 – Professional

FieldWorks Basic

Access 2002 Level 1

Civil3D

Trimble Geomatics

Geographic Calculator

Microsoft Excel Level 1

Microsoft Excel Level 2

Microsoft Excel Level 3

Concur and American Express

IntegraLink

Page 6: Wilson_Brad_Master_01072016

6 of 5

Mapping Data Solutions

Mapping Data Solutions Cloud Based

Geospatial Information Technology Association

GIS Strategy

PHMSA

Improving Pipeline Assessment Data Management

Mobile Data management

GIS Accuracy

Pipeline Data Management

Leveraging tablets and the cloud

Risk and Integrity Management

Photogrammetric Point Clouds

GIS - Offshore

Offshore ground and pipeline survey

Defensive Driving - DDC